material for bsc6910 gsm performance counter changes from gbss15.0 01 to gbss15.0 02

13
HUAWEI TECHNOLOGIES CO., LTD. www.huawei.com Huawei Confidential Security Level: 22/3/27 GSM Counter’s Enhancements in R15 V100R015C00SPC510 VS V100R015C00SPC100

Upload: mohammad-kamruzzaman

Post on 26-Dec-2015

37 views

Category:

Documents


0 download

DESCRIPTION

Changes between GBSS15.0.01 and GBSS15.0.02

TRANSCRIPT

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

Huawei Confidential

Security Level:

英文标题 :40-47pt

副标题 :26-30pt

字体颜色 : 反白内部使用字体 :

FrutigerNext LT Medium

外部使用字体 : Arial

中文标题 :35-47pt

字体 : 黑体 副标题 :24-28pt

字体颜色 : 反白字体 : 细黑体

23/4/19

GSM Counter’s Enhancements in R15

V100R015C00SPC510VS

V100R015C00SPC100

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2

Agenda

Overview

Counter Changes Summary of counter changes

Example of counter changes ( Added , Modified , Prepared to

delete , Deleted counter )

KPI Changes

Object Type Changes

Function Subset Changes

Function Set Changes

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 35

OverviewTo focus on meeting customer’s satisfaction, comprehensive object changes have been provided In GBSS15.0 including Adding, Modifying, Preparing to delete and Deleting .

Compared to V100R015C00SPC100, the changes of V100R015C00SPC510 as follows :

•Total changes : 95; Added objects: 71 ; Modified objects: 24; Prepared to delete objects: 0; Deleted objects: 0;

The prepared to delete objects will not be deleted at the current version, it will stay the same and be deleted in next two version.

Object Total

changes

Added (changes that will impact

NBI Data)

Modified (changes that will

impact NBI Data)

Prepared to delete(changes that will impact NBI

Data)

Deleted(changes that will impact NBI Data)

Counter 75 62 ( 0 ) 13 ( 1 ) 0 ( 0 ) 0 ( 0 )

Object Type 15 4 ( 0 ) 11 ( 11 ) 0 ( 0 ) 0 ( 0 )

Function Subset

5 5 ( 0 ) 0 ( 0 ) 0 ( 0 ) 0 ( 0 )

Function Set

0 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 0 ( 0 )

total 95 71 ( 0 ) 24 ( 12 ) 0 ( 0 ) 0 ( 0 )

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4

Summary of counter changesTo focus on meeting customer’s satisfaction, comprehensive counter changes have been provided In GBSS15.0. They are referred : Added counters :62(No impacts on NBI); Modified counters: 13(No impacts on NBI) ; Prepared to delete counters: 0(No impacts on NBI); Deleted counters: 0(No impacts on NBI). Added counters include added for reserved counters and added for normal counters. The counters added for reserved counters are used to replace the reserved counters added last version. The reserved counters added last version will be deleted at the current version.

The details are as follows :Object

Change

Number

Description Impact on NBI Data Type Change Reason the referred feature ; Purpose Number

Counter

Added for reserved counters 0        

Added for nomal counters

62

To perfect/evaluate old feature ( 9 )

Add the counter to measure the evaluation characteristics of power control on GU narrow-bandwidth interfering frequencies.

6

No

This counter is added to measure the PS LCS performance in the BSS-Based LCS (Cell ID + TA) feature.

2

Add the counter to measure the performance of the RACH Storm Filtration feature.

1

Transport ( 53 ) Added a counter to measure the effect of implementing IP over E1/T1 over the Abis interface.

53

Modified 13

The unit of this counter is modified. 3

NoChanged the contents measured by this counter. After the change, the value of this

counter fluctuates.2

Correct the object statistical method of the counter. 8

Deleted 0      

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5

Example of counter changes(Added—evaluate the old feature)

In order to evaluate the old feature ,6 counters are added. The changes have No impacts on Northbound Interface.

Example:

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6

Example of counter changes (Modified)3 counters are modified because the unit of this counters are modified. The changes have no impacts on Northbound Interface .

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Example of counter changes (Prepared to delete)

No counters are prepared to delete.

Page 7

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 8

Example of counter changes (Deleted)No counters are deleted.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9

Object Type changesAdding and Modifying are involved in Object Type changes

The details are as follows :

ObjectChange

TypeNumber Change Reason ID Name

Impact on NBI Data

Object Type

Added 4

Added a measurement object to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109023Measurement of MLPPP Performance

No

Added a measurement object to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109024Measurement of PPP Link Performance

No

Added a measurement object to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109056Measurement of MLPPP Queue Performance

No

Added a measurement object to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109057Measurement of PPP Queue Performance

No

Modified 11

A measurement object is Modified because the TRX Name parameter is added.

1275069422Measurement of TRX Performance

Yes

A measurement object is Modified because the BTS Name parameter is added.

1290795168Measurement of Performance for FE or GE Ports on the BTS Transmission Board

Yes

A measurement object is Modified because the BTS Name parameter is added.

1290795169Measurement of BTS PPP Link Performance

Yes

A measurement object is Modified because the BTS Name parameter is added.

1290795170Measurement of BTS Connect Performance

Yes

A measurement object is Modified because the BTS Name parameter is added.

1290825170Measurement of BTS MP Group Performance

Yes

A measurement object is Modified because the BTS Name parameter is added.

1290825188Measurement of BTS Tunnel Performance

Yes

A measurement object is Modified because the BTS Name parameter is added.

1290825190Measurement of BTS IPPM Performance

Yes

A measurement object is Modified because the remark parameter is added. 67109023

Measurement of MLPPP Performance

Yes

A measurement object is Modified because the remark parameter is added. 67109024

Measurement of PPP Link Performance

Yes

A measurement object is Modified because the remark parameter is added. 67109056

Measurement of MLPPP Queue Performance

Yes

A measurement object is Modified because the remark parameter is added. 67109057

Measurement of PPP Queue Performance

Yes

Deleted 0

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10

Function Subset changesFunction SubSet changes only refers to Adding. Modifying and Deleting are not involved.

The details are as follows :Object

Change Type

Number Change Reason ID NameImpact on NBI Data

Function Subset

Added 5

Added a function subset to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109490 MP Group Measurement No

Added a function subset to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109491 PPP Link Measurement No

Added a function subset to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109542 MP Queue Measurement No

Added a function subset to measure the effect of implementing IP over E1/T1 over the Abis interface.

67109543PPP Link Queue Measurement

No

Add the function subset to measure the evaluation characteristics of power control on GU narrow-bandwidth interfering frequencies.

1290823608

Interfering Frequency Power Control Measurement

No

Modified 0

Deleted 0

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11

Function Set changes

No Function Set is changed.

The details are as follows :

Object Change Type Number Change Reason ID NameImpact on NBI Data

Function Set

Added 0

Modified 0

Deleted 0

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12

One Goal, One Team

So do we!

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential