mdot annual report fy 2014
TRANSCRIPT
03 Letter from the Director
05 Executive Summary
09 Mississippi Transportation Commission
10 The Department
12Financial Management and Budget
19Addendum
Automobile Operating Costs
Maintenance Expenditures
Construction Expenditures
Contracts Awarded
Contents
MDOT Annual Report FY 20142 MDOT Annual Report FY 2014
The Mississippi Department of Transportation is responsible for providing a safe intermodal transportation network that is planned, designed, constructed and maintained in an effective, cost-efficient
and environmentally-sensitive manner.
Our Mission
The Mississippi Department of Transportation’s objective is to maximize taxpayers’ dollars by providing a safe, efficient multimodal
network which enhances economic stability and growth.
Our Vision
Interstate 55, Jackson
MDOT Annual Report FY 2014 3MDOT Annual Report FY 2014
Letter from the Executive DirectorDear Taxpayer:
I am pleased to present the Mississippi Department of Transportation (MDOT) Annual Report for Fiscal Year 2014, including a summary of the past year’s financial activities and reports required by the Mississippi Legislature. Our dedicated employees work diligently every day to preserve and enhance our state’s transportation network, provide safer commutes and grant citizens greater access to the goods they need, all at the best value for our taxpayers’ dollars.
The traveling public and countless businesses depend on Mississippi’s infrastructure network to afford a safe and secure means of transportation within the state and across the state’s borders. This continuous stream of people and goods contributes to significant industry growth for Mississippi. MDOT is committed to making taxpayer dollars go further towards preserving the existing infrastructure and adding capacity through new projects.
Over the past three decades, MDOT has made great progress in creating a safe and efficient transportation infrastructure with available resources. But, in recent years, we shifted our focus and financial resources to preserving that infrastructure instead of new construction projects that would upgrade roadway capacity due to lack of funding. It is our top priority to repair or replace deteriorating bridges, repave crumbling roadways and address safety concerns to improve the driving experience for motorists and stimulate the local economy. In the past year, we designated more than $50 million to replace 31 bridges statewide and spent another $4 million on routine bridge repair and maintenance. MDOT led over 3,000 bridge inspections across Mississippi to ensure the safety of motorists and to protect the investment in our existing bridges.
I have faith that through a collaborative effort we can continue to successfully move Mississippi forward and provide a quality product for the traveling public, but much of the state’s infrastructure is still in need of repair. The current needs have steadily outpaced available funding. MDOT aims to continue the allocation of the majority of its funding to system preservation and safety priorities. As a result of this shift in focus, new construction projects that would add capacity to the network and stimulate the economy will be delayed and added to the backlog of needs.
The Mississippi Transportation Commission and MDOT are eager to collaborate with our state and federal delegations in our common goals of a higher performing, more cost-effective transportation system that bolsters commercial growth for our state. With the aid of our partners at the State Capitol and Capitol Hill, MDOT is paving the way to economic progress. Help us continue to build Mississippi into a national leader with a transportation infrastructure that will sustain future economic growth for years to come.
Sincerely,
Melinda L. McGrath
MDOT Annual Report FY 2014 5MDOT Annual Report FY 2014
Executive SummaryRevenuesMDOT is a special fund agency and receives both federal and state revenue from dedicated taxes and fees which are annually appropriated by the Mississippi State Legislature. MDOT’s total revenue for FY 2014 was $1.2 billion. Federal and state motor fuel taxes provided 72.4% of the Department’s funding for FY 2014.
Interstate 55/20 Stack, Jackson
ExpendituresMDOT’s expenditures for FY 2014 totaled $1.2 billion. 86.0% of these expenditures were spent directly on the state highway system (Maintenance and Construction Programs). Of the highway system expenditures, 61% went toward infrastructure repair and routine maintenance activities, 28% went toward new capacity and system expansion projects, and 11% were federal pass-through to State Aid and local governments.
5
MDOT Annual Report FY 20146
By the Numbers
D’Iberville Boulvard Project, D’Iberville
Highways • $432,592,688 awarded in highway contracts • $588,578,366 spent on active highway contracts• Bridge replacement projects costing a total of $51,078,461 were let during FY 2014 to
replace 26 bridges. 5 more bridges were replaced as part of other construction projects• An additional $4,237,854 was spent on routine bridge repair and maintenance, and an
additional $377,769 was spent on repairs due to accidental vehicle impacts• 3,077 bridge inspections performed• 491 miles of roadway resurfaced• 780 lane miles of roadway sealed • 5,518 miles of unpaved shoulders reshaped• 2,503 miles of new pavement striping applied • $193,832,444 invested in routine maintenance projects such as overlays, restriping, patching
pot-holes, controlling invasive plants and chip sealing on roadways• 275,744 acres of state-maintained right-of-way grass mowed• 8,453 cubic yards of litter removed from the roadside• Volunteers collected 5,508 bags of litter through the Adopt-A-Highway program• 5,970 bags of litter collected through “Trash Bash” events• 294,416 bags of trash collected through the Inmate Litter Program• 55 women- and minority-owned small businesses certified under the federal Disadvantaged
Business Enterprise (DBE) program• Spent 10.67 percent of federal funds with DBE consultants and contractors exceeding the
target goal of 9.7 percent• Five contract compliance reviews conducted under MDOT’s equal opportunity construction
compliance program with no major findings of non-compliance• 14 Federal Aid Projects with 15,240 on-the-job training hours assigned to 20 enrolled trainees
MDOT Annual Report FY 2014 7
Safety Education Roll-over Rover Demonstration, Forrest Hill High School, Jackson
Enforcement• 5,923,129 tractor-trailers weighed • $1,908,201 collected in overweight penalty fees at weigh stations• 182,381 oversized/overweight load permits issued • $14,377,159.29 collected in permit fees• 38,571 commercial vehicle safety inspections performed
Multi-Modal Transportation Improvement Program• $3.4 million invested in airport improvement projects• $3.8 million obligated for improvements to the state’s 16 ports• $1.2 million allocated to railroad projects• $1.6 million utilized for public transit system projects
Education and Outreach• RIDES (Roadways in Developing Elementary Students) and TRAC (Transportation and Civil
Engineering)o trained 229 Mississippi school teachers in the RIDES education moduleso 266 classrooms throughout the state provided two TRAC modules (Bridge Builder and
Sim City)• Safety Education Program conducted 120 safety demonstration events, including 38 school
and college campuses, around the state• Litter Prevention Program reached 14,101 students through anti-litter education programs in
88 schools across Mississippi• Safe Routes to School National Partnership funded $2.3 million to 13 school projects in
Mississippi• 61 state certifications earned through several different programs offered through the
Mississippi State Personnel Board• 200 classes taken through the Federal Highways National Institute Program
MDOT Annual Report FY 2014 9
Mississippi Transportation CommissionThe State of Mississippi vests oversight of its transportation resources and operations in a three-member elected commission representing three geographic areas in the state—Northern, Central and Southern districts. The Commissioners have the authority and responsibility for the supervision of all modes of transportation in the state dealing with aeronautics, highways, public transit, ports and railroads.
Dick Hall, Central District Transportation Commissioner, Chairman Hall served 24 years in the Mississippi Legislature before his appointment to the Mississippi Transportation Commission in 1999 by Gov. Kirk Fordice to fill the unexpired term of a former commissioner. He was elected later that year to his first full term as Commissioner and has won re-election in each subsequent election. In the Mississippi Legislature, Hall served as Chairman of the Environmental Committees in both the House and Senate. While in the Senate, Hall served as Chairman of the Senate Appropriations Committee. He was the first recipient of the Hugh L. White Free Enterprise Award and has commercial real estate holdings.
Tom King, Southern District Transportation Commissioner King previously served as a state lawmaker since 1993 when he was elected to the House of Representatives. King served in the House until 2000 when he began his tenure in the Senate. While in the Senate, his leadership brokered many bills designed to better the lives of Mississippians. As Chairman of the Senate Highways and Transportation Committee, King authored resolutions that honored the achievements of persons throughout his district and the state. Most notably, King authored Senate Bill 3181—the $300 million bond bill for highways and bridges, and Senate Bill 3014 known as the John Paul Frerer Bicycle Act, which promotes safety for cyclists on the roadways.
Mike Tagert, Northern District Transportation Commissioner Prior to being elected Northern District Transportation Commissioner, Tagert served as Administrator of the Tennessee-Tombigbee Waterway Development Authority and President of the organization’s respective trade association, the Tennessee-Tombigbee Development Council, where he led their economic development and promotional efforts. While there, his accomplishments included the successful designation of the Marine Highway (M-65) Corridor and signing an International Agreement with the Panama Canal Authority to promote future trade and transportation via the Gulf of Mexico and Mississippi. He also currently serves as a member of the Trade and Transportation Advisory Council for the Federal Reserve Bank of Atlanta.
MDOT Annual Report FY 201410
The DepartmentTransportation Commission
Dick Hall – Central District Commissioner, Chairman
Craig Carter – Assistant to Commissioner Mary Beth McCullouch – Administrative
AssistantTom King – Southern District Commissioner Tim Ryan – Assistant to Commissioner Stacy Drinkard – Administrative AssistantMike Tagert – Northern District Commissioner Jerry Long – Assistant to Commissioner Jennifer Crowe – Administrative AssistantAmy Hornback – Secretary to the Commission
Administration Melinda McGrath – Executive DirectorMark McConnell - Deputy Executive Director/
Chief EngineerLisa Hancock – Deputy Executive Director/ AdministrationCharles Carr – Director, Office of Intermodal PlanningWillie Huff – Director, Office of Enforcement Ben Cohen – Chief Information OfficerJames Williams – Assistant Chief Engineer, OperationsWes Dean – Assistant Chief Engineer, Field OperationsAmy Mood – Assistant Chief Engineer, Preconstruction
Division Directors
Tommy Booth – Aeronautics Director Julie Ethridge – Asset Management Director Roy Tipton – Assistant Attorney GeneralDianne Gavin – Audit DirectorByron Flood – Budget DirectorCharlene Dear – Central Services DirectorCarolyn Bell – Civil Rights DirectorScot Ehrgott – Consulting Services DirectorBilly Owen – Contract Administration EngineerKim Thurman – Environmental DirectorAlison Brown – Financial Management
DirectorJohn Head – Human Resources DirectorRachel Westerfield – Hydraulics DirectorRobby Burt – Ports and Waterways DirectorRetha Gregory – Procurement DirectorMack Dowell – Programming DirectorJarrod Ravencraft – Public Affairs DirectorShirley Wilson – Public Transit DirectorJames Watkins – Research EngineerTrudi Loflin – Right-of-Way DirectorJohn Reese – Roadway Design EngineerJustin Walker – State Bridge EngineerRichard Chisolm – State Construction EngineerJeff Altman – State LPA EngineerHeath Patterson – State Maintenance EngineerMike Sullivan – State Materials EngineerJeff Ely – State Planning EngineerChad Ainsworth – State SurveyorJames Sullivan – State Traffic EngineerMike Cresap – Transportation Information
DirectorDistrict Engineers
Mark Holley, District 1, TupeloMitch Turner, District 2, BatesvilleKevin Magee, District 3, Yazoo CityDavid Foster, District 5, NewtonKelly Castleberry, District 6, HattiesburgAlbert White, District 7, McComb
MDOT Annual Report FY 2014 11
MD
OT
Org
aniz
atio
nal C
hart
As
of O
ctob
er 2
8, 2
014
Mis
siss
ippi
Tran
spor
tatio
nC
omm
issi
on
Secr
etar
yTo
The
Com
mis
sion
Exec
utiv
eD
irect
or
Dep
uty
Exec
utiv
e D
irect
orFo
r Adm
inis
trat
ion
Dep
uty
Exec
utiv
e D
irect
or/
Chi
ef E
ngin
eer
Publ
icA
ffairs
Info
rmat
ion
Syst
ems
Hum
anR
esou
rces
Civ
ilR
ight
s
Aud
it
Ass
ista
ntA
ttorn
ey G
ener
al
Offi
ce o
fEn
forc
emen
t Emer
genc
ySe
rvic
es
Com
mer
cial
Mot
or V
ehic
le &
Rai
lsEn
forc
emen
t
Enfo
rcem
ent
Adm
inis
trat
ion
Scal
esM
aint
enan
ce
Perm
its
Offi
ce o
fIn
term
odal
Aer
onau
tics
Publ
ic T
rans
it
Port
s an
dW
ater
way
s
Offi
ce o
fA
dmin
istr
ativ
e Se
rvic
es
Fina
ncia
lM
anag
emen
t
Bud
get
Proc
urem
ent
Ass
etM
anag
emen
t
Cen
tral
Ser
vice
s
Offi
ce o
fH
ighw
ays
Ope
ratio
ns
Con
trac
tA
dmin
istr
atio
nM
ater
ials
Res
earc
hLo
cal P
ublic
Age
ncy
Fiel
dO
pera
tions
Con
stru
ctio
nM
aint
enan
ceTr
affic
Engi
neer
ing
Pre-
Con
stru
ctio
n
Brid
geD
esig
nEn
viro
nmen
tal/
Loca
tion
Rig
ht O
fW
ayR
oadw
ayD
esig
nPl
anni
ngH
ydra
ulic
sSt
ate
Surv
eyor
Dis
tric
tO
ffice
s
Tupe
loD
istr
ict 1
Bat
esvi
lleD
istr
ict 2
Yazo
o C
ityD
istr
ict 3
New
ton
Dis
tric
t 5H
attie
sbur
gD
istr
ict 6
McC
omb
Dis
tric
t 7
Prog
ram
min
gTr
ansp
orta
tion
Info
rmat
ion
Con
sulti
ngSe
rvic
es
Organizational Chart
MDOT Annual Report FY 201412
Financial Management and Budget Statement of Receipts and Disbursements for the Fiscal Year ended June 30, 2014
Cash Balance as of July 1, 2013 (Unencumbered) $66,823,906
Receipts:
Federal Funds* $570,776,991
Fuel Tax 286,177,885
Interlocal Proceeds 152,576,745
Truck and Bus Taxes/Fees 67,149,385
Other Receipts 80,098,956
Tag Fees 15,405,329
Interest 4,638,697
Contractor’s Tax 4,009,347
Commercial Vehicle Fees 2,658,280
Lubricating Oil Tax 907,873
Total Receipts $1,184,399,488
Funds Available for Fiscal Year 2014 (Unencumbered) $1,251,223,394
FY 2014 Receipts
MDOT Annual Report FY 2014 13
Disbursements:
Capital Outlay – Other than Equipment $644,418,221
Salaries 161,217,868
Contractual Services 131,753,032
Subsidies, Loans, and Grants 172,187,080
Commodities 40,220,556
Capital Outlay – Equipment 11,215,092
Travel 2,464,318
Total Disbursements** $1,163,476,167
Cash Balance as of June 30, 2014 (Unencumbered) $87,747,227
* Includes FHWA ER funds of $2.9 million for Hurricanes Katrina and Gustav, FHWA and FTA ARRA funds of $8.0 million and GO Bonds/MDA proceeds of $13.2 million. ** Includes FHWA ER funds of $2.5 million for Hurricanes Katrina and Gustav, FHWA and FTA ARRA funds of $7.0 million and GO Bonds/MDA proceeds of $11.5 million.
FY 2014 Disbursements
MDOT Annual Report FY 201414
Budgeted Revenues and Expenditures for the Fiscal Year ending June 30, 2015
FY 2015 Budgeted Revenues
Cash Balance as of July 1, 2014 (Unencumbered) $87,747,227
Revenues:
Federal Funds* $460,000,000
Fuel Tax 287,000,000
Other Receipts 85,000,000
Truck and Bus Taxes/Fees 65,000,000
Tag Fees 15,000,000
Contractor’s Tax 5,000,000
Interest 5,000,000
Commercial Vehicle Fees 4,000,000
Lubricating Oil Tax 1,000,000
Budgeted Revenues $927,000,000
Total Available $1,014,747,227
MDOT Annual Report FY 2014 15
FY 2015 Budgeted Expenditures
Expenditures:
Capital Outlay – Other $422,608,454
Salaries 168,679,623
Contractual Services 147,507,606
Subsidies, Loans, and Grants 133,826,235
Commodities 43,247,033
Capital Outlay – Equipment 8,681,610
Travel 2,883,998
Budgeted Expenditures** $927,434,559
Estimated Cash Balance June 30, 2015 (Unencumbered) $87,312,668
* MDOT projects that it will receive $12.5 million in GO Bonds/MDA proceeds and $140 million in HELP proceeds which would raise total FY 2015 projected revenue to $1.08 billion. ** MDOT projects that it will spend $3.3 million on GO Bond/MDA projects, $140 million on HELP projects and $6.1 million on FHWA ARRA and FTA projects which would raise total FY 2015 expenditures to $1.08 billion.
MDOT Annual Report FY 201416
Revenue SourcesMDOT is funded through appropriations by the U.S. Congress and the Mississippi Legislature. Congress provides funding through the Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), the Federal Railroad Administration, and the Federal Aviation Administration. For FY 2014, MDOT received $570.7 million in federal funds.
State Revenue SourcesThe Mississippi Legislature provides state funding through motor fuel taxes and other fees. Mississippi has a state fuel tax of 18.4 cents per gallon. Under the Mississippi statutes, MDOT receives approximately 70 percent of total state fuel taxes. MDOT received 73 percent of total state fuel taxes collected in FY 2014: $286.2 million. The statutes allocate millions of dollars to non-road construction entities such as Wildlife and Fisheries and Marine Resources. By statute, the remainder goes to cities and counties for road projects and the State Aid Road fund for county bridge replacements.
MDOT is also funded through receipts derived from other dedicated state taxes such as truck and bus fees which include the truck and bus privilege tax, weight and size permits, and trip permits; a contractor’s tax of 3.5 percent assessed on certain highway construction contracts; a $5 per vehicle tag registration fee; a lubricating oil tax; and interest income.
Federal Revenue SourcesFederal highway construction assistance is paid to all states through the Federal-Aid Highway Program. Funding is derived from revenues collected by the U.S. Treasury from certain federal taxes on fuel, tire sales, and other items, which are deposited into the Federal Highway Trust Fund.
Distribution of assistance from the Federal Highway Trust Fund is subject to periodic authorization and annual appropriation by Congress. Since such assistance was
established by the Federal-Aid Highway Act of 1956, the program has been reauthorized many times in various forms at generally increasing funding levels. Actual payments to states have continued without interruption since 1956. Certain Federal-Aid Highway Program features are explained below:
• The Federal Highway Trust Fund: The Fund is a dedicated federal fund with revenues held in trust for reimbursement of expenditures by the states for costs of eligible transportation projects, including highway projects.
• Apportionment: For each federal fiscal year, the FHWA apportions the authorized funding among the states according to formulas that are established in authorizing statutes. The distribution of federal funds that do not have a statutory formula is called “allocation” rather than “apportionment.”
• Obligation Authority: “Obligation” is the commitment of the federal government to pay, through reimbursements to a state, its share of the eligible expenditures on an approved project. The amount of such federal revenues that a state can obligate in a given federal fiscal year is called its “Obligation Authority.”
• Role of Obligation Authority: The culmination of the federal authorization and appropriation process for the Federal-Aid Highway Program is the provision of Obligation Authority to a state. Obligation Authority, which is apportioned to states on an annual basis, sets the upper limit on the federal government’s commitment to pay, through reimbursements, its share of eligible expenditures on approved projects. Current year Obligation Authority plus prior years’ Obligation Authority obligated but not yet expended determines the maximum
Revenue, Expenditures, and Finance
MDOT Annual Report FY 2014 17
• amount of federal highway assistance that a state may receive under the Federal-Aid Highway Program. Although annual Obligation Authority is not a direct representation of the amount of reimbursements a state will receive under the Federal-Aid Highway Program in a given year (e.g., due to lags in spending), Obligation Authority levels will determine over time the amount of reimbursements that a state may receive. Mississippi has received substantial funding through the Federal-Aid Highway Program.
• Use of Obligation Authority: Mississippi has consistently utilized its entire total Obligation Authority. MDOT reasonably expects to continue to utilize its entire total Obligation Authority.
• Future Utilization of Federal Highway Assistance: Under the Federal-Aid Highway Program, as projects are approved by the FHWA, the aggregate dollar amount of each state contract relating to that project is obligated against the remaining annual amount of Obligation Authority still available to that state. The state then pays the amounts owed under each contract as the work progresses and receives reimbursement from the federal government for the federal share of the total costs. The aggregate amount of reimbursements received by a state in any year is not necessarily equal to the state’s apportionment for that year. Many projects and contracts extend over several years. The aggregate amount made available to a state in any one year, if fully obligated, may be received as reimbursement over a longer period of time relating to the actual period of construction. MDOT expects that, as a result of its extensive statewide road and bridge program, it will have sufficient federally-eligible project expenditures to be able to utilize all program assistance that may be made available to Mississippi.
Revenue ReceivedMDOT’s total revenue for FY 2014 was $1.184 billion. State motor fuel taxes and federal funds provided 72.4 percent of the Department’s funding for FY 2014. MDOT received $286.2 million in funds from state motor fuel taxes during this reporting period. As stated above, the state motor fuel tax is a primary funding source for the Department. Revenue from other state taxes for FY 2014 included the following:
• Truck & Bus Taxes/Fees $67.1 million
• Contractor’s Tax $4.0 million
• Railroad Mileage Tax $0.2 million
• Tag Fees $15.4 million
FHWA Emergency Relief Funds: MDOT has been appropriated a total of $1.057 billion in FHWA Emergency Relief funds to rebuild infrastructure along the Gulf Coast and remove debris from roadways throughout the state following Hurricane Katrina. MDOT received reimbursements from the FHWA of $17.9 million in FY 2011, $7.8 million in FY2012, $2.7 million in FY2013 and $2.9 million in FY2014 for Emergency Relief projects. These reimbursements should essentially conclude emergency funding relating to Hurricane Katrina.
American Recovery and Reinvestment Act (ARRA) of 2009: Under this Act, passed by Congress in February 2009, MDOT was apportioned $372 million in stimulus funds from the FHWA and the FTA to be spent on highway construction and public transit projects. MDOT spent $224.2 million in FY 2010, $98.7 million in FY 2011, $12.1 million in FY2012, $3.3 million in FY 2013 and $7.0 million in FY2014 on ARRA projects.
MDOT Annual Report FY 201418
Actual ExpendituresMDOT’s actual expenditures for FY 2014 totaled $1.16 billion. As shown below, the large majority of the Department’s expenditures were focused in the Construction Program (dollar amounts are in millions):
Maintenance Program
*Construction Program
Administration Program
Equipment & Buildings
Debt Service Program
Enforcement Program
Aeronautics, Rails, and Transit Programs
TOTALS
*Construction includes $420,782,192 of system preservation and infrastructure repair.
Bonded DebtState statutes provided authority for the issuance of $200 million in bonds for the Four-Lane Highway Program and $325 million in bonds for the Gaming Roads Program. The State Bond Commission has issued bonds for these programs as follows:
1987 Four-Lane Highway Program
• June 1999: $200 million in 10-year revenue bonds. This bond issue was retired in 2009.
Gaming Roads Program
• July 1998: $125 million in 20-year general obligation bonds.
• October 2000: $100 million in one-year general obligation notes.
• October 2002: The State Bond Commission issued $200 million in general obligation bonds to retire the outstanding $100 million in general obligation notes and to provide $100 million for new Gaming Roads Program construction.
$193.8
$807.2
$31.2
$16.3
$67.8
$13.8
$33.3
$1,163.4
16.6%
69.4%
2.7%
1.4%
5.8%
1.2%
2.9%
100%
H.E.L.P. Program
Under the H.E.L.P. statute (Highway Enhancement through Local Partnerships), MDOT, through the Mississippi Development Bank and local partners, has issued:
• January 2005: $45 million in special obligation bonds for the paving portion of I-69/SR 304 in Tunica County.
• October 2005: $102 million for a portion of Harrison County State Route 601/Canal Road.
• October 2005: $32 million in the city of Laurel for the I-59 S-Curve.
• October 2006: $145 million for the Madison County I-55 interchange, connectors, and frontage roads.
• October 2007: $83 million for a portion of I-269 in Marshall and DeSoto counties.
• August 2009: $72.8 million to continue the Harrison County State Route 601/Canal Road project.
• March 2010: $161.1 million to continue the DeSoto County I-269 project.
• October 2012: $163 million to continue the Marshall County I-269 project.
• June 2014: $82.94 million to continue the Desoto County I-269 project.
FY 2015 Projected Revenues & ExpendituresMDOT’s budgeted expenditures (as appropriated by the Mississippi Legislature) for FY 2015 are $927.4 million, while estimated revenues are $927 million.
fiscal year
2014 Annual Report Addendum
Automobile Operating CostsMaintenance ExpendituresConstruction Expenditures
Contracts Awarded
Requester: JETHRIDGEReport ID: DR000132
Vehicle MfgVehicleNumber
Original OperatingCost Miles
FYCost
MilePer
Disposed
Page 1 of 411/03/2014 02:48:50 pm
MS DEPARTMENT OF TRANSPORTATIONAutomobile Operating Costs
Fiscal Year: 2014
Cost
FORD 01-00011 4,282 18,408 0.2325,681
CHEV 01-00013 2,414 13,804 0.1715,178
FORD 01-00014 4,498 20,784 0.2220,086
FORD 01-00015 6,924 20,713 0.3320,070
FORD 01-00016 6,833 23,859 0.2920,070
FORD 01-00017 0 0 0.00 11/21/201320,070
FORD 01-00018 8,867 19,066 0.4720,070
FORD 01-00019 3,934 16,398 0.2420,070
FORD 01-00020 0 0 0.00 11/21/201320,070
FORD 01-00021 6,915 18,171 0.3820,070
FORD 01-00022 4,205 17,791 0.2420,070
FORD 01-00023 5,044 17,510 0.2920,070
FORD 01-00024 5,752 20,006 0.2920,070
FORD 01-00025 0 0 0.0020,070
FORD 01-00026 0 0 0.00 04/18/201420,070
FORD 01-00027 11,434 24,065 0.4820,070
DG 01-00029 2,081 10,611 0.2014,347
CHEV 01-00030 1,572 9,917 0.1614,990
FORD 01-00031 4,045 12,231 0.3320,070
FORD 01-00032 6,174 24,846 0.2520,070
FORD 01-00033 7,530 21,633 0.3520,070
CHEV 01-00035 2,425 17,844 0.1415,800
CHEV 01-00036 2,261 15,847 0.1415,800
CHEV 01-00037 2,883 17,207 0.1715,800
CHEV 01-00038 2,081 15,600 0.1315,800
CHEV 01-00039 2,262 17,127 0.1315,800
CHEV 01-00040 2,429 15,342 0.1615,800
CHEV 01-00041 1,872 14,327 0.1315,800
CHEV 01-00042 2,187 14,150 0.1515,800
CHEV 01-00043 1,726 12,557 0.1415,800
CHEV 01-00044 2,910 16,758 0.1715,800
FORD 01-00045 4,660 16,873 0.2820,070
FORD 01-00046 8,462 24,770 0.3420,070
FORD 01-00047 5,792 17,439 0.3320,070
FORD 01-00048 10,416 28,208 0.3720,070
FORD 01-00049 11,034 34,961 0.3220,070
FORD 01-00050 5,931 22,095 0.2720,070
FORD 01-00051 6,664 23,930 0.2820,070
FORD 01-00052 9,013 18,989 0.4720,070
FORD 01-00053 4,008 13,407 0.3020,070
FORD 01-00054 13,225 27,926 0.4720,070
FORD 01-00055 7,552 25,163 0.3020,070
CHEV 01-00056 1,661 12,898 0.1315,413
CHEV 01-00057 2,111 12,655 0.1715,413
CHEV 01-00058 1,507 11,830 0.1315,413
Excludes vehicles disposed prior to 07/01/2013 dw_automobile_oper_cost
Requester: JETHRIDGEReport ID: DR000132
Vehicle MfgVehicleNumber
Original OperatingCost Miles
FYCost
MilePer
Disposed
Page 2 of 411/03/2014 02:48:50 pm
MS DEPARTMENT OF TRANSPORTATIONAutomobile Operating Costs
Fiscal Year: 2014
Cost
CHEV 01-00059 1,702 13,869 0.1215,413
CHEV 01-00060 2,421 11,158 0.2215,413
CHEV 01-00061 2,857 14,184 0.2015,413
CHEV 01-00062 2,029 11,581 0.1815,413
FORD 01-00063 4,843 25,393 0.1920,412
CHEV 01-00064 4,235 20,932 0.2015,579
CHEV 01-00065 2,348 12,013 0.2015,579
CHEV 01-00066 0 0 0.0015,579
CHEV 01-00067 2,794 12,592 0.2215,579
CHEV 01-00068 2,563 14,660 0.1715,579
CHEV 01-00069 1,830 11,743 0.1615,579
CHEV 01-00070 2,482 14,871 0.1715,579
CHEV 01-00071 2,251 14,598 0.1515,579
CHEV 01-00072 2,724 17,278 0.1615,579
CHEV 01-00073 1,778 12,870 0.1415,579
CHEV 01-00074 3,461 13,052 0.2715,579
CHEV 01-00075 2,743 16,575 0.1715,579
CHEV 01-00076 3,477 15,050 0.2315,579
CHEV 01-00077 2,874 12,412 0.2315,579
CHEV 01-00078 2,643 15,505 0.1715,579
CHEV 01-00079 2,111 15,838 0.1315,579
FORD 01-00080 8,008 23,910 0.3321,295
FORD 01-00081 9,212 31,980 0.2921,295
FORD 01-00085 10,619 33,897 0.3121,295
FORD 01-00086 8,611 24,893 0.3521,295
FORD 01-00087 4,658 21,863 0.2121,295
FORD 01-00088 1,735 3,683 0.4720,688
FORD 01-00089 8,549 24,664 0.3521,295
FORD 01-00090 5,862 23,087 0.2521,295
FORD 01-00091 6,874 25,793 0.2721,295
FORD 01-00092 953 2,713 0.3521,295
FORD 01-00093 5,802 16,891 0.3421,295
FORD 01-00094 5,035 23,011 0.2221,295
FORD 01-00095 8,565 27,836 0.3121,295
FORD 01-00096 5,766 21,767 0.2621,295
CHEV 01-00097 2,261 15,412 0.1517,291
CHEV 01-00098 1,886 13,097 0.1417,291
CHEV 01-00099 5,480 23,584 0.2317,291
CHEV 01-00100 1,993 14,125 0.1417,291
DG 01-00101 3,002 16,240 0.1816,475
DG 01-00102 1,902 14,467 0.1316,475
DG 01-00103 2,414 14,949 0.1616,475
FORD 01-00104 1,279 3,388 0.3823,276
FORD 01-00105 5,001 25,704 0.1923,276
FORD 01-00106 10,002 16,170 0.6223,276
Excludes vehicles disposed prior to 07/01/2013 dw_automobile_oper_cost
Requester: JETHRIDGEReport ID: DR000132
Vehicle MfgVehicleNumber
Original OperatingCost Miles
FYCost
MilePer
Disposed
Page 3 of 411/03/2014 02:48:50 pm
MS DEPARTMENT OF TRANSPORTATIONAutomobile Operating Costs
Fiscal Year: 2014
Cost
CHEV 01-00107 1,925 11,329 0.1717,723
CHEV 01-00108 1,374 9,952 0.1417,723
FORD 01-00109 5,326 20,126 0.2621,365
FORD 01-00110 8,844 28,664 0.3121,365
FORD 01-00111 5,600 19,637 0.2921,365
CHEV 01-00112 2,290 13,145 0.1717,291
CHEV 01-00113 1,656 13,241 0.1317,291
CHEV 01-00114 1,849 14,847 0.1217,291
CHEV 01-00115 2,465 14,391 0.1717,291
CHEV 01-00116 1,953 11,656 0.1717,291
CHEV 01-00117 1,448 10,369 0.1417,291
CHEV 01-00118 2,573 12,887 0.2017,291
CHEV 01-00119 2,459 18,340 0.1317,291
CHEV 01-00120 2,129 14,345 0.1517,291
CHEV 01-00121 2,643 17,500 0.1517,291
CHEV 01-00122 750 6,033 0.1217,291
CHEV 01-00123 1,359 6,018 0.2317,291
CHEV 01-00124 1,700 14,144 0.1217,291
CHEV 01-00125 2,373 17,899 0.1317,291
CHEV 01-00126 3,155 18,460 0.1717,291
CHEV 01-00127 1,013 4,761 0.2117,291
CHEV 01-00128 4,329 28,143 0.1517,291
CHEV 01-00129 2,172 15,257 0.1417,291
CHEV 01-00130 2,208 18,644 0.1217,291
CHEV 01-00131 1,023 8,362 0.1217,291
CHEV 01-00132 2,370 15,079 0.1617,291
CHEV 01-00133 2,473 21,897 0.1117,291
CHEV 01-00134 2,225 16,239 0.1417,555
DG 01-00135 6,906 29,644 0.2322,263
CHEV 01-00136 1,489 8,974 0.1717,555
CHEV 01-00137 2,262 19,982 0.1117,555
CHEV 01-00138 2,144 16,159 0.1317,555
CHEV 01-00139 709 5,573 0.1317,945
CHEV 01-00140 294 1,471 0.2026,569
FORD 01-08382 1,883 8,995 0.2119,496
FORD 01-10307 5,204 15,645 0.3320,219
FORD 01-10511 0 0 0.00 11/21/201320,219
FORD 01-10512 1,532 877 1.75 11/21/201320,219
FORD 01-10520 0 0 0.00 11/21/201320,219
FORD 01-10627 5,379 16,226 0.3321,193
FORD 01-10893 2,721 10,608 0.2619,734
FORD 01-11111 3,410 16,335 0.2120,219
FORD 01-11114 158 0 0.00 11/21/201320,219
FORD 01-11115 8,378 16,543 0.5120,219
FORD 01-11117 1,664 3,498 0.4820,219
Excludes vehicles disposed prior to 07/01/2013 dw_automobile_oper_cost
Requester: JETHRIDGEReport ID: DR000132
Vehicle MfgVehicleNumber
Original OperatingCost Miles
FYCost
MilePer
Disposed
Page 4 of 411/03/2014 02:48:50 pm
MS DEPARTMENT OF TRANSPORTATIONAutomobile Operating Costs
Fiscal Year: 2014
Cost
FORD 01-11118 5,547 17,934 0.3120,219
FORD 01-11120 383 1,016 0.38 11/21/201320,219
FORD 01-11170 544 5,604 0.10 03/11/201412,669
FORD 01-11441 1,601 8,551 0.1911,676
FORD 01-11472 2,093 14,305 0.1511,676
FORD 01-11780 0 0 0.00 11/21/201320,219
FORD 01-11781 3,350 14,535 0.2320,219
FORD 01-11782 7,294 28,697 0.2520,219
FORD 01-11784 1,438 4,644 0.3120,219
FORD 01-11785 7,268 25,390 0.2920,219
FORD 01-11954 4,470 8,654 0.5220,219
FORD 01-11955 8,908 18,697 0.4820,219
FORD 01-11956 6,041 18,188 0.3320,219
FORD 01-11957 899 3,746 0.24 11/21/201320,219
FORD 01-11958 3,043 12,186 0.2520,219
FORD 01-11959 8,619 23,753 0.3620,219
Excludes vehicles disposed prior to 07/01/2013 dw_automobile_oper_cost
Requester: MHAYDEN Page 1 of 2Report ID: DR000147 11/03/2014 03:07:58 pmMaintenance Expenditures by County
MS DEPARTMENT OF TRANSPORTATION
CostMiles Cost Per Mile
Fiscal Year: 2014
County
11,284.48616,838.2154.66Adams10,098.96952,672.5494.33Alcorn4,238.35661,665.42156.11Amite1,475.20299,857.00203.27Attala2,367.35241,064.46101.83 Benton
755.38148,606.61196.73 Bolivar1,209.49152,005.92125.68 Calhoun4,053.20538,365.86132.83 Carroll1,832.29234,582.71128.03 Chickasaw
731.3260,908.4283.29 Choctaw2,711.36185,910.3268.57 Claiborne6,988.501,117,645.86159.93 Clarke2,367.94199,179.9284.12 Clay
0.000.00143.19Coahoma776.05113,768.80146.60 Copiah
5,591.07755,737.98135.17 Covington0.000.00209.98Desoto
12,534.331,487,643.40118.69 Forrest553.4045,048.0781.40 Franklin
5,479.11636,842.85116.23 George9,183.521,189,637.92129.54 Greene
611.5758,783.2396.12 Grenada18,119.211,736,318.5495.83 Hancock20,765.103,106,593.31149.61 Harrison16,575.433,067,053.12185.04 Hinds1,647.21259,041.37157.26 Holmes
0.000.0095.60Humphreys1,125.4370,922.7063.02 Issaquena6,692.601,104,763.09165.07 Itawamba
10,856.841,751,102.06161.29 Jackson4,967.13790,651.30159.18 Jasper
0.000.00101.83Jefferson4,638.52448,870.4296.77 Jefferson_Davis9,071.321,914,540.76211.05 Jones3,949.67596,976.38151.15 Kemper2,774.48412,518.50148.68 Lafayette8,212.64953,893.69116.15 Lamar8,362.491,910,864.34228.50 Lauderdale5,549.30690,852.77124.49 Lawrence3,689.86635,378.90172.20 Leake9,970.851,888,663.27189.42 Lee3,322.27370,397.81111.49 Leflore8,793.831,067,760.95121.42 Lincoln8,107.701,285,408.05158.54 Lowndes6,835.441,280,580.21187.34 Madison7,428.20918,705.02123.68 Marion3,237.87706,694.91218.26 Marshall2,895.27661,262.86228.39 Monroe3,981.40421,510.53105.87 Montgomery1,430.24269,464.67188.40 Neshoba1,064.03166,851.43156.81 Newton3,720.55453,249.48121.82 Noxubee2,213.12384,546.70173.76 Oktibbeha4,847.71849,830.59175.31 Panola6,575.241,219,690.33185.50 Pearl_River
dw_costs_per_mile_by_county
Requester: MHAYDEN Page 2 of 2Report ID: DR000147 11/03/2014 03:07:58 pmMaintenance Expenditures by County
MS DEPARTMENT OF TRANSPORTATION
CostMiles Cost Per Mile
Fiscal Year: 2014
County
5,919.82643,351.31108.68 Perry14,508.552,250,577.12155.12 Pike1,627.96347,151.50213.24 Pontotoc1,778.59250,895.67141.06 Prentiss3,135.47263,121.6783.92 Quitman8,859.882,425,471.79273.76 Rankin6,649.361,138,812.84171.27 Scott
0.000.0066.00Sharkey6,313.231,163,190.39184.25 Simpson9,696.541,563,141.33161.21 Smith7,495.17513,078.2368.45 Stone3,596.81499,463.95138.86 Sunflower1,373.71144,640.91105.29 Tallahatchie1,716.21142,862.0683.24 Tate2,586.97287,693.50111.21 Tippah3,912.29462,310.72118.17 Tishomingo1,272.9091,259.4571.69 Tunica3,347.69530,772.08158.55 Union
903.1496,094.04106.40 Walthall6,726.65631,731.3293.91 Warren8,366.281,591,635.90190.24 Washington6,408.60920,499.94143.64 Wayne1,505.46119,762.4879.55 Webster
11,157.45995,715.2189.24 Wilkinson2,003.51353,573.41176.48 Winston5,670.77747,545.44131.82 Yalobusha2,105.46389,367.07184.93 Yazoo
Report Totals: 5,230.5559,655,442.8959,655,442.8911,405.20
dw_costs_per_mile_by_county
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Alco
rn**
****
****
****
*
3051
64R
epai
r Pro
ject
sU
S 4
5 B
R #
270
.4B
ALC
OR
N C
O B
RID
GE
RA
IL B
Y S
TATE
FO
RC
ES
4,10
3.40
4,10
3.40
CO
N30
1000
/
Cou
nty
Tota
l4,
103.
