RESUME Name: Max WALL Address 13 Holden Crescent TRARALGON VIC 3844 Phone Home – (03) 5174 3330 Mobile – 0455 470 450 E-mail: [email protected] PROFESSIONAL PROFILE With more than twenty years on the job experience on construction sites I have developed a well rounded skill set in document control, quality assurance and construction activities as well as communication skills in dealing with both company personnel and client representatives. WORK EXPERIENCE Mechanical Construction Coordinator June 2016 - Current Wood Group Woodside Energy Limited – Karratha Gas Plant - Karratha Life Extension EPCM Coordinator for demolition/construction works on ship loading berths Review subcontractor works and sign off on competed work packs Conduct commissioning activities as required Mechanical Construction Engineer Feb 2016 – May 2016 Wood Group PSN Woodside Energy Limited – Perth - Karratha Life Extension Project Create mechanical work packs Review engineering documents and write work pack scope of work and job cards Construction Workpack Coordinator Apr 2014 – Dec 2015 Wood Group PSN Esso Australia – Longford Gas Plant – Kipper Mercury Removal Project Site management of Omega PIMS Completions Management System Manage control of site drawings and construction work packs using Aconex & Documentum Provide QA advice to construction crews for completion of installation records Copy & transmit as-built construction drawings to Client for site update of drawing sets Coordinate punch list items recording and close out utilising Omega PIMS and issue weekly reports Construction Workpack Coordinator Nov 2013 to Dec 2015 Wood Group PSN Esso Australia – Longford Gas Plant – Gas Conditioning Plant Brownfields Project Responsible for construction work packs receipt on site and completion by site crews Manage control of site drawings and work packs Ensure Construction and QA approval of installed works, both WGPSN & Client Offshore Mechanical Construction Coordinator Oct 2008 to Nov 2013 Wood Group PSN Esso Australia – Retrofit Contract – Sale Office Coordinate construction activities on offshore platforms in consultation with Construction Supervisor Provide cover as Construction Supervisor on platform as required Liaise with Melbourne based project engineers on construction sequence Review fabrication and delivery to warehouse for issue to offshore platforms

Upload: max-wall

Post on 07-Feb-2017

20 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Max Wall Resume

RESUME

Name: Max WALL

Address 13 Holden CrescentTRARALGON VIC 3844

Phone Home – (03) 5174 3330Mobile – 0455 470 450

E-mail: [email protected]

PROFESSIONAL PROFILE

With more than twenty years on the job experience on construction sites I have developed a well rounded skill set in document control, quality assurance and construction activities as well as communication skills in dealing with both company personnel and client representatives.

WORK EXPERIENCEMechanical Construction Coordinator June 2016 - Current Wood Group Woodside Energy Limited – Karratha Gas Plant - Karratha Life Extension EPCM Coordinator for demolition/construction works on ship loading berths Review subcontractor works and sign off on competed work packs Conduct commissioning activities as required

Mechanical Construction Engineer Feb 2016 – May 2016 Wood Group PSN Woodside Energy Limited – Perth - Karratha Life Extension Project Create mechanical work packs Review engineering documents and write work pack scope of work and job cards

Construction Workpack Coordinator Apr 2014 – Dec 2015Wood Group PSN Esso Australia – Longford Gas Plant – Kipper Mercury Removal Project Site management of Omega PIMS Completions Management System Manage control of site drawings and construction work packs using Aconex & Documentum Provide QA advice to construction crews for completion of installation records Copy & transmit as-built construction drawings to Client for site update of drawing sets Coordinate punch list items recording and close out utilising Omega PIMS and issue weekly reports

Construction Workpack Coordinator Nov 2013 to Dec 2015Wood Group PSN Esso Australia – Longford Gas Plant – Gas Conditioning Plant Brownfields Project Responsible for construction work packs receipt on site and completion by site crews Manage control of site drawings and work packs Ensure Construction and QA approval of installed works, both WGPSN & Client

Offshore Mechanical Construction Coordinator Oct 2008 to Nov 2013 Wood Group PSN Esso Australia – Retrofit Contract – Sale Office Coordinate construction activities on offshore platforms in consultation with Construction Supervisor Provide cover as Construction Supervisor on platform as required Liaise with Melbourne based project engineers on construction sequence Review fabrication and delivery to warehouse for issue to offshore platforms Nov 2011 – Aug 2012 – Seconded as Project Engineer on L.I.P. A-B Train Structural Upgrade & Condenser Replacement

Project - FEED - Responsible for construction input

Site Quality Engineer Jun 2005 to Oct 2008Wood Group PSN Esso Australia - Longford Gas Plant Maintain site document control system – Site Focal Point for receipt and issue of documents Ensure site Q.A. activities in work packs completed in a timely manner Generate and maintain material tracking spreadsheet for mechanical packages to be installed Co-ordinate materials to site and installation with Supervisors. Conduct training for site personnel in quality, document control and PSN systems (Oracle, IMPact, Inventory Lite)

Page 2: Max Wall Resume

RESUME – Max Wall

Warehouse Supervisor Nov 2004 –Jun 2005Wood Group PSN Esso Australia - Longford Gas Plant Responsible for warehouse activities and material receipt and issue, site purchasing requirements

Site Document, Materials & QA Control Mar 2004 to Nov 2004 Wood Group PSN Esso Australia – Long Island Point Fractionation Plant Maintained site documents, reviewed material requirements for planned construction, on-site assistance

with construction and ensured QA documentation completed.

