material source example for cpdg - oregon.gov

5
G G G G G AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE AE TOWER BASE GAS LINE STREAM OVERHEAD ELECTRIC TRANSMISSION LINE 970 m 975 m 975 m 975 m 975 m 980 m 980 m 980 m 980 m 980 m 980 m 985 m 985 m 1" minus stockpile AT04-01 AT04-02 AT04-03 AT04-05 AT04-06 AT04-07 AT04-08 AT04-10 AT04-09 AT04-34 AT04-33 AT04-32 AT04-18 AT04-22 AT04-23 AT04-24 AT04-21 AT04-19 AT04-20 AT04-13 AT04-15 AT04-16 AT04-17 AT04-14 AT04-11 AT04-12 AT04-28 AT04-29 AT04-30 AT04-31 AT04-27 AT04-26 980 m 985 m 985 m 970 m 975 m 980 m 980 m 980 m 985 m AT04-25 Existing and New Reject Fines Stockpile DH04-01 DH04-02 Overburden Storage Area Project Boundary Stormwater Control Berm Proposed Stockpile Existing Access Road Proposed Access Road Property Control Line NO WORK AREA Safety Berm Safety Berm PROSPECTIVE MATERIAL SOURCE SHEET NO. PROJECT TITLE HIGHWAY NAME COUNTY NAME FOR REVIEW ONLY OREGON DEPARTMENT OF TRANSPORTATION GM Reviewed By - Name Geology By - Name Drafted By - Name C R T I I E G N G E O L O I S E F D E N E E R I G G T OREGON FIRST I. LAST E0000 N I EXPIRES: 00/00/0000 1:1200 - 001 54" RED FIR SNAG OSPREY NEST 20 0 40 60 80 10 20 METERS 100 N 3/4 " minus stockpile Scalpings Stockpile 3/4 " minus stockpile Oversize Storage Area 1 1/2 " minus stockpile Access Road Excavation Area SITE PLAN ??V-?? PROSPECTIVE MATERIAL SOURCE QUARRY NAME SOURCE # OR-00-000-0 DOGAMI # 00-0000 HWY. 000, M.P. 00.0 SE 1/4 Sec. 00 & NE 1/4 Sec. 00, T.00 S., R.00 E., W.M. Existing Stockpile Safety Berm No Work Area Geotech Drill hole Air-Track Drill Hole Excavation Area Project Boundary Stockpile and Processing Area Existing Quarry Floor BLM Owned/Controlled BLM Owned/ODOT Controlled Tree Line BLM Owned/Controlled BLM Owned/ODOT Controlled BLM Owned/Controlled BLM Owned/ODOT Controlled NOTES: 1. Elevations Relative to Assumed Datum. 2. Contour Lines in 1 m Intervals. LEGEND Material Source Plan Must Include Boundaries & Features SUBTITLE TEXT: FT=24 TH=7.5 CO=4 WT=0 JUST=CC (Available from msV8_cache.dgn or geo.cel) AC=Arrow AS=1 stored in odot.cel or ODOT Menu SHEET TITLE TEXT: (Available from SeedV8.nam or geo.cel) LEADER LINE: CO=3 LC=0 WT=1 Use ODOT Menu/ General/Arrows/ Leader Bent LABEL TEXT: FT=24 TX=7.5 CO=4 LS=5 WT=2 JUST=LT Construct Bench Access Road Slash Disposal Area Project Boundary PLAN TEXT (Available from geo.cell) Submittal block or "V" number (Available from odot.cel) Generic stamps (Available from geo.cel)

Upload: others

Post on 18-Dec-2021

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Material Source example for CPDG - Oregon.gov