40
****
****
****
***
Amite
****
****
****
***
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L A
MIT
E C
O3,
528.
0047
,410
.58
3030
00/
3047
06P
roje
cts-
Oth
erS
R 5
67 F
RO
M IN
TER
SE
CTI
ON
OF
SR
24
NO
RTH
15.
6 M
ILE
S T
O E
OM
485,
365.
9448
5,36
5.94
CO
N30
1000
/
3051
53R
epai
r Pro
ject
sS
R 5
84 -
Am
ite C
ount
y - 2
00' s
outh
of i
nter
sect
ion
with
Gre
ensb
urg
Rd,
Tra
ffic
Con
trol,
Gua
rdra
il &
Sig
n R
epai
r. W
ork
to d
one
by S
tate
For
ces.
1,69
9.28
1,69
9.28
CO
N30
1000
/
Cou
nty
Tota
l49
0,59
3.22
****
****
****
***
Ben
ton
****
****
****
***
3049
15R
epai
r Pro
ject
sU
S78
@ B
RID
GE
# 4
6.9
BE
NTO
N C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,81
4.90
1,81
4.90
CO
N30
1000
/
Cou
nty
Tota
l1,
814.
90
****
****
****
***
Bol
ivar
****
****
****
***
3051
34R
epai
r Pro
ject
sU
S 6
1 B
OLI
VAR
CO
SIG
NA
L R
EPA
IR IN
SH
AW B
Y S
TATE
FO
RC
ES
2,94
1.33
2,94
1.33
CO
N30
1000
/
Cou
nty
Tota
l2,
941.
33
****
****
****
***
Cal
houn
****
****
****
***
3049
98R
epai
r Pro
ject
sS
R8&
9 B
R 4
0.9
CA
LHO
UN
CO
BR
IDG
ER
AIL
AN
D G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
3,43
6.33
3,43
6.33
CO
N30
1000
/
Cou
nty
Tota
l3,
436.
33
****
****
****
***
Car
roll
****
****
****
***
3044
99R
epai
r Pro
ject
sS
R 1
7 C
arro
llCo
Gua
rdra
il @
BR
# 66
.4 -
at C
.R. 1
42 in
ters
ectio
n. W
ork
will
be
perfo
rmed
by
Sta
te F
orce
s.2,
211.
512,
211.
51C
ON
3010
00/
3046
02P
roje
cts-
Oth
erS
eal,
Hw
y 35
349,
193.
6935
2,45
5.16
CO
N30
1000
/
3049
17R
epai
r Pro
ject
sI-5
5 @
BR
# 17
7.5A
CA
RR
OLL
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S3,
346.
163,
346.
16C
ON
3010
00/
3049
20R
epai
r Pro
ject
sI-5
5 1.
22 M
I S O
F E
X 19
5 C
AR
RO
LL C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,61
2.45
2,61
2.45
CO
N30
1000
/
3050
13R
epai
r Pro
ject
sI-5
5 1.
4 M
ILE
S N
OF
VAID
EN
EX
174
CA
RR
OLL
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
242.
382,
242.
38C
ON
3010
00/
Cou
nty
Tota
l35
9,60
6.19
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 2
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Chi
ckas
aw**
****
****
****
*
3047
97P
roje
cts-
Oth
erS
R 4
1 FM
SR
32
TO P
ON
TOTO
C C
O. L
N.
605,
568.
7860
5,56
8.78
CO
N30
1000
/
Cou
nty
Tota
l60
5,56
8.78
****
****
****
***
Cla
ibor
ne**
****
****
****
*
3045
99U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
3 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L C
LAIB
OR
NE
CO
see
106
509-
311
7,12
9.24
7,12
9.24
3110
00/
Cou
nty
Tota
l7,
129.
24
****
****
****
***
Cla
rke
****
****
****
***
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sC
LAR
KE
CO
HU
RR
ISA
AC
DIS
T 6
DE
BR
IS R
EM
OVA
L 1S
T PA
SS
(see
106
534)
-33,
069.
470.
0031
2000
/
3049
13R
epai
r Pro
ject
sS
R 1
1 C
LAR
KE
CO
GU
AR
DR
AIL
4 M
I N O
F E
NTE
RP
RIS
E B
Y S
TATE
FO
RC
ES
836.
0983
6.09
CO
N30
1000
/
3052
48U
nusu
al o
r Dis
aste
r Pro
ject
sC
LAR
KE
CO
TO
RN
AD
O D
AM
AG
E3,
812.
003,
812.
0031
2000
/
3052
98R
epai
r Pro
ject
sI-5
9 S
B @
EX
134
CLA
RK
E C
O G
UA
RD
RA
IL &
CO
NC
RE
TE B
RID
GE
RA
IL B
Y S
TATE
FO
RC
ES 4,
674.
014,
674.
01C
ON
3010
00/
Cou
nty
Tota
l-2
3,74
7.37
****
****
****
***
Coa
hom
a**
****
****
****
*
3047
61R
epai
r Pro
ject
sU
S 4
9 C
OA
HO
MA
CO
UN
TY G
UA
RD
RA
IL W
-MS
1 B
Y S
TATE
FO
RC
ES
7,41
2.87
7,41
2.87
CO
N30
1000
/
3048
22P
roje
cts-
Oth
erS
R 1
61 S
unflo
wer
Riv
er to
Byp
ass
2,09
8.03
2,09
8.03
CO
N30
1000
/
3050
55R
epai
r Pro
ject
sU
S 4
9 @
BR
IDG
E #
336
.8 C
OA
HO
MA
CO
BR
IDG
ER
AIL
AN
D G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
10,1
73.4
110
,173
.41
CO
N30
1000
/
Cou
nty
Tota
l19
,684
.31
****
****
****
***
Cop
iah
****
****
****
***
3046
52R
epai
r Pro
ject
sI-5
5 C
OP
IAH
CO
SIG
N @
MM
60.
WO
RK
WIL
L B
E P
ER
FOR
ME
D B
Y S
TATE
FO
RC
ES
.58
6.45
586.
45C
ON
3010
00/
3047
46R
epai
r Pro
ject
sI-5
5 N
/B C
OP
IAH
CO
UN
TY O
VE
RPA
SS
GA
LLM
AN
RD
BR
IDG
E R
EPA
IR B
Y C
ON
TRA
CT
FOR
CE
S17
,050
.00
17,0
50.0
0C
ON
3010
00/
3050
96P
roje
cts-
Oth
erS
R 2
7 FR
OM
I-55
TO
HIN
DS
CL
879,
758.
1387
9,75
8.13
CO
N30
1000
/
3052
64R
epai
r Pro
ject
sI-5
5 S
@ E
X 51
CO
PIA
H C
O L
IGH
TPO
LE2,
436.
002,
436.
00C
ON
3010
00/
Cou
nty
Tota
l89
9,83
0.58
****
****
****
***
Cov
ingt
on**
****
****
****
*
3042
91P
roje
cts-
Oth
erU
S 4
9 FR
OM
JU
ST
NO
RTH
OF
THE
INTE
RS
EC
TIO
N O
F U
S 8
4 &
US
49
IN C
OLL
INS
NO
RTH
7.2
MIL
ES
TO
JU
ST
SO
UTH
OF
MO
UN
T O
LIV
E (S
OU
THB
OU
ND
ON
LY)
19,0
56.0
02,
998,
763.
80C
ON
3010
00/
3045
68U
nusu
al o
r Dis
aste
r Pro
ject
sC
OV
ING
TON
CO
HU
RR
ISA
AC
DIS
T 7
EM
ER
GE
NC
Y O
PE
RAT
ION
S E
R 1
0655
2-2
20.0
00.
0031
6000
/
3046
98P
roje
cts-
Oth
erS
R 3
7 FR
OM
US
84
NO
RTH
7.9
MIL
ES
TO
SM
ITH
CL
1,71
2,04
0.66
1,72
0,28
5.26
CO
N30
1000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 3
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Cov
ingt
on**
****
****
****
*
3047
00P
roje
cts-
Oth
erU
S 4
9 FR
OM
SR
598
NO
RTH
9.3
MIL
ES
TO
JU
ST
SO
UTH
OF
KO
LA R
OA
D (S
B L
N O
NLY
) 1,80
2,63
0.99
1,80
2,63
0.99
CO
N30
1000
/
3049
78R
epai
r Pro
ject
sU
S 4
9 S
IGN
AL
0.25
MI N
OF
SR
590
CO
V C
O B
Y S
TATE
FO
RC
ES
3,85
9.22
3,85
9.22
CO
N30
1000
/
3050
04R
epai
r Pro
ject
sU
S49
S O
F C
OLL
INS
CO
VIN
GTO
N C
O T
RA
FFIC
CO
NTR
OL
& C
LEA
NU
P B
Y S
TATE
FO
RC
ES
520.
6052
0.60
CO
N30
1000
/
3050
86R
epai
r Pro
ject
sU
S 4
9 S
NE
AR
KE
LLY
GR
EE
N R
D C
OV
ING
TON
CO
TR
AFF
IC C
ON
TRO
L A
ND
CLE
AN
UP
BY
STA
TE F
OR
CE
S1,
793.
221,
793.
22C
ON
3010
00/
3051
92R
epai
r Pro
ject
sU
S 8
4 @
US
49
CO
VIN
GTO
N C
O G
UA
RD
RA
IL R
EPA
IR B
Y S
TATE
FO
RC
ES
4,02
3.18
4,02
3.18
CO
N30
1000
/
3051
93R
epai
r Pro
ject
sU
S 8
4 N
EA
R D
AN
EA
STE
RLI
NG
RD
CO
VIN
GTO
N C
O G
UA
RD
RA
IL R
EPA
IR B
Y S
TATE
FO
RC
ES
3,45
1.88
3,45
1.88
CO
N30
1000
/
Cou
nty
Tota
l3,
547,
155.
75
****
****
****
***
Des
oto
****
****
****
***
3046
74R
epai
r Pro
ject
sM
M 3
.1 U
S-7
8 D
ES
OTO
CO
UN
TY C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,47
4.50
1,47
4.50
CO
N30
1000
/
3046
75R
epai
r Pro
ject
sM
M 9
US
-78
DE
SO
TO C
OU
NTY
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
839.
001,
839.
00C
ON
3010
00/
3046
76R
epai
r Pro
ject
sM
M 9
.1 U
S-7
8 D
ES
OTO
CO
UN
TY C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
636.
0063
6.00
CO
N30
1000
/
3046
77R
epai
r Pro
ject
sM
M 8
.4 U
S-7
8 D
ES
OTO
CO
UN
TY C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
2,27
5.50
2,27
5.50
CO
N30
1000
/
3046
78R
epai
r Pro
ject
sM
M 5
.3 U
S-7
8 D
ES
OTO
CO
UN
TY C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
642.
0064
2.00
CO
N30
1000
/
3046
80R
epai
r Pro
ject
sM
M 2
78.9
I-55
DE
SO
TO C
OU
NTY
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
647.
001,
647.
00C
ON
3010
00/
3046
81R
epai
r Pro
ject
sM
M 2
79.1
I-55
DE
SO
TO C
OU
NTY
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
672.
501,
672.
50C
ON
3010
00/
3047
70R
epai
r Pro
ject
sI-5
5 D
ES
OTO
CO
CA
BLE
BA
RR
IER
@ M
M 2
75.9
BY
CO
NTR
AC
T FO
RC
ES
1,43
2.50
1,43
2.50
CO
N30
1000
/
3047
71R
epai
r Pro
ject
sI-5
5 D
ES
OTO
CO
CA
BLE
BA
RR
IER
@ M
M 2
77.1
BY
CO
NTR
AC
T FO
RC
ES
3,03
0.00
3,03
0.00
CO
N30
1000
/
3047
72R
epai
r Pro
ject
sI-5
5 D
ES
OTO
CO
CA
BLE
BA
RR
IER
@ M
M 2
78.9
BY
CO
NTR
AC
T FO
RC
ES
1,42
5.00
1,42
5.00
CO
N30
1000
/
3047
73R
epai
r Pro
ject
sI-5
5 D
ES
OTO
CO
@ M
M 2
80.1
BY
CO
NTR
AC
T FO
RC
ES
795.
0079
5.00
CO
N30
1000
/
3047
74R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
BA
RR
IER
MM
1.1
BY
CO
NTR
AC
T FO
RC
ES
1,45
2.00
1,45
2.00
CO
N30
1000
/
3047
75R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
UN
TY @
MM
5.5
BY
CO
NTR
AC
T FO
RC
ES
511.
5051
1.50
CO
N30
1000
/
3048
42R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
4.2
BY
CO
NTR
AC
T FO
RC
ES
5,76
6.00
5,76
6.00
CO
N30
1000
/
3048
43R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
4.4
BY
CO
NTR
AC
T FO
RC
ES
3,16
5.00
3,16
5.00
CO
N30
1000
/
3048
44R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
6.7
BY
CO
NTR
AC
T FO
RC
ES
5,65
1.50
5,65
1.50
CO
N30
1000
/
3048
45R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
6.9
BY
CO
NTR
AC
T FO
RC
ES
1,71
4.00
1,71
4.00
CO
N30
1000
/
3048
48R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
3.5
BY
CO
NTR
AC
T FO
RC
ES
1,32
9.00
1,32
9.00
CO
N30
1000
/
3048
49R
epai
r Pro
ject
sU
S 7
8 D
ES
OT
CO
CA
BLE
RA
IL @
MM
4.5
BY
CO
NTR
AC
T FO
RC
ES
4,42
5.00
4,42
5.00
CO
N30
1000
/
3048
50R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
5.2
BY
CO
NTR
AC
T FO
RC
ES
816.
0081
6.00
CO
N30
1000
/
3048
51R
epai
r Pro
ject
sU
S 7
8 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
6.7
BY
CO
NTR
AC
T FO
RC
ES
1,66
2.00
1,66
2.00
CO
N30
1000
/
3048
52R
epai
r Pro
ject
sI-5
5 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
275
.9 B
Y C
ON
TRA
CT
FOR
CE
S95
2.50
952.
50C
ON
3010
00/
3048
53R
epai
r Pro
ject
sI-6
9 D
ES
OTO
CO
CA
BLE
RA
IL @
MM
2.3
BY
CO
NTR
AC
T FO
RC
ES
2,35
5.00
2,35
5.00
CO
N30
1000
/
3049
28R
epai
r Pro
ject
sI-5
5 @
SLO
CU
M R
D D
ES
OTO
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S3,
216.
463,
216.
46C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 4
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Des
oto
****
****
****
***
3049
39R
epai
r Pro
ject
sI-5
5 @
EX
280
DE
SO
TO C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
3,18
9.10
3,18
9.10
CO
N30
1000
/
3049
40R
epai
r Pro
ject
sI-5
5 @
MM
276
.1 D
ES
OTO
CO
CA
BLE
BA
RR
IER
BY
CO
NTR
AC
T FO
RC
ES
1,75
5.00
1,75
5.00
CO
N30
1000
/
3049
41R
epai
r Pro
ject
sI-5
5 @
MM
279
DE
SO
TO C
O C
AB
LER
AIL
825.
0082
5.00
CO
N30
1000
/
3049
42R
epai
r Pro
ject
sU
S 7
8 @
MM
5.7
DE
SO
TO C
O C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,63
9.00
1,63
9.00
CO
N30
1000
/
3049
43R
epai
r Pro
ject
sU
S 7
8 @
MM
9.1
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
4,44
7.50
4,44
7.50
CO
N30
1000
/
3049
44R
epai
r Pro
ject
sU
S 7
8 @
MM
9.2
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,74
0.00
1,74
0.00
CO
N30
1000
/
3049
49R
epai
r Pro
ject
sI-5
5 @
MM
275
.5 D
ES
OTO
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
300.
002,
300.
00C
ON
3010
00/
3050
25R
epai
r Pro
ject
sI-6
9 @
MM
2.4
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,42
5.00
1,42
5.00
CO
N30
1000
/
3050
26R
epai
r Pro
ject
sI-6
9 @
MM
11.
2 D
ES
OTO
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
137.
502,
137.
50C
ON
3010
00/
3050
27R
epai
r Pro
ject
sI-5
5 @
MM
275
.7 D
ES
OTO
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S95
1.00
951.
00C
ON
3010
00/
3050
28R
epai
r Pro
ject
sI-5
5 @
MM
276
.9 D
ES
OTO
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S98
7.00
987.
00C
ON
3010
00/
3050
29R
epai
r Pro
ject
sI-5
5 @
MM
277
.8 D
ES
OTO
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
285.
501,
285.
50C
ON
3010
00/
3050
30R
epai
r Pro
ject
sI-5
5 @
MM
278
.9 D
ES
OTO
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S3,
921.
003,
921.
00C
ON
3010
00/
3050
31R
epai
r Pro
ject
sI-5
5 @
MM
279
.8 D
ES
OT
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
675.
501,
675.
50C
ON
3010
00/
3050
32R
epai
r Pro
ject
sU
S 7
8 @
MM
6.3
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
957.
0095
7.00
CO
N30
1000
/
3050
33R
epai
r Pro
ject
sU
S 7
8 @
MM
7.4
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,45
8.00
1,45
8.00
CO
N30
1000
/
3050
34R
epai
r Pro
ject
sU
S 7
8 @
MM
9.0
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
3,12
3.00
3,12
3.00
CO
N30
1000
/
3050
39R
epai
r Pro
ject
sU
S 7
8 @
MM
0.3
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,46
7.00
1,46
7.00
CO
N30
1000
/
3050
40R
epai
r Pro
ject
sU
S 7
8 @
MM
3.3
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,44
0.00
1,44
0.00
CO
N30
1000
/
3050
41R
epai
r Pro
ject
sI-5
5 @
MM
276
DE
SO
TO C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
637.
0063
7.00
CO
N30
1000
/
Cou
nty
Tota
l87
,245
.06
****
****
****
***
Forr
est
****
****
****
***
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sFO
RR
ES
T C
O H
UR
R IS
AA
C D
IST
6 D
EB
RIS
RE
MO
VAL
1ST
PAS
-4,5
88.6
10.
0031
8000
/
3048
13P
roje
cts-
Oth
erU
S 1
1 fro
m L
eaf R
iver
Brid
ge to
Wes
t 1st
Stre
et56
9,74
3.05
569,
743.
05C
ON
3010
00/
3050
92R
epai
r Pro
ject
sU
S 4
9 M
DO
T H
EA
DQ
RTR
S F
OR
RE
ST
CO
FE
NC
E B
Y S
TATE
FO
RC
ES
1,12
5.00
1,12
5.00
CO
N30
1000
/
3053
01R
epai
r Pro
ject
sU
S 4
9 N
@ B
OU
IE R
IVE
R B
RID
GE
# 1
1040
FO
RR
ES
T C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
4,71
6.52
4,71
6.52
CO
N30
1000
/
Cou
nty
Tota
l57
0,99
5.96
****
****
****
***
Fran
klin
****
****
****
***
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L FR
AN
KLI
N C
O3,
292.
8044
,527
.75
3190
00/
Cou
nty
Tota
l3,
292.
80
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 5
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Geo
rge
****
****
****
***
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sG
EO
RG
E C
O H
UR
R IS
AA
C D
IST
6 D
EB
RIS
RE
MO
VAL
1ST
PAS
-9,9
58.6
10.
0032
0000
/
3051
87R
epai
r Pro
ject
sS
R26
.25
MI E
OF
SIN
GIN
G R
IVE
R B
R G
EO
RG
E C
O C
ON
CR
ETE
BR
IDG
E R
AIL
AN
D T
RA
FFIC
CO
NTR
OL
BY
STA
TE F
OR
CE
S4,
287.
894,
287.
89C
ON
3010
00/
Cou
nty
Tota
l-5
,670
.72
****
****
****
***
Gre
ene
****
****
****
***
3051
86P
roje
cts-
Oth
erS
R 5
7 G
eorg
e C
L to
198
(Ultr
a Th
in O
verla
y)13
,678
.13
13,6
78.1
3C
ON
3010
00/
Cou
nty
Tota
l13
,678
.13
****
****
****
***
Gre
nada
****
****
****
***
3046
02P
roje
cts-
Oth
erS
eal,
Hw
y 35
16
2,44
0.22
165,
594.
32C
ON
3020
00/
3048
23P
roje
cts-
Oth
erS
R 3
32 F
rom
US
51
to E
OS
M89
3,75
8.05
893,
758.
05C
ON
3010
00/
3048
62P
roje
cts-
Oth
erE
mer
genc
y D
rain
age
Cor
rect
ion
in G
rena
da b
y S
tate
For
ces
13,2
85.6
819
,730
.89
CO
N30
1000
/
3049
21R
epai
r Pro
ject
sI-5
5 @
CA
RR
OLL
TON
RD
GR
EN
AD
A C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,25
2.91
1,25
2.91
CO
N30
1000
/
3049
23R
epai
r Pro
ject
sI-5
5 @
BR
#207
.1 G
RE
NA
DA
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
473.
391,
473.
39C
ON
3010
00/
3050
10R
epai
r Pro
ject
sI-5
5 1.
3 M
I N O
F C
AM
P M
CC
AIN
RD
GR
EN
AD
A C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,17
8.04
1,17
8.04
CO
N30
1000
/
Cou
nty
Tota
l1,
073,
388.
29
****
****
****
***
Han
cock
****
****
****
***
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sH
AN
CO
CK
CO
HU
RR
ISA
AC
DIS
T 6
DE
BR
IS R
EM
OVA
L 1S
T PA
S-1
69,9
50.2
50.
0032
3000
/
3046
27U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R IS
AA
C S
IGN
AL
CA
BN
ETS
DIS
TRIC
T 6.
I-1
0 AT
603
SIG
NA
L C
ON
TRO
L C
AB
INE
T8,
291.
668,
291.
6630
1000
/
3050
71R
epai
r Pro
ject
sI-1
0 E
50'
E O
F M
M 1
4 H
AN
CO
CK
CO
CO
NC
RE
TE M
ED
IAN
BA
RR
IER
WA
LL R
EPA
IR B
Y S
TATE
FO
RC
ES
1,97
7.93
1,97
7.93
CO
N30
1000
/
3051
00R
epai
r Pro
ject
sI-1
0 @
MM
7 H
AN
CO
CK
CO
LA
NE
CLO
SU
RE
& M
M P
OS
T B
Y S
TATE
FO
RC
ES
642.
5864
2.58
CO
N30
1000
/
3051
69P
roje
cts-
Oth
erS
R 6
07 fr
om U
S 9
0 to
I-10
2,01
2,58
0.46
2,01
2,58
0.46
CO
N30
1000
/
Cou
nty
Tota
l1,
853,
542.
38
****
****
****
***
Har
rison
****
****
****
***
3041
62P
roje
cts-
Oth
erM
S 6
05 B
AS
CU
LE B
RID
GE
EM
ER
GE
NC
Y R
EPA
IR.
RE
PAIR
S T
O M
AN
UA
L O
VE
RID
E M
OD
E 1
TO
BE
PE
RFO
RM
ED
IMM
ED
IATL
Y3,
354.
6462
2,80
0.83
CO
N30
1000
/
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sH
AR
RIS
ON
CO
HU
RR
ISA
AC
DIS
T 6
DE
BR
IS R
EM
OVA
L 1S
T PA
S-2
82,6
47.6
60.
0032
4000
/
3045
94R
epai
r Pro
ject
sI-1
0W H
arris
onC
o C
able
Rai
l @ 1
00ft
from
Exi
t 31.
Wor
k w
ill b
e pe
rform
ed b
y a
Con
tract
or.
300.
0030
0.00
CO
N30
1000
/
3046
27U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R IS
AA
C S
IGN
AL
CA
BIN
ETS
DIS
TRIC
T 6.
US
90
BTW
ST
LEW
IS B
AY B
RID
GE
AN
D L
ON
G B
EA
CH
AT
5 LO
CAT
ION
S41
,448
.34
41,4
48.3
430
2000
/
3046
41R
epai
r Pro
ject
sI-1
0 H
AR
RIS
ON
CO
CA
BLE
RA
IL 0
.4M
I EA
ST
OF
CO
UN
TY F
AR
M R
D.
WO
RK
WIL
L B
E P
ER
FOR
ME
D B
Y A
CO
NTR
AC
TOR
.94
5.00
945.
00C
ON
3010
00/
3046
42R
epai
r Pro
ject
sI-1
10 S
B H
AR
RIS
ON
CO
CA
BLE
RA
IL 5
00FT
NO
RTH
OF
BIG
RID
GE
RD
. WO
RK
WIL
L B
E P
ER
FOR
ME
D B
Y A
CO
NTR
AC
TOR
.2,
205.
002,
205.
00C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 6
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Har
rison
****
****
****
***
3046
48R
epai
r Pro
ject
sI-1
0 H
AR
RIS
ON
CA
BLE
RA
IL 2
00' W
EXI
T 28
. W
OR
K W
ILL
BE
PE
RFO
RM
ED
BY
CO
NTR
AC
TOR
.1,
145.
001,
145.
00C
ON
3010
00/
3048
61R
epai
r Pro
ject
sI-1
0W H
AR
RIS
ON
CO
CA
BLE
RA
IL @
MM
31.
3 B
Y C
ON
TRA
CT
FOR
CE
S2,
520.
002,
520.
00C
ON
3010
00/
3049
01R
epai
r Pro
ject
sU
S 4
9 H
AR
RIS
ON
CO
CU
RB
RE
PAIR
BY
STA
TE F
OR
CE
S2,
444.
833,
594.
78C
ON
3010
00/
3049
76R
epai
r Pro
ject
sI-1
0 W
@ M
M 2
7.6
WO
LF R
IVE
R B
R H
AR
RIS
ON
CO
CO
NC
RE
TE B
AR
RIE
R W
ALL
BY
STA
TE F
OR
CE
S5,
692.
555,
692.
55C
ON
3010
00/
3050
21R
epai
r Pro
ject
sI-1
0 E
@ M
M 4
3.3
SE
CO
RN
ER
TC
HO
UTA
CA
BO
UFF
A B
RID
GE
HA
RR
ISO
N C
O G
UA
RD
RA
IL B
Y D
ISTR
ICT
FOR
CE
S39
0.00
390.
00C
ON
3010
00/
3050
84R
epai
r Pro
ject
sI-1
10 N
@ M
M 3
HA
RR
ISO
N C
O C
AB
LER
AIL
, ELE
C. B
OX,
FE
NC
E P
OS
T, &
BA
RB
WIR
E B
Y C
ON
TRA
CT
FOR
CE
S1,
250.
001,
250.
00C
ON
3010
00/
3050
98R
epai
r Pro
ject
sU
S 4
9 @
HA
RR
ISO
N C
EN
TRA
L S
CH
OO
L R
D H
AR
RIS
ON
CO
TR
AFF
IC S
IGN
AL
PO
LE B
Y S
TATE
FO
RC
ES
1,85
6.06
1,85
6.06
CO
N30
1000
/
3051
18R
epai
r Pro
ject
sI-1
10 S
@ M
M 4
.3 H
AR
RIS
ON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
102.
561,
102.
56C
ON
3010
00/
3051
72R
epai
r Pro
ject
sI-1
0 E
RA
MP
W O
F U
S 4
9 H
AR
RIS
ON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
780.
871,
780.
87C
ON
3010
00/
3052
30R
epai
r Pro
ject
sU
S 9
0 E
@ E
ISE
NH
OW
ER
DR
HA
RR
ISO
N C
O A
TTE
NU
ATO
R B
Y S
TATE
FO
RC
ES
3,32
5.52
3,32
5.52
CO
N30
1000
/
3052
41R
epai
r Pro
ject
sI-1
10 S
@ M
M 4
.1 H
AR
RIS
ON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
093.
451,
093.
45C
ON
3010
00/
Cou
nty
Tota
l-2
11,7
93.8
4
****
****
****
***
Hin
ds**
****
****
****
*
3047
55R
epai
r Pro
ject
sI-5
5 N
@ F
OR
TIFI
CAT
ION
HIN
DS
CO
UN
TY F
EN
CE
RE
PAIR
BY
CO
NTR
AC
T FO
RC
ES
1,75
9.11
3,64
6.46
CO
N30
1000
/
3047
56R
epai
r Pro
ject
sI-5
5 S
@ S
AVA
NN
AH
ST.
HIG
H M
AS
T LI
GH
T R
EPA
IR B
Y S
TATE
& C
ON
TRA
CT
FOR
CE
S13
,488
.57
13,6
25.3
2C
ON
3010
00/
3047
69R
epai
r Pro
ject
sI-2
0 W
@ M
M 4
1 H
IND
S C
O L
IGH
T P
OLE
BY
STA
TE F
OR
CE
S2,
101.