Document Controller Aug 2003 to Mar 2004Spie Capag Lucas Joint Venture South East Australia Gas Pipeline – Adelaide Project Office Maintained QDMS software programme for recording and issue of all technical documentation. Controlled the receipt and issue of documents through design review to approved for construction Revised client supplied punch list database with additional reports designed as requested (MS Access) Maintained all project generated and subcontractor records for Project Data Books compilation

Site Close Out Co-ordinator Feb 2000 to Jun 2003Worley-ABB Joint Venture Esso Australia – Longford Gas Plant Initially Site Document Controller Set up site documentation system and responsible for receipt and issue of documentation from design office Trained Document Controller and transferred to Site Close Out Coordinator Completed development and implementation of weld record database using MS Access Coordinated project records to ensure copies transmitted to Client and Home Office

Project QA & Environmental Officer Jan 2000 to Feb 2000John Holland GroupWestern Treatment Plant – Werribee Hired on a casual basis to complete the implementation of the site Quality Assurance and Environmental system.

Document Controller Aug 1999 to Nov 1999McConnell Dowell South East Asia Pte LtdMSD Project Singapore Responsible to set up QDMS computer system for control and receipt of project documentation from Client Issued project documentation to site personnel

Lead Document Controller Oct 1998 to Jul 1999Fluor Daniel Pty Ltd Esso Australia – Longford Gas Plant - Longford Restoration Team Document controller for site activities and responsible for up to 5 full time and 3 part-time employees Receipt of drawings from Melbourne design office and site designers and issue of drawings to site personnel Issue of job cards generated on site to construction personnel Control of master drawing sets available for all site personnel

Project Quality Assurance Management Representative Jan 1996 to Aug 1998John Holland Construction & Engineering P/L Esso Construction Services Contract (till 31/3/98) then JHC&E Gippsland Area Project. Document controller for sites and workshops using QDMS computer database package Responsible for the management of project Q.A. system at onshore, offshore sites and company workshops Assisted with reviews of Quality Documents & generated ITP's and Project Forms for Fabrication and installation Assisted and acted in holiday relief role of General Superintendent for Offshore crew requirements Acted as afternoon shift supervisor in workshop and construction supervisor offshore as required

Quality Assurance Manager Jun 1994 to Sep 1995DiFabro Constructions Pty Ltd Steel fabrication workshop & sites Monitoring of paint shop & generated ITP's for site erection mechanical works Conducted site surveys at Greensborough Plaza & Melbourne Exhibition Centre (part time) Monitoring Sub-contractors works - steel fabrication & painting Monitoring steel fabrication for steel erection program

RESUME – Max Wall

Page 3: Max Wall Resume

Project Quality Assurance Management Representative Nov 1992 to Jun 1994Flakt - Holland Joint VentureLoy Yang 'B' Power Station - Precipitator Unit 2 Operated site quality system and reviewed sub-contractor quality assurance submissions prior to client submission Conducted audits of sub-contractors Site surveyor for erection set out and co-ordination of construction activities with sub-contractors Control of deliveries to site of precipitator components

Surveyor/Quality Assurance Officer Sep 1991 to Aug 1992John Holland Engineering Pty LtdLoy Yang 'B' Power Station - Coal Plant Project Operated site quality assurance system and control of site drawings Site surveyor for set out and work with tradesmen during erection. Supervised site modification and installation of dust extraction system Liaise with client quality assurance staff for site inspections

Engineering Surveyor Jun 1990 to Jun 1991Site Engineering ServicesLondon Liverpool St Station Redevelopment - site surveys with control of up to 3 survey parties Crumbles Harbour Development - site set-out surveys, checks of sub-contractors works Sewerage Treatment works - site set-out surveys, liaison with sub- contractors for quotes planning & programming of works,

site administration and ordering of materials and liaising with client for progress claims

Engineering Surveyor Jan 1990 to Jun 1990Self Employed Set out of Maryvale Private Hospital control grids for building contractor Location of photo control points for APM Forests quarry development Assistant for Vic Roads surveyor on road design & investigation surveys

Trainee Survey Assistant to Survey Officer Feb 1975 to Jan 1990State Electricity Commission of VictoriaLatrobe Valley, Victoria Member of survey party until March 1984 Survey party leader from March 1984 responsible for training of staff under my control Survey work undertaken - Open Cut mine operational & quantity surveys, Power Station boiler refurbishment set outs,

Computer downloading of field survey information & Supervision of field parties

GENERAL Internal Auditing Course – Registration No: SQG/IAC/0496 (Aug 05) Competent in the use of computers and software QDMS, Word, Excel, Access. Omega CMS, Aconex Victorian Car Drivers Licence No: 2694134 Maritime Security Identification Card – Expires May 2017 Certificate of Technology – Surveying Yallourn Technical College - 1975 – 1978 Woodside Energy Limited – ISSoW Restricted Performing Authority competency – Assessment 07.07.16

REFEREESPaul Webb Ben MackinEsso Australia Ltd Wood Group PSNQA Coordinator Construction Manager – ExxonMobil ContractsMobile 0407 514 860 Office 03 – 5149 1636

Mobile 0437 841 226

Colin Woodland Bob WilliamsGBG Concrete & Construction Worley ParsonsLongford Site Superintendent Construction Superintendent Office 03 – 5149 6404 Office 03 – 5149 6942Mobile 0407 947 238 Mobile 0419 153 222

Brad HansfordWood GroupImplementation & Commissioning ManagerOffice 08 – 6314 2914Mobile 0408 006 552