mb0052 quiz

Upload: dheeraj-kumar-jha

Post on 05-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 MB0052 Quiz

    1/39

    Unit 01-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NAQuestion:Which of the following are pillars of Toyota Production System? 1. Just-In-Time 2. Highlymotivated people 3. Total Productive maintenanceResponse:

    Business

    Survival

    Profit maximisation

    Feedback:

    Incorrect choice - It is involved in making profits in a business.

    Tactics

    Score of NA(skipped)Question:

    Which of the following inappropriate TPS?Response:

    Business strategy

    Organisation

    Planning

    Corporate strategy

    Score of NA

    (skipped)Question:

    _________ process of V4L is ensured with the use of the right metrics and requirement that aconsensus be reached before plans are changed.Response:

    Resources

  • 7/31/2019 MB0052 Quiz

    2/39

    Planning

    Capability

    Competency

    Score of NA(skipped)Question:Identify the correct set of Main learning principles? A. Create awareness B. Establish capabilityC. Make action protocols D. Generate system-level awarenessResponse:

    Critical Success Faculty

    Current Success Factor

    Critical Success Factor

    Current Success Facility

    Score of NA(skipped)Question:Which of the following are part of The Framework of Toyota production system? 1. Problemsolving 2. People and Partners 3. ProcessResponse:

    mission statement

    vision statement

    strategy

    goal

    Score of NA(skipped)Question:Identify the incorrect statement.Response:

    Exclusive Distribution

    Public Relations

    Strategy

    Pricing

  • 7/31/2019 MB0052 Quiz

    3/39

    Unit 01-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:Match the following sets?Response:

    A pattern to improve the performance over time.

    Not a framework for guiding project.

    Profit loss.

    Unrealistic goals.

    Score of NA(skipped)Question:Identify the incorrect statement.Response:

    Vision and mission

    Vision and value

    Tactics

    Goals

    Score of NA(skipped)Question:

    Which of the following are correct set of Assembly plant operations? A. Assembly shop. B. Paintshop C. Fabricated shop D. Plastic shopResponse:

    Corporate strategy

    Business strategy

  • 7/31/2019 MB0052 Quiz

    4/39

    Operational strategy

    Conceptual strategy

    Score of NA(skipped)Question:Match the following sets?Response:

    Should provide access to a wide range of

    markets.

    Should be difficult for the competitors to imitate.

    Should make considerable contribution to

    customers.

    Should be timely.

    Question:Which of the following are the characteristics of Kanban system? A. Smoothing of production B.Standardisation of jobs C. Autonamation D. Reduction of set-up time design of machine layoutResponse:

    Match Correct Answer User answer Fee

    dbac

    k

    Match Correct Answer User answer Feedback

    Resources

    and

    facilities

    To achieve targets as per

    the time frame

    To achieve targets as per

    the time frame

    Evaluation

    and control

    Short-term targets are

    evaluated on a timely and

    regular basis for thesuccess of strategy

    Short-term targets are

    evaluated on a timely and

    regular basis for thesuccess of strategy

    SWOT Strengths, weaknesses,

    opportunities and threats

    Strengths, weaknesses,

    opportunities and threats

  • 7/31/2019 MB0052 Quiz

    5/39

    Internal

    environme

    nt

    Financial resources,

    production capacity and

    manpower

    Financial resources,

    production capacity and

    manpower

    Unit 02-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:In Computer-Aided Design, the design engineer can use a visual display terminal along with

    ________ as an input device.Response:

    Design

    Crucial

    Systematic

    Integrated

    Score of NA(skipped)Question:In Robotics,__________ perform manufacturing process automatically.Response:

    Top level

    management

    Planning staff

    Stakeholders

    Board of directors

    Score of NAQuestion:In CAM, ______axis of machines are considered.Response:

  • 7/31/2019 MB0052 Quiz

    6/39

    Retrenchment

    Stability

    Expansion

    Feedback:

    Not the right choice - The organisations adopt expansion strategy when it increases

    its level of objectives much higher than the past achievement level.