383,
259.
49C
ON
3010
00/
3048
89R
epai
r Pro
ject
sI-2
20 @
IND
US
TRIA
L D
R H
IND
S C
O A
TTE
NTU
ATO
R B
Y S
TATE
FO
RC
ES
78
.26
9,95
0.40
CO
N30
1000
/
3049
35R
epai
r Pro
ject
sI-2
20 B
/W M
M 6
.5 &
6.2
5 H
IND
S C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
2,97
0.95
3,03
3.65
CO
N30
1000
/
3049
36R
epai
r Pro
ject
sI-2
20 B
/W M
M 1
0.25
& 1
1.5
HIN
DS
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S87
9.47
882.
77C
ON
3010
00/
3049
56R
epai
r Pro
ject
sU
S 4
9 S
S O
F K
EN
NE
BR
EW
RD
HIN
DS
CO
GU
AR
D2,
268.
712,
268.
71C
ON
3010
00/
3049
71R
epai
r Pro
ject
sI-2
20 S
/B @
BR
1.8
A H
IND
S C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,33
9.23
2,33
9.23
CO
N30
1000
/
3049
80R
epai
r Pro
ject
sI-5
5 C
AB
LE R
AIL
BTW
BY
RA
M &
WY
NN
DA
LE R
D B
Y C
ON
TRA
CT
1,92
5.48
1,92
5.48
CO
N30
1000
/
3049
82R
epai
r Pro
ject
sI-2
20 C
AB
LER
AIL
@ M
M 4
.5 IN
DU
STR
IAL
DR
IVE
BY
CO
NTR
AC
T2,
455.
002,
455.
00C
ON
3010
00/
3049
83R
epai
r Pro
ject
sI-5
5 C
AB
LER
AIL
@ M
M 7
7 S
O O
F TE
RR
Y B
Y C
ON
TRA
CT
1,97
5.00
1,97
5.00
CO
N30
1000
/
3049
85P
roje
cts-
Oth
erH
IND
S C
O S
IGN
OV
ER
LAY
ON
I-55
, I-2
0 A
ND
I-22
0 B
Y TR
AFF
IC E
NG
INE
ER
ING
FO
RC
ES
83,1
92.9
183
,192
.91
CO
N30
1000
/
3050
03R
epai
r Pro
ject
sI-2
0 W
@ M
M 2
9 H
IND
S C
O D
IES
EL
SP
ILL
BY
STA
TE F
OR
CE
S78
2.25
782.
25C
ON
3010
00/
3050
20R
epai
r Pro
ject
sI-5
5 S
B/W
MM
85
& M
M 8
4 H
IND
S C
O C
AB
LER
AIL
BY
STA
TE &
CO
NTR
AC
T FO
RC
ES
146.
3514
6.35
CO
N30
1000
/
3050
62R
epai
r Pro
ject
sI-2
20 B
/W M
M5.
75 &
MM
6 H
IND
S C
O C
AB
LER
AIL
BY
CO
NTR
CAT
FO
RC
ES
1,34
5.00
1,34
5.00
CO
N30
1000
/
3050
74R
epai
r Pro
ject
sI-2
20 N
@ IN
DU
STR
IAL
DR
HIN
DS
CO
ATT
EN
UAT
OR
BY
STA
TE F
OR
CE
S34
9.53
349.
53C
ON
3010
00/
3050
94R
epai
r Pro
ject
sI-2
20 N
@ C
LIN
TON
BLV
D H
IND
S C
O C
AB
LER
AIL
, LIG
HT
PO
LE, &
GU
AR
DR
AIL
EN
D T
ER
MIN
AL
BY
STA
TE &
CO
NTR
AC
T FO
RC
ES
5,59
9.11
5,59
9.11
CO
N30
1000
/
3051
31R
epai
r Pro
ject
sI-2
0 W
@ M
M 2
3 H
IND
S C
O T
RA
FFIC
CO
NTR
OL,
ER
OS
ION
BE
AU
TIFI
CAT
ION
, & R
E-S
EE
DIN
G B
Y S
TATE
FO
RC
ES
1,09
8.63
1,09
8.63
CO
N30
1000
/
3051
46R
epai
r Pro
ject
sI-5
5 S
B/W
MM
82
& M
M 8
3 H
IND
S C
O C
AB
LER
AIL
BY
STA
TE F
OR
CE
S2,
605.
002,
605.
00C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 7
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Hin
ds**
****
****
****
*
3051
61R
epai
r Pro
ject
sI-2
20 S
@ M
M 3
.50
@ B
R 3
.2A
HIN
DS
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
250.
142,
250.
14C
ON
3010
00/
3051
62R
epai
r Pro
ject
sI-5
5 N
@ W
ATE
RW
OR
KS
CU
RV
E S
OU
TH O
F W
OO
DR
OW
WIL
SO
N H
IND
S C
OU
NTY
ATT
EN
TUAT
OR
BY
STA
TE F
OR
CE
S4,
483.
374,
483.
37C
ON
3010
00/
3051
78R
epai
r Pro
ject
sI-5
5 N
@ P
EA
RL
ST
EX
HIN
DS
CO
FE
NC
E R
EPA
IR B
Y C
ON
TRA
CT
FOR
CE
S98
8.46
988.
46C
ON
3010
00/
3051
96R
epai
r Pro
ject
sI-2
20 @
EX
2A H
IND
S C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,81
8.55
1,81
8.55
CO
N30
1000
/
3052
18R
epai
r Pro
ject
sI-5
5 S
@ E
LTO
N R
D H
IND
S C
O D
IES
EL
SP
ILL
CLE
AN
UP
BY
STA
TE F
OR
CE
S73
9.92
739.
92C
ON
3010
00/
3052
19R
epai
r Pro
ject
sI-2
20 @
EXI
T 8
HIN
DS
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
702.
752,
702.
75C
ON
3010
00/
3052
34R
epai
r Pro
ject
sI-2
0 E
@ B
RID
GE
#42
.6B
HIN
DS
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
143.
072,
143.
07C
ON
3010
00/
3052
50R
epai
r Pro
ject
sI-2
0 E
@ R
R B
RID
GE
HIN
DS
CO
DE
BR
IS C
LEA
NU
P B
Y S
TATE
FO
RC
ES
2,42
2.99
2,42
2.99
CO
N30
1000
/
3052
52R
epai
r Pro
ject
sI-2
20 N
@ M
M 7
HIN
DS
CO
LIG
HT
PO
LE B
Y S
TATE
FO
RC
ES
734.
1273
4.12
CO
N30
1000
/
3052
57R
epai
r Pro
ject
sI-2
0 E
@ M
M 3
9 H
IND
S C
O T
RA
FFIC
CO
NTR
OL
BY
STA
TE F
OR
CE
S58
2.56
582.
56C
ON
3010
00/
3052
69R
epai
r Pro
ject
sI-5
5 S
@ M
M 8
1 H
IND
S C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
133.
1213
3.12
CO
N30
1000
/
3052
70R
epai
r Pro
ject
sS
R 2
7 N
4.2
MI N
OF
SR
18
HIN
DS
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
028.
542,
028.
54C
ON
3010
00/
3053
04R
epai
r Pro
ject
sI-2
20 S
B, S
OF
CLI
NTO
N B
LVD
HIN
DS
CO
CA
BLE
RA
IL R
EPA
IR B
Y C
ON
TRA
CT
FOR
CE
S14
6.65
146.
65C
ON
3010
00/
Cou
nty
Tota
l14
8,53
4.18
****
****
****
***
Hol
mes
****
****
****
***
3050
36R
epai
r Pro
ject
sI-5
5 S
@ E
X 16
4 H
OLM
ES
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
483.
592,
483.
59C
ON
3010
00/
Cou
nty
Tota
l2,
483.
59
****
****
****
***
Hum
phre
ys**
****
****
****
*
3050
47R
epai
r Pro
ject
sU
S 4
9 W
@ C
AR
TER
RD
HU
MP
HR
EY
S C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,10
9.03
2,10
9.03
CO
N30
1000
/
Cou
nty
Tota
l2,
109.
03
****
****
****
***
Issa
quen
a**
****
****
****
*
3043
37P
roje
cts-
Oth
er
SR
14
FR M
AYE
RS
VIL
LE T
O T
HE
INTE
RS
EC
TIO
N O
F S
R 1
AN
D S
R 1
416
,351
.74
1,24
5,50
3.40
CO
N30
1000
/
Cou
nty
Tota
l16
,351
.74
****
****
****
***
Itaw
amba
****
****
****
***
3041
32P
roje
cts-
Oth
erS
R 1
78 F
M O
LD 2
5 TO
NE
AR
AL
STA
TE L
INE
49.9
91,
349,
073.
67C
ON
3010
00/
3047
98P
roje
cts-
Oth
erS
R 1
78 F
M L
EE
CO
. LN
. TO
SR
363
1,53
0,85
4.03
1,53
0,85
4.03
CO
N30
1000
/
3048
75R
epai
r Pro
ject
sU
S 7
8 IT
AWA
MB
A C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
2,37
0.00
2,37
0.00
CO
N30
1000
/
3049
74R
epai
r Pro
ject
sS
R 1
78 IT
AWA
MB
A C
O F
EN
CE
/SIG
N R
EPA
IR B
Y S
TATE
FO
RC
ES
1,13
3.40
1,13
3.40
CO
N30
1000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 8
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Itaw
amba
****
****
****
***
3050
63R
epai
r Pro
ject
sS
R 2
5 IT
AWA
MB
A C
O G
UA
RD
RA
IL B
/N 1
60.1
A B
Y S
TATE
FO
RC
ES
1,14
2.86
1,14
2.86
CO
N30
1000
/
3051
59R
epai
r Pro
ject
sU
S 7
8 1
MI W
OF
SR
25
ITAW
AM
BA
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S4,
258.
684,
258.
68C
ON
3010
00/
3052
44U
nusu
al o
r Dis
aste
r Pro
ject
sIT
AWA
MB
A C
O T
OR
NA
DO
DA
MA
GE
6,63
7.72
6,63
7.72
3290
00/
3052
66U
nusu
al o
r Dis
aste
r Pro
ject
sC
ON
TRA
CT
DE
BR
IS R
EM
OVA
L IT
AWA
MB
A C
O34
7,23
8.59
347,
238.
5930
1000
/
Cou
nty
Tota
l1,
893,
685.
27
****
****
****
***
Jack
son
****
****
****
***
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sJA
CK
SO
N C
O H
UR
R IS
AA
C D
IST
6 D
EB
RIS
RE
MO
VAL
1ST
PAS
-22,
503.
250.
0033
0000
/
3045
87U
nusu
al o
r Dis
aste
r Pro
ject
sS
R 6
09 D
RAW
BR
IDG
E M
OTO
R R
EPA
IR E
R 1
0652
1-30
1-1
52,5
76.0
00.
0030
1000
/
3046
27U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R IS
AA
C S
IGN
AL
CA
BN
ETS
DIS
TRIC
T 6.
SR
611
@ O
RC
HA
RD
RD
AN
D S
R 6
13 @
DA
NTZ
LER
SIG
NA
L C
AB
INE
TS7,
816.
007,
816.
0030
4000
/
3046
49R
epai
r Pro
ject
sI-1
0 JA
CK
SO
N C
O C
AB
LER
AIL
.25M
I E M
M75
. W
OR
K W
ILL
BE
PE
RFO
RM
ED
BY
A C
ON
TRA
CTO
R.
2,19
0.00
2,19
0.00
CO
N30
1000
/
3048
17P
roje
cts-
Oth
erS
R 6
13 fr
om H
wy
63 n
orth
to ra
ilroa
d cr
ossi
ng a
t Big
Poi
nt1,
634,
588.
151,
634,
588.
15C
ON
3010
00/
3052
33R
epai
r Pro
ject
sI-1
0 W
@ M
M 5
6 JA
CK
SO
N C
O C
LEA
N U
P B
Y S
TATE
FO
RC
ES
2,31
3.25
2,31
3.25
CO
N30
1000
/
Cou
nty
Tota
l1,
471,
828.
15
****
****
****
***
Jasp
er**
****
****
****
*
3048
10P
roje
cts-
Oth
erS
R 1
8 fro
m S
mith
CL
Eas
t 8.2
47 m
iles
2,66
4,99
6.58
2,66
4,99
6.58
CO
N30
1000
/
3048
14P
roje
cts-
Oth
erS
R 1
5 Fm
Jon
es C
L N
orth
2.4
88 M
iles
990,
231.
5599
0,23
1.55
CO
N30
2000
/
Cou
nty
Tota
l3,
655,
228.
13
****
****
****
***
Jeffe
rson
_Dav
is**
****
****
****
*
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L JE
FF D
AVIS
CO
3,29
2.80
39,1
40.2
333
3000
/
3050
95R
epai
r Pro
ject
sM
S 3
5 JE
FFE
RS
ON
DAV
IS C
O T
RA
FFIC
CO
NTR
OL,
SH
OU
LDE
R R
EPA
IR, &
CLE
AN
UP
3,27
8.42
3,27
8.42
CO
N30
1000
/
3052
22R
epai
r Pro
ject
sU
S 4
2 @
INT
OF
SR
184
JE
FFE
RS
ON
DAV
IS C
O T
RA
FFIC
CO
NTR
OL
& C
LEA
N U
P B
Y S
TATE
FO
RC
ES
412.
4441
2.44
CO
N30
1000
/
3052
65R
epai
r Pro
ject
sS
R 1
3 @
GR
EE
NS
CR
EE
K R
D J
EFF
DAV
IS C
O T
RA
FFIC
CO
NTR
OL,
CLE
AN
UP
& A
SP
HA
LT R
EPA
IRS
BY
STA
TE F
OR
CE
S4,
437.
464,
437.
46C
ON
3010
00/
Cou
nty
Tota
l11
,421
.12
****
****
****
***
Jone
s**
****
****
****
*
3046
91R
epai
r Pro
ject
sI-5
9 S
/B N
EA
R M
M 8
8 JO
NE
S G
UA
RD
RA
IL2,
605.
002,
605.
00C
ON
3010
00/
3048
14P
roje
cts-
Oth
erS
R15
Fm
Lyo
n D
r to
Jasp
er C
o2,
227,
771.
752,
227,
771.
75C
ON
3010
00/
3049
58R
epai
r Pro
ject
sU
S 1
1 JO
NE
S C
O T
RA
FFIC
SIG
NA
L P
OLE
@ C
HA
NTI
LLY
BY
STA
TE F
OR
CE
S2,
529.
762,
529.
76C
ON
3010
00/
3049
63R
epai
r Pro
ject
sU
S 8
4 R
OS
E L
AK
E G
UA
RD
RA
IL J
ON
ES
CO
. W
OR
K B
Y S
TATE
FO
RC
ES
3,03
0.72
3,03
0.72
CO
N30
1000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 9
of 2
3
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Jone
s**
****
****
****
*
3049
64R
epai
r Pro
ject
sU
S 8
4 E
AS
TVIE
W D
R G
UA
RD
RA
IL J
ON
ES
CO
. W
OR
K B
Y S
TATE
FO
RC
ES
4,07
1.22
4,07
1.22
CO
N30
1000
/
3050
97R
epai
r Pro
ject
sI-5
9 N
50'
S O
F E
X 85
JO
NE
S C
O IN
TER
STA
TE S
IGN
BY
DIS
TRIC
T &
TR
AFF
IC E
NG
INE
ER
ING
FO
RC
ES
3,79
2.40
3,79
2.40
CO
N30
1000
/
3050
99R
epai
r Pro
ject
sI-5
9 N
@ M
M 9
9 JO
NE
S C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,45
1.10
1,45
1.10
CO
N30
1000
/
3052
23R
epai
r Pro
ject
sS
R 1
1 @
SR
590
JO
NE
S C
O T
RA
FFIC
CO
NTR
OL,
ETC
. @ T
RA
IN D
ER
AIL
ME
NT
BY
STA
TE F
OR
CE
S2,
040.
802,
040.
80C
ON
3010
00/
3052
32R
epai
r Pro
ject
sI-5
9 N
@ E
X 96
A JO
NE
S C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,66
5.30
2,66
5.30
CO
N30
1000
/
3052
48U
nusu
al o
r Dis
aste
r Pro
ject
sJO
NE
S C
O T
OR
NA
DO
DA
MA
GE
30,0
31.0
530
,031
.05
3340
00/
Cou
nty
Tota
l2,
279,
989.
10
****
****
****
***
Kem
per
****
****
****
***
3050
58R
epai
r Pro
ject
sS
R 1
6 @
BR
# 1
50.9
KE
MP
ER
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
681.
191,
681.
19C
ON
3010
00/
3050
88R
epai
r Pro
ject
sU
S 4
5 @
BR
# 10
6.0
B K
EM
PE
R C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,53
8.42
1,53
8.42
CO
N30
1000
/
Cou
nty
Tota
l3,
219.
61
****
****
****
***
Lafa
yette
****
****
****
***
3047
18P
roje
cts-
Oth
erS
IGN
ING
OV
ER
LAY
SR
6/U
S 2
78 L
AFA
YE
TTE
CO
UN
TY.
WO
RK
BY
STA
TE F
OR
CE
S.
26,4
00.5
161
,960
.99
CO
N30
1000
/
3049
33R
epai
r Pro
ject
sU
S 2
78 @
LA
MA
R B
LVD
LA
FAY
ETT
E C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,63
7.49
1,63
7.49
CO
N30
1000
/
3049
34R
epai
r Pro
ject
sM
S 7
@ M
S 6
LA
FAY
ETT
E C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,08
1.21
2,08
1.21
CO
N30
1000
/
3049
68P
roje
cts-
Oth
erU
S 2
78 IN
TER
CH
AN
GE
SIG
NS
&S
UP
PO
RTS
AT
MS
7 A
ND
MS
334
BY
TED
FO
RC
ES
89,8
69.2
689
,869
.26
CO
N30
1000
/
Cou
nty
Tota
l11
9,98
8.47
****
****
****
***
Lam
ar**
****
****
****
*
3044
13P
roje
cts-
Oth
erU
S 1
1 fro
m M
itche
ll S
treet
to F
orre
st C
L19
,628
.30
1,93
5,01
6.81
CO
N30
1000
/
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sLA
MA
R C
O H
UR
R IS
AA
C D
IST
6 D
EB
RIS
RE
MO
VAL
1ST
PAS
-1,9
77.1
60.
0033
7000
/
3049
02R
epai
r Pro
ject
sH
WY
11 S
B L
AM
AR
CO
ATT
EN
UAT
OR
RE
PLA
CE
ME
NT
BY
CO
NTR
AC
T FO
RC
ES
25,9
20.0
025
,920
.00
CO
N30
1000
/
3049
10R
epai
r Pro
ject
sI-5
9 N
@ M
M63
LA
MA
R C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,38
9.58
3,95
0.18
CO
N30
1000
/
3049
65R
epai
r Pro
ject
sI-5
9 @
HA
RD
Y S
T G
UA
RD
RA
IL L
AM
AR
CO
BY
STA
TE F
OR
CE
S1,
675.
121,
675.
12C
ON
3010
00/
3050
44R
epai
r Pro
ject
sI-5
9 S
@ 4
TH S
T LA
MA
R C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
968.
2596
8.25
CO
N30
1000
/
3051
17R
epai
r Pro
ject
sI-5
9 N
, S O
F W
4TH
ST
LAM
AR
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
613.
711,
613.
71C
ON
3010
00/
Cou
nty
Tota
l50
,217
.80
****
****
****
***
Laud
erda
le**
****
****
****
*
3047
12R
epai
r Pro
ject
sLI
GH
TPO
LE I-
59 @
29T
H A
VE
LA
UD
ER
DA
LE C
OU
NY
BY
STA
TE F
OR
CE
S65
7.60
1,35
3.17
CO
N30
1000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
0 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Laud
erda
le**
****
****
****
*
3047
14R
epai
r Pro
ject
s1-
59 W
/B L
AU
DE
RD
ALE
CO
UN
TY L
IGH
T P
OLE
BY
STA
TE F
OR
CE
S35
3.26
1,04
0.04
CO
N30
1000
/
3047
49R
epai
r Pro
ject
sI-5
9 M
M16
9 LA
UD
ER
DA
LE C
OU
NTY
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S40
6.65
2,03
2.83
CO
N30
1000
/
3047
50R
epai
r Pro
ject
sI-5
9 M
M16
9 LA
UD
ER
DA
LE C
OU
NTY
CA
BLE
RA
IL B
Y S
TATE
FO
RC
ES
1,51
0.00
1,51
0.00
CO
N30
1000
/
3049
75R
epai
r Pro
ject
s I-
59 @
MM
170
.6 L
AU
DE
RD
ALE
CO
CA
BLE
RA
IL B
Y S
TATE
FO
RC
ES
2,13
2.50
2,13
2.50
CO
N30
1000
/
3049
88R
epai
r Pro
ject
sI-2
0 W
@ M
M 1
29 L
AU
DE
RD
ALE
CO
SIG
N R
EPA
IR B
Y S
TATE
FO
RC
ES
9,73
9.69
9,73
9.69
CO
N30
1000
/
3049
89R
epai
r Pro
ject
sI-5
9 @
MM
170
.7 L
AU
DE
RD
ALE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
300.
001,
300.
00C
ON
3010
00/
3050
06R
epai
r Pro
ject
sI-5
9 @
MM
167
.9 L
AU
DE
RD
ALE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
140.
002,
140.
00C
ON
3010
00/
3050
07R
epai
r Pro
ject
sI-5
9 @
MM
167
.9 L
AU
DE
RD
ALE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
825.
001,
825.
00C
ON
3010
00/
3050
11R
epai
r Pro
ject
sI-5
9 @
MM
168
LA
UD
ER
DA
LE C
O C
AB
LER
AIL
BY
STA
TE F
OR
CE
S1,
975.
001,
975.
00C
ON
3010
00/
3050
73R
epai
r Pro
ject
sI-2
0 / I
-59
@ M
M 1
51 L
IGH
T P
OLE
BY
STA
TE F
OR
CE
S1,
232.
371,
232.
37C
ON
3010
00/
3051
02R
epai
r Pro
ject
sI-2
0 E
@ I-
20/5
9 S
PLI
T LA
UD
ER
DA
LE C
O G
UA
RD
RA
IL &
FE
NC
E R
EPA
IR5,
560.
985,
560.
98C
ON
3010
00/
3051
08R
epai
r Pro
ject
sI-5
9 E
@ M
M 1
53 L
AU
DE
RD
ALE
CO
LIG
HTP
OLE
BY
STA
TE F
OR
CE
S47
7.11
477.
11C
ON
3010
00/
3051
23R
epai
r Pro
ject
sI-2
0 E
@ M
M 1
50 L
AU
DE
RD
ALE
CO
LIG
HTP
OLE
BY
STA
TE F
OR
CE
S23
1.30
231.
30C
ON
3010
00/
3051
43R
epai
r Pro
ject
sI-5
9 E
@ M
M 1
22.4
LA
UD
ER
DA
LE C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,86
3.19
1,86
3.19
CO
N30
1000
/
3052
05R
epai
r Pro
ject
sI-2
0 E
B/W
MM
126
& M
M 1
27 L
AU
DE
RD
ALE
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
299.
001,
299.
00C
ON
3010
00/
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sLA
UD
ER
DA
LE C
O T
OR
NA
DO
DA
MA
GE
26,1
71.5
926
,171
.59
3380
00/
3052
94R
epai
r Pro
ject
sI-2
0 E
B @
MM
125
.6 L
AU
DE
RD
ALE
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
750.
791,
750.
79C
ON
3010
00/
Cou
nty
Tota
l60
,626
.03
****
****
****
***
Law
renc
e**
****
****
****
*
3045
68U
nusu
al o
r Dis
aste
r Pro
ject
sLA
WR
EN
CE
CO
HU
RR
ISA
AC
DIS
T 7
EM
ER
GE
NC
Y O
PE
RAT
ION
S E
R 1
0655
2-3
72.0
00.
0033
9000
/
3051
48P
roje
cts-
Oth
erS
R 1
84 B
EG
IN A
T IN
T. U
S 8
4 (W
ES
T O
F M
ON
TIC
ELL
O) E
AS
T 6.
6 M
ILE
S T
O IN
T. U
S 8
4 (E
AS
T O
F M
ON
TIC
ELL
O)
1,81
5.84
1,81
5.84
CO
N30
1000
/
Cou
nty
Tota
l1,
443.
84
****
****
****
***
Leak
e**
****
****
****
*
3051
74P
roje
cts-
Oth
erS
R 4
87 fr
m R
oseb
ud to
Seb
asto
pol
620,
092.
4362
0,09
2.43
CO
N30
1000
/
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sLE
AK
E C
O T
OR
NA
DO
DA
MA
GE
4,76
4.83
4,76
4.83
3400
00/
Cou
nty
Tota
l62
4,85
7.26
****
****
****
***
Lee
****
****
****
***
3048
01P
roje
cts-
Oth
erS
R 1
45 F
M S
R 3
48 T
O P
RE
NTI
SS
CO
. LN
.1,
098,
112.
871,
098,
112.
87C
ON
3010
00/
3051
05P
roje
cts-
Oth
erS
R 6
FM
SR
76
TO J
US
T W
ES
T O
F U
S 4
51,
025,
591.
621,
025,
591.
62C
ON
3020
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
1 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Lee
****
****
****
***
3052
04P
roje
cts-
Oth
erS
ALT
ILLO
AN
D U
S 4
5 LE
E C
O S
IGN
S &
SU
PP
OR
TS B
Y TR
AFF
IC E
NG
INE
ER
ING
FO
RC
ES
1,03
6.84
1,03
6.84
CO
N30
1000
/
3052
06R
epai
r Pro
ject
sU
S 4
5 @
SR
145
LE
E C
OU
NTY
TR
AFF
IC S
IGN
AL
BY
CO
NTR
AC
T FO
RC
ES
11,4
50.0
011
,450
.00
CO
N30
1000
/
3052
44U
nusu
al o
r Dis
aste
r Pro
ject
sLE
E C
O T
OR
NA
DO
DA
MA
GE
61,4
78.3
561
,478
.35
3410
00/
Cou
nty
Tota
l2,
197,
669.
68
****
****
****
***
Leflo
re**
****
****
****
*
3050
52R
epai
r Pro
ject
sU
S 8
2 LE
FLO
RE
CO
TR
AFF
IC S
IGN
AL
BY
STA
TE F
OR
CE
S2,
470.
872,
470.
87C
ON
3010
00/
Cou
nty
Tota
l2,
470.
87
****
****
****
***
Linc
oln
****
****
****
***
3045
68U
nusu
al o
r Dis
aste
r Pro
ject
sLI
NC
OLN
CO
HU
RR
ISA
AC
DIS
T 7
EM
ER
GE
NC
Y O
PE
RAT
ION
S E
R 1
0655
2-2
61.0
00.
0034
3000
/
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L LI
NC
OLN
CO
3,29
2.80
71,2
39.6
434
3000
/
3046
00U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R IS
AA
C I-
55 F
EN
CE
RE
PAIR
- P
E (C
ON
106
668)
1,14
0.64
28,8
24.9
314
3000
/
3049
59R
epai
r Pro
ject
sI-5
5 S
NE
AR
EX
38 L
INC
OLN
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
975.
001,
975.
00C
ON
3010
00/
3049
67P
roje
cts-
Oth
erI-5
5 LI
NC
OLN
CO
SIG
NS
& S
UP
PO
RTS
BY
TED
FO
RC
ES
96,3
45.5
296
,345
.52
CO
N30
1000
/
3049
69R
epai
r Pro
ject
sM
S-5
83 .5
MI N
OF
EN
TER
PR
ISE
SC
HO
OL
LIN
CO
LN C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,36
9.76
2,36
9.76
CO
N30
1000
/
3049
79R
epai
r Pro
ject
sI-5
5 G
UA
RD
RA
IL @
EXI
T 42
LIN
CO
LN C
O B
Y S
TATE
FO
RC
ES
3,03
0.11
3,03
0.11
CO
N30
1000
/
3050
02R
epai
r Pro
ject
sI-5
5 S
N O
F M
S55
0 O
VE
RPA
SS
NB
LIN
CO
LN C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
3,
400.
003,
400.
00C
ON
3010
00/
3050
49R
epai
r Pro
ject
sI-5
5 @
MM
29.
5 LI
NC
OLN
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S4,
145.
004,
145.
00C
ON
3010
00/
3050
50R
epai
r Pro
ject
sI-5
5 @
MM
43.
6 LI
NC
OLN
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S4,
460.
004,
460.
00C
ON
3010
00/
3050
60R
epai
r Pro
ject
sI-5
5 @
MM
39
LIN
CO
LN C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,97
5.00
1,97
5.00
CO
N30
1000
/
3050
61R
epai
r Pro
ject
sI-5
5 N
EA
R M
M 4
2 LI
NC
OLN
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
575.
001,
575.
00C
ON
3010
00/
3050
93R
epai
r Pro
ject
sI-5
5 S
@ M
M 3
7.2
LIN
CO
LN C
O C
AB
LER
AIL
BY
STA
TE F
OR
CE
S98
7.50
987.
50C
ON
3010
00/
3051
39R
epai
r Pro
ject
sI-5
5 @
MM
39.
1 LI
NC
OLN
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
660.
001,
660.
00C
ON
3010
00/
3051
58R
epai
r Pro
ject
sI-5
5 S
@ M
M 3
9.2
LIN
CO
LN C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
844.
6584
4.65
CO
N30
1000
/
3051
95R
epai
r Pro
ject
sU
S 5
1 @
WIL
LIA
MS
LA
KE
LIN
CO
LN C
O G
UA
RD
RA
IL R
EPA
IR B
Y S
TATE
FO
RC
ES
3,10
9.72
3,10
9.72
CO
N30
1000
/
3052
00R
epai
r Pro
ject
sI-5
5 @
MM
41.
9 LI
NC
OLN
CO
CA
BLE
RA
IL B
Y S
TATE
FO
RC
ES
3,55
0.00
3,55
0.00
CO
N30
1000
/
3052
09R
epai
r Pro
ject
sI-5
5 @
MM
41.
5 LI
NC
OLN
CO
GU
AR
DR
AIL
AN
D C
AB
LER
AIL
BY
STA
TE A
ND
CO
NTR
AC
T FO
RC
ES
3,06
7.19
3,06
7.19
CO
N30
1000
/
3052
10R
epai
r Pro
ject
sI-5
5 @
MM
29.
5 LI
NC
OLN
CO
CA
BLE
RA
IL R
EPA
IR B
Y C
ON
TRA
CT
FOR
CE
S2,
562.
502,
562.
50C
ON
3010
00/
3052
17R
epai
r Pro
ject
sI-5
5 E
X 38
LIN
CO
LN C
O T
RA
F C
ON
& C
LEA
NU
P86
3.94
863.
94C
ON
3010
00/
3052
27R
epai
r Pro
ject
sI-5
5 S
EX
42 L
INC
OLN
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
502.
501,
502.
50C
ON
3010
00/
3052
31R
epai
r Pro
ject
sI-5
5 S
, S O
F M
T ZI
ON
RD
EX
LIN
CO
LN C
O T
RA
FFIC
CO
NTR
OL
BY
STA
TE F
OR
CE
S1,
273.
941,
273.
94C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
2 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Linc
oln
****
****
****
***
3052
55R
epai
r Pro
ject
sS
R 5
50 W
OF
CA
SE
YV
ILLE
LIN
CO
LN C
O G
UA
RD
RA
IL &
CLE
AN
UP
BY
STA
TE F
OR
CE
S5,
231.
375,
231.
37C
ON
3010
00/
3052
56R
epai
r Pro
ject
sI-5
5 @
UN
ION
ST
EXT
LIN
CO
LN C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,58
9.12
1,58
9.12
CO
N30
1000
/
3052
62R
epai
r Pro
ject
sI-5
5 N
@ M
M 4
3.7
LIN
CO
LN C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
3,12
5.84
3,12
5.84
CO
N30
1000
/
3052
95R
epai
r Pro
ject
sI-5
5 @
MM
46
LIN
CO
LN C
O T
RA
FFIC
CO
NTR
OL
BY
STA
TE F
OR
CE
S2,
638.
232,
638.
23C
ON
3010
00/
Cou
nty
Tota
l15
5,45
4.33
****
****
****
***
Low
ndes
****
****
****
***
3048
00P
roje
cts-
Oth
erS
R 1
2 FM
HW
Y 82
TO
AL
STA
TE L
N.
2,92
2,51
3.05
2,92
2,51
3.05
CO
N30
1000
/
3052
44U
nusu
al o
r Dis
aste
r Pro
ject
sLO
WN
DE
S C
O T
OR
NA
DO
DA
MA
GE
10,9
50.2
210
,950
.22
3440
00/
3052
67U
nusu
al o
r Dis
aste
r Pro
ject
sC
ON
TRA
CT
DE
BR
IS R
EM
OVA
L LO
WN
DE
S C
O91
,126
.19
91,1
26.1
930
1000
/
Cou
nty
Tota
l3,
024,
589.
46
****
****
****
***
Mad
ison
****
****
****
***
3045
43R
epai
r Pro
ject
sU
S 5
1 M
adis
onC
o Tr
affic
Sig
nal &
Pol
e @
Wie
senb
erge
r Rd.
Wor
k w
ill b
e pe
rform
ed b
y S
tate
For
ces.
108.
002,
392.
69C
ON
3010
00/
3047
44R
epai
r Pro
ject
sI-2
20 M
AD
ISO
N C
OU
NTY
CA
BLE
RA
IL A
T H
AN
GIN
G M
OS
S B
Y C
ON
TRA
CT
FOR
CE
S1,
345.
001,
345.
00C
ON
3010
00/
3048
07S
tate
Pro
ject
sS
R 4
3 fro
m R
anki
n C
L to
Din
kins
St.
1,96
8,54
3.45
1,96
8,54
3.45
CO
N30
1000
/
3048
31R
epai
r Pro
ject
sU
S 4
9 @
HW
Y 22
MA
DIS
ON
CO
TR
AFF
IC S
IGN
AL
PO
LE B
Y D
ISTR
ICT/
TED
FO
RC
ES
19,5
00.0
023
,548
.15
CO
N30
1000
/
3048
58R
epai
r Pro
ject
sI-5
5 S
/B M
AD
ISO
N C
O G
UA
RD
RA
IL &
TR
US
S S
IGN
@ S
OLD
IER
CO
LON
Y R
D B
Y S
TATE
FO
RC
ES
1,61
1.62
12,5
86.3
2C
ON
3010
00/
3049
08R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
22 M
AD
ISO
N C
O F
EN
CE
BY
CO
NTR
AC
T FO
RC
ES
850.