G

GGGGA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA E

TOWERBASE

GAS LINE

STREA

M

OVERHEAD ELECTRIC TRANSMISSION LINE

970 m

975 m

975 m

975 m

975 m

980 m

980 m

980 m

980 m

980 m

980 m

985 m

985 m

1" minusstockpile

AT04-01

AT04-02

AT04-03

AT04-05

AT04-06

AT04-07

AT04-08

AT04-10

AT04-09

AT04-34

AT04-33

AT04-32

AT04-18

AT04-22

AT04-23

AT04-24

AT04-21

AT04-19

AT04-20

AT04-13

AT04-15AT04-16

AT04-17

AT04-14

AT04-11

AT04-12

AT04-28

AT04-29

AT04-30

AT04-31

AT04-27

AT04-26

980 m

985 m

985 m

970 m

975 m

980 m

980 m

980 m

985 m

AT04-25

Existing and NewReject Fines Stockpile

DH04-01

DH04-02

OverburdenStorage

Area

Project Boundary

Stormwater Control Berm

Proposed Stockpile

Existing Access Road

Proposed Access Road

Property Control Line

NO

WORK

AREA

Safety Berm

Safety Berm

PROSPECTIVEMATERIAL SOURCE

SHEET

NO.

PROJECT TITLE

HIGHWAY NAME

COUNTY NAME

FO

R R

EV

IEW

ON

LY

OREGON DEPARTMENT OF TRANSPORTATION

GM

Reviewed By - Name

Geology By - Name

Drafted By - Name

C RTIIE

G

NG EOLO

IS

E F D

EN

EERI G

GT

OREGON

FIRST I. LAST

E0000

NI

EXPIRES: 00/00/0000

1:1200 - 001

54" RED FIR SNAG

OSPREY NEST

200 40 60 801020

METERS

100

N

3/4 " minusstockpile

ScalpingsStockpile

3/4 " minusstockpile

OversizeStorage

Area

1 1/2 " minusstockpile

Access R

oad

ExcavationArea

SITE PLAN

??V-??PROSPECTIVE MATERIAL SOURCE

QUARRY NAME

SOURCE # OR-00-000-0 DOGAMI # 00-0000HWY. 000, M.P. 00.0

SE 1/4 Sec. 00 & NE 1/4 Sec. 00, T.00 S., R.00 E., W.M.

Existing Stockpile

Safety Berm

No Work Area

Geotech Drill hole

Air-Track Drill Hole

Excavation Area

Project Boundary

Stockpile andProcessing Area

ExistingQuarryFloor

BL

M O

wned/C

ontro

lled

BL

M O

wned/O

DO

T C

ontro

lled Tree Line

BL

M O

wned/C

ontr

oll

ed

BL

M O

wned/O

DO

T C

ontr

oll

ed

BLM Owned/Controlled

BLM Owned/ODOT Controlled

NOTES:

1. Elevations Relative to Assumed Datum.

2. Contour Lines in 1 m Intervals.

LEGEND

Material Source Plan

Must Include

Boundaries & Features

SUBTITLE TEXT:

FT=24 TH=7.5

CO=4 WT=0

JUST=CC

(Available from

msV8_cache.dgn

or geo.cel)

AC=Arrow

AS=1

stored in

odot.cel or

ODOT Menu

SHEET TITLE TEXT:

(Available from

SeedV8.nam

or geo.cel)

LEADER LINE:

CO=3 LC=0

WT=1

Use ODOT Menu/

General/Arrows/

Leader Bent

LABEL TEXT:

FT=24

TX=7.5 CO=4

LS=5 WT=2

JUST=LT

Construct BenchAccess Road

SlashDisposal

Area

Project Boundary

PLAN TEXT

(Available from

geo.cell)

Submittal block

or "V" number

(Available from

odot.cel)

Generic stamps

(Available from

geo.cel)

Page 2: Material Source example for CPDG - Oregon.gov

980 m

975 m

975 m

980 m

980 m

Safety Berm

Safety Berm

OverburdenStorage

Area

Stockpile and

Processing AreaExisting and NewReject Fines Stockpile

Project Boundary

Stormwater Control Berm

Access R

oad

Proposed Stockpile

A

A

Existing Access Road

Proposed Access Road

Property Control LineNO

WORK

AREA

Construct Bench

Access Road

1:1200 - 002

PROSPECTIVEMATERIAL SOURCE

SHEET

NO.