    Corporate restructuring

    Score of NA(skipped)

    Question:User confidence can be built on _____ visualisation.Response:

    Corporate level

    Tactical of functional level

    Business level

    Operational level

    Score of NA(skipped)Question:Benefits of robots are ____________. A. Helps in using G-code programming language. B.Helps to minimise the cost. C. Helps to achieve high levels of quality. D. Helps in performingrisky choice.Response:

    Strategic analysis

    Strategic implementation

    Strategic formulation

    Strategic choice

    Score of NA

  • 7/31/2019 MB0052 Quiz

    7/39

    (skipped)Question:Companies doing online auction will have to _____________. A. Worry about the reliability ofthe suppliers. B. Use a rating system to identify the integrity of the suppliers. C. Use a ratingsystem to identify the creditworthiness of the suppliers. D. Stop being aware about the suppliersavailable.

    Response:

    Divestment

    Bankruptcy

    Liquidation

    Turnaround

    Unit 02-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:

    Features of the software for operations management includes _____________. A. Waiting lineB. Enterprise Resource Planning C. Forecasting D. InventoryResponse:

    1F, 2T

    1T, 2T

    1T, 2F

    1F, 2F

    Score of NA(skipped)Question:The three competitive advantages in problem solving are _______________. A. Improvement ofprocess and customer service. B. Improvement of Response time. C. Improvement of Qualitymanagement. D. Improvement of the Capacity management by doing inventory.Response:

  • 7/31/2019 MB0052 Quiz

    8/39

    Variation and retention

    Values and retention

    Variation and response

    Values and response

    Score of NA(skipped)Question:Identify the inappropriate sentence. The present CAM users can generate _______________ .

    A. Streamlined tool paths B. Cutting operations C. Optimised tool axis tilt used for higher feedrates D. Optimised Z axis depth cuts.Response:

    Choosing and

    implementing.

    Analysing and framing.

    Planning and scheduling.

    Planning and choosing.

    Score of NA

    (skipped)Question:The following activities are done at the preliminary investigation stage: A. Old product ideas B.True market C. Technical D. Financial assessmentsResponse:

    High level of expertise in the manufacturing process, Industry reputation for quality

    and innovation.

    Low level expertise and low quality products.

    The company does not possess skills in designing modules.

    Do not have expertise for industry reputation in quality and innovation.

    Unit 03-1 Mark Quiz QuestionsLast question skipped.

  • 7/31/2019 MB0052 Quiz

    9/39

    You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:The graphs used for monitoring the production of large quantities of products are called _____.Response:

    Benchmarking

    Resource audit

    Quality

    Financialanalysis

    Score of NA(skipped)Question:

    ______________ is a degree which describes intended function of equipment.Response:

    Michael

    Porter

    Prahalad

    Robert

    Kaplan

    Gary Hamel

    Score of NA(skipped)Question:

    _______________ is a process to confirm that the product meet the needs and expectations ofthe donors and beneficiaries.

    Response:

    Economic force

    Technological force

  • 7/31/2019 MB0052 Quiz

    10/39

    Political-legal force

    Socio-cultural force

    Score of NA

    (skipped)Question:Identify the quality characteristics related to the attributes, measures and methods attached to aparticular product or service.Response:

    Environmental Scanning

    Environmental appraisal

    External analysis

    SWOT analysis

    Score of NA(skipped)Question:

    _____ represents a set of guidelines and is used to develop Quality Management systems.Response:

    Strategy implementation

    Strategy planning

    Strategy management

    Strategy analysis

    Score of NA(skipped)Question:State whether the following sentence True or False. 1. Organisation cannot attain customer

    satisfaction through integrated system of tools, techniques and training. 2. The goal of TotalQuality Management is to do the rights things, right from the first time .Response:

    S-O strategies

    W-O strategies

  • 7/31/2019 MB0052 Quiz

    11/39

    S-T strategies

    W-T strategies

    Unit 03-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:State whether the following sentence True or False. 1. Quality is to provide a product or service,

    at a price the customer can afford.2. Quality is the manufacturers perceptionResponse:

    Michael Porter, Gary Hamel

    Prahalad, Gary Hamel

    Robert Kaplan, David Norton

    Prahalad, Michael Porter

    Score of NA(skipped)Question:

    A risk that materialises is no longer a risk, they are considered to be a _________.Response:

    Cash cows have low market share.

    Dogs are products that have low market share and do not have the potential to

    bring in much cash.

    Stars have low growth and low market share.

    Question marks have high growth and high market share.

    Score of NA(skipped)Question:

  • 7/31/2019 MB0052 Quiz

    12/39

    An ideal risk management method should produce the ________ risk cost and maintains thesecost stable form year to year.Response:

    Good reputation among customers is one of the strength of an organisation.