0085
0.00
CO
N30
1000
/
3049
37R
epai
r Pro
ject
sM
S 1
6 E
OF
US
51
MA
DIS
ON
CO
SIG
N P
OS
T B
Y S
TATE
FO
RC
ES
109.
0115
4.01
CO
N30
1000
/
3049
38R
epai
r Pro
ject
sM
S 1
6 E
OF
I-55
MA
DIS
ON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
489.
502,
489.
50C
ON
3010
00/
3049
70R
epai
r Pro
ject
sS
R 8
57/N
ISS
AN
DR
MA
DIS
ON
CO
LIG
HT
PO
LE B
Y S
TATE
FO
RC
ES
780.
8378
0.83
CO
N30
1000
/
3050
46R
epai
r Pro
ject
sS
R 8
57 M
AD
ISO
N C
O L
IGH
TPO
LE1,
737.
921,
737.
92C
ON
3010
00/
3051
25R
epai
r Pro
ject
sI-5
5 N
PA
ST
CO
UN
TY L
INE
RD
MA
DIS
ON
CO
ME
DIA
N B
AR
RIE
R W
ALL
BY
STA
TE F
OR
CE
S4,
493.
024,
493.
02C
ON
3010
00/
3051
26R
epai
r Pro
ject
sI-5
5 N
, N O
F M
M 1
15 M
AD
ISO
N C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,31
2.38
2,31
2.38
CO
N30
1000
/
3051
42R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
14 M
AD
ISO
N C
O S
IGN
RE
PAIR
BY
STA
TE F
OR
CE
S81
7.00
817.
00C
ON
3010
00/
3051
80R
epai
r Pro
ject
sI-5
5 N
@ O
LD A
GE
NC
Y R
D M
AD
ISO
N C
O S
HO
ULD
ER
BY
CO
NTR
AC
T FO
RC
ES
8,16
3.03
8,16
3.03
CO
N30
1000
/
3051
97R
epai
r Pro
ject
sS
R 4
3 N
OF
RA
NK
IN C
O L
INE
MA
DIS
ON
CO
BR
IDG
E R
AIL
RE
PAIR
BY
STA
TE F
OR
CE
S5,
215.
595,
215.
59C
ON
3010
00/
3052
20R
epai
r Pro
ject
sI-5
5 @
SP
LIT
DIA
MO
ND
PR
OJE
CT
MA
DIS
ON
CO
PAV
ED
DIT
CH
, CU
RB
, GU
TTE
R, F
EN
CE
, GR
AS
S &
SH
OU
LDE
R R
EPA
IR B
Y C
ON
TRA
CT
FOR
CE
S6,
034.
036,
034.
03C
ON
3010
00/
3052
29R
epai
r Pro
ject
sI-5
5 N
@ S
PLI
T D
IAM
ON
D M
AD
ISO
N C
O A
TTE
NTU
ATO
R B
Y C
ON
TRA
CT
FOR
CE
S5,
100.
005,
100.
00C
ON
3010
00/
3052
36R
epai
r Pro
ject
sI-2
20 N
@ M
M 1
1.5
MA
DIS
ON
CO
LIG
HT
PO
LE B
Y S
TATE
FO
RC
ES
235.
3523
5.35
CO
N30
1000
/
3052
42R
epai
r Pro
ject
sI-5
5 S
@ M
M 1
22 M
AD
ISO
N C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,89
8.11
1,89
8.11
CO
N30
1000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
3 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Mad
ison
****
****
****
***
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sM
AD
ISO
N C
O T
OR
NA
DO
DA
MA
GE
3,56
0.34
3,56
0.34
3450
00/
3052
53R
epai
r Pro
ject
sI-2
20 N
@ M
M 1
0.5
MA
DIS
ON
CO
LIG
HT
PO
LE B
Y S
TATE
FO
RC
ES
1,63
5.32
1,63
5.32
CO
N30
1000
/
3053
00R
epai
r Pro
ject
sI-5
5 S
B, S
OF
MM
115
MA
DIS
ON
CO
GU
AR
DR
AIL
& F
EN
CE
RE
PAIR
S B
Y S
TATE
& C
ON
TRA
CT
FOR
CE
S1,
580.
221,
580.
22C
ON
3010
00/
Cou
nty
Tota
l2,
038,
119.
72
****
****
****
***
Mar
ion
****
****
****
***
3050
05R
epai
r Pro
ject
sU
S98
E P
EA
RL
RIV
ER
BR
MA
RIO
N C
O T
RA
FFIC
CO
NTR
OL
& B
RID
GE
RE
PAIR
53
,293
.07
53,2
93.0
7C
ON
3010
00/
3051
45R
epai
r Pro
ject
sS
R 3
5 @
INT.
W/ M
S 1
3 M
AR
ION
CO
TR
AFF
IC C
ON
TRO
L B
Y S
TATE
FO
RC
ES
713.
5271
3.52
CO
N30
1000
/
3052
16R
epai
r Pro
ject
sU
S 9
8 E
PE
AR
L R
IVE
R B
RID
GE
MA
RIO
N C
O B
RID
GE
RE
PAIR
BY
STA
TE A
ND
CO
NTR
AC
T FO
RC
ES
14,6
95.0
614
,695
.06
CO
N30
1000
/
3052
58R
epai
r Pro
ject
sU
S 9
8 E
@ P
EA
RL
RIV
ER
BR
IDG
E M
AR
ION
CO
2,
962.
952,
962.
95C
ON
3010
00/
3052
96R
epai
r Pro
ject
sS
R 5
87, 0
.5 M
ILE
S S
OU
TH O
F LA
WR
EN
CE
CO
. LIN
E, M
AR
ION
CO
TR
AFF
IC C
ON
TRO
L &
CLE
AN
UP
BY
STA
TE F
OR
CE
S16
5.00
165.
00C
ON
3010
00/
Cou
nty
Tota
l71
,829
.60
****
****
****
***
Mar
shal
l**
****
****
****
*
3046
70R
epai
r Pro
ject
sM
M 3
3.9
US
78 M
AR
SH
ALL
CO
UN
TY C
AB
LE B
AR
RIE
R B
Y C
ON
TRA
CT
FOR
CE
S1,
336.
501,
336.
50C
ON
3010
00/
3046
71R
epai
r Pro
ject
sM
M 2
7 U
S-7
8 M
AR
SH
ALL
CO
UN
TY C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
1,14
6.00
1,14
6.00
CO
N30
1000
/
3046
72R
epai
r Pro
ject
sM
M 3
0.4
US
-78
MA
RS
HA
LL C
OU
NTY
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
458.
001,
458.
00C
ON
3010
00/
3046
73R
epai
r Pro
ject
sM
M 3
1.6
US
-78
MA
RS
HA
LL C
OU
NTY
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
242.
001,
242.
00C
ON
3010
00/
3047
76R
epai
r Pro
ject
sU
S 7
8 M
AR
SH
ALL
CO
CA
BLE
BA
RR
IER
@M
M 2
6.7
BY
CO
NTR
TAC
T FO
RC
ES
2,50
5.00
2,50
5.00
CO
N30
1000
/
3047
77R
epai
r Pro
ject
sU
S 7
8 M
AR
SH
ALL
CO
CA
BLE
BA
RR
IER
@ M
M29
.2 B
Y C
ON
TRA
CT
FOR
CE
S67
3.50
673.
50C
ON
3010
00/
3047
78R
epai
r Pro
ject
sU
S 7
8 M
AR
SH
ALL
CO
CA
BLE
BA
RR
IER
@ M
M 3
3 B
Y C
ON
TRA
CT
FOR
CE
S95
2.50
952.
50C
ON
3010
00/
3047
79R
epai
r Pro
ject
sU
S 7
8 M
AR
SH
ALL
CO
CA
BLE
BA
RR
IER
@ M
M 3
0 B
Y C
ON
TRA
CT
FOR
CE
S6,
417.
006,
417.
00C
ON
3010
00/
3048
47R
epai
r Pro
ject
sU
S 7
8 M
AR
SH
ALL
CO
CA
BLE
RA
IL @
MM
33.
8 B
Y C
ON
TRA
CT
FOR
CE
S17
,605
.00
17,6
05.0
0C
ON
3010
00/
3049
45R
epai
r Pro
ject
sU
S 7
8 @
MM
29.
2 M
AR
SH
ALL
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
460.
002,
460.
00C
ON
3010
00/
3049
46R
epai
r Pro
ject
sU
S 7
8 @
MM
33.
2 M
AR
SH
ALL
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
064.
002,
064.
00C
ON
3010
00/
3050
35R
epai
r Pro
ject
sU
S 7
8 @
MM
26.
8 M
AR
SH
ALL
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S64
5.00
645.
00C
ON
3010
00/
3052
12R
epai
r Pro
ject
sU
S 7
8 @
BR
# 27
.1A
MA
RS
HA
LL C
O G
UA
RD
RA
IL &
SIG
N R
EPA
IR B
Y TR
AFF
IC E
NG
INE
ER
ING
& D
ISTR
ICT
FOR
CE
S68
1.76
681.
76C
ON
3010
00/
Cou
nty
Tota
l39
,186
.26
****
****
****
***
Mon
roe
****
****
****
***
3048
02P
roje
cts-
Oth
erS
R 1
45 F
M U
S 4
5 S
AB
RD
N T
O U
S 4
5 N
AB
RD
N1,
606,
560.
111,
606,
560.
11C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
4 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Mon
roe
****
****
****
***
3051
15P
roje
cts-
Oth
erU
S 4
5A F
M 1
MI N
OF
SR
25
TO W
ILS
ON
-HIL
L LO
OP.
1,00
0,43
3.51
1,00
0,43
3.51
CO
N30
1000
/
Cou
nty
Tota
l2,
606,
993.
62
****
****
****
***
Mon
tgom
ery
****
****
****
***
3045
57P
roje
cts-
Oth
erS
R 1
82 fr
om U
S 8
2 to
US
51
52,1
59.6
679
5,90
7.41
CO
N30
1000
/
3052
45U
nusu
al o
r Dis
aste
r Pro
ject
sM
ON
TGO
ME
RY
CO
TO
RN
AD
O D
AM
AG
E2,
180.
032,
180.
0334
9000
/
Cou
nty
Tota
l54
,339
.69
****
****
****
***
Nes
hoba
****
****
****
***
3045
47P
roje
cts-
Oth
erS
R 2
1 FR
M S
R 1
6 TO
PH
ILA
DE
LPH
IA C
ITY
LIM
ITS
390,
863.
2141
3,58
0.09
CO
N30
1000
/
3048
08P
roje
cts-
Oth
erS
R 2
1 Fr
m N
ewto
n C
L to
Sou
th o
f Dix
on2,
022,
431.
712,
022,
431.
71C
ON
3010
00/
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sN
ES
HO
BA
CO
TO
RN
AD
O D
AM
AG
E33
,128
.91
33,1
28.9
135
0000
/
Cou
nty
Tota
l2,
446,
423.
83
****
****
****
***
New
ton
****
****
****
***
3048
08P
roje
cts-
Oth
erS
R 2
1 Fr
m S
cott
CL
to N
esho
ba C
L13
1,94
0.53
131,
940.
53C
ON
3020
00/
3049
05R
epai
r Pro
ject
sI-2
0/U
S80
NE
WTO
N C
O C
ON
CR
ETE
BE
AM
DA
MA
GE
BY
STA
TTE
FO
RC
ES
1,48
6.17
1,76
7.17
CO
N30
1000
/
3049
77R
epai
r Pro
ject
sU
S 8
0 W
NE
WTO
N C
O C
ON
CR
ETE
BA
RR
IER
WA
LL B
Y C
ON
TRA
CT
FOR
CE
S36
,994
.47
36,9
94.4
7C
ON
3010
00/
3050
90R
epai
r Pro
ject
sI-2
0 E
/B E
CH
UN
KY
EXI
T O
N R
T S
HO
ULD
ER
NE
WTO
N C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES 2,
674.
372,
674.
37C
ON
3010
00/
3051
14P
roje
cts-
Oth
erS
R 5
03 fr
om H
icko
ry to
Dec
atur
6,
015.
516,
015.
51C
ON
3010
00/
3051
50R
epai
r Pro
ject
sI-2
0 E
B/W
MM
113
& M
M 1
14 N
EW
TON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S4,
483.
774,
483.
77C
ON
3010
00/
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sN
EW
TON
CO
TO
RN
AD
O D
AM
AG
E30
,465
.39
30,4
65.3
935
1000
/
3052
87R
epai
r Pro
ject
sI-2
0 W
@ B
R 1
19 N
EW
TON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
355.
972,
355.
97C
ON
3010
00/
Cou
nty
Tota
l21
6,41
6.18
****
****
****
***
Nox
ubee
****
****
****
***
3049
81R
epai
r Pro
ject
sU
S 4
5 S
IGN
AL
@ S
R 1
4 N
OXU
BE
E C
O B
Y S
TATE
FO
RC
ES
1,90
1.21
1,90
1.21
CO
N30
1000
/
Cou
nty
Tota
l1,
901.
21
****
****
****
***
Okt
ibbe
ha**
****
****
****
*
3044
85P
roje
cts-
Oth
erS
R 1
5 FM
OK
TIB
BE
HA
CL
TO N
OR
TH O
F M
AB
EM
1,06
1.77
311,
037.
06C
ON
3020
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
5 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Okt
ibbe
ha**
****
****
****
*
3047
96P
roje
cts-
Oth
erS
R 1
82 F
M L
ON
G S
T. T
O O
LD W
ES
T P
OIN
T R
D.
2,95
9,77
0.13
2,95
9,77
0.13
CO
N30
1000
/
3052
07R
epai
r Pro
ject
sS
R 1
82 @
BR
# 1
.1 O
KTI
BB
EH
A C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,29
7.21
2,29
7.21
CO
N30
1000
/
Cou
nty
Tota
l2,
963,
129.
11
****
****
****
***
Pano
la**
****
****
****
*
3047
80R
epai
r Pro
ject
sI-5
5 PA
NO
LA C
O C
AB
LE B
AR
RIE
R @
MM
252
.5 B
Y C
ON
TRA
CT
FOR
CE
S6,
825.
006,
825.
00C
ON
3010
00/
3047
81R
epai
r Pro
ject
sI-5
5 PA
NO
LA C
O C
AB
LE B
AR
RIE
R @
MM
237
.2 B
Y C
ON
TRA
CT
FOR
CE
S49
6.50
496.
50C
ON
3010
00/
3047
82R
epai
r Pro
ject
sI-5
5 PA
NO
LA C
O C
AB
LE B
AR
RR
IER
@ M
M 2
52.2
BY
CO
NTR
AC
T FO
RC
ES
2,50
5.00
2,50
5.00
CO
N30
1000
/
3049
25R
epai
r Pro
ject
sI-5
5 @
MS
35
PAN
OLA
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
877.
832,
877.
83C
ON
3010
00/
3049
26R
epai
r Pro
ject
sI-5
5 0.
3 M
I N O
F M
S35
PA
NO
LA C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,06
0.92
1,06
0.92
CO
N30
1000
/
3049
32R
epai
r Pro
ject
sU
S 2
78 @
TA
LLA
HAT
CH
IE R
IVE
R B
R P
AN
OLA
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
430.
212,
430.
21C
ON
3010
00/
3049
50R
epai
r Pro
ject
sI-5
5 @
MM
236
.5 P
AN
OLA
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
382.
002,
382.
00C
ON
3010
00/
3050
14R
epai
r Pro
ject
sI-5
5 .4
MI N
OF
HE
NTZ
RD
EX
237
PAN
OLA
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
387.
252,
387.
25C
ON
3010
00/
3050
24R
epai
r Pro
ject
sI-5
5 @
MM
251
.9 P
AN
OLA
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S75
7.50
757.
50C
ON
3010
00/
3051
09R
epai
r Pro
ject
sS
R 2
78 @
INTE
RS
EC
T W
/ HO
US
E-C
AR
LSO
N D
R P
AN
OLA
CO
TR
AFF
IC S
IGN
AL
PO
LE B
Y C
ON
TRA
CT
FOR
CE
S4,
652.
004,
652.
00C
ON
3010
00/
Cou
nty
Tota
l26
,374
.21
****
****
****
***
Pear
l_R
iver
****
****
****
***
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sP
EA
RL
RIV
ER
CO
HU
RR
ISA
AC
DIS
T 6
DE
BR
IS R
EM
OVA
L 1S
T PA
S-7
8,72
0.93
0.00
3550
00/
3046
22R
epai
r Pro
ject
sI-5
9 N
B P
earlR
iver
Co
Cab
le R
ails
@ M
M3.
Wor
k w
ill b
e pe
rform
ed b
y a
Con
tract
or.
1,10
2.50
1,10
2.50
CO
N30
1000
/
3048
16P
roje
cts-
Oth
erU
S 1
1 fro
m I
59 O
verp
ass
Brid
ge n
orth
4.6
5 m
iles
to H
obol
ochi
tto C
reek
Brid
ge1,
199,
528.
031,
199,
528.
03C
ON
3010
00/
Cou
nty
Tota
l1,
121,
909.
60
****
****
****
***
Perr
y**
****
****
****
*
3051
60R
epai
r Pro
ject
sU
S 9
8 P
ER
RY
CO
TR
AIN
DE
RA
ILM
EN
T B
Y S
TATE
& C
ON
TRA
CT
FOR
CE
S13
,355
.30
13,3
55.3
0C
ON
3010
00/
3052
28R
epai
r Pro
ject
sS
R 4
2 @
RU
NN
ELS
TOW
N P
ER
RY
CO
TR
AFF
IC C
ON
TRO
L, C
LEA
NU
P, &
MA
NP
OW
ER
FO
R O
VE
RTU
RN
ED
TR
UC
K IN
RO
W B
Y S
TATE
FO
RC
ES
1,66
6.61
1,66
6.61
CO
N30
1000
/
Cou
nty
Tota
l15
,021
.91
****
****
****
***
Pike
****
****
****
***
3045
68U
nusu
al o
r Dis
aste
r Pro
ject
sP
IKE
CO
HU
RR
ISA
AC
DIS
T 7
EM
ER
GE
NC
Y O
PE
RAT
ION
S E
R 1
0655
2-3
4,11
9.52
0.00
3570
00/
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L P
IKE
CO
3,52
8.00
96,5
62.4
135
7000
/
3046
00U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R IS
AA
C I-
55 F
EN
CE
RE
PAIR
- P
E10
,371
.99
13,7
44.8
415
7000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
6 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Pike
****
****
****
***
3046
97P
roje
cts-
Oth
erS
R 4
8 FR
OM
US
51
EA
ST
9.4
MIL
ES
TO
STA
LLIN
G C
UR
VE
S R
OA
D
2,24
2,37
8.12
2,24
5,54
8.85
CO
N30
1000
/
3048
09R
epai
r Pro
ject
sI-5
5 P
IKE
CO
AT
SR
48
BR
IDG
E R
EPA
IR B
Y S
TATE
FO
RC
ES
9,04
2.43
9,04
2.43
CO
N30
1000
/
3048
90R
epai
r Pro
ject
sI-5
5 S
PIK
E C
O .2
MI S
OF
LIN
CO
LN/P
IKE
CO
LIN
E G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,61
8.51
3,00
5.92
CO
N30
1000
/
3049
53R
epai
r Pro
ject
sI-5
5 N
@ E
X 10
PIK
E C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
3,13
3.33
3,13
3.33
CO
N30
1000
/
3049
54R
epai
r Pro
ject
sI-5
5 N
@ E
X 15
PIK
E C
O C
AB
LE R
AIL
BY
CO
NTR
AC
T FO
RC
ES
2,18
8.34
2,18
8.34
CO
N30
1000
/
3049
55R
epai
r Pro
ject
sI-5
5 N
@ E
XIT
17 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
708.
331,
708.
33C
ON
3010
00/
3049
66P
roje
cts-
Oth
erI-5
5 P
IKE
CO
SIG
NS
& S
UP
PO
RTS
BY
TED
FO
RC
ES
167,
851.
9816
7,85
1.98
CO
N30
1000
/
3050
12R
epai
r Pro
ject
sI-5
5 N
OF
SR
48 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S6,
380.
006,
380.
00C
ON
3010
00/
3050
43R
epai
r Pro
ject
sI-5
5 N
B @
WE
IGH
STA
TIO
N P
IKE
CO
SIG
N &
HO
ME
LAN
D S
EC
UR
ITY
CA
ME
RA
BY
STA
TE F
OR
CE
S26
4.96
264.
96C
ON
3010
00/
3050
70R
epai
r Pro
ject
sI-5
5 @
MM
7.8
PIK
E C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
3,44
0.83
3,44
0.83
CO
N30
1000
/
3050
76R
epai
r Pro
ject
sI-5
5 N
0.5
MI N
OF
MS
/LA
LIN
E P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S3,
722.
503,
722.
50C
ON
3010
00/
3050
77R
epai
r Pro
ject
sI-5
5 N
0.6
M N
OF
MS
/LA
LIN
E P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S98
7.50
987.
50C
ON
3010
00/
3050
78R
epai
r Pro
ject
sI-5
5 N
MM
19.
2 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S3,
465.
003,
465.
00C
ON
3010
00/
3050
87R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
8 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S3,
707.
503,
707.
50C
ON
3010
00/
3051
27R
epai
r Pro
ject
sI-5
5 N
1.7
5 M
I N O
F M
S/L
A LI
NE
PIK
E C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,27
5.48
2,27
5.48
CO
N30
1000
/
3051
30R
epai
r Pro
ject
sI-5
5 S
, S O
F E
X 8
PIK
E C
O C
AB
LER
AIL
BY
STA
TE F
OR
CE
S98
7.50
987.
50C
ON
3010
00/
3051
81R
epai
r Pro
ject
sI-5
5 S
B @
MM
5.5
PIK
E C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
701.
2270
1.22
CO
N30
1000
/
3051
82R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
9.3
PIK
E C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
529.
6552
9.65
CO
N30
1000
/
3051
83R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
9.6
PIK
E C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
529.
6552
9.65
CO
N30
1000
/
3051
84R
epai
r Pro
ject
sI-5
5 S
@ M
M 1
1.9
PIK
E C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
2,26
2.15
2,26
2.15
CO
N30
1000
/
3052
08R
epai
r Pro
ject
sI-5
5 S
B @
SR
24
PIK
E C
O B
RID
GE
RE
PAIR
BY
STA
TE F
OR
CE
S30
1.67
301.
67C
ON
3010
00/
3052
13R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
.0 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S2,
447.
502,
447.
50C
ON
3010
00/
3052
21R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
8.9
PIK
E C
O C
AB
LER
AIL
, GU
AR
DR
AIL
, & T
RA
FFIC
CO
NTR
OL
BY
STA
TE A
ND
CO
NTR
AC
T FO
RC
ES
10,4
84.1
710
,484
.17
CO
N30
1000
/
3052
54R
epai
r Pro
ject
sI-5
5 S
@ M
M 7
.6 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S1,
235.
831,
235.
83C
ON
3010
00/
3052
61R
epai
r Pro
ject
sI-5
5 N
@ M
M 1
9 P
IKE
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S4,
385.
834,
385.
83C
ON
3010
00/
Cou
nty
Tota
l2,
455,
810.
45
****
****
****
***
Pont
otoc
****
****
****
***
3051
05P
roje
cts-
Oth
erS
R 6
FM
SR
76
TO J
US
T W
ES
T O
F U
S 4
546
7,59
7.00
467,
597.
00C
ON
3010
00/
Cou
nty
Tota
l46
7,59
7.00
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
7 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Pren
tiss
****
****
****
***
3048
03P
roje
cts-
Oth
erS
R 4
FM
E O
F M
LK D
R T
O S
R 3
7192
2,97
4.94
922,
974.
94C
ON
3010
00/
3052
03P
roje
cts-
Oth
erW
HE
ELE
R A
ND
US
45
PR
EN
TIS
S C
O S
IGN
S &
SU
PP
OR
TS B
Y TR
AFF
IC E
NG
INE
ER
ING
FO
RC
ES
4,33
2.84
4,33
2.84
CO
N30
1000
/
Cou
nty
Tota
l92
7,30
7.78
****
****
****
***
Qui
tman
****
****
****
***
3048
21S
tate
Pro
ject
sS
R 3
from
Dar
ling
To S
ledg
e1,
923,
507.
271,
923,
507.
27C
ON
3010
00/
3048
24S
tate
Pro
ject
sS
R 3
Fro
m T
alla
hatc
hie
Cou
nty
Line
To
SR
61,
747,
644.
331,
747,
644.
33C
ON
3020
00/
3049
31R
epai
r Pro
ject
sU
S 2
78 0
.1 M
I W O
F G
UN
N R
D Q
UIT
MA
N C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,98
5.91
1,98
5.91
CO
N30
1000
/
Cou
nty
Tota
l3,
673,
137.
51
****
****
****
***
Ran
kin
****
****
****
***
3046
09P
roje
cts-
Oth
erS
R 2
5 H
IGH
WAY
SIG
NIN
G A
T IN
TER
SE
CTI
ON
S S
R 4
3, 4
71 A
ND
GO
SH
EN
SP
RIN
GS
14,3
00.8
288
,857
.28
CO
N30
1000
/
3047
11R
epai
r Pro
ject
sG
UA
RD
RA
IL I-
20 W
/B R
AN
KIN
CO
UN
TY B
Y C
ON
TRA
CT
FOR
CE
S2,
000.
002,
000.
00C
ON
3010
00/
3049
60R
epai
r Pro
ject
sI-2
0 W
OF
US
80
RA
NK
IN C
O G
UA
RD
RA
IL/B
RID
GE
/FE
NC
E B
Y S
TATE
& C
ON
TRA
CT
FOR
CE
S5,
325.
805,
325.
80C
ON
3010
00/
3049
72R
epai
r Pro
ject
sI-2
0E @
BR
# 5
6.88
RA
NK
IN C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
1,61
6.04
1,61
6.04
CO
N30
1000
/
3050
45R
epai
r Pro
ject
sI-2
0 E
@ M
M 5
1 R
AN
KIN
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
080.
702,
080.
70C
ON
3010
00/
3050
51R
epai
r Pro
ject
sI-2
0 W
B @
PE
AR
L R
IVE
R B
R R
AN
KIN
CO
DE
BR
IS C
LEA
NU
P B
Y S
TATE
FO
RC
ES
1,49
1.94
1,49
1.94
CO
N30
1000
/
3050
64R
epai
r Pro
ject
sU
S 8
0 R
AN
KIN
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S1,
692.
701,
692.
70C
ON
3010
00/
3050
85R
epai
r Pro
ject
sI-2
0 E
RA
NK
IN C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,39
5.90
2,39
5.90
CO
N30
1000
/
3051
12P
roje
cts-
Oth
erS
R 4
69 fr
om S
imps
on C
L to
Flo
renc
e C
ity L
imits
92
.00
92.0
0C
ON
3010
00/
3051
16P
roje
cts-
Oth
erO
verla
y C
ross
-ove
rs o
n S
R 2
5 bt
wn
SR
475
& S
R 4
71
99
5,54
3.49
995,
543.
49C
ON
3010
00/
3051
19R
epai
r Pro
ject
sU
S 4
9 N
RA
NK
IN C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,86
5.95
2,86
5.95
CO
N30
1000
/
3051
28R
epai
r Pro
ject
sI-2
0 W
RA
NK
IN C
O G
UA
RD
RA
IL &
BR
IDG
ES
BY
STA
TE F
OR
CE
S4,
172.
564,
172.
56C
ON
3010
00/
3051
29R
epai
r Pro
ject
sS
R 2
5 @
VIN
E D
R R
AN
KIN
CO
TR
AFF
IC S
IGN
AL
& P
OLE
BY
STA
TE F
OR
CE
S1,
330.
361,
330.
36C
ON
3010
00/
3051
75R
epai
r Pro
ject
sI-2
0 @
AIR
PO
RT
RD
RA
NK
IN C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,19
1.18
2,19
1.18
CO
N30
1000
/
3052
40R
epai
r Pro
ject
sU
S 4
9 @
RR
BR
IDG
E #
141.
7 R
AN
KIN
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
724.
232,
724.
23C
ON
3010
00/
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sR
AN
KIN
CO
TO
RN
AD
O D
AM
AG
E7,
062.
337,
062.
3336
1000
/
3052
71R
epai
r Pro
ject
sI-2
0 R
AN
KIN
CO
SIG
N R
EPA
IR B
Y S
TATE
FO
RC
ES
1,44
3.60
1,44
3.60
CO
N30
1000
/
Cou
nty
Tota
l1,
048,
329.
60
****
****
****
***
Scot
t**
****
****
****
*
3047
93S
tate
Pro
ject
sU
S 8
0 Fr
m 4
.346
Mi.
E. o
f SR
35
to N
ewto
n C
ount
y Li
ne
1,89
3,40
9.86
1,89
3,40
9.86
CO
N30
1000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
8 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Scot
t**
****
****
****
*
3049
57R
epai
r Pro
ject
sU
S 8
0 S
cott
Cou
nty
at B
ridge
No.
97.
0, W
est o
f Litt
le It
aly
Rd,
wor
ked
to b
e pe
rform
ed b
y st
ate
forc
es a
nd c
ontra
ctor
b49
,604
.35
49,6
04.3
5C
ON
3010
00/
3051
11P
roje
cts-
Oth
erS
R 2
1 fro
m S
teel
e to
Seb
asto
pol
2,
263.
892,
263.
89C
ON
3010
00/
3051
13P
roje
cts-
Oth
erU
S 8
0 fro
m 1
.546
mi E
ast o
f SR
35
to 4
.346
Eas
t of S
R 3
5
232.
5923
2.59
CO
N30
1000
/
3052
47U
nusu
al o
r Dis
aste
r Pro
ject
sS
CO
TT C
O T
OR
NA
DO
DA
MA
GE
1,10
1.69
1,10
1.69
3620
00/
Cou
nty
Tota
l1,
946,
612.
38
****
****
****
***
Sim
pson
****
****
****
***
3049
18R
epai
r Pro
ject
sM
S 1
3 N
@ U
S 4
9 S
IMP
SO
N C
O B
RID
GE
RE
PAIR
BY
STA
TE F
OR
CE
S1,
598.
531,
598.
53C
ON
3010
00/
3050
37R
epai
r Pro
ject
sU
S 4
9 S
OF
MA
GE
E S
IMP
SO
N C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,48
6.00
2,48
6.00
CO
N30
1000
/
3051
98R
epai
r Pro
ject
sS
R 2
8 W
OF
EJ
LUC
KE
TT R
D S
IMP
SO
N C
O S
HO
ULD
ER
RE
PAIR
@ C
LEA
NU
P B
Y S
TATE
FO
RC
ES
4,67
7.13
4,67
7.13
CO
N30
1000
/
3052
38R
epai
r Pro
ject
sU
S 4
9 @
INTE
RS
EC
TIO
N O
F O
LD G
RAV
EL
RD
SIM
PS
ON
CO
TR
AFF
IC C
ON
TRO
L &
CLE
AN
UP
1,29
1.91
1,29
1.91
CO
N30
1000
/
3052
49U
nusu
al o
r Dis
aste
r Pro
ject
sS
IMP
SO
N C
O T
OR
NA
DO
DA
MA
GE
2,49
0.34
2,49
0.34
3640
00/
Cou
nty
Tota
l12
,543
.91
****
****
****
***
Smith
****
****
****
***
3052
24R
epai
r Pro
ject
sS
R 5
01 S
OF
CR
520
-B S
MIT
H C
O T
RA
FFIC
CO
NTR
OL
& S
HO
ULD
ER
RE
PAIR
BY
STA
TE F
OR
CE
S1,
125.
541,
125.
54C
ON
3010
00/
3052
49U
nusu
al o
r Dis
aste
r Pro
ject
sS
MIT
H C
O T
OR
NA
DO
DA
MA
GE
2,36
6.38
2,36
6.38
3650
00/
Cou
nty
Tota
l3,
491.
92
****
****
****
***
Ston
e**
****
****
****
*
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sS
TON
E C
O H
UR
R IS
AA
C D
IST
6 D
EB
RIS
RE
MO
VAL
1ST
PAS
-99,
101.
320.
0036
6000
/
3048
11P
roje
cts-
Oth
erS
R 2
6 fro
m F
airg
roun
d S
t. in
Wig
gins
to S
teve
n M
oore
Roa
d75
0,03
0.83
750,
134.
38C
ON
3010
00/
3048
12P
roje
cts-
Oth
erS
R 2
6 fro
m S
teve
n M
oore
Rd
to 4
50 fe
et W
est o
f SR
15
836,
560.
9683
6,56
0.96
CO
N30
1000
/
3049
73R
epai
r Pro
ject
sU
S 4
9 @
MC
DO
NA
LD R
D S
TON
E C
O G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
4,21
7.54
4,21
7.54
CO
N30
1000
/
3052
35R
epai
r Pro
ject
sU
S 4
9 N
560
' N
OF
PE
RK
SIL
VE
R R
UN
RD
STO
NE
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
187.
122,
187.
12C
ON
3010
00/
Cou
nty
Tota
l1,
493,
895.
13
****
****
****
***
Sunf
low
er**
****
****
****
*
3050
79R
epai
r Pro
ject
sM
S8
@ B
R#
31.2
SU
NFL
OW
ER
CO
BR
IDG
E R
AIL
BY
STA
TE F
OR
CE
S7,
389.
157,
389.
15C
ON
3010
00/
3051
65P
roje
cts-
Oth
erS
R 4
48 F
R S
unflo
wer
CL
to N
of U
S 8
266
5,50
1.31
665,
501.
