![Page 1: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/1.jpg)
Material Handling Tools for a Discrete Manufacturing System: A Comparison of
Optimization and Simulation Frank Werner
Fakultät für Mathematik OvGU Magdeburg, Germany
1
(Joint work with Yanting Ni, Chengdu University, China)
![Page 2: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/2.jpg)
Overview of the Talk • Introduction • Literature Review • Markov Decision Process Model • Dynamic Programming Algorithm • Numerical Experiments • Conclusion
2
![Page 3: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/3.jpg)
Introduction
Background: • A material handling tool (MHT) is one of the
essential components in a manufacturing system. • MHTs are responsible for the transitions of the
lots between the stations. • The strategy of MHTs will impact the delivery
rate, cycle time and WIP level.
3
![Page 4: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/4.jpg)
Introduction
• A Markov decision process (MDP) will be applied to model the MHT system.
• A dynamic programming algorithm will be used to solve this problem.
4
![Page 5: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/5.jpg)
Introduction Two contributions are discussed in this paper:
• A systematic management method of MHTs under a
discrete manufacturing will be developed using a Markov decision process. The quantified relationships between MHTs and WIP will be discussed within the constant WIP (CONWIP) methodology and constant demand.
• The dynamic MHT replenishment method of MHTs will be discussed within the theory of Little’s law.
5
![Page 6: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/6.jpg)
Literature Review • Many approaches for analyzing the performance
of MHTs have been proposed, etc.: • Huang et al. (2011) study the vehicle allocation
problem in a typical 300 mm wafer fabrication. They formulate it as a simulation-optimization problem and propose a conceptual framework to handle the problem.
• Chang et al. (2014) study the vehicle fleet sizing problem in semiconductor manufacturing and propose a formulation and a solution method to facilitate the determination of the optimal vehicle fleet size that minimizes the vehicle cost while satisfying time constraints.
![Page 7: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/7.jpg)
Literature Review • To overcome the shortcomings of simulation, some
mathematical models are developed to quantify the parameters of a material handling system (MHS), such as a queuing theory model, queuing network model and a Markov chain model.
• Nazzal and McGinnis (2008) model a multi-vehicle material handling system as a closed-loop queuing network with finite buffers and general service times.
• Zhang et al. (2015) propose a modified Markov chain model to analyze and evaluate the performance of a closed-loop automated material handling system .
![Page 8: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/8.jpg)
MDP Model System Analysis • In a discrete manufacturing factory, there exist many
types of MHTs to carry the working lots between different stages.
• There might exist only two possible scenarios for each individual workstation - an MHT change or no change.
8
![Page 9: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/9.jpg)
System Analysis
LoadUpload ProcessingProcessing
Machine
LotLot
MHT X (Y)MHT X (Y)
LotLot
MHT X (Y)MHT X (Y)
1.MHT no Change – Single Cycle
2.MHT Change – Two-Loop Cycle
LoadUpload ProcessingProcessing
Machine
MHT XMHT X
LotLot
MHT YMHT Y
Empty MHTEmpty MHTEmpty MHTEmpty MHTMHT XBUFFERMHT X
BUFFERMHT Y
BUFFERMHT Y
BUFFER
MHT XBUFFERMHT X
BUFFER
iM
iM
LotLot …....…....
LotLotLotLot …....…....
MDP Model
Figure 1: MHT Cycle Classification
9
![Page 10: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/10.jpg)
MDP Model
Some basic notations:
10
![Page 11: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/11.jpg)
MDP Model Assumptions: (1) The processing time at each station is constant, and
production meets an M/G/1 queuing system. (2) A lot arrives according to an exponential distribution
with the associated parameter . (3) Each MHT transports the lots based on the FIFO (first-
in-first-out) rule. (4) The loading time, the unloading time and the running
speed of the vehicles have a deterministic value, and both acceleration and deceleration of vehicles are ignored.