PROJECT TITLE

HIGHWAY NAME

COUNTY NAME

FO

R R

EV

IEW

ON

LY

OREGON DEPARTMENT OF TRANSPORTATION

Reviewed By - Name

Geology By - Name

Drafted By - Name

C RTIIE

G

NG EOLO

IS

E F D

EN

EERI G

GT

OREGON

FIRST I. LAST

E0000

NI

EXPIRES: 00/00/0000GM-2

AT04-05

AT04-06

AT04-34

AT04-33

AT04-32

AT04-18985 m

985 m

980 m

Project Boundary

Project Boundary

200 40 60 801020

METERS

100

SCALE

PLAN

N

3/4 " minusstockpile Scalpings

Stockpile

DH04-01

AT04-03

DH04-02

AT04-08

AT04-07OversizeStorage

Area

1 1/2 " minusstockpile

3/4 " minusstockpile

1" minusstockpile

AT04-15

AT04-19

AT04-20

AT04-11

AT04-13

AT04-12

AT04-10

AT04-09

AT04-01

AT04-02

AT04-17

AT04-16

AT04-14

Excavation

Area

B

B

Existing Stockpile

Safety Berm

No Work Area

Geotech Drill hole

Air-Track Drill Hole

Excavation Area

Stormwater Control Berm

??V-??PROSPECTIVE MATERIAL SOURCE

QUARRY NAME

SOURCE # OR-00-000-0 DOGAMI # 00-0000HWY. 000, M.P. 00.0

SE 1/4 Sec. 00 & NE 1/4 Sec. 00, T.00 S., R.00 E., W.M.

NOTES:

1. Elevations Relative to Assumed Datum.

2. Contour Lines in 1 m Intervals.

SlashDisposal

Area

Existing

Quarry

Floor

BL

M O

wned/C

ontr

oll

ed

BL

M O

wned/O

DO

T C

ontr

oll

ed

BLM Owned/ODOT Controlled

BLM Owned/Controlled

LEGEND

SCALE BAR:

Use ODOT Menu/

Geotech/Aggregate/

Notes

LEGEND:

Use msV8_cache.dwg

CROSS-SECTION

ARROW

From Geotech/

Aggregate/Arrows

CROSS-SECTION

TEXT

FT=24

TX=12.5 CO=0

JUST=CB WT=4

Page 3: Material Source example for CPDG - Oregon.gov

970

975

980

985

990 990

0 20 40 60 80 100 120 140

970

975

980

985

970

980

985

0 20 40 60 80

975

160m

140m

Ele

vati

on

(m

)

Ele

vati

on

(m

)

970

980

985

975

100

Safety Berm

Safety Berm

Safety Berm

Ele

vati

on

(m

)

Ele

vati

on

(m

)

120

990990

Sloped To Contain Runoff

Sloped To Contain Runoff

1:1200 - 003

PROSPECTIVEMATERIAL SOURCE

SHEET

NO.

PROJECT TITLE

HIGHWAY NAME

COUNTY NAME

FO

R R

EV

IEW

ON

LY

OREGON DEPARTMENT OF TRANSPORTATION

Reviewed By - Name

Geology By - Name

Drafted By - Name

C RTIIE

G

NG EOLO

IS

E F D

EN

EERI G

GT

OREGON

FIRST I. LAST

E0000

NI

EXPIRES: 00/00/0000GM-3

965 965

AT04-01

AT04-03 AT04-05AT04-06 AT04-07DH04-01

AT04-05

AT04-01

965 965

DH04-02

Overburden

Ground Line

Overburden

Ground Line

Excavation Area

Excavation Area

SECTION B-B

SECTION A-A

Pro

ject

Boundary

Storm WaterControl Berm

OverburdenStorage

Area

Pro

ject

Boundary

Distance (m)

Sl.

4V

:1H

Sl.

4V

:1H

??V-??

3m

3m

PROSPECTIVE MATERIAL SOURCE

QUARRY NAME

SOURCE # OR-00-000-0 DOGAMI # 00-0000HWY. 000, M.P. 00.0

SE 1/4 Sec. 00 & NE 1/4 Sec. 00, T.00 S., R.00 E., W.M.