31C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 1
9 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Sunf
low
er**
****
****
****
*
3053
03R
epai
r Pro
ject
sU
S 8
2 S
UN
FLO
WE
R C
O. B
RID
GE
RA
IL R
EPA
IR B
Y C
ON
TRA
CT
FOR
CE
S29
,771
.95
29,7
71.9
5C
ON
3010
00/
Cou
nty
Tota
l70
2,66
2.41
****
****
****
***
Talla
hatc
hie
****
****
****
***
3048
24S
tate
Pro
ject
sS
R 3
Fro
m U
S 4
9 to
Qui
tman
Cou
nty
Line
1,00
9,37
6.67
1,00
9,37
6.67
CO
N30
1000
/
3049
04P
roje
cts-
Oth
erH
wy
32 fr
om T
alla
hatc
hie
Riv
er to
Hw
y 35
2,45
2,13
9.73
2,45
2,13
9.73
CO
N30
1000
/
3051
10R
epai
r Pro
ject
sS
R 3
5 @
BR
# 2
48.1
TA
LLH
ATC
HIE
CO
BR
IDG
ER
AIL
BY
STA
TE F
OR
CE
S1,
889.
761,
889.
76C
ON
3010
00/
3051
55P
roje
cts-
Oth
erS
R 3
2 fro
m U
S 4
9 E
(Nor
th) t
o E
ast E
nd T
alla
hatc
hie
Riv
er B
ridge
180,
270.
5618
0,27
0.56
CO
N30
1000
/
Cou
nty
Tota
l3,
643,
676.
72
****
****
****
***
Tate
****
****
****
***
3039
51P
roje
cts-
Oth
erO
verla
y S
R 3
06 -
From
US
51
to S
R 3
0515
,877
.66
2,91
9,10
8.54
CO
N30
1000
/
Cou
nty
Tota
l15
,877
.66
****
****
****
***
Tipp
ah**
****
****
****
*
3051
73P
roje
cts-
Oth
erS
R 3
54 F
M S
R 1
5 TO
EN
D S
TATE
MA
INTE
NA
NC
E88
,381
.68
88,3
81.6
8C
ON
3010
00/
Cou
nty
Tota
l88
,381
.68
****
****
****
***
Tuni
ca**
****
****
****
*
3049
99R
epai
r Pro
ject
sS
R3
.6 M
I N O
F P
RIT
CH
AR
D R
D T
UN
ICA
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S4,
752.
844,
752.
84C
ON
3010
00/
Cou
nty
Tota
l4,
752.
84
****
****
****
***
Uni
on**
****
****
****
*
3047
99P
roje
cts-
Oth
erS
R 3
48 F
M C
O. R
D. 1
21 T
O L
EE
CO
. LN
. LO
G M
I 4.4
15 -
13.6
371,
701,
628.
761,
701,
628.
76C
ON
3010
00/
3050
89R
epai
r Pro
ject
sU
S 7
8 0.
4 M
I W O
F S
R 9
CA
BLE
RA
IL &
HIG
H M
AS
T LI
GH
T R
EPA
IR B
Y C
ON
TRA
CTO
R F
OR
CE
S,T
RA
FFIC
CO
NTR
OL
& C
LEA
NU
P B
Y S
TATE
FO
RC
ES
42
,830
.00
42,8
30.0
0C
ON
3010
00/
Cou
nty
Tota
l1,
744,
458.
76
****
****
****
***
Wal
thal
l**
****
****
****
*
3045
68U
nusu
al o
r Dis
aste
r Pro
ject
sW
ALT
HA
LL C
O H
UR
R IS
AA
C D
IST
7 E
ME
RG
EN
CY
OP
ER
ATIO
NS
ER
106
552
-11,
131.
520.
0037
4000
/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 2
0 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Wal
thal
l**
****
****
****
*
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L W
ALT
HA
LL C
O3,
292.
8042
,764
.10
3740
00/
Cou
nty
Tota
l-7
,838
.72
****
****
****
***
War
ren
****
****
****
***
3042
67R
epai
r Pro
ject
sI-2
0 W
arre
nCo
Brid
ge R
epai
r 40
feet
of B
ridge
Rai
l @ B
rdg#
1.3
B.
To b
e A
dver
tised
and
Let
to C
ontra
ct-2
1.30
228,
229.
57C
ON
3020
00/
3046
54R
epai
r Pro
ject
sI-2
0 W
AR
RE
N C
AB
LE R
AIL
IND
IAN
A AV
E.
WO
RK
TO
BE
PE
RFO
RM
ED
BY
CO
NTR
AC
TOR
. 2,2
47.5
02,
247.
50C
ON
3010
00/
3049
84R
epai
r Pro
ject
sI-2
0 G
UA
RD
RA
IL @
FLO
WE
RS
EXI
T 15
BY
STA
TE F
OR
CE
S4,
341.
364,
341.
36C
ON
3010
00/
3049
91R
epai
r Pro
ject
sU
S 6
1 N
WA
RR
EN
CO
LIG
HT
PO
LE B
Y C
ON
TRA
CT
FOR
CE
S6,
775.
006,
775.
00C
ON
3010
00/
3050
53R
epai
r Pro
ject
sI-2
0 E
@ B
R #
117
.5 W
AR
RE
N C
O B
RID
GE
RE
PAIR
BY
CO
NTR
AC
T FO
RC
ES
25,5
50.0
025
,550
.00
CO
N30
1000
/
3051
63R
epai
r Pro
ject
sI-2
0 W
@ E
X 1A
WA
RR
EN
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
720.
032,
720.
03C
ON
3010
00/
3052
43R
epai
r Pro
ject
sI-2
0 @
CLA
Y S
T W
AR
RE
N C
O D
IRE
CTI
ON
AL
SIG
N B
Y S
TATE
FO
RC
ES
753.
1775
3.17
CO
N30
1000
/
3052
46U
nusu
al o
r Dis
aste
r Pro
ject
sW
AR
RE
N C
O T
OR
NA
DO
DA
MA
GE
13,4
22.4
113
,422
.41
3750
00/
Cou
nty
Tota
l55
,788
.17
****
****
****
***
Way
ne**
****
****
****
*
3045
67U
nusu
al o
r Dis
aste
r Pro
ject
sW
AYN
E C
O H
UR
R IS
AA
C D
IST
6 D
EB
RIS
RE
MO
VAL
1ST
PAS
-59,
374.
040.
0037
7000
/
3047
43U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R IS
AA
C S
LID
E U
S 8
4 W
AYN
E C
O 2
MIL
ES
FR
OM
AL
STA
TE L
INE
. W
OR
K B
Y S
TATE
FO
RC
ES
see
106
506-
302
-177
,184
.55
0.00
3010
00/
3051
32R
epai
r Pro
ject
sU
S 4
5 N
0.5
MI N
OF
SR
145
WAY
NE
CO
UN
TY G
UA
RD
RA
IL B
Y S
TATE
FO
RC
ES
2,37
4.62
2,37
4.62
CO
N30
1000
/
3052
48U
nusu
al o
r Dis
aste
r Pro
ject
sW
AYN
E C
O T
OR
NA
DO
DA
MA
GE
15,7
06.3
315
,706
.33
3770
00/
Cou
nty
Tota
l-2
18,4
77.6
4
****
****
****
***
Web
ster
****
****
****
***
3044
85P
roje
cts-
Oth
erS
R 1
5 FM
US
82
TO W
EB
STE
R C
L1,
054.
1555
2,04
9.11
CO
N30
1000
/
3049
11R
epai
r Pro
ject
sU
S 8
2 W
EB
STE
R C
O G
UA
RD
RA
IL B
R#1
30.8
C B
Y S
TATE
FO
RC
ES
653.
811,
482.
68C
ON
3010
00/
3049
12R
epai
r Pro
ject
sU
S 8
2 W
EB
STE
R C
O .2
MI E
OF
HW
Y 15
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S65
3.81
1,27
7.56
CO
N30
1000
/
3050
48R
epai
r Pro
ject
sU
S 8
2 W
EB
STE
R C
O T
RA
FFIC
CO
NTR
OL
BY
STA
TE F
OR
CE
S11
,085
.32
11,0
85.3
2C
ON
3010
00/
3051
68P
roje
cts-
Oth
erW
ebst
er C
ount
y S
crub
Sea
l Pro
ject
24,0
15.3
624
,015
.36
CO
N30
1000
/
3051
68P
roje
cts-
Oth
erW
ebst
er C
ount
y S
crub
Sea
l Pro
ject
18,7
64.1
718
,764
.17
CO
N30
2000
/
Cou
nty
Tota
l56
,226
.62
****
****
****
***
Wilk
inso
n**
****
****
****
*
3045
68U
nusu
al o
r Dis
aste
r Pro
ject
sW
ILK
INS
ON
CO
HU
RR
ISA
AC
DIS
T 7
EM
ER
GE
NC
Y O
PE
RAT
ION
S E
R 1
0655
2-7
0,40
6.70
0.00
3790
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 2
1 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Wilk
inso
n**
****
****
****
*
3045
97U
nusu
al o
r Dis
aste
r Pro
ject
sD
ISTR
ICT
7 C
ON
TRA
CT
DE
BR
IS R
EM
OVA
L W
ILK
INS
ON
CO
3,29
2.80
39,1
40.1
937
9000
/
3045
98U
nusu
al o
r Dis
aste
r Pro
ject
sS
R 3
3 S
LID
E R
EPA
IR H
UR
R IS
AA
C P
E C
ON
106
223-
301
25,4
20.9
619
3,94
4.78
1010
00/
Cou
nty
Tota
l-4
1,69
2.94
****
****
****
***
Win
ston
****
****
****
***
3051
07R
epai
r Pro
ject
sS
R 1
5 @
BR
# 1
92.1
A W
INS
TON
CO
GU
AR
DR
AIL
BY
STA
TE F
OR
CE
S2,
210.
312,
210.
31C
ON
3010
00/
3051
67P
roje
cts-
Oth
erW
inst
on C
ount
y C
hip
Sea
l Pro
ject
8,15
0.97
8,15
0.97
CO
N30
1000
/
3051
67P
roje
cts-
Oth
erW
inst
on C
ount
y C
hip
Sea
l Pro
ject
30,3
15.0
830
,315
.08
CO
N30
2000
/
3051
67P
roje
cts-
Oth
erW
inst
on C
ount
y C
hip
Sea
l Pro
ject
184,
570.
6118
4,57
0.61
CO
N30
3000
/
3051
67P
roje
cts-
Oth
erW
inst
on C
ount
y C
hip
Sea
l Pro
ject
12,7
41.0
912
,741
.09
CO
N30
4000
/
3052
44U
nusu
al o
r Dis
aste
r Pro
ject
sW
INS
TON
CO
TO
RN
AD
O D
AM
AG
E72
,326
.74
72,3
26.7
438
0000
/
Cou
nty
Tota
l31
0,31
4.80
****
****
****
***
Yalo
bush
a**
****
****
****
*
3047
83R
epai
r Pro
ject
sI-5
5 YA
LOB
US
HA
CO
CA
BLE
BA
RR
IER
@ M
M 2
152,
063.
502,
063.
50C
ON
3010
00/
3047
84R
epai
r Pro
ject
sI-5
5 YA
LOB
US
HA
CO
CA
BLE
BA
RR
IER
@M
M22
0.2
BY
CO
NTR
AC
T FO
RC
ES
1,98
6.00
1,98
6.00
CO
N30
1000
/
3047
85R
epai
r Pro
ject
sI-5
5 YA
LOB
US
HA
CO
CA
BLE
BA
RR
IER
@ M
M 2
17 B
Y C
ON
TRA
CT
FOR
CE
S78
7.50
787.
50C
ON
3010
00/
3048
46R
epai
r Pro
ject
sI-5
5 YA
LOB
US
HA
CO
CA
BLE
RA
IL @
MM
223
.7 B
Y C
ON
TRA
CT
FOR
CE
S4,
245.
004,
245.
00C
ON
3010
00/
3048
54R
epai
r Pro
ject
sI-5
5 YA
LOB
US
HA
CO
CA
BLE
RA
IL @
MM
224
.2 B
Y C
ON
TRA
CT
FOR
CE
S1,
515.
001,
515.
00C
ON
3010
00/
3049
47R
epai
r Pro
ject
sI-5
5 @
MM
215
.2 Y
ALO
BU
SH
A C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
4,79
5.50
4,79
5.50
CO
N30
1000
/
3049
48R
epai
r Pro
ject
sI-5
5 @
MM
220
.5 Y
ALO
BU
SH
A C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
487.
5048
7.50
CO
N30
1000
/
3049
51R
epai
r Pro
ject
sI-5
5 @
MM
214
.6 Y
ALO
BU
SH
A C
O C
AB
LER
AIL
BY
CO
NTR
AC
T FO
RC
ES
2,02
9.50
2,02
9.50
CO
N30
1000
/
3050
22R
epai
r Pro
ject
sI-5
5 @
MM
216
YA
LOB
US
HA
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S12
,502
.50
12,5
02.5
0C
ON
3010
00/
3050
23R
epai
r Pro
ject
sI-5
5 @
MM
221
YA
LOB
US
HA
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S63
7.50
637.
50C
ON
3010
00/
3050
42R
epai
r Pro
ject
sI-5
5 @
MM
217
YA
LOB
US
HA
CO
CA
BLE
RA
IL B
Y C
ON
TRA
CT
FOR
CE
S6,
987.
006,
987.
00C
ON
3010
00/
Cou
nty
Tota
l38
,036
.50
****
****
****
***
Yazo
o**
****
****
****
*
3039
32U
nusu
al o
r Dis
aste
r Pro
ject
sTO
RN
AD
O 0
4-24
-10
YAZO
O C
AP
ITA
L A
SS
ETS
DA
MA
GE
RE
CO
VE
RY.
FO
R E
QU
IPM
EN
T A
ND
BU
ILD
ING
S D
AM
AG
ED
IN Y
AZO
O C
OU
NTY
2,40
0.00
236,
395.
7830
1000
/
3045
71U
nusu
al o
r Dis
aste
r Pro
ject
sYA
ZOO
CO
HU
RR
ISA
AC
DIS
T 3
DE
BR
IS R
EM
OVA
L 1S
T PA
S40
.00
5,00
2.95
3820
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 2
2 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Yazo
o**
****
****
****
*
3046
18U
nusu
al o
r Dis
aste
r Pro
ject
sD
IST
3 O
CT
17 2
012
STO
RM
DA
MA
GE
YA
ZOO
CO
10.0
01,
630.
0238
2000
/
Cou
nty
Tota
l2,
450.
00
****
****
****
***
Dis
tric
twid
e - D
istr
ict 1
****
****
****
***
3042
61R
epai
r Pro
ject
sC
able
Bar
rier R
epai
r - D
istri
ct 1
357,
720.
0064
5,79
0.42
CO
N30
1000
/
Cou
nty
Tota
l35
7,72
0.00
****
****
****
***
Dis
tric
twid
e - D
istr
ict 2
****
****
****
***
3042
61R
epai
r Pro
ject
sC
able
Bar
rier R
epai
r - D
istri
ct 2
32,1
96.5
027
5,34
3.00
CO
N30
2000
/
Cou
nty
Tota
l32
,196
.50
****
****
****
***
Dis
tric
twid
e - D
istr
ict 3
****
****
****
***
3042
61R
epai
r Pro
ject
sC
able
Bar
rier R
epai
r - D
istri
ct 3
103,
386.
5018
6,61
9.50
CO
N30
3000
/
3047
87P
roje
cts-
Oth
erS
R 8
26, S
R 1
, SR
16
and
SR
434
in S
hark
ey C
ount
y. S
R 1
, SR
14,
SR
16
and
SR
465
in Is
saqu
ena
Cou
nty.
4,77
6,44
3.95
4,77
6,75
1.95
CO
N30
1000
/
Cou
nty
Tota
l4,
879,
830.
45
****
****
****
***
Dis
tric
twid
e - D
istr
ict 5
****
****
****
***
3042
61R
epai
r Pro
ject
sC
able
Bar
rier R
epai
r - D
istri
ct 5
145,
840.
0029
7,95
2.50
CO
N30
5000
/
3048
26P
roje
cts-
Oth
erR
aise
d P
avem
ent M
arke
rs -
Dis
trict
527
9,86
0.86
279,
860.
86C
ON
3010
00/
3051
41P
roje
cts-
Oth
erD
istri
ct W
ide
Rai
sed
Pav
emen
t Mar
kers
207,
821.
9320
7,82
1.93
CO
N30
1000
/
Cou
nty
Tota
l63
3,52
2.79
****
****
****
***
Dis
tric
twid
e - D
istr
ict 6
****
****
****
***
3042
61R
epai
r Pro
ject
sC
able
Bar
rier R
epai
r - D
istri
ct 6
260,
945.
0061
6,94
0.50
CO
N30
6000
/
3048
18P
roje
cts-
Oth
erD
istri
ct W
ide
Rai
sed
Pav
emen
t Mar
ker I
nsta
llatio
n25
6,93
6.68
256,
936.
68C
ON
3010
00/
3052
25P
roje
cts-
Oth
erD
istri
ctw
ide
chip
/fog
seal
6,77
0.96
6,77
0.96
CO
N30
1000
/
Cou
nty
Tota
l52
4,65
2.64
****
****
****
***
Dis
tric
twid
e - D
istr
ict 7
****
****
****
***
3042
61R
epai
r Pro
ject
sC
able
Bar
rier R
epai
r - D
istri
ct 7
31,4
08.0
713
8,71
3.57
CO
N30
7000
/
3047
07P
roje
cts-
Oth
erD
ISTR
ICTW
IDE
RA
ISE
D P
AVE
ME
NT
MA
RK
ER
S13
9,07
6.54
139,
076.
54C
ON
3010
00/
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NM
aint
enan
ce P
roj E
xpen
ditu
res
by C
ount
yR
eque
ster
: M
HAY
DE
NR
epor
t ID
: D
R00
0152
11/0
3/20
14 0
3:11
:51
pmPa
ge 2
3 of
23
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
****
****
****
***
Dis
tric
twid
e - D
istr
ict 7
****
****
****
***
3048
05P
roje
cts-
Oth
erC
HIP
SE
AL
ON
VA
RIO
US
RO
UTE
S IN
DIS
TRIC
T 7
285,
901.
1728
5,90
1.17
CO
N30
1000
/
3051
57P
roje
cts-
Oth
erD
ISTR
ICT
WID
E S
CR
UB
SE
AL
-61.
60-6
1.60
CO
N30
1000
/
Cou
nty
Tota
l45
6,32
4.18
****
****
****
***
STAT
EWID
E**
****
****
****
*
3003
42P
roje
cts-
Oth
erH
ER
BIC
IDE
RE
SE
AR
CH
PR
OG
RA
M9,
335.
521,
945,
741.
87C
ON
1000
/
3003
42P
roje
cts-
Oth
erD
epar
tmen
t of P
lant
and
Soi
l Sci
ence
s at
Mis
siss
ippi
Sta
te U
nive
rsity
to c
ontin
ue to
dev
elop
the
inte
grat
ed p
roce
ss fo
r man
agin
g ve
geta
tion
with
in h
ighw
ay ri
ghts
-of-w
ay.
145,
076.
8814
5,07
6.88
CO
N20
00/
3046
65R
adio
Equ
ipm
ent
MS
WIN
(MS
Wire
less
Info
rmat
ion
Net
wor
k)11
4,95
0.07
141,
042.
4030
1000
/
3050
65U
nusu
al o
r Dis
aste
r Pro
ject
sH
UR
R K
AR
EN
STA
TEW
IDE
SU
PP
OR
T1,
689.
641,
689.
6430
1000
/
Cou
nty
Tota
l27
1,05
2.11
Rep
ort T
otal
s62
,205
,248
.53
dw_m
aint
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
1 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Adam
s**
****
****
****
*
1029
42N
atio
nal H
ighw
ay S
yste
m(N
HS
)5-
LAN
E R
EC
ON
STR
UC
TIO
N O
F VA
RIO
US
SE
CTI
ON
S O
F U
S 6
1 FR
OM
SO
UTH
CIT
Y LI
MIT
S O
F N
ATC
HE
Z TO
TH
E IN
TER
SE
CTI
ON
OF
US
61
AN
D U
S 8
4 AT
WA
SH
ING
TON
FO
R 1
1.4
MIL
266.
281,
163,
423.
95E
NG
1010
00/
1029
42N
atio
nal H
ighw
ay S
yste
m(N
HS
)R
EC
ON
STR
UC
T O
F IN
TER
CH
AN
GE
AT
US
61
AN
D D
EV
ER
EU
X R
OA
D2,
953,
579.
8023
,743
,971
.38
CO
N30
1000
/
1045
98N
atio
nal H
ighw
ay S
yste
m(N
HS
)A
dam
s C
ount
y B
oard
of S
uper
viso
rs -
Por
t of N
atch
ez -
Rea
lign
and
Wid
en G
over
nmen
t Fle
et R
d. &
Ext
ensi
on to
L.E
. Bar
ry R
d.38
3.69
2,93
6,37
7.65
CO
N70
1000
/
1045
98N
atio
nal H
ighw
ay S
yste
m(N
HS
)G
ov. F
leet
Rd.
& e
xten
. to
L.E
. Bar
ry R
d11
7,45
4.69
564,
623.
69C
ON
7020
00/
1045
98S
tate
Pro
ject
sA
dam
s C
ount
y B
oard
of S
uper
viso
rs -
Por
t of N
atch
ez -
Rea
lign
and
Wid
en G
over
nmen
t Fle
et R
d. &
Ext
ensi
on to
L.E
. Bar
ry R
d.68
4.30
684.
3079
9000
/
1052
22S
tate
Pro
ject
sE
ME
RA
LD M
OU
ND
AC
CE
SS
RD
TO
TH
E N
ATC
HE
Z TR
AC
E [P
UR
CH
AS
E R
OW
FO
R T
HE
PA
RK
SE
RV
ICE
]1,
298.
0045
6,15
8.95
RO
W20
1000
/
1054
16S
tate
Pro
ject
sM
ISS
ISS
IPP
I RIV
ER
BR
IDG
E A
T N
ATC
HE
Z, IN
SP
EC
TIO
N B
Y H
NTB
.14
,800
.17
133,
338.
74E
NG
1010
00/
1054
16Vi
sion
21
MIS
SIS
SIP
PI R
IVE
R B
RID
GE
AT
NAT
CH
EZ
(1A
)87
9,38
6.47
880,
404.
36C
ON
3010
00/
1059
72S
tate
Pro
ject
sC
ity o
f Nat
chez
- S
t. C
athe
rine
Stre
et -
Fork
s of
the
Roa
d Tr
ails
pro
ject
. Pro
ject
will
incl
ude
side
wal
ks, l
ands
capi
ng, c
urb
cuts
, lig
htin
g, a
nd k
iosk
ben
ches
. 80
2.28
802.
2879
9000
/
1063
45S
tate
Pro
ject
sC
ity o
f Nat
chez
-Rot
h H
illl B
ridge
of S
ighs
Sce
nic
Byw
ay p
roje
ct45
7.20
457.
2079
9000
/
1063
97S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi R
iver
Brid
ges
ITS
- TIG
ER
III G
rant
[Nat
chez
Brid
ge]
1,07
5,16
8.14
1,07
5,16
8.14
CO
N30
2000
/
1064
87Vi
sion
21
US
84
Wes
tbou
nd M
issi
ssip
pi R
iver
Brid
ge39
0,90
8.95
511,
200.
00E
NG
1010
00/
1066
54S
tate
Pro
ject
sU
S 6
1 &
Hig
hlan
d B
lvd
inte
rsec
tion
2.2m
i Sou
th17
,164
.46
18,3
60.4
0E
NG
1010
00/
1066
55S
tate
Pro
ject
sS
R 5
55 &
US
61
inte
rsec
tion
2.5m
i Nor
th14
,099
.13
16,1
29.5
5E
NG
1010
00/
1066
74S
tate
Pro
ject
sC
ity o
f Nat
chez
- H
isto
ric D
epot
Reh
abili
tatio
n - w
ill m
ake
the
Yazo
o an
d M
issi
ssip
pi V
alle
y R
ailro
ad D
epot
the
trailh
ead
for t
he N
atch
ez B
luff
Trai
ls a
nd N
atch
ez D
ownt
own
Trai
ls lo
cate
d on
Bro
adw
ay S
treet
in d
ownt
own
Nat
chez
.1,
293.
631,
293.
6379
9000
/
1067
27S
tate
Pro
ject
sC
ity o
f Nat
chez
-Reh
abili
tatio
n of
the
Toll
Pla
za C
olon
nade
5,18
7.94
5,18
7.94
7990
00/
Cou
nty
Tota
l5,
472,
935.
13
****
****
****
***
Alco
rn**
****
****
****
*
1051
26S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Cor
inth
- Im
prov
e P
edes
trian
AD
A ac
cess
ibili
ty in
Dow
ntow
n C
orin
th H
isto
ric D
istri
ct.
Pro
vide
AD
A ra
mps
at s
treet
cro
ssin
gs.
Pro
vide
impr
oved
pav
emen
t/cro
ssw
alk
mar
king
s.15
1.96
380,
928.
41C
ON
7010
00/
1059
81U
rban
City
of C
orin
th -
Mill
ing,
Ove
rlay
& A
DA
impr
ovem
ents
on
Fillm
ore
Stre
et fr
om C
hild
s S
treet
to M
ain
Stre
et1,
632.
9713
5,05
4.45
CO
N70
1000
/
1059
82U
rban
City
of C
orin
th -
Stre
et Im
prov
emen
ts, P
rope
r Stre
et b
etw
een
Cru
ise
Stre
et a
nd Y
oung
Stre
et fo
r a to
tal p
roje
ct le
ngth
of 0
.46
mile
s.1,
488.
3122
8,90
6.87
CO
N70
1000
/
1062
72S
afet
yM
S 2
from
Alc
orn/
Tipp
ah C
L to
Kos
suth
[10-
13 S
FTY
GP
PG
I-7]
180,
453.
9018
5,82
7.31
EN
G10
1000
/
1062
72S
afet
yM
S 2
from
Alc
orn/
Tipp
ah C
L to
Kos
suth
16
,476
.79
16,4
76.7
9C
ON
3010
00/
1065
19P
avem
ent R
ehab
ilita
tion
US
45
FM S
OF
HA
RP
ER
RD
EXI
T TO
TN
SL
4,65
3,79
0.44
4,71
9,67
3.07
CO
N30
1000
/
1066
01S
tate
Pro
ject
sC
ity o
f Cor
inth
- S
outh
Par
kway
Stre
et a
t HW
Y 72
Impr
ovem
ents
384.
6038
4.60
7990
00/
Cou
nty
Tota
l4,
854,
378.
97
****
****
****
***
Amite
****
****
****
***
1023
84Vi
sion
21
SR
570
BTW
TH
OM
PS
ON
RO
AD
AN
D P
IKE
CO
UN
T-3
57,8
01.4
70.
00C
ON
3011
00/
1023
84Vi
sion
21
SR
570
BTW
TH
OM
PS
ON
RO
AD
AN
D P
IKE
CO
UN
T42
9,31
4.12
429,
314.
12C
ON
3012
00/
1027
12Vi
sion
21
SR
48
FM E
AS
T FO
RK
RD
TO
PIK
E C
L7,
248.
723,
019,
604.
05E
NG
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
2 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Amite
****
****
****
***
1027
12Vi
sion
21
SR
24
FM E
AS
T FO
RK
RD
TO
PIK
E C
L10
8,64
6.56
3,95
3,35
9.76
RO
W20
1000
/
1039
63S
afet
yS
R 3
3 be
twee
n G
lost
er a
nd C
oles
--to
pay
Fran
klin
Tel
epho
ne C
o.54
,870
.82
54,8
70.8
2R
OW
2011
00/
1064
38B
ridge
SR
24
Rep
lace
Brid
ge N
o. 5
5.9
over
Tan
yard
Cre
ek
54,4
87.9
610
3,69
7.74
EN
G10
1000
/
1067
48P
avem
ent R
ehab
ilita
tion
SR
24
FRO
M T
AN
YAR
D C
RE
EK
BR
IDG
E E
AS
T 1.
8 M
ILE
S T
O T
HE
EA
ST
CIT
Y LI
MIT
S IN
LIB
ER
TY61
8,61
6.15
618,
616.
15C
ON
3010
00/
Cou
nty
Tota
l91
5,38
2.86
****
****
****
***
Atta
la**
****
****
****
*
1024
35S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
3 B
ETW
EE
N S
R 3
5 A
ND
1 M
ILE
NO
RTH
OF
SR
35
38,4
92.5
46,
933,
880.
36C
ON
3010
00/
1033
25B
ridge
SR
12
FR H
OLM
ES
CL
TO C
HO
CTA
W C
L - P
. E. -
Gen
eral
Obl
igat
ion
Bon
d22
5,00
3.78
668,
006.
65E
NG
1020
00/
1033
25Vi
sion
21
SR
12
FRO
M T
HE
HO
LME
S C
L K
OS
CIU
SK
O [B
RID
GE
#s
87.6
, 90.
2 &
91.
2]57
,022
.52
418,
267.
15R
OW
2010
00/
1033
25Vi
sion
21
SR
12
FRO
M T
HE
HO
LME
S C
L K
OS
CIU
SK
O [B
RID
GE
#s
87.
6, 9
0.2
& 9
1.2]
88,9
60.4
088
,960
.40
CO
N30
1000
/
1033
25Vi
sion
21
SR
12
FRO
M K
OS
CIU
SK
O T
O T
HE
CH
OC
TAW
CL
BR
NO
S.
101.
7, 1
03.8
, 104
.7, 1
07.3
, 110
.1, 1
10.4
, 113
.2, 1
14.5
, 115
.4, 1
17.8
, 119
.3,1
19.4
- 3R
[10-
13 B
RD
GE
RE
PL
I-5]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct3,
084,
169.
0120
,109
,029
.16
CO
N30
2000
/
1052
53U
rban
City
of K
osci
usko
- Rep
lace
men
t of s
pan-
wire
mou
nted
traf
fic s
igna
ls w
ith n
ew m
ast-a
rm m
ount
ed s
igna
ls a
t tw
o S
R 1
2 in
ters
ectio
ns: N
orth
Wel
ls S
treet
and
Nor
th J
acks
on S
treet
6,87
3.91
145,
972.
91C
ON
7010
00/
1061
05Vi
sion
21
SR
35
Brid
ge R
epla
cem
ent [
Brid
ge #
163
.7]
39,5
66.8
245
,631
.05
EN
G10
1000
/
1067
58P
avem
ent R
ehab
ilita
tion
SR
12
Hol
mes
CL
to 0
.03
mile
s W
est o
f MS
431
(Sal
lis)
991,
052.
8599
1,05
2.85
CO
N30
1000
/
Cou
nty
Tota
l4,
531,
141.
83
****
****
****
***
Ben
ton
****
****
****
***
1033
28B
ridge
SR
178
FR
OM
SR
5 T
O U
NIO
N C
OU
NTY
LIN
E [B
RID
GE
# 5
1.3
OA
KLI
ME
TER
CR
EE
K]
32,1
44.1
174
,186
.28
EN
G10
1000
/
1042
33N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 7
8 -U
PG
RA
DE
FO
R I-
22-D
IST
210
,085
,258
.95
11,4
54,5
74.9
9C
ON
3030
00/
1051
89B
ridge
SR
7 B
RID
GE
RE
PLA
CE
ME
NTS
- G
ener
al O
blig
atio
n B
ond
255,
093.
4439
0,09
6.25
EN
G10
2100
/
1051
89Vi
sion
21
SR
7 B
RID
GE
RE
PLA
CE
ME
NT
[BR
IDG
E #
s 16
6.2,
166
.4, 1
67.8
, & 1
68.3
]3,
598.
0520
7,47
3.80
RO
W20
2000
/
1062
69S
afet
yU
S 7
2 @
MS
7 [
10-1
3 S
FTY
GP
PG
I-7]
38,9
63.1
480
,770
.33
EN
G10
1000
/
1062
69S
afet
yU
S 7
2 @
MS
711
1,84
3.44
111,
843.
44C
ON
3010
00/
1064
80S
afet
yU
S 7
2 ne
ar M
S 7
DO
T# 2
97 7
15T
MS
Cen
tral R
R21
3,10
8.23
213,
108.
23C
ON
3010
00/
Cou
nty
Tota
l10
,740
,009
.36
****
****
****
***
Bol
ivar
****
****
****
***
1004
44B
ridge
SR
448
RE
PLA
CE
BR
BT
BE
NO
IT &
SH
AW B
R #
's 1
2.3,
8.5
, 5.5
, 13.
371
,169
.47
368,
248.
29E
NG
1000
/
1004
44B
ridge
SR
448
BR
NO
S. 5
.5,
8.5,
12.
3, 1
3.3
BTW
N B
EN
OIT
& S
HAW
258.
2026
,899
.22
RO
W20
1000
/
1021
55S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 8
FR
OM
CLE
VE
LAN
D T
O S
UN
FLO
WE
R C
.L. (
AD
D 2
LN
S)
183.
1867
4,39
2.27
EN
G10
00/
1021
55Vi
sion
21
SR
8 F
RO
M C
LEV
ELA
ND
TO
SU
NFL
OW
ER
C.L
. (A
DD
2 L
AN
ES
) [I-
29]
714,
926.
881,
570,
504.
86C
ON
3030
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
3 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Bol
ivar
****
****
****
***
1046
43S
tate
Pro
ject
sB
oliv
ar C
ount
y us
61
(log
mile
32.
850
to 4
4.02
5)92
9.20
21,9
54.0
4E
NG
1080
00/
1057
14S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Cle
vela
nd -
Bic
ycle
/Ped
estri
an w
alki
ng p
ath
on th
e ab
ando
ned
C&
G R
ailro
ad C
orrid
or s
outh
of L
ee S
treet
.6,
832.
9678
9,20
2.46
CO
N70
1000
/
1061
89N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 6
1 S
outh
Of S
R 4
46 In
Boy
le a
nd e
nd a
t Cla
rk S
treet
in C
leve
land
[10
-13
O&
M G
P P
G I-
6]11
,048
.10
5,59
0,79
4.65
CO
N30
1000
/
Cou
nty
Tota
l80
5,34
7.99
****
****
****
***
Cal
houn
****
****
****
***
1021
60B
ridge
SR
8 B
TW C
ALH
OU
N C
ITY
AN
D D
ER
MA
(3 L
AN
ES
,RE
CO
NS
T)32
,919
.63
2,56
4,07
5.53
RO
W20
2000
/
1021
60B
ridge
SR
8 B
ETW
EE
N C
ALH
OU
N C
ITY
AN
D D
ER
MA
[3 B
RID
GE
S]
2,
883,
494.