11
λ
![Page 12: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/12.jpg)
MDP Model Assumptions (cont’d): (5) The WIP quantity meets the CONWIP scenario
and the desired WIP level is . (6) The route of the MHT at a specific work station
for one specific product is fixed within the product design period.
(7) The delivery quantity is aligned with the demand of the master production schedule (MPS).
(8) Only one product is considered in this paper. 12
*w
![Page 13: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/13.jpg)
MDP Model
TS
13
![Page 14: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/14.jpg)
MDP Model Decision times Lots of production tasks will be released based
on the numbers of available vehicles and the recycle status at each time,
where is the length of the defined production cycle.
T
{ }+= 0,1,2,...,t T L L∈ ∈Ν
L
14
![Page 15: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/15.jpg)
MDP Model Definition of the set of states
S
15
![Page 16: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/16.jpg)
MDP Model Definition of the set of actions
A
16
![Page 17: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/17.jpg)
MDP Model Definition of the set of actions
A
17
![Page 18: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/18.jpg)
MDP Model State transition probabilities
transP
transP
18
![Page 19: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/19.jpg)
MDP Model State transition probabilities
transP
transP
19
![Page 20: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/20.jpg)
MDP Model State transition probabilities
transP
transP
20
![Page 21: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/21.jpg)
MDP Model State transition probabilities The state will change when new lots arrive, tasks are
cancelled or a machine has a breakdown. These three events can separately occur and so the state transition probability is:
transP
transP
'( ) a b ctrans i i i i iP s s P P P= × ×
21
( )' , , , , ( ) ( ) ( )= × ×a b ctrans i i i i i iP s s a k l m P k P l P m
![Page 22: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/22.jpg)
MDP Model
Reward Function v(SA) The purpose of the vehicle management is to minimize
the penalties for late deliveries of each product and to control the WIP level in the whole line within certain lower and upper limits. We can formulate the following optimization function as:
22
![Page 23: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/23.jpg)
MDP Model Maximize the Reward Function v(SA) s.t.
( , ) tDt i iR s a e
γ−
=
23
![Page 24: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/24.jpg)
MDP Model (cont’d)
( , ) tDt i iR s a e
γ−
=
24
![Page 25: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/25.jpg)
Dynamic Programming Algorithm
• The whole set of stages are grouped into 3 parts: a bottleneck group, a front group and a backend group.
• The CONWIP methodology is used for the front group and the FIFO rule is used for backend group.
25
![Page 26: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/26.jpg)
Dynamic Programming Algorithm
26
![Page 27: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/27.jpg)
Dynamic Programming Algorithm
27
![Page 28: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/28.jpg)
Dynamic Programming Algorithm
28
![Page 29: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/29.jpg)
Dynamic Programming Algorithm
29
![Page 30: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/30.jpg)
Dynamic Programming Algorithm
30
![Page 31: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/31.jpg)
Dynamic Programming Algorithm
31
![Page 32: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/32.jpg)
Dynamic Programming Algorithm
32
![Page 33: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/33.jpg)
Dynamic Programming Algorithm Station 1 Station 2 Station k-1 Station k Station k+1 Station n-1 Station n
Stage1:
CONWIP for front stations
Stage2 to Stage k-1
Stage(k+1):
Stage(k+2) to Stage(n-1)
Stage n
0 1
( )
[ ( , )]L n
t i it i
v SA
MaxE R s a= =
=
∑∑ *( )k kf s FIFO for backend stations
*1 1( )f s
* *2 2 1 1( ) ( )k kf s to f s− −
*+1 +1( )k kf s
* *2 2 1 1( ) ( )k k n nf s to f s+ + − −
*( )n nf s* * * * * * * * * * * * *1 1 1 2 2 2 1 1 1( , ( ), , ( ),..., , ( ), , ( ),..., )t
k k k k k k nSA s a s s a s s a s s a s s+ + +=
0 1( , ,..., ,..., )t LSA SA SA SA
First: Stage k
Figure 2: Sequence graph for dynamic programming
33
![Page 34: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/34.jpg)
Experiments We implemented our approach in a 300 mm
semiconductor assembly and test factory and collected the required data for performing the experiments.
