maxim batangas schedule of loads (1)
TRANSCRIPT
LOCATION: RODI AREACKT. No. QTY LOAD DESCRIPTION
MAIN CB: 60AT, 100AF, 3P FEEDER: 22mm THW + 3.5 mm32mm IMCVOLTS WATTS Connected Load A (3) AT
PANELBOARD DESIGNATION: MOUNTING:BRANCH CKT BKR. AF P KAIC
40/60GPM RODISURFACE MOUNTEDCONDUIT SIZE(IMC)
SIZE OF WIRES (THHN) BRANCH CKT. GROUND
1 2 3 4 5 6 7 8
1 1 1 1 1 1
Raw Water Pump Raw Water Pump High Pressure Pump CIP Pump RO Permeate Booster Pump RO Permeate Booster Pump SPARE SPARE
230 230 230 230 230 230 230 230
3000.00 3000.00 18000.00 2200.00 3000.00 3000.00 5000.00 5000.00
4.51 4.51 27.06 3.31 4.51 4.51 7.52 7.52
20 20 50 20 20 20 20 20
50 50 50 50 50 50 50 50
3 3 3 3 3 3 3 3
22 22 22 22 22 22 22 22
3-3.5mm 3-3.5mm 3-5.5mm 3-3.5mm 3-3.5mm 3-3.5mm
15mm 15mm 15mm 15mm 15mm 15mm
TOTAL
37200.00
55.93
COMPUTATION: IT = = (Sum of 3-Phase Connected Load + 25% of Highest Motor Load ) X DF + 0.25 X 27.06 ) X .8 3-8.0mm THW + 5.5 mm USE: I T = = ( 55.93 50.16 Amperes 25mm IMC IT = =
PROTECTION: USE:70AT, 100AF, 480V,3P
ELECRICAL ESTIMATE FOR CONSTRUCTION
FINAL QUANTITY ITEM No. DESCRIPTION QTY UNITS
B5 Wiring Devices One gang switch (Metallic Black- full color wide) Two gang switch (Metallic Black- full color wide) Three gang switch (Metallic Black- full color wide) Duplex C.O Grounding type (230V) (Metallic Black- full color wide) Single C.O Grounding type (230V) (Metallic Black- full color wide)
12 3 2 41 2
set set set set set
C4 LAN Outlet WEG2164H(6P4C) WEG2488H(CAT5E) WEG6801MB-1 (METALIC BLACK ) WEG6802MB-2 (METALIC BLACK )LEGEND: urgent material other as per site usages
16 25 39 2
set set set set
FODC HOMEBASE RENOVATION MAN POWER COSTRegular Day DAY Labor Cost Hr/Day 52 18,200.00 2 52 33,280.00 4 52 30,992.00 4 Php82,472.00 Total Man Power CostNote: Labor Cost + OT&ND
MAN POWER Forman Electrician Helper
QTY. 1 2 2 Total:
Cost 350 320 298
Night Differential/O.T Rate Days Total O.T & N.D 3,033.33 29 52 5,546.67 27 52 5,165.33 25 52 Php13,745.33 Php96,217.33 Php14,432.60
Equipment Cost and Tools:Note: Equipment and Tools 15% Labor Cost
Manpower Project Total Cost
Php110,649.93
Engr. Delmar A. Ferrer, EEElectrical Engineer In-Charge GMC_CDC Thong Hsing Project
ITEMIZED MATERIAL BREAKDOWN DESCRIPTION QTY UNIT MATERIAL Unit Cost Material Cost
ITEMS
LABOR Unit Cost Labor Cost
1
Panel P-1 MCB: 60AT,100AF,230V,2P,55KAIC Surface Mounted Branches: 8 - 20AT,50AF,230V,2P,10KAIC Panel P-2 MCB: 60AT,100AF,230V,2P,55KAIC Surface Mounted Branches: 8 - 20AT,50AF,230V,2P,10KAIC Panel P-3 MCB: 60AT,100AF,230V,2P,55KAIC Surface Mounted Branches: 8 - 20AT,50AF,230V,2P,10KAIC Panel P-4 MCB: 60AT,100AF,230V,2P,55KAIC Surface Mounted Branches: 8 - 20AT,50AF,230V,2P,10KAIC Panel P-5 MCB: 60AT,100AF,230V,2P,55KAIC Surface Mounted Branches: 8 - 20AT,50AF,230V,2P,10KAIC Busbar Gutter,NEMA 3R w/ lock 2 - 1/4 in. W x 1/2 in T x 1.2 m L with 22mm terminal lugs Enclosure:200mm H x100mm W x1.5m L (250 Amp) Meter Base 2 Pole Wires: 50 mm 22 mm 3.5 mm Pipes 50 mm 32 mm 15 mm 32 mm 25 mm 15 mm 15 mm 50 mm 32 mm 32 mm
1
SET
2
1
SET
3
1
SET
4
1
SET
5
1
SET
6
1
SET
7 8
5
SET
200 2625
lm lm lm
9
RSC pipes IMC pipes EMT pipes PVC pipes PVC pipes PVC pipes FMC RSC elbow IMC elbow PVC elbow
4 8 30 35 40 275 120 3 10 20
lgths lgths lgths lgths lgths lgths lm pcs pcs pcs
10
Boxes Junction box w/ cover (metal) Utility box (PVC) Pull box Fittings 15 mm 15 mm 15 mm 15 mm 15 mm 32 mm 32 mm
350 160 1 1 200 1550 100 80 600 10 20 1 1
pcs pcs lot lot pcs pcs pcs pcs pcs pcs pcs lot lot
11
FMC connector PVC connector EMT connector EMT coupling EMT loknut & bushing IMC bushing IMC locknut
12 13 14
Hangers & Support Consumable Materials Wiring Devices One gang switch Two gang Switch Three gang switch Three way switch Duplex C.O. Aircon Outlet Lighting Fixtures
20 15 10 10 80 15
SET SET SET SET SET SET
15
1 x 40 W flourescent lamp 18 W pinlight Others 50 mm Entrance cup Grounding rod Grounding clamp
60 20
SET SET
16
2 5 5
pcs pcs pcs