    High cost structure is one of the strength of the organisation.

    Removal of international trade barriers is a threat to an organisation.

    Increased trade barriers is an opportunity for the organisations.

    Score of NA(skipped)Question:Which of the following sentence is appropriate with respect to project quality.1. Project Quality

    Management is an independent process. 2. Project Quality Management is not an independentprocess. 3. Project Quality Management occurs in the middle of an activity to measure the levelof quality of the output. 4. Project Quality Management occurs at the end of an activity tomeasure the level of quality of the output .Response:

    Operational goals, customer

    Customer perspective

    Customer satisfaction, market share goals

    Financial success, shareholder

    Unit 04-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:

    ________ defines risk as the totality effect of outcomes (i.e. states of nature) that can bedescribed within established confidence limits (i.e. probability distributions).Response:

    Image

  • 7/31/2019 MB0052 Quiz

    13/39

    Milestone

    Strength

    Character

    Score of NA(skipped)Question:Identify the statement which is an example of Catastrophic risks.Response:

    Implementatio

    n

    Planning

    Certification

    Replacement

    Score of NA(skipped)Question:Identify the statement which is not included in defining Project Risks:Response:

    Strategical information

    Technical information

    Environmental

    information

    Policy

    Score of NA(skipped)Question:State whether the statement is True or False. 1. Risk monitoring and control is a process whichkeeps track of the identified risks, residual risks, and new risks involved in a project. 2. Riskmanagement helps the organisation to control and monitor various activities in a project.Response:

    Certification

  • 7/31/2019 MB0052 Quiz

    14/39

    Road map

    Mission

    statement

    Policy

    Score of NA(skipped)Question:This risk may also lead to cost risks, as longer projects always cost more. Identify the correctoption which defines this statement?Response:

    Strategy

    Wisdom

    Guidelin

    e

    Process

    Score of NA(skipped)Question:Match the following

    Response:

    Manual

    Software

    Methodical

    Comparative

    Unit 04-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question Results

  • 7/31/2019 MB0052 Quiz

    15/39

    Score of NA(skipped)Question:Identify the statement which is not included in Project Risk Management Methodologies: 1. Therisk management is not one-size-fits-all. It needs to match to the risk profiles and objectives ofthe project. 2. Contingency plan is a response that is designed for use when ongoing events. 3.

    It produces a project risk register which consists of the identified risks that may affect the abilityof the project to achieve its objectives. 4. The ultimate goal in this aspect of the project is toreduce residual waste to an acceptable level.Response:

    Encouraging communication standards and preserving core strengths are the

    goals of a company while working on its Critical Success Factor.

    Designing competitive positions and enhancing image are the goals of a

    company while working on its Critical Success Factor.

    Developing high level goals and implementing analysis matrices are the goals

    of a company while working on its Critical Success Factor.

    Encouraging communication standards and developing high level goals are

    the goals of a company while working on its Critical Success Factor.

    Score of NA(skipped)Question:Identify the three factors of a project required for risk management in an organisation: 1. Time 2.Money estimate 3. Manpower 4. InformationResponse:

    Finance, short-term

    Negotiation, long-

    term

    Liquidity, long-term

    Products, short-term

    Score of NA(skipped)Question:The expansion of PMIS is:Response:

    Peace, information

    Organisational structure, strategic

    vision

  • 7/31/2019 MB0052 Quiz

    16/39

    Strategies, strategic vision

    Organisational structure, peace

    Score of NA

    (skipped)Question:There are________aspects of speech that are essential for clear conversation in the conferencecall.Response:

    Setting up guideline development group, scheduling time for events

    Breaking up the project and extracting task, assigning the task to the

    resources

    Recognising the need for services, evaluation of potential suppliers

    Establishing priorities, assigning the task to the resources

    Unit 05-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:

    ________is responsible for making a detailed research and analysis of the project requirementsand manages to discuss with each member.Response:

    Synergy

    Operational control

    Strategic control

    Key stakeholders

    expectations

    Score of NA(skipped)Question:

  • 7/31/2019 MB0052 Quiz

    17/39

    Which of the following statement is False?Response:

    Feedforward

    controls

    Concurrent controls

    Feedback controls

    Operational controls

    Score of NA(skipped)Question:Match the following :Response:

    Strategic control

    Strategic evaluation

    Operational control

    Synergy

    Score of NA

    (skipped)Question:Identify the appropriate statements 1. A periodic review of the project is necessary to monitorthe status of the workflow. 2. The centre of the model is represented as, the retailer followed bythe middle ring of the manufacturer, and finally the outside ring being the consumer. 3. Onreviewing of the project by the senior members of the team it is not necessary that the changeshas to be approved by the other members of the team. 4. A review is performed in terms offinancial issues to make sure that the planned budget does not exceed the occurred expenses.Response:

    Managers

    Analysts

    Shareholders

    Stakeholders

    Score of NA

  • 7/31/2019 MB0052 Quiz

    18/39

    (skipped)Question:This is not a feature of the Microsoft Project Planner:Response:

    Measure performance

    Create pre-established standards

    Take remedial action

    Recognise the activity to be

    measured

    Score of NA(skipped)Question:Which is not a factor that is considered for Teamwork and Relationships among Teammembers.Response:

    Short term arrangement

    Goal displacement

    Behavior substitution

    Sub-optimisation

    Unit 05-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA

    (skipped)Question:Match the following features of Requisites of Project Management System.Response:

    1T, 2T

    1T, 2F

  • 7/31/2019 MB0052 Quiz

    19/39

    1F, 2F

    1F, 2T

    Score of NA(skipped)Question:In an organisation, the __________ type of organisation will become more popular and staffroles will decrease.Response:

    Strategic decisions are concerned with analysing the accuracy of the decision

    premise.

    Key Stakeholders are a subset of stakeholders who can do not leave a direct impact

    on the organisation and can influence the success or failure of the organisation

    Strategic control is established to focus on the resources used in the performance

    (input), activities that generate the performance (behaviour) and the result of actual

    performance (output).

    Downsizing and divesting may result in negative synergy.

    Score of NA(skipped)Question:Identify which of the following is not a project checklist constrain:Response:

    1T, 2T

    1T, 2F

    1F, 2T

    1F, 2F

    Score of NA(skipped)Question:Expansion of IIPDF is:Response:

    To create a new business

  • 7/31/2019 MB0052 Quiz

    20/39

    To focus on the performance of the HR department

    To identify the activities that do not fall within the tolerance

    range

    To calculate EVA and MVA

    Unit 06-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA

    (skipped)Question:

    ______________ adopted a list of infrastructure facilities for the purpose of extending creditfacility as infrastructure lending to a borrower company engaged in developing, operating andmaintaining such infrastructure facilities.Response:

    Organisational goals

    Organisational behaviour

    Coordination

    Decision making

    Score of NA(skipped)Question:Recently _________ sector participation as well collaboration with experienced _______infrastructure companies are necessary to spur the growth of infrastructure in the country.Response:

    Budget

    Policy statements

    Resource

  • 7/31/2019 MB0052 Quiz

    21/39

    Performance

    Score of NA(skipped)Question:

    State whether the statement is True or False: 1. Private participation can range from partialownership, operation and maintenance of an infrastructure facility to just contracted operation ofthe facility. 2. A project aimed at significant social benefits such as high cost metro transit maybe more suitable for government ownership.Response:

    Process

    Metrics

    Policy

    Programme

    Score of NA(skipped)Question:Identify the statement which does not define the role of Special Purpose Vehicle (SPV):Response:

    Corporate culture

    Statement

    Culture

    Outcome

    Score of NA(skipped)Question:State whether the statements are True or False? 1. The interdependence of countries withregard to their economic development is leading to an increase in the sharing of material and

    human resources across the countries. 2. The significance of geographical distance indeveloping and maintaining trade, socio-cultural and international relations is reducing rapidly.Response:

    Process

    Implied

  • 7/31/2019 MB0052 Quiz

    22/39

    Interpreting

    Written

    Score of NA(skipped)Question:Match the followingResponse:

    Top level management

    Business policies

    Resources

    Coordination

    Unit 06-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:Identify the statements which are a part of the transport Infrastructure projects:1. Their initiationand progress are heavily dependent on Government policy as well as Government funding. 2.They are always financially viable, because of their long gestation periods and limited financialreturns. 3. They have a long operating life. 4. They are not always financially viable, because oftheir long gestation periods and limited financial returns.Response:

    Policy does not identify the company rules.

    Procedure identifies the specific actions and explains when an action needs to

    be taken.

    Programme is not a concrete scheme of activities designed to accomplish a

    specific objective.

    Process is not intended to achieve organisational goals.