ST1: SCAM ST2: EPOXY ST3: CURE ST4: BA
ST8: Finish ST7: Test ST6: CTL ST5: BI
Wafer Store
Warehouse
Vehicle Vehicle X Y
a b c c
da a a
Figure 3: Workstation flow in the case factory
34
![Page 35: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/35.jpg)
Experiments • Experiment 1: =3.64 lots/hour
1λ
1λ
35
![Page 36: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/36.jpg)
Experiments • Experiment 1: =3.64 lots/hour
1λ
1λ
81.000082.000083.000084.000085.000086.000087.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Quantity of WIP comparison (Mean)ku
7.0000
7.5000
8.0000
8.5000
9.0000
9.5000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Quantity of WIP comparison (Stdev)ku
6.4
6.5
6.6
6.7
6.8
6.9
7
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Cycle time Comparison (Mean)Day
1
1.05
1.1
1.15
1.2
1.25
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Cycle time Comparison (Stdev)Day
0.60.650.7
0.750.8
0.850.9
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Vehicle mean utilization rate (Mean)
00.020.040.060.08
0.10.120.14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Vehicle mean utilization rate (Stdev)
36
![Page 37: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/37.jpg)
Experiments • Experiment 2: =4.42 lots/hour
1λ
2λ
37
![Page 38: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/38.jpg)
Experiments • Experiment 2: =4.42 lots/hour
1λ
2λ
70.0000
75.0000
80.0000
85.0000
90.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Quantity of WIP comparison (Mean)ku
0.00002.0000
4.00006.0000
8.000010.0000
12.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Quantity of WIP comparison (Stdev)ku
6.0000
6.5000
7.0000
7.5000
8.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Cycle time Comparison (Mean)Day
0.0000
0.20000.4000
0.6000
0.80001.0000
1.2000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Cycle time Comparison (Stdev)Day
0.6000
0.7000
0.8000
0.9000
1.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Vehicle mean utilization rate (Mean)
0.00000.02000.04000.06000.08000.10000.1200
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Vehicle mean utilization rate (Stdev)
38
![Page 39: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/39.jpg)
Experiments • Experiment 3: =3.09 lots/hour
1λ
3λ
39
![Page 40: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/40.jpg)
Experiments • Experiment 3: =3.09 lots/hour
1λ
3λ
70.0000
75.0000
80.0000
85.0000
90.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Quantity of WIP comparison (Mean)ku
0.00002.0000
4.00006.0000
8.000010.0000
12.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Quantity of WIP comparison (Stdev)ku
6.0000
6.5000
7.0000
7.5000
8.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Cycle time Comparison (Mean)Day
0.0000
0.20000.4000
0.6000
0.80001.0000
1.2000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Cycle time Comparison (Stdev)Day
0.6000
0.7000
0.8000
0.9000
1.0000
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Vehicle mean utilization rate (Mean)
0.00000.02000.04000.06000.08000.10000.1200
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MDP+DP Simulation
Vehicle mean utilization rate (Stdev)
40
![Page 41: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/41.jpg)
Conclusion
• The results of the experiments showed some improvements of the MDP+DP approach over simulation for the majority of the runs and confirmed that the proposed approach is both feasible and effective.
41
![Page 42: Material Handling Tools for a Discrete Manufacturing ...werner/ICCSS2017-slides.pdf · • In a discrete manufacturing factory, there exist many types of MHTs to carry the working](https://reader033.vdocument.in/reader033/viewer/2022042115/5e92030c2b21a11e537d4e53/html5/thumbnails/42.jpg)
Future work • A first extension is to generalize the model
since we simplified the model by including only one product with several stations in contrast to real complex discrete manufacturing systems.
• An effective traceability method for the MHTs for
the daily operations will be developed. In this way, we want to provide a practical method for manufacturing managers and supervisors.
42