748,
308,
665.
08C
ON
3020
00/
1025
27B
ridge
SR
32
RE
PLA
CE
5 B
R B
TW O
LD S
R 7
& C
ALH
OU
N19
7,64
8.92
493,
898.
61C
ON
3021
00/
Cou
nty
Tota
l3,
114,
063.
29
****
****
****
***
Car
roll
****
****
****
***
1023
21P
avem
ent R
ehab
ilita
tion
I-55
FRO
M H
OLM
ES
C/L
TO
0.5
MI S
OU
TH O
F S
R 3
5 (C
oncr
ete
War
rant
y)41
,698
.26
12,0
67,8
35.9
7C
ON
3010
00/
1044
10P
avem
ent R
ehab
ilita
tion
* I5
5-0.
5 M
ILE
S S
OU
TH O
F S
R 3
5 TO
TH
E C
AR
RO
LL/M
ON
TGO
ME
RY
CO
LIN
E75
,165
.97
6,00
1,87
3.04
CO
N30
1000
/
1046
43S
tate
Pro
ject
sI-5
5 C
AR
RO
LL C
O. L
M 0
.000
TO
7.1
5654
0.06
89,6
79.8
5E
NG
1030
00/
1061
02Vi
sion
21
US
51
Brid
ge R
epla
cem
ents
- 6
brid
ges
[16
8.2,
169
.5, 1
69.6
, 169
.9, 1
70.0
, 170
.1]
38,7
66.3
549
,882
.37
EN
G10
1000
/
1062
26P
avem
ent R
ehab
ilita
tion
US
82
FRO
M P
AVE
ME
NT
MA
NA
GE
ME
NT
SE
CTI
ON
AP
PR
OXI
MAT
ELY
4.5
MIL
ES
WE
ST
OF
CA
RR
OLL
TON
TO
TH
E M
ON
TGO
ME
RY
CO
UN
TY L
INE
[EA
STB
OU
ND
LA
NE
S O
NLY
] [1
0-13
O&
M G
P P
G I-
6]44
3.50
2,92
6,44
9.62
CO
N30
1000
/
Cou
nty
Tota
l15
6,61
4.14
****
****
****
***
Chi
ckas
aw**
****
****
****
*
1052
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)G
M&
O R
ails
to T
rails
Rec
reat
ion
Dis
trict
of N
orth
MS
- P
urch
ase
of ra
ilroa
d rig
hts-
of-w
ay, r
eloc
atio
n of
railr
oad
stor
age
yard
and
con
stru
ctio
n of
a m
ultiu
se re
crea
tiona
l tra
il fro
m N
ew A
lban
y to
Hou
ston
, MS
.[V-2
3]82
5,21
0.90
7,84
6,78
8.35
CO
N70
1000
/
1066
25S
afet
yH
ighw
ay 1
5 &
Hig
hway
389
71
,806
.95
71,8
06.9
5E
NG
1010
00/
Cou
nty
Tota
l89
7,01
7.85
****
****
****
***
Cla
ibor
ne**
****
****
****
*
1010
68P
hase
IIU
S 6
1 FR
OM
JE
FFE
RS
ON
C L
TO
NAT
CH
EZ
TRA
CE
PE
101
065/
1000
CO
NS
102
054
276.
252,
339,
995.
04R
OW
1000
/
1018
19P
hase
IIU
S 6
1 FR
NAT
CH
EZ
TRA
CE
TO
4LA
NE
NO
RTH
OF
PO
RT
GIB
SO
N66
,390
.74
794,
421.
20E
NG
1010
00/
1036
97S
peci
al P
roje
cts(
Dem
o)TC
SP
-PO
RT
OF
CLA
IBO
RN
E C
O R
D (n
et a
mou
nt p
aid)
12,1
37.0
534
3,38
1.67
EN
G10
2000
/
1036
97S
peci
al P
roje
cts(
Dem
o)TC
SP
-PO
RT
OF
CLA
IBO
RN
E C
O R
D (w
e pa
y th
em 8
0%)
56,7
06.3
71,
612,
024.
43R
OW
2010
00/
1064
01Vi
sion
21
SR
547
RE
PLA
CE
BR
IDG
E #
4.1
88
,778
.41
267,
284.
38E
NG
1010
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
4 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Cla
ibor
ne**
****
****
****
*
1068
51S
tate
Pro
ject
sC
ity o
f Por
t Gib
son
- H
isto
ric R
ailro
ad D
epot
aqu
isiti
on a
nd re
nova
tion
at 1
202
Mar
ket S
treet
in d
ownt
own
Por
t Gib
son
374.
6637
4.66
7990
00/
Cou
nty
Tota
l22
4,66
3.48
****
****
****
***
Cla
rke
****
****
****
***
1007
78B
ridge
SR
512
AT
CH
ICK
AS
AWH
AY R
IVE
R, B
RID
GE
RE
PLA
CE
ME
NT
[BR
# 1
7.6]
3,
614.
675,
374,
471.
12C
ON
3010
00/
1022
42S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 5
11 F
RO
M S
R 1
8 TO
EO
SM
INTE
RS
EC
TIO
N IM
PR
OV
EM
EN
T2,
751.
1399
,218
.13
EN
G10
00/
1025
33B
ridge
US
11
RE
PLA
CE
BR
IDG
E #
135.
8 O
VE
R S
OU
INLO
VE
Y C
RE
EK
94,4
04.8
461
1,97
8.43
EN
G10
00/
1025
33Vi
sion
21
US
11
RE
PLA
CE
BR
IDG
E #
135.
8 &
#13
6.2
AT S
OU
INLO
VE
Y C
RE
EK
13,8
57.9
711
2,84
0.34
RO
W20
1000
/
1025
34S
tate
Pro
ject
sU
S 1
1 R
EP
L B
RID
GE
S #
146.
8 N
. OF
CH
UN
KY
RIV
ER
44,5
90.8
024
2,39
0.79
EN
G10
1000
/
1025
34Vi
sion
21
US
11
RE
PL
BR
IDG
ES
#14
6.8
N. O
F C
HU
NK
Y R
IVE
R16
0,84
5.00
171,
716.
02R
OW
2010
00/
1059
20P
avem
ent R
ehab
ilita
tion
I-59
FM J
AS
PE
R C
L TO
6.5
MI N
O O
F JA
SP
ER
CL
2,29
8.43
48,1
40.6
8E
NG
1010
00/
1059
20P
avem
ent R
ehab
ilita
tion
I-59
FM J
AS
PE
R C
L TO
6.5
MI N
O O
F JA
SP
ER
CL
10,1
36,2
93.5
012
,564
,227
.50
CO
N30
1000
/
1062
33S
afet
yU
S 4
5 at
CR
212
[10
-13
SFT
Y G
P P
G I-
7]2,
019,
783.
262,
401,
722.
25C
ON
3010
00/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
312]
33,0
69.4
733
,069
.47
3120
00/
Cou
nty
Tota
l12
,511
,509
.07
****
****
****
***
Cla
y**
****
****
****
*
1051
86S
afet
yC
ity o
f Wes
t Poi
nt -
Dev
elop
Saf
ety
Edu
catio
n an
d E
nfor
cem
ent P
rogr
ams.
11,6
48.0
019
,089
.00
CO
N40
2000
/
1053
05S
afet
yC
ity o
f Wes
t Poi
nt -
Impr
ove
Sid
ewal
ks &
Con
stru
ctio
n of
new
Sid
ewal
ks a
long
var
ious
rout
es to
5th
Stre
et S
choo
l & C
entra
l Sch
ool.
16,0
50.4
716
,536
.87
EN
G41
1000
/
1053
05S
tate
Pro
ject
sC
ity o
f Wes
t Poi
nt -
Impr
ove
Sid
ewal
ks &
Con
stru
ctio
n of
new
Sid
ewal
ks a
long
var
ious
rout
es to
5th
Stre
et S
choo
l & C
entra
l Sch
ool.
1,98
0.12
1,98
0.12
7990
00/
1057
23S
tate
Pro
ject
sC
ity o
f Wes
t Poi
nt -
Wid
en tu
rn la
ne o
n E
shm
an A
ve fr
om E
Hal
f Mile
Stre
et to
Indu
stria
l Acc
ess
Roa
d (W
est D
efen
se F
acili
ty A
cces
s Im
prov
emen
ts).
248.
9624
8.96
7990
00/
1057
23S
peci
al P
roje
cts(
Dem
o)C
ity o
f Wes
t Poi
nt -
Ove
rlay
Esh
man
Ave
. - P
relim
inar
y en
gine
erin
g82
9.74
85,1
75.2
0C
ON
8110
00/
1066
06S
afet
yU
pgra
de R
R C
ross
ings
on
Tibb
ee in
the
City
of W
est P
oint
DO
T#90
7 81
4D16
8.90
168.
90E
NG
1020
00/
Cou
nty
Tota
l30
,926
.19
****
****
****
***
Coa
hom
a**
****
****
****
*
1027
33Vi
sion
21
SR
6 F
RO
M U
S 6
1 TO
QU
ITM
AN
CO
UN
TY L
INE
193,
965.
781,
537,
593.
80E
NG
1010
00/
1046
43S
tate
Pro
ject
sC
OA
HO
MA
CO
. US
61
LM 0
.000
TO
9.9
001,
780.
5718
,271
.90
EN
G10
4000
/
1051
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Cla
rksd
ale
- Fre
ight
Dep
ot Im
prov
emen
ts (D
elta
Blu
es M
useu
m).
Site
Dev
elop
men
t Reh
abili
tatio
n of
Dep
ot, A
dditi
on. E
duca
tiona
l Exh
ibits
and
Pro
gram
s.27
,721
.63
1,26
1,25
9.26
CO
N70
1000
/
1061
93S
tate
Pro
ject
sC
ity o
f Cla
rksd
ale-
Cul
tura
l Her
itage
Wal
king
Tra
il th
roug
hout
His
toric
Dis
trict
of C
lark
sdal
e th
at w
ill in
clud
e in
terp
retiv
e si
gnag
e an
d pe
dest
rian
impr
ovem
ents
/faci
litie
s.
1,04
5.79
1,04
5.79
7990
00/
1062
00P
avem
ent R
ehab
ilita
tion
US
161
FR
OM
CE
NTE
RLI
NE
US
61
TO S
UN
FLO
WE
R R
IVE
R B
RID
GE
TH
RO
UG
H C
LAR
KS
DA
LE
[1
0-13
O&
M G
P P
G I-
6]24
5.34
1,23
5,23
1.19
CO
N30
1000
/
1062
68S
afet
yU
S 6
1 @
Eag
les
Nes
t Roa
d 87
,561
.33
214,
857.
59E
NG
1010
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
5 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Coa
hom
a**
****
****
****
*
1063
13P
avem
ent R
ehab
ilita
tion
SR
1 F
M B
OLI
VAR
CL
TO S
HE
RA
RD
[10
-13
O&
M G
P P
G I-
6]43
,042
.14
2,94
9,49
4.37
CO
N30
1000
/
1063
97S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi R
iver
Brid
ges
ITS
- TI
GE
R II
I Gra
nt [L
ula/
Hel
ena
Brid
ge]
1,76
6,98
8.51
1,76
6,98
8.51
CO
N30
4000
/
1064
28S
afet
yG
T-05
7 U
pgra
de a
cro
ssin
g su
rface
on
US
61
near
Lul
a (D
OT
# 30
1 74
9Y)
146,
551.
4914
6,55
1.49
CO
N30
1000
/
1066
58S
tate
Pro
ject
sC
oaho
ma
Cou
nty
BO
S -
Moo
n La
ke L
andi
ng B
ike
Trai
l whi
ch w
ill b
egin
at t
heM
issi
ssip
pi W
elco
me
Cen
ter a
t Hw
y 49
& H
wy
61fo
llow
ing
the
Yazo
o P
ass
to th
e pa
rk o
n M
oon
Lake
Rd
(2 m
iles
in le
ngth
).75
.35
75.3
579
9000
/
Cou
nty
Tota
l2,
268,
977.
93
****
****
****
***
Cop
iah
****
****
****
***
1030
45B
ridge
SR
18
BR
NO
S. 1
9.2,
19.
4, 2
3.0,
24.
2 B
TW C
LAIB
OR
NE
CL
AN
D H
IND
S C
L68
,148
.06
848,
243.
79E
NG
1010
00/
1052
15S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)To
wn
of W
esso
n -S
idew
alk,
Lan
dsca
ping
, and
Lig
htin
g al
ong
Hig
hway
51
and
Bee
ch S
treet
.13
.48
213,
453.
90C
ON
7010
00/
1054
44In
ters
tate
I-55
Wid
en B
ridge
Sho
ulde
rs D
esig
n B
uild
3,46
0.19
92,5
87.8
5E
NG
1050
00/
1054
44In
ters
tate
I-55
Wid
en B
ridge
Sho
ulde
rs D
esig
n B
uild
7,50
8,84
2.82
9,38
2,39
2.89
CO
N30
5000
/
1057
84S
afet
yC
N S
igna
ls/G
ates
on
Mon
ticel
lo R
d in
Haz
elhu
rst,
MS
(Cop
iah
Cou
nty)
DO
T 29
9 85
0T-5
,000
.00
0.00
EN
G10
1000
/
1057
84S
afet
yC
N S
igna
ls/G
ates
on
Mon
ticel
lo R
d in
Haz
elhu
rst,
MS
(Cop
iah
Cou
nty)
DO
T 29
9 85
0T20
,694
.02
132,
702.
86C
ON
3010
00/
1066
26S
afet
yM
S 2
7 @
Lee
Ave
/Old
Hw
y 27
#1
132,
135.
0313
2,13
5.03
EN
G10
1000
/
1066
93S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 fro
m S
. Pat
Har
rison
Dr t
o S
R 2
786
9,01
7.78
869,
017.
78C
ON
3010
00/
Cou
nty
Tota
l8,
597,
311.
38
****
****
****
***
Cov
ingt
on**
****
****
****
*
1008
22P
avem
ent R
ehab
ilita
tion
US
84
BTW
CO
LLIN
S &
JO
NE
S C
TY L
INE
- R
EC
ON
STR
UC
TIO
N O
F W
ES
T B
OU
ND
LA
NE
S 19,
502.
761,
163,
012.
13E
NG
1000
/
1008
22O
ther
US
84
BTW
CO
LLIN
S &
JO
NE
S C
TY L
INE
RE
CO
NS
TRU
CTI
ON
OF
WE
ST
BO
UN
D L
AN
ES
86,0
91.3
93,
090,
846.
59R
OW
2010
00/
1020
69P
hase
III
US
84
CO
LLIN
S B
YPA
SS
,FM
1.9
MI W
OF
US
49 T
O 0
.5 E
NO
TE: P
. E. I
S 1
0117
7-3
00,0
00.0
016
,564
,964
.21
CO
N30
2000
/
1046
43S
tate
Pro
ject
sU
S 8
411
,781
.42
27,1
47.3
0E
NG
1150
00/
1049
89S
tate
Pro
ject
sU
S 4
9 FR
OM
FO
RR
ES
T C
OU
NTY
LIN
E T
O T
HE
SIM
PS
ON
CO
UN
TY L
INE
166,
816.
771,
129,
830.
93E
NG
1000
/
1051
33S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Col
lins
- Ren
ovat
ion
(incl
udin
g th
e re
mov
al o
f non
-his
toric
add
ition
s) o
f the
Gul
f & S
hip
Isla
nd R
R D
epot
.16
,768
.22
610,
958.
92C
ON
7010
00/
1052
75S
tate
Pro
ject
sS
R 5
90 R
EP
LAC
E B
RID
GE
# 3
.9 O
VE
R C
UR
RE
Y C
RE
EK
3.9
MIL
ES
EA
ST
OF
US
49
279,
578.
311,
711,
535.
89E
NG
1010
00/
1052
75B
ridge
SR
590
RE
PLA
CE
BR
IDG
E #
3.9
OV
ER
CU
RR
EY
CR
EE
K85
,409
.67
85,4
09.6
7R
OW
2010
00/
1057
78S
afet
yP
E -
US
49
@ K
ola
Roa
d in
Cov
ingt
on C
ount
y (s
igna
lized
inte
rsec
tion)
64,0
18.9
737
6,41
8.36
EN
G10
1000
/
1057
78N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 @
Kol
a R
oad
in C
ovin
gton
Cou
nty
122,
662.
5544
6,42
8.43
RO
W20
1000
/
1063
26N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 fro
m F
orre
st C
L to
Col
lins
1,42
8.00
3,52
5.15
EN
G10
1000
/
1063
26N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 fro
m C
ollin
s to
the
Sim
pson
CL
33,5
69.3
712
2,37
7.23
EN
G10
2000
/
1063
38S
afet
yS
urfa
ce/S
igna
l Upg
rade
, US
184
Col
lins
- New
Cro
ssin
g S
urfa
ce D
OT
#305
366
J C
N R
ailro
ad15
,079
.23
15,0
79.2
3C
ON
3010
00/
1063
38S
afet
yS
urfa
ce/S
igna
l Upg
rade
, US
184
Col
lins
- Fla
shin
g Li
ghts
& G
ates
DO
T #
305
366J
CN
Rai
lroad 120,
141.
9412
0,14
1.94
CO
N30
2000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
6 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Cov
ingt
on**
****
****
****
*
1065
02S
afet
yU
S 4
9 @
4th
Stre
et a
nd U
S 4
9 @
Pin
ecre
st S
treet
in C
ollin
s, M
S72
,982
.37
129,
455.
23E
NG
1010
00/
1065
02S
afet
yU
S 4
9 @
4th
St.,
Pin
ecre
st S
t., S
unse
t Rd/
Ora
Sw
amp,
& S
elm
a R
d. in
Col
lins,
MS
7,18
6.92
7,18
6.92
CO
N30
1000
/
1065
08S
tate
Pro
ject
sTo
wn
of M
ount
Oliv
e - R
emov
al o
f par
king
in th
e m
iddl
e of
Mai
n S
treet
by
putti
ng a
con
cret
e cu
rb a
nd g
utte
r med
ian
with
impr
oved
dra
inag
e st
ruct
ures
and
rais
ed p
edes
trian
cro
ssw
alks
.41
7.61
417.
6179
9000
/
1065
52E
mer
genc
y R
elie
fD
ist 7
Hur
rican
e Is
sac
Em
erge
ncy
Ope
ratio
ns [
3045
68 3
16]
220.
0014
,117
.38
3160
00/
1067
00S
afet
yU
S 8
4 at
MS
35
8,79
8.35
8,79
8.35
EN
G10
1000
/
Cou
nty
Tota
l81
2,45
3.85
****
****
****
***
Des
oto
****
****
****
***
1002
22Vi
sion
21
I-55
FRO
M W
ELC
OM
E C
EN
TER
SO
UTH
OF
HE
RN
AN
DO
TO
TN
STA
TE L
INE
-428
,225
.97
1,54
0,18
2.18
EN
G10
00/
1002
22Vi
sion
21
I-55
FRO
M R
ELO
CAT
ED
SR
304
TO
CH
UR
CH
RO
AD
334,
580.
0855
9,17
6.94
EN
G10
2000
/
1002
22Vi
sion
21
I-55
FRO
M C
HU
RC
H R
OA
D T
O S
R 3
0234
1,07
5.93
494,
150.
87E
NG
1030
00/
1002
22Vi
sion
21
* I-5
5 FR
OM
CH
UR
CH
RO
AD
TO
SR
302
[EA
RM
AR
K]
1,67
2.37
3,54
4,27
6.08
RO
W20
3000
/
1002
22Vi
sion
21
I-55
FRO
M R
ELO
CAT
ED
SR
304
TO
CH
UR
CH
RO
AD
AD
D 2
LA
NE
S[T
ruck
Sca
les
1020
98] (
Wid
en to
8 L
anes
)1,
415,
000.
001,
415,
000.
00R
OW
2050
00/
1002
22Vi
sion
21
I-55
FR W
EL
CTR
SO
UTH
OF
HE
R T
O T
N S
T LN
(U
RS
to p
rovi
de c
onst
ruct
ion
docu
men
t rev
iew
sup
port
for p
endi
ng li
tigat
ion)
894.
3729
,384
.24
CO
N30
1100
/
1013
78G
amin
gS
PU
R F
RO
M E
XIS
TIN
G 3
04 T
O R
ELO
CAT
ED
304
13,4
73.0
157
,659
.81
RO
W20
2000
/
1014
27S
tate
Pro
ject
sS
R 3
05 F
RO
M L
EW
ISB
UR
G T
O G
OO
DM
AN
RO
AD
33,4
75.2
759
7,80
4.45
EN
G10
1000
/
1014
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 3
05 F
RO
M U
S 7
8 TO
GO
OD
MA
N R
OA
D54
,462
.66
6,31
4,72
9.32
RO
W20
1000
/
1014
27Vi
sion
21
SR
305
FR
OM
US
78
TO G
OO
DM
AN
RO
AD
2,
937,
608.
142,
977,
211.
47C
ON
3010
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M I-
55 T
O S
R 3
0529
,900
.25
6,00
4,83
2.01
EN
G10
1000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
05 T
O T
HE
MA
RS
HA
LL C
L67
3.49
4,31
4,42
3.50
EN
G10
2000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M I-
55 T
O S
R 3
0579
1,37
5.97
45,4
11,9
78.8
8R
OW
2010
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
05 T
O T
HE
MA
RS
HA
LL C
L12
,456
.44
20,8
32,1
37.3
3R
OW
2020
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M I-
55 T
O S
TA. 2
40+0
016
,591
,649
.88
17,3
60,4
73.9
4C
ON
3100
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
TA. 2
40+0
0 TO
SR
305
29
,300
,344
.99
29,3
01,9
52.4
9C
ON
3110
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
05 T
O S
TA 6
25+0
015
,823
,881
.49
38,1
04,4
28.5
9C
ON
3120
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
TA 6
25+0
0 TO
MA
RS
HA
LL C
L16
,246
,275
.05
24,8
66,7
24.8
3C
ON
3130
00/
1033
18R
egul
ar-A
RR
A**
MIS
S 3
05 F
RO
M C
OC
KR
UM
TO
LE
WIS
BU
RG
BR
NO
S. 1
4.9,
15.
2,15
.3,1
5.6
1,08
3,66
5.45
8,67
0,57
3.60
CO
N30
2000
/
1033
18B
ridge
SR
305
F S
R 4
TO
LE
WIS
BU
RG
-1,0
83,6
65.4
50.
00C
ON
3021
00/
1034
05P
avem
ent R
ehab
ilita
tion
I-55
FRO
M T
ATE
CL
TO 2
.5 M
ILE
S N
OR
TH O
F TA
TE C
L - C
ON
CR
ETE
RE
HA
B
2,74
0,13
0.46
3,05
6,67
6.85
CO
N30
2000
/
1044
12P
avem
ent R
ehab
ilita
tion
I-55-
FR
OM
2.3
MI N
OR
TH O
F TA
TE/D
ES
OTO
CO
LIN
E T
O 0
.5 M
ILE
S S
OU
TH O
F G
OO
DM
AN
RD
201,
913.
999,
359,
303.
52C
ON
3010
00/
1045
74S
tate
Pro
ject
sC
ity o
f Sou
thav
en -
Get
wel
l Roa
d fr
302
to S
tate
Lin
e R
d.75
.35
75.3
579
9000
/
1047
95U
rban
City
of O
live
Bra
nch
- Ale
xand
er R
d fro
m G
oodm
an R
d. to
nor
th o
f S.R
. 302
. Wid
en fr
om 2
to 4
lane
s w
ith c
urb
and
gutte
r and
sid
ewal
ks.
6,53
1.79
612,
736.
93C
ON
7010
00/
1049
11S
afet
yIN
TER
SE
CTI
ON
US
51&
STA
R L
AN
DIN
G R
OA
D A
ND
LIC
EN
SE
DR
IVE
30,7
38.1
134
5,31
5.18
EN
G10
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
7 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Des
oto
****
****
****
***
1049
11S
afet
yU
S 5
1 @
STA
R L
AN
DIN
G R
OA
D59
,469
.24
59,4
69.2
4E
NG
1020
00/
1049
11S
afet
yIN
TER
SE
CTI
ON
US
51&
STA
R L
AN
DIN
G R
OA
D A
ND
LIC
EN
SE
DR
IVE
69
7,47
2.69
2,24
0,03
1.05
RO
W20
1000
/
1049
19S
tate
Pro
ject
sC
ity o
f Oliv
e B
ranc
h - C
raft
Roa
d W
iden
ing
from
2 L
ane
to 5
Lan
e. F
rom
Goo
dman
Rd
(SR
302)
to th
e so
uth
ram
ps o
f US
Hw
y 78
.5,
000.
975,
000.
9779
9000
/
1052
49S
tate
Pro
ject
sD
esot
o C
ount
y S
igna
l Stu
dy -
Pha
se 1
35,0
80.3
326
5,20
9.72
EN
G11
2000
/
1052
85U
rban
City
of H
erna
ndo
- Tra
ffic
Sig
nal a
nd In
ters
ectio
n Im
prov
emen
ts a
t Byh
alia
and
McI
ngva
le. C
ross
wal
ks, T
urn
Bay
s, a
nd C
urb
and
Gut
ter.
19,3
96.0
035
3,80
5.17
CO
N70
1000
/
1053
13S
peci
al P
roje
cts(
Dem
o)S
tar L
andi
ng R
oad
from
app
rox.
Tul
ane
Roa
d to
Get
wel
l Roa
d - E
nviro
nmen
tal
454,
838.
2968
1,62
4.53
EN
G81
1000
/
1055
10N
atio
nal H
ighw
ay S
yste
m(N
HS
)**
US
78
FRO
M IN
GR
AM
S M
ILL
TO M
AR
SH
ALL
CO
UN
TY L
INE
442,
101.
788,
934,
391.
44C
ON
3010
00/
1055
75S
tate
Pro
ject
sI-5
5 R
est A
rea
in D
esot
o C
ount
y2,
542.
9797
,028
.67
EN
G10
1000
/
1056
82S
afet
yC
ity o
f Her
nand
o - S
afet
y ac
tiviti
es a
t Oak
Gro
ve E
lem
enta
ry S
choo
l.7,
389.
007,
389.
00C
ON
4020
00/
1057
91In
ters
tate
I-55
From
The
Tat
e C
ount
y Li
ne N
orth
For
App
roxi
mat
ely
2.5
mile
s33
,276
.52
404,
579.
03C
ON
3020
00/
1061
73S
afet
yU
S 6
1 A
t Del
ta V
iew
Roa
d a
t Wal
ls
724,
071.
151,
092,
757.
96C
ON
3010
00/
1062
41S
afet
yM
S 3
02 S
afet
y C
orrid
or S
tudy
[10
-13
SFT
Y G
P P
G I-
7]3,
408.
6499
,660
.92
EN
G10
1000
/
1063
17O
ther
FY12
Mem
phis
MP
O U
rban
ized
Are
a M
etro
Pla
nnin
g10
,944
.00
354,
712.
8610
1000
/
1063
55S
tate
Pro
ject
sC
ity o
f Her
nand
o bi
ke/p
ed p
ath
421.
0742
1.07
7990
00/
1063
64P
avem
ent R
ehab
ilita
tion
Hw
y. 6
1 - .
1 m
i S o
f SR
3 to
MS
/TN
SL
6,82
1.21
4,50
6,47
4.86
CO
N30
1000
/
1064
15S
afet
yR
oadw
ay W
eath
er In
form
atio
n S
yste
ms
Inst
alla
tions
141,
981.
2014
5,31
3.35
CO
N30
1000
/
1064
25S
tate
Pro
ject
sB
ethe
l Roa
d S
igna
l at t
he M
etho
dist
Hos
pita
l in
Oliv
e B
ranc
h4,
317.
814,
317.
81C
ON
3010
00/
1064
92S
tate
Pro
ject
sC
ity o
f Hor
n La
ke -
Tula
ne R
d C
onne
ctor
Pro
ject
1,79
3.50
1,79
3.50
7990
00/
1065
31S
tate
Pro
ject
sI-5
5 S
lide
Rep
air
79,2
43.2
880
,105
.78
EN
G10
1000
/
1066
08S
tate
Pro
ject
sC
ity o
f Oliv
e B
ranc
h - c
onst
ruct
a 1
0 ft.
wid
e sh
ared
bik
e la
ne fr
om C
raft
Rd
at th
e C
hurc
h R
d in
ters
ectio
n an
d ru
n pa
ralle
l to
Chu
rch
Rd
east
app
rox.
8,6
00 li
near
ft to
the
Geo
rge
Har
rison
Soc
cer P
ark
near
Chu
rch
Rd
& H
wy
305
75.3
575
.35
7990
00/
1067
57P
avem
ent R
ehab
ilita
tion
US
51
Tate
/Des
oto
CL
to 0
.3 M
iles
Nor
th M
aint
enan
ce H
eadq
uarte
rs5,
375.
195,
375.
19C
ON
3010
00/
1067
79S
afet
yM
S 3
02 fr
om U
S 6
1 to
the
Mar
shal
l/Des
oto
CL
25,9
23.2
425
,923
.24
EN
G10
1000
/
1067
81S
tate
Pro
ject
sC
ity o
f Sou
thav
en -
Ped
& B
ike
Trai
l 3,
058.
263,
058.
2679
9000
/
Cou
nty
Tota
l89
,243
,964
.81
****
****
****
***
Forr
est
****
****
****
***
1006
77S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 4
9 R
EC
ON
STR
UC
TIO
N F
R C
AM
P S
HE
LBY
TO U
2,14
6.56
558,
333.
84E
NG
1000
/
1006
77Vi
sion
21
US
49
RE
CO
NS
TRU
CTI
ON
FR
CA
MP
SH
ELB
Y TO
US
98
16,5
25.3
61,
104,
770.
68E
NG
1020
00/
1006
92S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
2 FR
OM
PE
RR
Y C
.L. T
O I-
59
PE
100
747/
1000
CO
NS
102
214/
301,
1022
18/3
01-1
09,7
00.0
03,
095,
308.
27R
OW
1000
/
1022
45S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 1
1 FR
OM
SR
42
TO G
RE
EN
'S C
RE
EK
104.
3326
9,15
2.87
EN
G10
00/
1022
45B
ridge
US
11
RE
PLA
CE
BR
IDG
E 7
7.9
OV
ER
GR
EE
N'S
CR
EE
K
2,22
8,86
8.23
3,58
3,75
4.89
CO
N30
2000
/
1023
34In
ters
tate
I-59
INTE
RC
HA
NG
E A
T S
R 4
28,
715.
241,
404,
509.
55E
NG
1010
00/
1023
34Vi
sion
21
I-59
INTE
RC
HA
NG
E A
T S
R 4
270
9,73
9.65
9,68
8,65
5.23
RO
W20
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
8 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Forr
est
****
****
****
***
1048
70S
peci
al P
roje
cts(
Dem
o)C
ity o
f Pet
al -
Byr
d P
arkw
ay E
xten
sion
.22
0,35
9.89
220,
359.
89C
ON
8010
00/
1048
73S
peci
al P
roje
cts(
Dem
o)C
ity o
f Hat
tiesb
urg
- Wes
t 4th
Stre
et fr
om N
. 25t
h Av
e. to
Hut
chin
son
Ave.
2,
394,
561.
392,
463,
772.
34C
ON
8010
00/
1049
88S
tate
Pro
ject
sU
S 4
9 FR
OM
LA
MA
R C
OU
NTY
LIN
E T
O S
R 4
214
,168
.16
356,
682.
71E
NG
1000
/
1049
89S
tate
Pro
ject
sU
S 4
9 FR
OM
SR
42
NO
RTH
OF
HAT
TIE
SB
UR
G T
O T
HE
CO
VIN
GTO
N C
OU
NTY
LIN
E19
,397
.28
105,
467.
01E
NG
4000
/
1050
34U
rban
City
of H
attie
sbur
g - H
ardy
St.
from
Wes
t Pin
e to
21s
t. Av
enue
. Mill
and
Ove
rlay
973.
9759
3,54
2.12
CO
N70
1000
/
1051
94S
peci
al P
roje
cts(
Dem
o)C
ity o
f Hat
tiesb
urg
- Wid
en &
Ove
rlay
Har
dy S
t. fro
m 2
1st A
ve. t
o H
wy.
49.
19
5,71
9.77
559,
857.
49C
ON
8010
00/
1052
73S
tate
Pro
ject
sU
S 4
9 R
EP
LAC
E 5
BR
IDG
ES
BE
TWE
EN
BR
OO
KLY
N A
ND
CA
MP
SH
ELB
Y (S
OU
THB
OU
ND
LA
NE
) Som
e P
E w
ork
perfo
rmed
und
er 1
0211
0/00
1 - G
O B
ond
BR
IDG
ES
# 5
6.3,
# 5
1.4,
# 5
2.5,
# 5
4.7,
# 5
7.0A
177,
686.
5247
5,47
4.02
EN
G10
1000
/
1052
73S
tate
Pro
ject
sU
S 4
9 R
EP
LAC
E F
IVE
(5) B
RID
GE
S B
ETW
EE
N B
RO
OK
LYN
AN
D C
AM
P S
HE
LBY
(SB
LA
NE
) B
RID
GE
S #
56.
3, #
51.
4, #
52.
5, #
54.
7, #
57.
0A21
0,90
1.89
210,
901.
89R
OW
2010
00/
1053
75S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
2 Fr
om T
he E
ast C
orpo
rate
Lim
it of
Pet
al to
Mac
edon
ia R
oad
144,
563.
4517
,053
,919
.24
CO
N30
1000
/
1058
10S
afet
yC
ity o
f Hat
tiesb
urg
- Con
stru
ct S
idew
alks
at R
owan
Ele
men
tary
Sch
ool.
22,0
42.5
618
8,14
3.02
CO
N40
1000
/
1058
25R
egul
ar-A
RR
A
Long
leaf
Tra
ce a
t US
49
Acc
ess
Impr
ovem
ents
from
Bik
eway
to U
SM
88.2
888
0,48
8.28
CO
N30
1000
/
1058
25S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)Lo
ngle
af T
race
at U
S 4
9 A
cces
s Im
prov
e6,
961.