  • 7/31/2019 MB0052 Quiz

    23/39

    Score of NA(skipped)Question:State whether the following statements are true or False? 1. Govt. has allowed FDI in mostinfrastructure sectors to the extent of 57%. 2. Banks which were lending earlier for a period of 3years are now proactive and lend upto 8 15 years. 3. Operate, Maintain, Transfer (OMT)

    model is also being adopted for roads. The government funds the road, while the contractoroperates and maintains it for a fee and then transfers it for a fee. 4. A large part of the GoldenQuadrilateral, the countrys largest expressway project, is operated on a fixed annuity paymentto contractors on BOT model.Response:

    Goals, values and lessons

    Attitude, values and skills

    Standards, skills and

    resource

    Attitude, value and

    standards

    Score of NA(skipped)Question:PSNext's rich graphical interface is ________ in nature.Response:

    Simple words

    Jargons and

    connotations

    Precise

    Clear words

    Score of NA(skipped)Question:Tasks that are scheduled to various resources is commonly referred

    as____________________.Response:

    Communication

    skills

    Specific

  • 7/31/2019 MB0052 Quiz

    24/39

    Uniform

    Appropriate

    Unit 07-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:HRIS helps to integrate: 1. Performance 2. Development 3. Payroll 4. Operating system

    Response:

    Rules

    Decisions

    Guideline

    s

    Strategie

    s

    Score of NA(skipped)Question:State whether the statement is True or False 1. Setting up of project management, projectbusiness is conceptualised and is referred as Project portfolio management. 2. Setting up ofproject management, project business is conceptualised and is referred as Businessadministration.Response:

    Resources

    Policies

    Stakeholder

    s

    Shareholder

    s

    Score of NA

  • 7/31/2019 MB0052 Quiz

    25/39

    (skipped)Question:State whether the statement is True or False The advantage of web application are: 1. In web-based approach, only a single user can access the application. 2. In web-based approach,project information is not available when user or server goes offline.Response:

    Top level

    management

    Strategy planning

    staff

    Board of directors

    Policy decision

    makers

    Score of NA(skipped)Question:

    ____________ is a software developed by ______________ ,has an interactive Gantt chart thatis normally available only in higher-end suites.Response:

    Framing and monitoring

    Analysing and

    implementing

    Reviewing and monitoring

    Analysing and framing

    Score of NA(skipped)Question:

    ____________ approach in project management software gives the most responsive andgraphically-intense style of interfaceResponse:

    Resources

    Shareholders

    Objectives

  • 7/31/2019 MB0052 Quiz

    26/39

    Managerial

    actions

    Score of NA(skipped)Question:

    In ____ approach, solutions offered allows users to go offline with a copy of data and respondsslower than ____.Response:

    Drafting policy based on factors discussed in

    meetings.

    Analysing factors.

    Gathering information.

    Planning the procedure to draft policy.

    Unit 07-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA

    (skipped)Question:PSNext has these functional areas: 1. Project portfolio management, tracking time 2. Projectsand Resources planning 3. Tracking time 4. Dash board and reportingResponse:

    1T, 2T

    1T, 2F

    1F, 2T

    1F, 2F

    Score of NA(skipped)Question:The advantages of web based approach in project management software include: 1. Centraliseddatabase repository 2. Easy access control 3. Responds slower than desktops. 4. Without

  • 7/31/2019 MB0052 Quiz

    27/39

    installing software on user's computer, the web application can be accessed from any type ofcomputer.Response:

    1T, 2T

    1F, 2T

    1F, 2F

    1T, 2F

    Score of NA(skipped)Question:

    A __________ can be as simple as a single equation or as complex as an ____________of

    many equations and functions.Response:

    Machinery and training

    Design and implementation

    Analysis and design

    Machinery and

    implementationScore of NA(skipped)Question:

    A ____________ is a collection of cost estimating relationships.Response:

    It is the process of identifying and analysing the defined objectives of the

    organisation.

    It is the process of creating space for understanding the need for policy

    change.

    It is the process of detailed description of what the company is and assessing

    its sphere of operations.

    It is the process of applying the drafted policies in situations that are in

    compliance between the organisation and the employees.

