The following information supplements and/or supersedes the bid documents. This Addendum forms part of the Con-tract Documents and is to be read, interpreted and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the in-formation contained in the original draw-ings and specifications issued for the above named project to the extent refer-enced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number on the Bid Form. Failure to do so may subject bidder to disqualification.
!
Addendum! MTA Project No: MCCN-16-01 Project: McCain Bookstore renovations Date: November 01, 2016
Addendum No: 1 1. In the Specifications
1. General:
1. Sections 00 11 16 Invitation to Tender and 00 21 13 Instructions to Bidder: change closing date to Thursday November 10 @ 4:00 PM Local Time.
2. On the Drawings 1. Drawing 100:
1. Detail 4: extent of flooring removals and installation is entire floor area bounded by bold outline on floor plan. Flooring may have to be installed in phases in order to maintain op-
eration of the bookstore during installation. Flooring removals, prep work and installation of new flooring will have to occur after hours or on weekends to minimize impact on Bookstore.
2. Drawing 101: 1. Note existing ceiling height in area between Grid Lines E2 and EX is 94”. 2. All equipment, shelving, books, supplies, etc., will be moved by the University.
3. Work can be performed during regular business hours in the area of the renovation be-tween Grid Lines 1X and 1W.
4. Flooring shall be Mirra Wood by American Biltrite Flooring.
5. Provide 4 boxes (150±SF) of maintenance materials. 3. Drawing M-1:
1. Note that thermostat installed on the South side of column on grid line E7 by 1X will be
removed by controls contractor. Patching of gypsum board is included in work of this pro-ject.
4. Drawing E-1:
1. Note that all new data and power devices shall be flush mounted with no exposed conduit or boxes.
2. Refer to attached drawing SK-E1 for location of Comm Room and routing of data wiri
updn
ramp
up
Corridor
up
Shipping/Receiving
Dock & Canopy
2'-6"
DN
SinkWire Racks
Ice Ice Ice
PizzaImpinger
Pizza
Oven
Hand
Sink
Cash
Menu Sign
On Doors
Ramp
Dn.
Ramp
Dn.Landing
Landing Waste & Recycling
Recycling
Oven Fridge Fridge
Exhaust
Hood
Condiments
RO
Dn.
Grille Grille
Bar
Height
Cooler
DJ Booth
Folding
Grille
7"
Display
Showcase
DSS D1
ColourCopier
Clothing
Books
Clothing
Clothing
Supplies
CashCash
Wall Display Shelves
Work Area
ReproDesk
49'-0 1/2"
7"
7'-8 1/2"
9'-0 1/2"
DN
83'-3"
70'-9"
13'-10 1/2"
8"
3"1'-9"
Ground Floor Lobby
G01
Custodial
G19
Vestibule
G80 Vestibule
G81
Bookstore
G82
Bookstore Storage
G87
Vending
G10
W/C
G09
W/C
G08
Comm.
G02
Vestibule
G20
Dishwashing
G57
Storage
G55
W/C
G53
W/C
G52
Pub
G66
Bar
G67
G71
Keg Stor.
G69
W/C
G68
W/C
G74
Office
G72
4'-5 1/2"
G59
G58
G50
G56
G54
G51
3'-10"
G63
G62
G07
G65
Coats
G60
STG02
Hand
Sink D/W Ice
A
A B
A
A B
A
B
A
B
B
C
SS Work
Table
ABStorage
G59.1
G54.1
Cash
#2
Mail Machine
Server
Safe
Cutter
ClothingBooks
4 High
Mail boxes
G03
7 (10'-0")
Convection
Hood
C
P2
2'-1"
2'-6"
1'-3"
13'-8 1/2"
2'-10"
10 1/2"
4 (5'-0")
AtriumAbove up
AtriumAbove up
16'-6 1/2"
6'-0"8'-5"12'-2" 5'-6" 6'-0" 6'-0" 5'-6"
29'-2 1/2" 7'-0"
P2
P2
P1 P1
P2
P8
P8
P3
P10
P6
P6
P6
P6
P6
P6
P6
P6
P15
P15
P15
P15
P15
P15
P15
P15
P15
P15P15
P15 P15
P15
P15
P15
P1
P1
P1P6
P6P1
P1
P1
P1P1
P12
P2
P13
P17
P17
P17
P17
P17P11
P11
P1
P2
P9
P9 P9P9
P9
P9
P9
P9
P14P14
P9
P10
P10P10
P10
P15
P15
P15
P15
P15
P1
P1
P8 P8
P8
Custodial
G75
5'-10"
P6
P8
P8
P9
83'-7 5/8"
3'-0"3'-11 1/4"
G64
1'-3"
5 1/2"
1'-3"
1'-3"
10'-0"10'-4 1/2"
W32
W29
W30 W31
W33 W33
LSD LSD
8'-7 1/2"
8'-10"
5'-0" 5'-0" 8'-10"
1'-2" 4'-4" 4'-0" 13'-0" 4'-0" 4'-4" 1'-2"
P1P1BEER TOWER
P1ICE MACHINEP1
P1Cooler
1'-9 5/8"
GWCASH MACHINE
P1
G71.1
P1
P1
82'-11 1/4"
6'-1 3/4"
R 9'-10"
BENCH BENCH BENCH
3'-7 1/2"
8'-10 1/2"
CAST CONCRETE STAIR
CAST CONCRETE STAIR
CAST CONCRETE STAIR
TOPPING 1 1/2" ± ON
STAIRS AND LANDINGS
3
A5.8
1
A5.8
2
A1.2a
2
A1.2a
1
SKA-94
11'-10 3/8"
EXTENT OF SILL
& APRON
PLAM ON PLYWOOD SILL
TYPICAL AT WINDOWS
UNLESS NOTED OTHERWISE
EXTENT OF SILL & APRON
12'-1" 6'-6"
PLAM ON 3/4" WOOD
PRODUCT, SILL TYPICAL AT
STAIR CENTER RAIL
24'-0" BULLETIN BOARD
4'-0" BULLETIN BOARD
5'-9 3/8"
6'-2"
8'-8 3/8"
EXTENT OF SILL & APRON
EXTENT OF SILL & APRON
Exhaust
Hood
11"
HDTV Display
3'-11"
5'-0"
4'-9"
3'-5 1/4"
Voice
TV/Cable
AC
CABINET
CABINET
P19
14'-4 5/8" 5'-4" 7'-6 1/8" 9'-2 7/8"
Cafe
G61
30" GWB WALL
Elevated structural
concrete topping on
steel decking infill
over existing stair to
basement
27'-1"
C
3'-6 3/4"
3'-6 5/8"
13'-1 3/4"
4'-7 3/4"P19
P2
P8
7'-1"
7'-5"CONDENSER
10 (13'-0")P1
P1
6'-0" 15'-4"
1 (3'-0")
Add a 1'-4" wall to support
mailboxes on bottom side.