6534
,636
.12
CO
N30
1100
/
1058
44S
peci
al P
roje
cts(
Dem
o)C
ity o
f Hat
tiesb
urg
- Wes
tern
Bel
tway
Tra
nspo
rtatio
n In
frast
ruct
ure
Pla
n - A
long
exi
stin
g Ja
ckso
n R
oad
from
Hw
y 98
to H
wy
49.
187,
792.
8918
7,79
2.89
EN
G81
1000
/
1059
40S
afet
y
-1
1,25
0.00
11,2
50.0
0E
NG
1010
00/
1059
40S
afet
yJa
mes
Stre
et in
Hat
teis
burg
, MS
on
CN
Cor
ridor
Pro
ject
. D
OT
305
287X
for G
ate
inst
alla
tion.
18,9
79.0
813
1,83
8.34
CO
N30
1000
/
1059
40S
afet
yB
usch
man
Stre
et in
Hat
tiesb
urg,
MS
on
CN
Cor
ridor
Pro
ject
. D
OT
305
291M
for G
ate
inst
alla
tion. 8
86.3
210
5,35
0.98
CO
N30
2000
/
1059
40S
afet
yE
ast F
ront
Stre
et in
Hat
tiesb
urg,
MS
for C
N C
orrid
or P
roje
ct.
DO
T 30
5 29
4H fo
r Gat
e In
stal
latio
n.
25,4
78.6
315
6,04
6.47
CO
N30
3000
/
1059
40S
afet
yE
ast P
ine
Stre
et in
Hat
tiesb
urg,
MS
for C
N C
orrid
or P
roje
ct.
DO
T 30
5 29
5P fo
r Gat
e U
pgra
de. 2
,715
.51
142,
367.
05C
ON
3040
00/
1059
40S
afet
y2n
d an
d M
obile
Stre
et in
Hat
tiesb
urg,
MS
on
CN
Cor
ridor
Pro
ject
. D
OT
305
296W
for f
lash
er u
pgra
de.
9,53
4.73
94,0
28.8
3C
ON
3050
00/
1059
40S
afet
y4t
h S
treet
in H
attie
sbur
g, M
S fo
r CN
Cor
ridor
Pro
ject
. D
OT
305
297D
for g
ate
inst
alla
tion
57,0
31.6
913
6,78
6.20
CO
N30
6000
/
1060
05U
rban
City
of H
attie
sbur
g - H
wy
11 S
outh
Inte
rsec
tion
Impr
ovem
ents
and
Sig
nals
at i
nter
sect
ion
of P
arkw
ay B
lvd
6,71
5.33
350,
002.
00C
ON
7010
00/
1061
26S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
nive
rsity
of S
outh
ern
MS
/land
scap
e an
d de
cora
tive
fenc
e pr
ojec
t alo
ng H
ardy
Stre
et, H
wy
49th
, and
4th
stre
et.
[10-
13 E
NH
N G
RP
PG
I-5]
64,1
59.2
348
1,67
8.65
CO
N70
1000
/
1061
39S
peci
al P
roje
cts(
Dem
o)C
ity o
f Hat
tiesb
urg
- Woo
dley
Ele
men
tary
- P
relim
inar
y E
ngin
eerin
g1,
768.
8724
,196
.16
EN
G41
1000
/
1061
80N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 S
igna
l @ P
earl
Riv
er C
omm
Col
lege
[10-
13 H
PFL
O&
M V
-131
]62
.60
241,
056.
64C
ON
3010
00/
1062
15S
afet
yU
S 4
9 frm
Cam
pbel
l Loo
p R
d/C
onve
ntio
n C
ente
r Ave
to N
. 31s
t Ave
[10
-13
HP
FL S
FTY
V-13
3]-6
15.4
373
,263
.99
EN
G10
1000
/
1062
15S
afet
yU
S 4
9 frm
Cam
pbel
l Loo
p R
d/C
onve
ntio
n C
ente
r Ave
to N
. 31s
t Ave
[10-
13 H
PFL
SFT
Y V-
133] 1
3,84
1.65
1,13
0,24
1.87
CO
N30
1000
/
1062
22P
avem
ent R
ehab
ilita
tion
US
11
from
Lam
ar/F
orre
st C
ount
y Li
ne to
Lin
coln
Roa
d [
10-1
3 H
PFL
O&
M V
-131
]-1
,298
.76
2,01
9,36
9.98
CO
N30
1000
/
1063
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
SM
- 31s
t Ave
ped
estri
an c
orrid
or62
,143
.08
611,
935.
77C
ON
7010
00/
1064
24S
afet
yS
CO
OT
sign
al c
ontro
l on
US
98
and
US
49
567.
2740
,398
.35
EN
G10
1000
/
1064
24S
afet
yS
CO
OT
sign
al c
ontro
l on
US
98
and
US
49
1,04
5,25
4.65
1,04
5,25
4.65
CO
N30
1000
/
1064
30U
rban
City
of H
attie
sbur
g - W
.S.F
. Tat
um B
lvd
/ Bon
hom
ie R
oad
traffi
c si
gnal
pro
ject
125,
425.
9712
5,42
5.97
CO
N70
1000
/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
318]
4,58
8.61
4,58
8.61
3180
00/
1065
62P
avem
ent R
ehab
ilita
tion
US
98
From
I-59
Eas
t 3.7
39 M
iles
2,55
7,19
3.51
2,60
0,16
8.22
CO
N30
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
9 o
f 52
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Forr
est
****
****
****
***
1065
94In
ters
tate
I-59
Des
ign
Bui
ld B
ridge
Wid
enin
g38
,494
.21
38,4
94.2
1E
NG
1030
00/
1065
94In
ters
tate
I-59
Des
ign
Bui
ld B
ridge
Wid
enin
g10
3,55
4.48
103,
554.
48C
ON
3030
00/
1065
95S
tate
Pro
ject
sS
R 4
2 S
igna
ls fr
om M
onro
e R
d. to
Sun
rise
Rd
35,4
96.6
635
,496
.66
EN
G10
1000
/
1066
72S
tate
Pro
ject
sU
S 4
9 fro
m U
S 9
8 to
Cam
p S
helb
y...W
orke
d pe
rform
ed b
y S
tate
For
ces
409,
461.
8340
9,46
1.83
EN
G10
1000
/
1067
09S
tate
Pro
ject
sP
earl
Riv
er C
omm
unity
Col
lege
- re
purp
osin
g of
exi
stin
g ro
adw
ays
into
ped
estri
an c
omm
on a
rea
that
will
con
nect
cen
traliz
ed c
ampu
s pa
rkin
g to
stu
dent
& fa
culty
bui
ldin
gs w
ith p
athw
ays
and
sitti
ng a
reas
.2,
701.
702,
701.
7079
9000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - M
axie
Chu
rch
Roa
d - 3
0526
1V28
,000
.00
28,0
00.0
0C
ON
3280
00/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - Y
eato
n S
pur R
oad
- 305
263J
28,0
00.0
028
,000
.00
CO
N32
9000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - M
ain
Driv
e - 3
0526
5X28
,000
.00
28,0
00.0
0C
ON
3300
00/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - S
ports
man
Lak
e R
oad
- 305
272H
28,0
00.0
028
,000
.00
CO
N33
2000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - O
ld U
S 4
9 - R
ural
- 30
5264
R28
,000
.00
28,0
00.0
0C
ON
3330
00/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - S
. Gat
e R
oad
- 305
275D
28,0
00.0
028
,000
.00
CO
N33
5000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - R
alst
on R
oad
- 305
278Y
28,0
00.0
028
,000
.00
CO
N33
6000
/
1067
77S
afet
yU
S 4
9 @
MS
42
(Wes
t)10
,958
.26
10,9
58.2
6E
NG
1010
00/
1067
91B
ridge
US
49
@ B
lack
Cre
ek [B
ridge
# 4
9.3A
]64
.71
64.7
1C
ON
3020
00/
Cou
nty
Tota
l11
,231
,531
.46
****
****
****
***
Fran
klin
****
****
****
***
1062
98S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)B
ank
stab
iliza
tion
@ S
R 3
3 H
omm
ochi
tto R
iver
Brid
ge o
n th
e W
ilkin
son/
Fran
klin
Cou
nty
Line
116,
223.
8357
2,16
0.97
EN
G10
1000
/
1062
98B
ridge
Brid
ge L
engt
heni
ng @
SR
33
Hom
moc
hitto
Riv
er B
ridge
on
the
Wilk
inso
n/Fr
ankl
in C
ount
y Li
ne 162
,509
.86
162,
509.
86E
NG
1020
00/
1062
98B
ridge
Brid
ge L
engt
heni
ng @
SR
33
Hom
moc
hitto
Riv
er B
ridge
on
the
Wilk
inso
n/Fr
ankl
in C
L3,
007.
013,
007.
01C
ON
3020
00/
Cou
nty
Tota
l28
1,74
0.70
****
****
****
***
Geo
rge
****
****
****
***
1024
88B
ridge
SR
198
RE
PL
BR
IDG
ES
OV
ER
BIG
CR
EE
K &
RO
CK
Y C
RE
EK
AT
LUC
ED
ALE
57,9
94.7
059
2,68
9.24
EN
G10
1000
/
1024
88S
tate
Pro
ject
sS
R 1
98 R
EP
L B
RID
GE
S O
VE
R R
OC
KY
CR
EE
K B
RID
GE
# 2
12.5
69,9
62.0
619
3,45
6.08
EN
G10
2000
/
1024
88B
ridge
SR
198
RE
PL
BR
IDG
ES
OV
ER
BIG
CR
EE
K A
T LU
CE
DA
LE87
,160
.92
1,41
8,22
3.50
RO
W20
1000
/
1024
88B
ridge
SR
198
RE
PL
BR
IDG
ES
OV
ER
RO
CK
Y C
RE
EK
BR
IDG
E #
212
.515
8,05
8.07
158,
058.
07R
OW
2020
00/
1030
62S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R26
FR
OM
SR
63 T
O S
R 1
98 IN
LU
CE
DA
LE6,
275.
5329
7,75
3.11
EN
G10
1000
/
1062
23S
afet
yU
S 9
8 at
MS
198
/Roc
ky C
reek
Roa
d, U
S 9
8 at
Bea
ver D
am R
oad
Traf
fic S
igna
lizat
ion
292.
6448
,223
.07
EN
G10
1000
/
1062
23S
afet
yU
S 9
8 at
MS
198
/Roc
ky C
reek
Roa
d, U
S 9
8 at
Bea
ver D
am R
oad
¿ Tr
affic
Sig
naliz
atio
n12
3,41
2.83
171,
262.
66E
NG
1011
00/
1062
23S
afet
yU
S 9
8 at
MS
198
/Roc
ky C
reek
Roa
d, U
S 9
8 at
Bea
ver D
am R
oad
/Tra
ffic
Sig
naliz
atio
n88
,709
.85
88,7
09.8
5C
ON
3010
00/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
320]
9,95
8.61
9,95
8.61
3200
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
10
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Geo
rge
****
****
****
***
1065
64P
avem
ent R
ehab
ilita
tion
SR
613
Fro
m E
vans
ton
Roa
d to
SR
198
653,
880.
3565
3,88
0.35
CO
N30
1000
/
1067
53P
avem
ent R
ehab
ilita
tion
US
98
from
Gre
ene
CL
to S
R 6
32,
765,
842.
422,
765,
842.
42C
ON
3010
00/
Cou
nty
Tota
l4,
021,
547.
98
****
****
****
***
Gre
ene
****
****
****
***
1044
84B
ridge
SR
42
RE
PLA
CE
BR
. #88
.1, #
90.0
, & #
90.1
27
,581
.85
353,
153.
76E
NG
1010
00/
1044
84Vi
sion
21
SR
42
RE
PLA
CE
BR
. #88
.1, #
90.0
, & #
90.1
17,4
05.9
61,
359,
719.
54R
OW
2020
00/
1057
30S
afet
yS
urfa
ce a
t MS
57,
McC
llain
, DO
T 30
4294
E49
3.89
11,8
41.0
4C
ON
3010
00/
1067
93S
tate
Pro
ject
sS
R 4
2 C
hick
asaw
hay
Riv
er [B
ridge
#10
7.9]
343.
6334
3.63
EN
G10
1000
/
Cou
nty
Tota
l45
,825
.33
****
****
****
***
Gre
nada
****
****
****
***
1003
00B
ridge
US
51
NO
RTH
OF
YALO
BU
SH
A R
IVE
R T
O I-
5540
6.12
1,84
7,85
2.22
EN
G10
00/
1003
00S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 N
OR
TH O
F YA
LOB
US
HA
RIV
ER
TO
I-5
5 [I-
12]
4,42
3,23
3.71
17,7
19,4
56.6
6C
ON
3010
00/
1003
00B
ridge
US
51
NO
RTH
OF
YALO
BU
SH
A R
VR
TO
I-55
BR
# 2
11.2
, 211
.4, 2
11.8
, 212
.1, 2
12.2
, 212
.6, 2
13.3
[I-1
2]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct1,
049,
222.
566,
894,
931.
94C
ON
3020
00/
1022
50U
rban
U
S 5
1 FR
OM
EN
D O
F 5
LAN
E N
OR
TH T
O Y
ALO
BU
SH
A R
IVE
RIN
CLU
DE
S B
RID
GE
#21
0.5
95,1
84.8
19,
367,
957.
19R
OW
2010
00/
1033
95P
avem
ent R
ehab
ilita
tion
I-55
FR .5
MI S
SR
8 T
O Y
ALO
BU
SH
A C
L66
.35
98,7
68.6
8E
NG
1010
00/
1051
66U
rban
City
of G
rena
da- M
ill &
Ove
rlay
of M
ain,
Sec
ond,
Sou
th, E
ddie
and
Mon
roe
Stre
ets.
45,1
92.4
171
4,99
0.99
CO
N70
1000
/
1058
07Vi
sion
21
US
51
Brid
ge R
epla
cem
ent [
BR
IDG
E #
205
.4]
12,3
86.4
617
4,73
2.18
EN
G10
1000
/
1058
07S
tate
Pro
ject
sU
S 5
1 B
ridge
Rep
lace
men
t at B
ridge
# 2
03.1
Bat
upan
Bog
ue T
rib a
nd B
ridge
#20
5.4
Jack
son
Cre
ek98
,341
.05
98,3
41.0
5E
NG
1011
00/
1067
10S
tate
Pro
ject
sS
R 8
Em
erge
ncy
Dra
inag
e C
orre
ctio
n in
the
City
of G
rena
da (3
0486
2)12
0,15
0.84
120,
150.
84R
OW
2010
00/
1067
10S
tate
Pro
ject
sS
R 8
Em
erge
ncy
Dra
inag
e C
orre
ctio
n in
the
City
of G
rena
da (3
0486
2)
222,
542.
7622
2,54
2.76
CO
N30
2000
/
Cou
nty
Tota
l6,
066,
727.
07
****
****
****
***
Han
cock
****
****
****
***
1007
19In
ters
tate
I-10
RE
PLA
CE
ME
NT
JOU
RD
AN
RIV
ER
BR
IDG
E M
A-3
,929
.00
249,
293.
78E
NG
1000
/
1007
19B
ridge
I-10
RE
PLA
CE
ME
NT
JOU
RD
AN
RIV
ER
BR
IDG
E M
A3,
929.
0036
,741
,531
.78
CO
N30
1000
/
1012
10G
amin
gS
R 4
3/60
3 K
ILN
BY
PAS
S F
RO
M E
ND
OF
FOU
R L
AN
E T
O N
OR
TH O
F K
ILN
587,
610.
393,
185,
249.
39E
NG
1000
/
1041
41S
afet
yS
T C
HA
RLE
S S
T. IN
BAY
ST.
LO
UIS
HIG
H S
PE
ED
RA
IL C
RO
SS
ING
22.0
014
7,99
8.94
CO
N30
3000
/
1047
27N
atio
nal H
ighw
ay S
yste
m(N
HS
)P
ort B
ienv
ille
- Han
cock
Cou
nty
Por
t & H
arbo
r Com
mis
sion
. P
hase
I. Im
prov
emen
ts a
nd O
verla
y al
ong
Por
t and
Har
bor D
rive.
4,99
9.55
730,
517.
00C
ON
7010
00/
1048
08In
ters
tate
I-10
@N
AS
A E
AS
TBO
UN
D-N
EW
TR
UC
K S
CA
LES
2,23
7.74
183,
100.
19E
NG
1010
00/
1053
48S
afet
y
8,
253.
358,
425.
38E
NG
1010
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
11
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Han
cock
****
****
****
***
1053
48S
afet
y
5,15
6.44
9,13
0.40
EN
G10
2000
/
1053
48S
afet
y
57.2
157
.21
CO
N30
2000
/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
5921
,788
.53
1,84
8,57
2.00
EN
G10
1000
/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
59
548,
987.
741,
758,
701.
26R
OW
2010
00/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
59 H
anco
ck C
ount
y3,
364,
844.
363,
364,
959.
36C
ON
3010
00/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
5912
,628
.92
12,6
28.9
2C
ON
3040
00/
1054
94O
ther
Por
t Bie
nvill
e Fe
asib
ility
and
Env
Stu
dy F
unds
tran
ferre
d fro
m F
HW
A to
FR
A.
Dem
o #
MS
140. 7
4,38
1.14
747,
462.
58E
NG
1010
00/
1055
42S
afet
yU
S 9
0 AT
SR
607
INTE
RS
EC
TIO
N R
EC
ON
STR
UC
TIO
N2,
126.
0385
,048
.06
EN
G10
1000
/
1055
42S
afet
yU
S 9
0 AT
SR
607
INTE
RS
EC
TIO
N R
EC
ON
STR
UC
TIO
N18
,234
.69
75,7
94.3
3R
OW
2010
00/
1061
56U
rban
City
of B
ay S
t. Lo
uis
- Lig
htin
g Im
prov
emen
ts M
ain
St f
rom
Bea
ch B
lvd
to H
wy
90 [1
0-13
GR
PC
O&
MG
P V-
87]
699,
917.
1380
0,87
9.01
CO
N70
1000
/
1062
47S
afet
yU
S 9
0 @
Bou
slog
Stre
et
26,6
35.6
773
,138
.44
EN
G10
1000
/
1064
07P
avem
ent R
ehab
ilita
tion
I-10
AT J
OR
DA
N R
IVE
R B
RID
GE
- P
E.
PAV
E A
PP
RO
X 1
MIL
ES
EA
CH
EN
D O
F B
RID
GE
4,60
2.48
4,60
2.48
EN
G10
1000
/
1064
44S
tate
Pro
ject
sH
anco
ck C
ount
y S
ceni
c B
yway
Pro
ject
777.
6277
7.62
7990
00/
1065
03S
tate
Pro
ject
sH
wy
603
from
Tex
as F
lat R
d to
Inte
rsec
tion
of H
wy
4310
4,74
9.55
289,
760.
04E
NG
1010
00/
1065
20U
rban
City
of D
iam
ondh
ead-
Tra
ffic
Eng
inee
ring
Stu
dy21
,772
.09
44,3
15.9
7E
NG
7110
00/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
323]
169,
950.
2516
9,95
0.25
3230
00/
1065
98B
ridge
I-10
over
E. P
earl
Riv
er B
ridge
- #0
.084
,753
.62
84,7
53.6
2E
NG
1010
00/
1066
20S
tate
Pro
ject
sH
anco
ck C
ount
y B
OS
- E
xten
sion
of t
he B
each
Blv
d S
ceni
c B
yway
bik
ing
and
pede
stria
n pa
rkw
ay fr
om it
s so
uthw
este
rn te
rmin
ue to
Bay
ou C
adet
(Bay
ou C
addy
) at t
he e
nd o
f the
byw
ay.
2,64
5.68
2,64
5.68
7990
00/
Cou
nty
Tota
l5,
767,
132.
18
****
****
****
***
Har
rison
****
****
****
***
1012
12G
amin
gS
R 6
01 B
ETW
EE
N U
S 9
0 AT
TH
E P
OR
T O
F G
ULF
PO
RT
AN
D I-
10 A
T C
AN
AL
RO
AD
86,0
48.5
83,
820,
810.
35E
NG
1010
00/
1012
12G
amin
gS
R 6
01 B
T U
S 9
0 AT
TH
E P
OR
T O
F G
ULF
PO
RT
AN
D I-
10 [E
AR
MA
RK
MS
087]
42,4
44.4
77,
873,
070.
84E
NG
1020
00/
1012
12Vi
sion
21
SR
601
FR
OM
33R
D S
TRE
ET
TO 6
00 F
EE
T S
OU
TH O
F TH
E S
EA
BO
AR
D R
R [H
.E.L
.P.]
143,
474.
1621
,624
,681
.65
RO
W20
1000
/
1012
12Vi
sion
21
SR
601
FR
OM
600
FE
ET
SO
UTH
OF
THE
SE
AB
OA
RD
RR
TO
200
0 FE
ET
NO
RTH
OF
I-10
INTE
RC
HA
NG
E [H
.E.L
.P.]
513,
286.
9367
,158
,023
.06
RO
W20
2000
/
1012
12Vi
sion
21
SR
601
FR
OM
TH
E P
OR
T O
F G
ULF
PO
RT
[SO
UTH
OF
US
90]
TO
33R
D S
TRE
ET
[H.E
.L.P
.] 345
,946
.39
39,8
66,3
89.5
4R
OW
2030
00/
1012
12Vi
sion
21
SR
601
/ C
anal
Roa
d W
etla
nd M
itiga
tion
467,
204.
4410
,028
,800
.20
RO
W20
4000
/
1021
11N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 FR
OM
ON
EA
L R
OA
D T
O L
ITTL
E B
ILO
XI R
IVE
R40
,263
.44
2,03
2,44
1.10
EN
G10
00/
1021
11N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 FR
OM
ON
EA
L R
OA
D T
O N
OR
TH O
F S
CH
OO
L R
OA
D91
5,29
8.46
23,1
29,5
19.6
1R
OW
2010
00/
1021
11B
ridge
US
49
RE
PLA
CE
BR
IDG
E O
VE
R L
ITTL
E B
ILO
XI R
IVE
R19
6,88
7.45
1,28
9,52
5.79
RO
W20
2000
/
1021
11Vi
sion
21
US
49
RE
PLA
CE
BR
IDG
ES
OV
ER
LIT
TLE
BIL
OXI
RIV
ER
[11.
1 A
&B
] 2,
781,
093.
994,
450,
055.
80C
ON
3020
00/
1041
41S
afet
yE
SP
Y S
T IN
PA
SS
CH
RIS
TIA
N H
IGH
SP
EE
D R
AIL
CR
OS
SIN
G22
.00
130,
963.
14C
ON
3080
00/
1043
60S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)O
HR
-O'K
EE
FE W
ELC
OM
E C
EN
TER
-BIL
OXI
(Th
is is
the
new
con
tract
)-3
7.63
4,74
9,96
1.81
CO
N80
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
12
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Har
rison
****
****
****
***
1043
84S
tate
Pro
ject
sP
OP
PS
FE
RR
Y R
D IN
BIL
OXI
5,78
9.90
5,78
9.90
7990
00/
1043
84S
peci
al P
roje
cts(
Dem
o)P
OP
PS
FE
RR
Y R
D IN
BIL
OXI
1,23
5.51
546,
885.
98E
NG
8110
00/
1043
84S
peci
al P
roje
cts(
Dem
o)C
ity o
f Bilo
xi -
P.E
. for
Pop
ps F
erry
Roa
d in
Bilo
xi99
0,79
0.60
1,15
5,05
8.56
EN
G81
2000
/
1045
68U
rban
Har
rison
Cou
nty
Boa
rd o
f Sup
ervi
sors
- M
LK B
lvd.
Sid
ewal
k Im
prov
emen
ts16
,305
.32
302,
543.
42C
ON
7010
00/
1048
66S
tate
Pro
ject
sD
edea
ux R
d. F
rom
Thr
ee R
iver
s R
d. to
SR
605
. Gul
fpor
t MS
768.
1076
8.10
7990
00/
1048
66S
peci
al P
roje
cts(
Dem
o)C
ity o
f Gul
fpor
t - D
edea
ux R
d fro
m T
hree
Riv
ers
Rd
to S
R 6
0511
6,99
7.17
1,26
8,62
8.15
EN
G81
1000
/
1051
69U
rban
City
of G
ulfp
ort -
Wid
enin
g of
Thr
ee R
iver
s R
oad
and
Cre
osot
e R
oad
addi
ng la
nes,
incl
udin
g fo
ur th
roug
h la
nes
and
addi
tiona
l tur
ning
lane
s, w
ith a
ssoc
iate
d su
bsur
face
dra
inag
e im
prov
emen
ts18
5,60
5.59
185,
605.
59C
ON
7010
00/
1052
70S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Lon
g B
each
- C
onst
ruct
ion
of b
ike/
pede
stria
n tra
il ap
prx.
8 fe
et w
ide,
2.5
mile
s in
leng
th a
long
Can
al #
2 be
twee
n B
eatli
ne R
oad
and
Klo
ndyk
e R
oad.
9,26
6.82
272,
045.
99C
ON
7010
00/
1052
81Vi
sion
21
I-10
AT I-
110
NE
W IN
TER
CH
AN
GE
WIT
H C
ON
NE
CTO
RS
IN D
'IBE
RV
ILLE
27,2
26.0
92,
310,
251.
82E
NG
1000
/
1052
81Vi
sion
21
I-10
AT I-
110
NE
W IN
TER
CH
AN
GE
WIT
H C
ON
NE
CO
RS
IN D
'IBE
RV
ILLE
207,
896.
4871
2,86
9.32
EN
G10
1000
/
1052
81Vi
sion
21
I-10
AT I-
110
NE
W IN
TER
CH
AN
GE
59,0
48.5
654
0,90
3.69
EN
G10
1100
/
1052
81Vi
sion
21
SR
67
AT T
HE
SA
NG
AN
I BO
ULE
VAR
D13
,981
.62
491,
921.
74E
NG
1030
00/
1052
81Vi
sion
21
I-10
AT I-
110
INTE
RC
HA
NG
E W
/CO
NN
EC
TOR
S86
0,72
9.64
36,8
40,2
60.0
3R
OW
2010
00/
1052
81Vi
sion
21
SR
67
AT T
HE
SA
NG
AN
I BO
ULE
VAR
D32
2,06
3.42
14,8
37,9
04.5
2R
OW
2030
00/
1052
81Vi
sion
21
I-10
- CD
Roa
ds, L
eg R
amps
, Loo
p R
amps
and
the
DIb
ervi
lle R
d In
terc
hang
e11
,406
,078
.63
11,4
06,1
36.1
3C
ON
3010
00/
1052
81Vi
sion
21
I-110
At P
opps
Fer
ry R
d an
d B
oney
Ave
1,12
3,59
0.72
1,12
3,59
0.72
CO
N30
2000
/
1052
81Vi
sion
21
SR
67
/ SR
15
at S
anga
ni B
oule
vard
H66
0 =
DE
MO
# M
S08
81,
680,
393.
557,
442,
121.
77C
ON
3030
00/
1052
81Vi
sion
21
I-10
AT I-
110
NE
W IN
TER
CH
AN
GE
H66
0 =
DE
MO
# M
S08
942
0.34
1,23
6,67
4.07
CO
N30
3001
/
1052
93S
tate
Pro
ject
sS
R 5
3 AT
CA
NA
L R
OA
D &
CO
UN
TY F
AR
M R
OA
DS
103,
770.
5650
2,13
8.36
EN
G10
1000
/
1052
93S
afet
yS
R 5
3 AT
CA
NA
L R
OA
D &
CO
UN
TY F
AR
M R
OA
DS
5,49
1.95
28,8
06.0
5E
NG
1011
00/
1052
93S
afet
yS
R 5
3 AT
CA
NA
L R
OA
D &
CO
UN
TY F
AR
M R
OA
DS
25,6
38.0
734
1,95
0.68
RO
W20
1000
/
1053
07N
atio
nal H
ighw
ay S
yste
m(N
HS
)G
ulfp
ort/B
iloxi
Inte
rnat
iona
l Airp
ort -
Rem
oval
and
Rep
lace
men
t of t
he E
xist
ing
Stre
et L
ghtin
g al
ong
Airp
ort R
oad
and
the
Con
stru
ctio
n of
a N
ew S
igna
lized
Inte
rsec
tion.
Airp
ort R
d. fr
om U
S 4
9 to
Ter
min
al E
xit R
oad.
2,18
8.47
1,14
1,61
6.82
CO
N70
1000
/
1053
56U
rban
City
of B
iloxi
- P
ass
Rd
Inte
rsec
tion
Impr
ovem
nets
, Upg
rade
the
exis
ting
span
wire
traf
fic s
igna
l to
mas
ter a
rm a
t Eis
enho
wer
Dr.
& B
ig L
ake
Rd.
, ins
talli
ng a
new
mas
ter a
rm s
igna
l at S
tenn
is D
r. &
Pas
s R
d.15
,505
.91
1,05
0,72
1.79
CO
N70
1000
/
1054
95S
afet
yU
S 4
9 Fr
om A
irpor
t Roa
d to
Ded
eaux
Roa
d in
Gul
fpor
t - In
stal
l Con
cret
e M
edia
n-5
62.5
090
4,69
3.83
CO
N30
1000
/
1054
95S
afet
yU
S 4
9 fro
m P
ass
Rd
to A
rkan
sas
Ave
.6,
652.
1047
0,34
9.56
CO
N30
2000
/
1055
50Vi
sion
21
I-110
Bas
cule
Brid
ge R
epai
r Pha
se 1
Grid
Rep
lace
men
t-3
0,71
6.76
5,03
2,28
0.45
CO
N30
1000
/
1055
50Vi
sion
21
I-110
Bas
cule
Brid
ge R
epai
r Pha
se 2
7,
425,
222.
707,
834,
785.
56C
ON
3020
00/
1055
56S
tate
Pro
ject
sB
ridge
Pat
hway
@ B
ay S
t Lou
is B
ridge
Han
--to
pay
settl
emen
t50
0.00
500.
00R
OW
2011
00/
1056
84N
atio
nal H
ighw
ay S
yste
m(N
HS
)
260.
2938
6,53
6.97
CO
N70
1000
/
1057
16U
rban
City
of D
'Iber
ville
- W
iden
San
gani
Blv
d fro
m H
wy
15 to
Lam
ey B
ridge
Roa
d.1,
752,
715.
791,
942,
200.
81C
ON
7010
00/
1057
19R
egul
ar-L
PA A
RR
AC
ity o
f Lon
g B
each
- S
igna
lizat
ion
and
inte
rsec
tion
impr
ovem
ents
at t
he in
ters
ectio
n of
Klo
ndyk
e R
oad
and
28th
Stre
et.
913.
8836
7,17
4.21
CO
N70
1000
/
1057
19R
egul
ar-L
PA A
RR
AC
ity o
f Lon
g B
each
- In
ters
ectio
n Im
p.10
,998
.58
106,
327.
18C
ON
7050
00/
1057
19S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Lon
g B
each
- In
ters
ectio
n Im
p.-5
19.6
40.
00C
ON
7051
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
13
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Har
rison
****
****
****
***
1057
21R
egul
ar-L
PA A
RR
AC
ity o
f Gul
fpor
t - U
S 9
0 Li
ghtin
g7,
231.
3695
,519
.29
CO
N70
5000
/
1057
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Gul
fpor
t - U
S 9
0 Li
ghtin
g-2
,219
.81
5,01
1.55
CO
N70
5100
/
1058
64S
peci
al P
roje
cts(
Dem
o)C
ity o
f Lon
g B
each
- S
idew
alks
alo
ng C
omm
issi
on R
oad.
5,59
7.81
27,0
64.7
1E
NG
4110
00/
1059
22P
avem
ent R
ehab
ilita
tion
I-110
FM
US
90
TO I-
10
1,97
8.53
36,0
48.4
5E
NG
1010
00/
1059
22P
avem
ent R
ehab
ilita
tion
I-110
FM
US
90
TO I-
10
2,07
3,66
7.83
2,07
3,66
7.83
CO
N30
1000
/
1059
45N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 9
0 FR
OM
20T
H A
VE
NU
E T
O S
R 6
05 [B
EA
CH
PAT
HW
AY]
400.
002,
501,
200.
29C
ON
3010
00/
1061
23S
afet
yU
S 4
9 at
Wes
t Wor
tham
Roa
d [1
0-13
GR
PC
SFT
Y G
P V-
86]
11,1
38.5
192
0,40
2.60
CO
N30
1000
/
1062
53S
peci
al P
roje
cts(
Dem
o)C
ity o
f Bilo
xi -
Pop
p's
Ferry
Rd
Ext
ensi
on fr
om P
ass
Roa
d to
Hw
y 90
58,6
72.6
828
3,46
8.87
EN
G81
1000
/
1064
35S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)G
RP
C-C
ourth
ouse
Roa
d P
roje
ct-F
easi
bilit
y S
tudy
- H
wy
90 N
orth
to P
ass
Roa
d in
Gul
fpor
t.2,
696.
6621
,703
.30
EN
G10
1000
/
1064
64S
afet
yR
R U
pgra
de: F
lash
ers
and
Gat
es D
OT
# 34
0 19
8X Q
uere
ns R
oute
in B
iloxi
CS
X R
R4,
594.
439,
000.
00E
NG
1080
00/
1064
64S
afet
yR
R U
pgra
de: F
lash
ers
and
Gat
es D
OT
# 34
0 19
8X Q
uere
ns R
oute
in B
iloxi
CS
X R
R2,
408.
612,
408.
61C
ON
3080
00/
1065
28E
mer
genc
y R
elie
fU
S H
wy
90 S
idew
alk
repa
ir/re
plac
emen
t16
0,25
9.96
160,
259.
96C
ON
3010
00/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
324]
282,
647.
6628
2,64
7.66
3240
00/
1066
36S
afet
yM
S 1
5 @
Lam
ey B
ridge
Roa
d61
,114
.77
61,1
14.7
7E
NG
1010
00/
1066
40S
tate
Pro
ject
sC
ity o
f Bilo
xi -
Con
stru
ct p
edes
trian
and
pub
lic tr
ansi
t acc
ess
impr
ovem
ents
alo
ng C
.T. S
witz
er, S
r. D
rive
from
Eis
enho
wer
Driv
e to
Deb
uys
Roa
d.86
7.01
867.
0179
9000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - O
ld S
till R
oad
- 305
220R
28,0
00.0
028
,000
.00
CO
N31
3000
/
1068
22S
afet
yM
S 6
7 @
Tra
ditio
ns P
arkw
ay40
5.25
405.