  • 7/31/2019 MB0052 Quiz

    28/39

    Unit 08-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:State Whether True or False 1. Top- Down Approach is less time consuming. 2. Theimplementation cost is likely to be higher in Bottom-Up Approach.Response:

    Facilitate

    Integrate

    Validate

    Analyses

    Score of NA(skipped)Question:The system is used to measure and/or estimate the cost associated with the development,manufacture, or modification of a specified end item. Which is the system referred here?Response:

    Sensitive

    Important

    Confidential

    Political

    Score of NA

    (skipped)Question:Match the following setsResponse:

    Reputational

  • 7/31/2019 MB0052 Quiz

    29/39

    Financial

    Loss of privacy

    Loss of integrity

    Score of NA(skipped)Question:

    ________ serves as a standard to evaluate the actual performance of a company.Response:

    Contingency Planning

    Business Continuity Planning

    Business Continuity Management

    Business Continuity Policy

    Score of NA(skipped)Question:State whether true or False 1. F statistic should have a value greater than 4.0 or 5.0 to indicatethat we have selected a good cost driver for the cost model and that the form of the equation isacceptable. 2. The t statistic can be used to check the validity of adding a particular cost driver

    variable.Response:

    Research

    Review

    Analysis

    Identification

    Score of NA(skipped)Question:The system can also be designed to estimate items as small as modules or components, or aslarge as subsystems, systems, total programs, or large development activities. What is thesystem referred to?Response:

  • 7/31/2019 MB0052 Quiz

    30/39

    Informational

    Operational

    Fundamental

    Documental

    Unit 08-2 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:Post accommodation and divestment plan phase of project development includes _______.Response:

    Commercially, intellectual property

    Sensitive, intellectual property

    Personal, information

    Relocating, intellectual property

    Score of NA(skipped)Question:The third stage in the project life cycle is _______.Response:

    BIA enhances process optimisation program which results in expenditure reduction in

    BCP.

    The BCP program is unable to address Backlog Trap problem.

    The BCP complicates the recovery program

  • 7/31/2019 MB0052 Quiz

    31/39

    BCP program is unable to identify the mission critical activities of an organisation.

    Score of NA(skipped)Question:

    Match the following setsResponse:

    The cost of implementing and testing a BCP program is low.

    The whole BCP program is less time consuming.

    Less time is required to set up facilities.

    Relocating and accommodating recovery team members lead to logistical

    difficulties.

    Score of NA(skipped)Question:Match the following setsResponse:

    Confidentiality,

    availability

    Integrity, loyalty

    Planning, availability

    Vulnerability, integrity

    Unit 09-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:? = Earned Value - Actual CostThe above formula is used to calculate:Response:

    Certification

  • 7/31/2019 MB0052 Quiz

    32/39

    Documentatio

    n

    Consultation

    Financing

    Score of NA(skipped)Question:State whether the statement is True or False. 1. The organisation has to prepare cost controltechniques for various phases of project development to make the project successful. 2. Theimportant part of proposal preparation process is the preparation of an accurate budget.Response:

    Quarterly

    Business

    Long-term

    Profitable

    Score of NA(skipped)Question:

    Which of the following are true about inflation? 1. If rate of inflation decreases below thepredicted level during the project, then the original cost estimate will exceed. 2. It will result inlack of control over time and cost inputs. 3. Inflation increases the original estimates ofconstruction costs. 4. It is the rate at which the overall general level of prices for goods andservices in an economy is rising, and, subsequently, purchasing power is falling.Response:

    Cerification

    Accrediatio

    n

    Subsidiaries

    Strategies

    Score of NA(skipped)Question:Match the following set:

  • 7/31/2019 MB0052 Quiz

    33/39

    Response:

    Empirical

    document

    Factual statement

    Internal document

    Legal document

    Score of NA(skipped)Question:

    _______ refers to the worth of work that should be completed by a specific time in the projectschedule.Response:

    Diversifie

    s

    Assists

    Assures

    Inhibits

    Score of NA

    (skipped)Question:The operational phase of project development includes which of the following steps: 1.Determining sufficient allocated resources. 2. Virtual linking of project service to the system. 3.Evaluating the technical resources of the project.Response:

    Team

    Customer

    Management

    Competitor

    Unit 09-2 Mark Quiz Questions

  • 7/31/2019 MB0052 Quiz

    34/39

    Last question skipped.You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:Identify the correct sequence of steps undertaken in the definition phase of projectdevelopment.Response:

    Internal transformation, financial restructuring

    Distribution problems, faulty time management

    Augmentation of strategic control, focused diversification strategy

    creation

    Franchising, strategic alliances

    Score of NA(skipped)Question:Identify the correct choice with respect to ARR:Response:

    Qualifying the best target markets, Resolving the financial

    matters

    Defining the business vision, Testing the market strategy

    Understanding the customer, Making a list of goals

    Identifying all the target markets, Identifying the tools and

    strategies

    Score of NA(skipped)Question:Three Square Inc. is a well established infrastructure company. It now wants to enter into thesoftware development field and explore the opportunities here in the name of Three SquareSoftware Inc. and create a brand name for itself in the development of software's. Which of thefollowing factors it has to consider in deciding the overall cost of the project. 1. Timescale 2.Features of site 3. New build or improvements 4. Project specificationsResponse:

    Consultation,

    warehousing

  • 7/31/2019 MB0052 Quiz

    35/39

    Supervision, human

    Standards, managerial

    Focus, Storage

    Score of NA(skipped)Question:Identify the correct choice with respect to Capital Investment.Response:

    A proper business venture helps in identifying the market strategy

    A proper business venture improves distribution channels by extending market

    positions.

    A proper business venture helps in resolving the financial matters.

    A proper business venture helps in understanding the customer.

    Unit 10-1 Mark Quiz QuestionsLast question skipped.You have completed your quiz attempt. You have scored0of6possible points.

    Question ResultsScore of NA(skipped)Question:Identify the correct sequence of statement with respect to Capital Investment. While makingcapital investment decisions it is required to ___________________. A. Define the objectives ofthe capital investment. B. Define an objective in decision making to maximise the value of thefirm. C. Define an objective to maximise stockholder's wealth. D. Define an objective to minimisethe stock price.Response:

    Manage

    Capitalis

    e

    Project

  • 7/31/2019 MB0052 Quiz

    36/39

    Analysis

    Score of NA(skipped)Question:

    The _________ often termed as the project _______ is critical in making an appropriatedecision.Response:

    Budget

    Franchising

    Outsourcing

    Performanc

    e

    Score of NA(skipped)Question:

    ________ fails to capture the project's new path of action to obtain the end result.Response:

    Private firm

    Planning

    Multi National

    Corporation

    Government firms

    Score of NA(skipped)Question:Identify correct statement. A. Dividends do not matter and dividend policy does not affect valueif companies can issue stock. B. Dividends are bad, and increasing dividends will reduce valueif dividends have a tax disadvantage. C. Dividends are good, and increasing dividends will

    increase value if dividends operate as a signal of present prospects. D. Dividends are good, andincreasing dividends will increase value if dividends operate as a signal of future prospects.Response:

    Host country

    regulations

    Threats

  • 7/31/2019 MB0052 Quiz

    37/39

    Competency

    Regression

    Score of NA

    (skipped)Question:Identify the correct equation: Average Rate of Return (ARR) =Response:

    Global

    companies

    Organisations

    TNCs

    Companies

    Score of NA(skipped)Question:Match the following aspects related with CPA.Response:

    Decoding

    Transmitting

    Interpreting

    Globalisatio

    n

    Unit 10-2 Mark Quiz QuestionsLast question skipped.

    You have completed your quiz attempt. You have scored0of8possible points.

    Question ResultsScore of NA(skipped)Question:

    An offering memorandum is also known as a __________.Response:

  • 7/31/2019 MB0052 Quiz

    38/39

    The most important advantage of MNCs is the patented technical knowledge

    which enables them to compete internationally

    Large MNCs do not have access to advanced levels of technology which are

    either developed or acquired by the corporation

    The technologies of MNCs are not patented

    Technology cannot be in the areas of management, services or production

    Score of NA(skipped)Question:Project evaluation is a _____________ process of collecting, recording and organising aboutproject results.Response:

    Globalisation is the process of integration of the world community into acommon economical or social system

    The first phase of globalisation is not to integrate the population of the world

    economically

    The disadvantage of globalisation is to reduce the geographical inequalities by

    distributing jobs and business opportunities all over the world

    The market equilibrium between under developing and developed countries is

    not obtained by currency exchange

    Score of NA(skipped)Question:Match the following aspects related with CPA.Response:

    Schedule and budget

    Create jobs and

    Technology

    Cost and values

    Organisation and goals

    Score of NA(skipped)Question:

    ________ and _________ are the two most commonly used flexibility valuation tools.Response:

  • 7/31/2019 MB0052 Quiz

    39/39

    Unstable, tend to

    change

    Hard working, stable

    Flexible, uncertain

    Stable and unchanged