ExistingQuarryFloor

DH04-02

Pro

pert

y L

ine

Pro

ject

Bo

un

dary

AT04-34

OversizeStorage

Area

3m

NOTES:

1. Elevations Relative to Assumed Datum.

2. Side-Slopes Are Shown As Vert. To Horiz.

Illustrate Location,

Distribution And

Arrangement Of

Material At The Site

SECTION TEXT:

FT=4

TX=12.5 CO=3

JUST=CB WT=4

PROFILE GRID:

AC=DET_SUBSURFPRO

AS=1

Geo.cel

EXCAVATION

AREA PATTERN:

CO=4 WT=2

HATCH ANG.=45

SPACING=16

Page 4: Material Source example for CPDG - Oregon.gov

G

Project Boundary

Disposal Area

FEET

50 25 0 50 100 150

SCALE

Disposal Area

N

Disposal Site Boundary

Proposed Stockpile

Stormwater Control Berm

PLAN

PROSPECTIVE DISPOSAL SITE

QUARRY NAME

SOURCE # OR-00-000-0 DOGAMI # 00-0000HWY. 000, M.P. 00.0

SE 1/4 Sec. 00 & NE 1/4 Sec. 00, T.00 S., R.00 E. W.M.

??V-??

NOTES:

1. Elevations Relative to Assumed Datum.

2. Contour Lines in 5 ft Intervals.

Existing Fence

Proposed Fence

Proposed Gate

Remove Existing Fence

Construct Storm Water Control Berm

Construct Storm Water Control Berm

Install Gate

Install Type 1 Fence

Access Road

Project Boundary

Slash

Disposal

Area

EXPIRES: 00/00/0000

SHEET

NO.

PROJECT TITLE

HIGHWAY NAME

COUNTY NAME

OREGON DEPARTMENT OF TRANSPORTATION

Reviewed By - Name

Geology By - Name

Drafted By - Name

MANDATORYDISPOSAL SITE

OREGON

FIRST I. LAST

E0000

LEGEND

GM

Disposal Site Plan

Must Include

Boundaries & Features

Same standards apply

as shown on Prospecitve

Material Source examples

Page 5: Material Source example for CPDG - Oregon.gov

960

980

1000

1020

1040

1060

1080

1100

960

980

1000

1020

1040

1060

1080

1100

960

980

1000

1020

1040

1060

1080

11001100

Disposal Area

Ground Line

0

960

980

1000

1020

1040

1060

1080

1100

100 200 300 400

Distance (ft)

0 100 200 300

0 100 200 300 400 500 600 700 800 900

960

980

1000

1020

1040

1060

1080

1100

960

980

1000

1020

1040

1060

1080

1100

Ground Line

Disposal Area

Ground Line

Disposal Area

Distance (ft)

Distance (ft)

SECTION A-A

SECTION B-B SECTION C-C

PROSPECTIVE DISPOSAL SITE

QUARRY NAME

SOURCE # OR-00-000-0 DOGAMI # 00-0000HWY. 000, M.P. 00.0

SE 1/4 Sec. 00 & NE 1/4 Sec. 00, T.00 S., R.00 E. W.M.

??V-??

NOTES:

1. Elevations Relative to Assumed Datum.

2. Side-Slopes Are Shown As Vert. To Horiz.

Storm WaterControl Berm

Storm WaterControl Berm

10 ft

10 ft

Proposed Fence

Proposed Fence

Proposed Fence

Project Boundary

Project Boundary

Proposed Fence

Proposed Fence

Project Boundary

5 ft

Buffer

500

Project Boundary

5 ft

5 ft

5 ft

5 ft

400

5 ft

5 ft

Project Boundary

1

1

1

1

EXPIRES: 00/00/0000

SHEET

NO.

PROJECT TITLE

HIGHWAY NAME

COUNTY NAME

OREGON DEPARTMENT OF TRANSPORTATION

Reviewed By - Name

Geology By - Name

Drafted By - Name

GM-2MANDATORY

DISPOSAL SITE

Roughen Surface Upon Completion

OREGON

FIRST I. LAST

E0000

Same standards apply

as shown on Prospecitve

Material Source examples