mch power point 01.15.10
DESCRIPTION
Aardex delivers a LEED Gold Ground Source Geo-thermal hospital at 30% less costTRANSCRIPT
![Page 1: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/1.jpg)
Muskogee Community Hospital
Developed by Aardex LLC
![Page 2: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/2.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
• Founded in 1983, Aardex LLC is a developer, designer, builder and manager of quality medical, office, hospitality and government facilities
• 3 most recent Projects
– Double LEED Platinum Signature Centre
– LEED Gold Muskogee Community Hospital
– LEED Gold St. Anthony North Medical Office Building
![Page 3: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/3.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Muskogee Community Hospital
• 100,000 SF LEED Gold, Energy Star Rated Hospital
• 45 licensed patient rooms
• 4 OR’s and 3 endoscopic procedure rooms
• Level IV Emergency Department
• Physician owned Hospital
• Financed through traditional debt and equity and the use of New Market Tax Credits
![Page 4: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/4.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Muskogee Community Hospital
Muskogee hospital certified LEED Gold and first hospital in the US to receive Energy Star rating
![Page 5: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/5.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Muskogee Community Hospital
• Muskogee was the first hospital in the US to receive the Energy Star rating – The rating is based upon a scoring system– Energy efficiency that is sustainable and long term– Includes
• energy modeling• product selection to programming of building automation systems
– The rating is also based upon continued measurement and maintenance of physical structure and mechanical/electrical systems
![Page 6: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/6.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
What is LEED
• Leadership in Energy and Environmental Design
– Rating system is 26 points minimum for certified to 52 minimum for platinum
– Gold Rating - 39 to 51 points– Muskogee Submitted on 41 points and were denied 0.– Points are submitted for and if they are denied there is
no resubmission
![Page 7: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/7.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
MCH LEED Highlights
• Sustainable Sites
• Water Efficiency
• Energy and Atmosphere
• Materials & Resources
• Indoor Environmental Quality
• Innovation & Design Process
![Page 8: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/8.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Sustainable Sites Possible points 14 / Points Achieved 12
• Sediment Control
• Erosion Control
• Access to 2 bus lines
• Bicycle storage
• Preferred Parking • Onsite Parking car/van pool
• Storm water management
• Heat Island Effect
![Page 9: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/9.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Water Efficiency Possible points 5 / Points Achieved 4
• Water Efficient Landscaping (recycled wastewater)
• Onsite Water Treatment
• Water Use Reduction
![Page 10: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/10.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Energy & Atmosphere Possible points 17 / Points Achieved 4
• Commissioning of Energy System
• Maximum Energy Performance
• No Refrigerants in HVAC
• Energy Cost savings: 21.9%
![Page 11: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/11.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Materials & Resources Possible points 13 / Points Achieved 6
• Storage/Collection recyclables
• Construction Waste Management
• Recycled Content
• Regional Materials
![Page 12: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/12.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Indoor Environmental Quality Possible points 15 / Points Achieved 10
• Minimum IAQ Performance
• IAQ Management (During Construction & Before Occupancy)
• Outdoor Air Delivery Monitoring
• Low VOC’s
• Low Emitting Materials
• Indoor Chemical & Pollutant Source Control
• Thermal Comfort
![Page 13: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/13.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Innovation & Design Process Possible points 5 / Points Achieved 5
• Innovation Design
– Maximized Open Space
– Recycled Content
– Sustainable Design Program
– Connection to Natural World
– LEED AP on Project
![Page 14: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/14.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Quality of Development/Construction
![Page 15: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/15.jpg)
![Page 16: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/16.jpg)
![Page 17: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/17.jpg)
![Page 18: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/18.jpg)
![Page 19: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/19.jpg)
![Page 20: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/20.jpg)
![Page 21: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/21.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Costs of Development/Construction
• Construction costs were 30% below industry average
![Page 22: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/22.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Muskogee Community Hospital
Innovations
![Page 23: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/23.jpg)
![Page 24: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/24.jpg)
![Page 25: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/25.jpg)
![Page 26: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/26.jpg)
![Page 27: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/27.jpg)
![Page 28: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/28.jpg)
![Page 29: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/29.jpg)
![Page 30: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/30.jpg)
![Page 31: Mch Power Point 01.15.10](https://reader033.vdocument.in/reader033/viewer/2022051111/55420493b4c905a8148b45c5/html5/thumbnails/31.jpg)
ddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd
Muskogee Community Hospital
Questions?