Finish new stub wall to wing
walls as shown in detail
SKA-143. Also See SKA-123-R
10.1 (5'-0")
11'-6"1'-6"
1'-1"
UPA2'-5" 3'-6"
DN
123456
1w1x1y1z
4x5x5y6x
14'-0" 28'-0" 28'-0" 28'-0"
2'-5" 14'-11 1/4" 14'-11 1/4" 14'-11 1/4"
16'-10 5/8"20'-0" 16'-10 5/8"
8'-8" 2'-10 5/8"
50'-8"
25'-4 3/4" 25'-3 1/4"
L
H
E
E2
K
Ex
Ey
C
G1
4y
D
T4
E1
B
Cz
C
4y
E7
J
53'-10 3/4"
8'-2" 10'-1 1/2" 5'-7 1/2" 5'-7 1/2" 10'-1 1/2" 8'-2"
53'-10 3/4"
7'-0"7'-0"1'-4 1/2"
88'-9 3/4"
16'-10 5/8"
T5
T5
T3
Ec
1
A4.1
2
A4.3
2
A4.1
T3ECEB ED EEEA EF
Mount AllisonU N I V E R S I T Y
June 2009
06-37
STAFF
Contractor must check and verify all dimensions on the job, and report
any discrepancies to the Architect before proceeding with the work.
DO NOT SCALE THIS DRAWING.
This drawing will remain the property of Sperry &Partners Limited
whether the project for which it is intended is executed or not. It is
not to be used by any party on any other project or extensions to
this project except by the agreement of, and compensation to,
Sperry & Partners Limited. This drawing and accompanying
specifications shall not be reproduced in any manner without the
express written consent of Sperry & Partners Limited.
Copyright © 2007
MOUNT ALLISON
STUDENT CENTRE
Construction North Stamp
Project Name
Drawing Title
Description No. Date
Designed
Drawn
Checked
Date
Project No.
Drawing No.
Scale
PR
OJE
CT
NO
.
PLO
T D
ATE
:
06- 3
7
102 Portland Street, Dartmouth; Nova Scotia, Canada; B2Y 1H8
Phone: 902 469 9000; Fax: 902 469 4399
Owner
MOUNT ALLISON
UNIVERSITY
SACKVILLE, N.B.
22006
James C. Reardon
SPERRY & PARTNERS
LIMITED
Jun
18, 2
009
JCR
CONSTRUCTION
NORTH
TRUEMAN HOUSE
McCONNELL
HALL
TWEEDIE
HALLEXISTING
FITNESS CENTRE
(NIC)
TP 7.6 Prodema Panels 1 JAN 23, 2008
TP 8.6 Aluminum Curtain Wall & Ent. 1 JAN 23, 2008
TP 5.5 Steel Stairs, HR & Guards MAR 13, 20081
TP 5.4 Glass Railings & Handrails MAR 13, 20081
TP 9.2 Studs, GB, SAT Ceilings NOV 29, 20071
Issued For Construction MAR 20, 20082
TP 6.3 Millwork MAR 25, 20081
TP 10.1 Specialties 1 APR 9, 2008
RECORD DRAWINGSTHIS DRAWING HAS BEEN PREPARED,
IN PART, BASED UPON INFORMATION
FURNISHED BY OTHERS. WHILE THIS
INFORMATION IS BELIEVED TO BE
RELIABLE, SPERRY AND PARTNERS
CANNOT ASSURE ITS ACCURACY, AND
THUS IS NOT RESPONSIBLE FOR THE
ACCURACY OF THIS RECORD DRAWING
OR FOR ANY OMISSIONS WHICH MAY
HAVE BEEN INCORPORATED INTO IT
AS A RESULT. THOSE RELYING ON
THIS RECORD DOCUMENT ARE
ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY
BEFORE APPLYING IT FOR ANY
PURPOSE.
1/8"=1'-0"
PARTIAL GROUND FLOOR PLAN
BOOKSTORE / PUB / CAFE
A2.1
New raised floor structure with concrete topping
TAS/LMB
Reinforced structural concrete slab
Px Wall Tags-See A6.0 for more information
Limit of Plam sills & aprons; Plam mounted to 3/4"
plywood unless noted otherwise.
X'-X" BULLETIN BOARDBulletin board length and location
X'-X" SIGNAGESignage length and location - Will require
sheet metal backing
routing of network cabling from Comm Room
Exisitng Comm Room
Drawing Issued for Reference onlyto show location of exisitng Comm Room and building dimensions
MCCN-16-01 McCain Bookstore RenovationsAddendum#1
SCALE: 1/16" = 1'-0"