25E
NG
1010
00/
Cou
nty
Tota
l34
,577
,641
.40
****
****
****
***
Hin
ds**
****
****
****
*
1005
51S
peci
al P
roje
cts(
Dem
o)A
CC
ES
S R
OA
D B
ETW
EE
N I
-55
& S
R 4
75 [P
E F
OR
NE
W C
ON
STR
UC
TIO
N] H
IND
S2,
890.
711,
308,
796.
28E
NG
1000
/
1005
51S
peci
al P
roje
cts(
Dem
o)A
CC
ES
S R
OA
D B
ETW
EE
N I-
55 T
HR
U S
R 4
68 [P
E &
RO
W F
OR
NE
W C
ON
STR
UC
TIO
N] H
IND
S11
,164
.00
2,32
3,23
1.06
EN
G10
1000
/
1005
51S
peci
al P
roje
cts(
Dem
o)A
CC
ES
S R
OA
D B
ETW
EE
N I-
55 T
HR
U S
R 4
68 [P
E &
RO
W F
OR
NE
W C
ON
STR
UC
TIO
N] H
IND
S -100
.00
2,18
6.03
RO
W20
1000
/
1005
51S
peci
al P
roje
cts(
Dem
o)A
IRP
OR
T PA
RK
WAY
BE
TWE
EN
I-55
& S
R 4
75 [P
E &
RO
W F
OR
NE
W B
RID
GE
S] H
IND
S50
4.49
2,50
4.49
RO
W20
3000
/
1005
85B
ridge
SR
473
AT
VAU
GH
N C
RE
EK
(2.7
)98
,711
.86
147,
237.
21E
NG
1010
00/
1016
10S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)I-2
0 AT
CLI
NTO
N-R
AYM
ON
D R
D55
7.10
289,
816.
81R
OW
1000
/
1016
10S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)I-2
0 AT
CLI
NTO
N-R
AYM
ON
D R
D4,
376.
163,
970,
859.
96R
OW
2200
/
1022
91N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-2
0 FM
BIG
BLA
CK
RIV
ER
, EA
STW
AR
D 6
.3 M
I80
3.05
23,1
77,0
47.0
0C
ON
3010
00/
1024
69Vi
sion
21
SR
18
BT
CO
PIA
H C
L A
ND
SR
27
(25.
1)19
9,73
1.89
241,
590.
55E
NG
1010
00/
1024
69S
tate
Pro
ject
s
SR
18
at W
hite
Oak
Bay
ouB
ridge
Hyd
raul
ic R
ecom
men
datio
ns a
nd P
relim
inar
y B
ridge
Lay
outs 3
7,32
4.59
37,3
24.5
9E
NG
1011
00/
1039
01S
peci
al P
roje
cts(
Dem
o)C
ITY
OF
JAC
KS
ON
- IT
S-H
IGH
WAY
/RA
IL C
ON
TRO
L13
5,97
0.11
290,
308.
13C
ON
7010
00/
1039
14P
avem
ent R
ehab
ilita
tion
I-20
FRO
M E
DW
AR
DS
TO
TH
E N
ATC
HE
Z TR
AC
E [1
0-13
JXN
O&
M G
P V-
43]
4,33
8,94
7.67
13,7
93,4
36.4
5C
ON
3030
00/
1039
24S
peci
al P
roje
cts(
Dem
o)TR
AFF
IC C
ALM
ING
IN J
AC
KS
ON
64,0
84.8
912
9,13
8.63
EN
G10
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
14
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Hin
ds**
****
****
****
*
1041
02S
peci
al P
roje
cts(
Dem
o)C
ity o
f Clin
ton
- Wid
en P
ineh
aven
Driv
e fro
m 2
Lan
e to
5 L
ane
from
Nor
thsi
de D
rive
to 4
00 '
Nor
th o
f Ber
ry D
rive.
Impr
ovem
ents
Incl
ude
a 10
' Wid
e M
ultip
urpo
se T
rail
on O
ne S
ide
and
a 5'
Sid
ewal
k on
the
Oth
er S
ide.
4,90
8,63
0.82
5,37
8,47
5.16
CO
N80
1000
/
1041
78S
afet
yC
N R
ailro
ad S
igna
ls a
nd G
ates
on
Nor
thsi
de D
rive
in J
acks
on, M
S1,
147.
7761
,432
.77
CO
N30
7000
/
1045
87S
peci
al P
roje
cts(
Dem
o)C
ITY
OF
JAC
KS
ON
- LY
NC
H S
TR. I
MP
RO
VE
ME
NTS
- W
IGG
INS
ST.
TO
US
HIG
HW
AY 8
0 - P
E (8
0-20
)58
,392
.41
768,
649.
06E
NG
8110
00/
1048
75S
tate
Pro
ject
sI-2
0 W
B O
VE
R U
S 5
1, R
EP
LAC
E B
RID
GE
(BR
45.
5)5,
254.
0949
7,08
6.74
EN
G10
2000
/
1048
75B
ridge
I-20
WB
OV
ER
US
51,
RE
PLA
CE
BR
IDG
E (B
R 4
5.5)
114,
375.
9714
,387
,789
.03
CO
N30
2000
/
1048
77In
ters
tate
I-20
AT P
EA
RL
RIV
ER
, BR
IDG
E M
AIN
T 16
,282
.76
444,
275.
40E
NG
1011
00/
1050
14S
peci
al P
roje
cts(
Dem
o)W
est C
ount
y Li
ne R
d Im
prov
emen
t, P
hase
1C
- P.
E.
82,7
14.6
682
,714
.66
EN
G81
2000
/
1050
22B
ridge
I-20
EB
AT
BR
IDG
E O
VE
R R
AIL
RO
AD
, RE
PLA
CE
BR
IDG
E (3
1.5)
131,
718.
3083
8,10
4.22
EN
G10
1000
/
1050
22B
ridge
I-20
EB
AT
BR
IDG
E O
VE
R R
AIL
RO
AD
(31.
5)16
,081
.00
22,9
34.3
7R
OW
2010
00/
1051
74S
afet
yM
issi
ssip
pi D
epar
tmen
t of H
ealth
, Inj
ury/
Viol
ence
Pre
vent
ion
Bra
nch
- Con
duct
Pre
sent
atio
ns, S
R2S
Eve
nts,
and
Adm
inis
terin
g a
Med
ia C
ampa
ign.
157,
198.
0036
5,29
6.00
CO
N40
2000
/
1053
25S
peci
al P
roje
cts(
Dem
o)C
ITY
OF
JAC
KS
ON
- FO
RTI
FIC
ATIO
N S
TRE
ET
RE
HA
BIL
ITAT
ION
FR
OM
BA
ILE
Y AV
E T
O I-
553,
893,
563.
007,
013,
022.
97C
ON
8010
00/
1053
37S
tate
Pro
ject
sU
S 4
9 R
EP
LAC
E B
RID
GE
173
.0A
24,7
52.1
424
,752
.14
EN
G10
1000
/
1054
45In
ters
tate
I-20/
I-55/
I-220
Sig
n A
nd T
russ
Rep
lace
men
ts59
,246
.05
4,62
9,77
2.92
CO
N30
1000
/
1055
62S
tate
Pro
ject
sC
ity o
f Clin
ton
- Ham
pste
ad B
lvd.
from
app
roxi
mat
ely
0.5
mile
s so
uth
of H
wy
80 to
0.7
5 m
iles
east
of S
prin
grid
ge R
d.1,
048.
989,
289.
62E
NG
1010
00/
1057
76S
peci
al P
roje
cts(
Dem
o)H
inds
Cou
nty
Boa
rd o
f Sup
ervi
sors
2,41
0.28
3,61
5.42
EN
G41
1000
/
1058
58Vi
sion
21
I-20/
55 S
TUD
Y FR
OM
I-22
0 TO
STA
CK
361
,465
.52
789,
422.
22E
NG
1011
00/
1059
27In
ters
tate
Inte
rsta
te S
lides
@ V
ario
us L
ocat
ions
2,
621.
8276
9,78
8.80
CO
N30
1000
/
1059
27In
ters
tate
Inte
rsta
te S
lide
at S
tate
Stre
et a
nd G
alla
tin S
treet
.-5
18.4
529
,428
.17
CO
N30
2000
/
1060
23In
ters
tate
I-55
From
Cop
iah
CL
To M
cDow
ell R
oad
144,
468.
962,
855,
876.
64E
NG
1010
00/
1060
23In
ters
tate
I-55
from
Ter
ry to
Byr
am98
5,68
0.11
1,01
2,52
9.84
EN
G10
2000
/
1060
23In
ters
tate
I-55
from
Cop
iah
CL
to T
erry
71,5
75.7
093
,758
.83
EN
G10
3000
/
1060
23In
ters
tate
I-55
from
the
Cop
iah
Cou
nty
Line
to M
cDow
ell R
oad
- Fea
sibi
lity
Stu
dy27
2,94
5.43
591,
592.
51E
NG
1050
00/
1060
23N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-5
5 Fr
om B
yram
To
McD
owel
l Roa
d32
,471
,974
.90
32,8
57,4
33.0
3C
ON
3010
00/
1060
58S
peci
al P
roje
cts(
Dem
o)
1,
403,
764.
091,
403,
764.
09C
ON
8010
00/
1061
27N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-2
0 W
iden
ing
from
Nat
chez
Tra
ce P
arkw
ay to
SR
18.
430,
021.
471,
514,
736.
64E
NG
1010
00/
1061
27S
tate
Pro
ject
sI-2
0 W
iden
ing
from
Nat
chez
Tra
ce to
SR
18
19,6
30.9
855
1,19
0.63
EN
G10
1100
/
1061
86P
avem
ent R
ehab
ilita
tion
I-220
FR
OM
US
49
TO M
AD
ISO
N C
L - P
E42
,862
.34
42,8
62.3
4E
NG
1010
00/
1062
12U
rban
City
of C
linto
n - A
rrow
Driv
e Im
prov
emen
t - w
iden
ing
Arro
w D
r fro
m C
ynth
ia R
oad
to W
est A
cces
s R
oad
to C
linto
n H
igh
Sch
ool
[10
-13
JXN
O&
M G
P V-
43]
179,
277.
601,
116,
519.
30C
ON
7010
00/
1062
13U
rban
City
of C
linto
n-C
linto
n P
arkw
ay @
Fai
rmon
t Stre
et S
igna
lizat
ion
and
Inte
rsec
tion
Impr
ovem
ents
, sig
naliz
ing
pede
stria
n an
d bi
cycl
e cr
ossi
ng13
5,93
9.44
136,
013.
44C
ON
7010
00/
1063
30S
tate
Pro
ject
sLa
kela
nd D
rive
from
Cur
ran
Driv
e (S
t. D
omin
ic's
Hos
pita
l Ent
ranc
e) W
est f
or a
bout
100
0 ft
130,
045.
391,
513,
152.
40C
ON
3010
00/
1064
83N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-5
5/La
kela
nd D
rive
Inte
rsec
tion
Impr
ovem
ents
60,0
44.5
423
6,48
3.30
EN
G10
1000
/
1064
83N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-5
5/La
kela
nd D
rive
Inte
rsec
tion
Impr
ovem
ents
229,
456.
3422
9,45
6.34
CO
N30
1000
/
1064
94B
ridge
Brid
ge o
n W
oodr
ow W
ilson
ove
r Mill
Stre
et in
the
City
of J
acks
on -
Brid
ge R
ehab
.86
,092
.74
86,0
92.7
4E
NG
1010
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
15
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Hin
ds**
****
****
****
*
1064
94S
tate
Pro
ject
sB
ridge
on
Woo
drow
Wils
on o
ver M
ill S
treet
in th
e C
ity o
f Jac
kson
- B
ridge
Reh
ab.
5,22
0.90
5,22
0.90
EN
G10
2000
/
1065
14S
afet
yB
ike
Wal
k M
issi
ssip
pi -
Low
-Inco
me
Em
pow
erm
ent I
nitia
tive
for i
ncre
ased
ped
estri
an a
nd b
icyc
le fr
iend
ly c
omm
uniti
es in
Mis
siss
ippi
16,8
00.0
025
,027
.00
CO
N40
2000
/
1065
33S
tate
Pro
ject
sI-5
5 @
Riv
ersi
de D
rive
Brid
ge #
s 96
.7A
& 9
6.7B
39,6
96.5
640
,776
.56
EN
G10
1000
/
1065
33B
ridge
I-55
@ R
iver
side
Driv
e B
ridge
#s
96.7
A&
B ((
For U
tility
Rel
ocat
ion)
)5,
845.
635,
845.
63R
OW
2010
00/
1065
33B
ridge
I-55
@ R
iver
side
Driv
e B
ridge
#s
96.7
A&
B [L
ET
with
304
990]
249,
314.
0924
9,31
4.09
CO
N30
1000
/
1065
53B
ridge
I-20
Brid
ge In
spec
tion
over
Val
ley
Stre
et11
1,47
7.30
111,
477.
30E
NG
1010
00/
1065
59S
afet
yM
idto
wn
Par
tner
s, In
c. N
on In
fast
ruct
ure
Impr
ovem
ent i
n th
e ar
ea o
f Bro
wn
Ele
men
tary
and
Row
an M
iddl
e S
choo
ls in
the
Mid
tow
n ar
ea o
f Jac
kson
21,3
87.7
221
,387
.72
CO
N40
2000
/
1065
87U
rban
City
of B
yram
- G
ary
Roa
d R
econ
stru
ct E
xist
ing
Two
Lane
Roa
dway
and
Add
Add
ition
al T
urn
Lane
s fro
mTe
rry R
oad
to D
avis
Roa
d62
1,97
8.27
621,
978.
27C
ON
7010
00/
1065
96S
tate
Pro
ject
sH
inds
Cou
nty
Boa
rd o
f Sup
ervi
sors
- Byr
am S
win
ging
Brid
ge P
arki
ng L
ot Im
prov
emen
ts
167.
4916
7.49
7990
00/
1065
98B
ridge
Brid
ge J
oint
Rep
air -
Dis
trict
510
4,96
1.59
104,
961.
59C
ON
3050
00/
1066
13In
ters
tate
I-55
NB
Exi
t Ram
p to
Atk
ins-
Bea
sley
126,
823.
4212
6,82
3.42
EN
G10
1000
/
1066
19N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-2
0 W
estb
ound
at M
cRav
en14
,425
.95
2,16
4,81
0.07
CO
N30
1000
/
1066
19N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-2
0 W
estb
ound
at M
cRav
en (h
ead
to h
ead
traffi
c fo
rce
acco
unt w
ork)
995,
220.
101,
064,
902.
23C
ON
3020
00/
1066
51S
tate
Pro
ject
sI-2
0 fro
m N
atch
ez T
race
to S
R 1
8 18
3,78
1.93
183,
781.
93E
NG
1010
00/
1066
51In
ters
tate
I-20
from
Nat
chez
Tra
ce to
SR
18
9,39
0.40
9,39
0.40
CO
N30
1000
/
1066
51In
ters
tate
I-20
from
Nat
chez
Tra
ce to
SR
18
180.
3218
0.32
CO
N30
2000
/
1067
99S
tate
Pro
ject
sH
inds
Cou
nty
BO
S-C
ount
y W
ide
Res
urfa
cing
1,27
7.73
1,27
7.73
7990
00/
1068
60S
afet
yM
S 2
5 M
ast A
rm R
epla
cem
ents
- M
S 2
5 at
Coo
l Pap
a B
ell/H
ighl
and
Driv
e an
d M
S 2
5 at
Rid
gew
ood
Roa
d 13
7.84
137.
84E
NG
1010
00/
Cou
nty
Tota
l53
,603
,218
.91
****
****
****
***
Hol
mes
****
****
****
***
1003
72S
tate
Pro
ject
sU
S 4
9E R
R O
VE
RPA
SS
AT
BE
E L
AK
E
R
OW
&C
ON
S 1
0212
753
7,92
8.17
1,53
2,37
3.18
EN
G10
00/
1004
18S
tate
Pro
ject
sS
R 1
4 R
EP
LAC
E B
R 2
.7 M
I WE
ST
OF
SR
17
R
OW
&C
ON
S 1
0237
44,
502.
2986
2,25
9.33
EN
G10
00/
1004
35B
ridge
SR
17
RE
PL
2 B
RS
#45
.9,4
7.3,
51.9
N O
F LE
XIN
GTO
N79
,743
.21
726,
307.
26E
NG
1000
/
1004
35B
ridge
SR
17
BR
# 4
5.9,
47.3
, 51.
9, N
OF
LEXI
NG
TON
14,3
97.7
562
5,65
5.93
RO
W20
1000
/
1021
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)
US
49E
RA
ILR
OA
D O
VE
RPA
SS
AT
BE
E L
AK
EP
E 1
0037
213
3,61
0.47
133,
610.
47R
OW
2010
00/
1021
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 4
9E R
AIL
RO
AD
OV
ER
PAS
S A
T B
EE
LA
KE
46,0
52.7
720
1,35
6.90
RO
W20
2000
/
1023
74S
tate
Pro
ject
sS
R 4
33 R
epla
ce B
ridge
45.
814
,643
.13
43,2
26.0
9E
NG
1020
00/
1023
74S
tate
Pro
ject
sS
R 1
4 B
R N
OS
. 64.
4, 6
4.6,
66.
0, 6
6.4
W O
F S
R 1
7 P
E 1
0041
8 G
ener
al O
blig
atio
n B
ond
Pro
ject
106,
118.
3434
8,08
7.55
RO
W20
1000
/
1023
74S
tate
Pro
ject
sS
R 4
33 R
EP
LAC
E B
RID
GE
45.
843
,912
.62
64,9
94.4
9R
OW
2020
00/
1029
45Vi
sion
21
SR
12
FRO
M I-
55 T
O S
R 3
5 N
EA
R K
OS
CIU
SK
O10
3.04
155,
869.
63E
NG
1000
/
1030
97B
ridge
SR
12
BR
NO
. 60.
9 AT
FA
NN
EG
US
HA
CR
EE
K B
TWN
TC
HU
LA A
ND
LE
XIN
GTO
N12
3,76
0.98
599,
478.
38E
NG
1010
00/
1030
97S
tate
Pro
ject
sS
R 1
2 B
R N
O. 6
0.9
AT F
AN
NE
GU
SH
A C
RE
EK
BTW
N T
CH
ULA
AN
D L
EXI
NG
TON
40,4
76.5
340
,476
.53
RO
W20
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
16
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Hol
mes
****
****
****
***
1033
20B
ridge
SR
12
BR
NO
49.
6 AT
TC
HU
LA L
AK
E13
,647
.41
2,66
2,77
7.96
CO
N30
1000
/
1045
23R
egul
ar-A
RR
AI-5
5 FR
OM
SR
17
TO T
WO
MIL
ES
SO
UTH
OF
SR
12
AT D
UR
AN
T-2
1,65
5.93
10,5
70,8
00.0
0C
ON
3010
00/
1045
23In
ters
tate
I-55
FRO
M S
R 1
7 TO
TW
O M
ILE
S S
OU
TH O
F S
R 1
2 AT
DU
RA
NT
-1,8
90,7
91.6
90.
00C
ON
3011
00/
1045
23In
ters
tate
I-55
FRO
M S
R 1
7 TO
TW
O M
ILE
S S
OU
TH O
F S
R 1
2 AT
DU
RA
NT
1,91
2,44
7.62
1,91
2,44
7.62
CO
N30
3000
/
1052
33S
afet
yC
ross
ing
at S
R 1
2, D
uran
t, H
olm
es C
o.97
6.75
151,
809.
18C
ON
3010
00/
1055
33R
egul
ar-A
RR
A *
*I-5
5 R
est A
rea
in H
olm
es C
ount
y-S
ite Im
prov
emen
ts63
,284
.00
579,
662.
67C
ON
3010
00/
1055
33In
ters
tate
I-55
Res
t Are
a in
Hol
mes
Cou
nty
-39,
154.
1622
6,59
8.34
CO
N30
1100
/
1055
33In
ters
tate
I-55
Res
t Are
a in
Hol
mes
Cou
nty
32,1
53.6
71,
485,
281.
03C
ON
3020
00/
1061
76P
avem
ent R
ehab
ilita
tion
I-55
FM Y
AZO
O C
L TO
BE
GIN
NIN
G O
F C
ON
CR
ETE
NO
RTH
OF
SR
17
NO
RTH
BO
UN
D L
AN
ES
ON
LY
30
,022
.77
30,0
22.7
7C
ON
3020
00/
1064
17S
afet
yI-5
5 C
able
Bar
rier
43,7
70.0
653
2,03
3.34
CO
N30
2000
/
Cou
nty
Tota
l1,
289,
949.
80
****
****
****
***
Issa
quen
a**
****
****
****
*
1064
46S
tate
Pro
ject
sS
R 1
4 fro
m th
e in
ters
ectio
n of
SR
1 to
Sha
rkey
CL
135,
562.
1815
6,53
9.56
EN
G10
1000
/
1065
17P
avem
ent R
ehab
ilita
tion
SR
1 F
M S
R 1
/SR
14
INT.
TO
WA
SH
ING
TON
CL
1,19
2,32
0.79
1,19
3,62
3.59
CO
N30
1000
/
1067
59S
tate
Pro
ject
sS
truct
ural
& E
valu
atio
n S
afet
y S
tudy
SR
465
Ove
r Ste
el B
ayou
36,9
05.6
336
,905
.63
EN
G10
1000
/
Cou
nty
Tota
l1,
364,
788.
60
****
****
****
***
Itaw
amba
****
****
****
***
1001
34B
ridge
SR
178
BT
CLA
Y &
ALA
BA
MA
STA
TE L
INE
- G
ener
al O
blig
atio
n B
ond
Pro
ject
146,
599.
0588
1,43
3.31
EN
G10
1000
/
1001
34S
tate
Pro
ject
sS
R 1
78 B
T C
LAY
& A
LAB
AM
A S
TATE
LIN
E B
RID
GE
S #
117
.1, #
115
.7,
# 11
3.5,
# 1
15.0
, # 1
19.3
, # 1
15.2
, #
115
.4, #
114
.825
0,74
6.97
250,
746.
97R
OW
2010
00/
1020
75Vi
sion
21
* AP
D V
FA
IRV
IEW
TO
SR
23
[EA
RM
AR
K]
P
E 1
0004
6 C
ON
S 1
0207
6/30
117
,567
.17
3,30
0,01
2.08
RO
W20
1000
/
1020
75O
ther
AP
D V
US
78)
FR
OM
SR
23
TO A
LAB
AM
A S
TATE
LIN
E
P
.E. 1
0004
6/10
00 C
ON
S 1
0207
6/30
219
,791
.33
4,79
4,86
4.31
RO
W20
2000
/
1026
15Vi
sion
21
SR
25
FRO
M T
HE
MO
NR
OE
CL/
ITAW
AM
BA
CL
NO
RTH
I M
ILE
PE
102
000
174,
515.
9048
7,35
7.73
RO
W20
1000
/
1048
61S
peci
al P
roje
cts(
Dem
o)S
prin
g S
t. In
dust
rial A
cces
s R
d, F
ulto
n64
,944
.69
410,
006.
25E
NG
1010
00/
1062
17P
avem
ent R
ehab
ilita
tion
US
78
FM H
WY
25 S
TO
HW
Y 25
N [
10-1
3 O
&M
GP
PG
I-6]
6,25
6.80
1,96
5,79
6.23
CO
N30
1000
/
1063
44S
tate
Pro
ject
sU
S 7
8 B
etw
een
SR
25
Nor
th A
nd S
R 2
346
,368
.31
51,6
22.4
7R
OW
2010
00/
1063
54P
avem
ent R
ehab
ilita
tion
SR
25
FM S
R 1
78 T
O E
ND
4-L
AN
E [1
0-13
O&
M G
P P
G I-
6]10
,755
.94
987,
237.
89C
ON
3010
00/
Cou
nty
Tota
l73
7,54
6.16
****
****
****
***
Jack
son
****
****
****
***
1007
10P
avem
ent R
ehab
ilita
tion
SR
611
FR
OM
US
90
TO E
ND
OF
RO
UTE
74,9
09.8
61,
725,
741.
41E
NG
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
17
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Jack
son
****
****
****
***
1007
10P
avem
ent R
ehab
ilita
tion
Rai
lroad
cro
ssin
g su
rface
s, g
ates
and
ligh
ts1,
411.
221,
411.
22E
NG
1010
00/
1007
10P
avem
ent R
ehab
ilita
tion
SR
611
FR
OM
US
90
TO E
ND
OF
RO
UTE
- R
evie
w p
urch
ase
of R
OW
4,49
6,14
3.24
6,61
8,27
5.62
RO
W20
2000
/
1007
10Vi
sion
21
SR
611
AN
D U
S 9
0 IN
TER
CH
AN
GE
[MD
A]
7,31
5,67
9.91
28,9
28,6
89.8
9C
ON
3010
00/
1007
10Vi
sion
21
SR
611
FR
OM
US
90
INTE
RC
HA
NG
E T
O E
ND
OF
RO
UTE
[MD
A]
560,
878.
6256
0,87
8.62
CO
N30
2000
/
1007
74B
ridge
SR
57
RE
PLA
CE
BR
20.
3 AT
RE
D C
RE
EK
116,
911.
7824
5,90
1.52
EN
G10
00/
1012
04N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-1
0 fro
m S
R 6
09 to
SR
57
- Fin
al D
esig
n19
6,99
6.06
447,
158.
68E
NG
1030
00/
1012
04N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-1
0 FR
OM
HA
RR
ISO
N C
OU
NTY
LIN
E T
O S
R 6
092,
587.
5013
,855
,363
.48
CO
N30
2000
/
1030
60Vi
sion
21
SR
57
FRO
M I-
10 T
O V
AN
CLE
AVE
177,
185.
014,
340,
778.
64E
NG
1010
00/
1030
60Vi
sion
21
SR
57
FRO
M I-
10 T
O V
AN
CLE
AVE
27,5
02.0
686
3,39
7.33
EN
G10
2000
/
1030
60Vi
sion
21
SR
57
FRO
M I-
10 T
O H
UM
PH
RE
Y R
OA
D [
Ear
mar
k]3,
696,
648.
9118
,637
,264
.18
RO
W20
1000
/
1030
60Vi
sion
21
SR
57
FRO
M H
UM
PH
RE
Y R
OA
D T
O V
AN
CLE
AVE
{V-9
0]73
0,06
7.18
14,7
67,1
49.0
5R
OW
2020
00/
1030
60Vi
sion
21
SR
57
FRO
M I-
10 T
O V
AN
CLE
AVE
- R
eloc
atio
n of
Util
ities
165,
814.
3616
5,81
4.36
RO
W20
3000
/
1031
03P
avem
ent R
ehab
ilita
tion
US
90
FM P
AS
CA
GO
ULA
ST
TO V
ER
DO
N S
T54
.92
5,19
8,38
3.11
RO
W20
1000
/
1038
03P
avem
ent R
ehab
AR
RA
**U
S90
FR
OM
DO
LPH
IN D
RIV
E T
O T
HE
WE
ST
PAS
CA
GO
ULA
RIV
ER
(3R
OV
ER
LAY,
AD
D A
UXI
LAR
Y LA
NE
EB
, AN
D T
RA
FFIC
SIG
NA
L U
PG
RA
DE
)-5
2,57
0.98
10,7
99,8
00.0
0C
ON
3010
00/
1038
03P
avem
ent R
ehab
ilita
tion
US
90 F
RO
M D
OLP
HIN
DR
IVE
TO
TH
E W
ES
T PA
SC
52,5
70.9
81,
014,
665.
98C
ON
3011
00/
1041
41S
afet
yIN
DU
STR
IAL
DR
. IN
PA
SC
AG
OU
LA22
.00
23,3
43.0
0C
ON
3010
00/
1041
41S
afet
yC
HIC
OT
RD
IN P
AS
CA
GO
ULA
HIG
H S
PE
ED
RA
IL C
RO
SS
ING
22.0
067
,141
.37
CO
N30
2000
/
1042
73N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-1
0 IN
TER
CH
AN
GE
AT
GA
UTI
ER
-VA
NC
LEAV
E R
OA
D (E
XIT
61) (
GE
OM
ETR
IC IM
PR
OV
EM
EN
TS, T
RA
FFIC
SIG
NA
LS)
14,1
05.0
113
9,88
8.54
EN
G10
1000
/
1042
73N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-1
0 IN
TER
CH
AN
GE
AT
GA
UTI
ER
-VA
NC
LEAV
E R
OA
D (E
XIT
61) (
GE
OM
ETR
IC IM
PR
OV
EM
EN
TS, T
RA
FFIC
SIG
NA
LS)
2,18
8,47
0.76
2,32
6,70
1.37
CO
N30
1000
/
1043
52U
rban
GA
UTI
ER
-VA
NC
LEAV
E R
D A
T C
OLL
EG
E D
R IN
GA
-2,8
87.2
592
,000
.00
CO
N30
1000
/
1044
74B
ridge
SR
613
RE
PLA
CE
BR
. #13
.6 O
VE
R B
LAC
K C
RE
EK
57,3
09.9
369
,845
.28
EN
G10
1000
/
1045
20P
avem
ent R
ehab
ilita
tion
I-10
FRO
M P
AS
CA
GO
ULA
RIV
ER
TO
ALA
BA
MA
SL
[PE
IS N
ON
PA
RT]
20,9
33.3
465
,994
.50
EN
G10
1000
/
1045
20P
avem
ent R
ehab
ilita
tion
I-10
FRO
M P
AS
CA
GO
ULA
RIV
ER
TO
ALA
BA
MA
SL
[10-
13 G
RP
C O
&M
V-8
5]3,
094,
484.
5812
,260
,967
.73
CO
N30
1000
/
1045
20P
avem
ent R
ehab
ilita
tion
I-10
at th
e P
asca
goul
a R
iver
Brid
ge -
RE
MO
VAL
OF
CA
ISS
ON
4,28
8,89
7.84
4,28
8,89
7.84
CO
N30
2000
/
1050
69S
peci
al P
roje
cts(
Dem
o)P
relim
inar
y E
ngin
eerin
g - W
iden
and
Impr
ove
Mar
tin B
luff
Roa
d, G
au63
6.23
374,
608.
80E
NG
8110
00/
1051
17E
mer
genc
y R
elie
fC
ity o
f Mos
s P
oint
-Rep
air T
raffi
c S
igna
ls a
nd P
oles
, Oth
er T
raffi
c E
quip
men
t at M
LK &
2nd
, Bel
lvie
w &
Mag
nolia
, Grif
fin &
Riv
erw
ood,
Mag
nolia
& M
LK, 2
nd &
Fre
deric
k. R
epai
r Cro
ssdr
ain,
Roa
dway
& S
igna
l at G
riffin
& C
umbe
rland
.9,
942.
0042
8,29
9.78
CO
N70
1000
/
1053
06U
rban
City
of P
asca
goul
a - W
iden
Sho
rtcut
Rd.
Fro
m M
acph
elah
Roa
d to
Jef
fers
on S
treet
.15
0,59
8.47
3,19
5,32
4.51
CO
N70
1000
/
1054
01S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Pas
cago
ula
- Ped
estri
an a
nd b
icyc
le p
athw
ay li
nkin
g hi
stor
ic s
ites
thro
ugh
dow
ntow
n an
d co
nstru
ctio
n of
a b
oat l
aunc
h an
d pa
rkin
g ar
ea in
lieu
of t
he li
ghth
ouse
rest
orat
ion.
. 60
,805
.77
1,96
8,87
5.10
CO
N70
1000
/
1054
01S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Pas
cago
ula
- CS
X R
ailro
ad C
ross
ing
(MS
0018
Fre
deric
k S
treet
Cro
ssin
g (D
.O.T
. #34
0150
V) [
V-74
]6,
042.
1020
4,03
5.91
CO
N70
2000
/
1055
70R
egul
ar-A
RR
A**
I-10
Eas
tRes
t Are
a in
Jac
kson
Cou
nty
-3,6
11.5
151
8,40
0.00
CO
N30
1000
/
1055
70In
ters
tate
I-10
E &
W R
est A
rea
in J
acks
on C
ount
y-5
5,69
4.74
0.00
CO
N30
1100
/
1055
70In
ters
tate
I-10
E &
W R
est A
rea
in J
acks
on C
ount
y-se
wag
e lif
t sta
tion
59,3
06.2
566
9,62
0.03
CO
N30
2000
/
1055
70R
egul
ar-A
RR
A**
I-10
Wes
t Res
t Are
a in
Jac
kson
Cou
nty
-128
.77
492,
700.
00C
ON
3030
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
18
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Jack
son
****
****
****
***
1055
70In
ters
tate
I-10
E &
W R
est A
rea
in J
acks
on C
ount
y12
8.77
2,57
8.22
CO
N30
3100
/
1056
71S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)Ja
ckso
n C
ount
y B
oard
of S
uper
viso
rs26
,940
.05
30,6
68.6
1C
ON
7020
00/
1057
26U
rban
City
of O
cean
Spr
ings
- In
stal
latio
n of
Tra
ffic
Sig
nals
with
railr
oad
pree
mpt
ion
at th
e in
ters
ectio
n of
Gov
ernm
ent S
t. &
Han
ley
Rd.
& G
over
nmen
t Stre
et a
nd O
cean
Spr
ings
Rd.
, Ove
rlay
at G
over
nmen
t St.
@ O
cean
Spr
ings
Roa
d24
0.79
471,
925.
63C
ON
7010
00/
1057
26U
rban
City
of O
cean
Spr
ings
- O
cean
Spr
ings
Roa
d - F
ield
wire
the
exis
ting
hous
e w
ith C
WT
equi
pmen
t and
add
3 s
econ
ds o
f ad
vanc
e pr
eem
ptio
n. I
nclu
de ja
ck a
nd b
ore
for n
ew tr
affic
sig
nal c
able
66,7
99.3
966
,799
.39
CO
N70
2000
/
1057
26U
rban
City
of O
cean
Spr
ings
- C
E&
I est
imat
e fo
r Han
ley
Rd.
- In
stal
l a n
ew 6
x 6
hou
se a
nd F
LS&
G's
, with
a H
XP-3
R a
nd 3
sec
onds
of a
dvan
ce p
reem
ptio
n w
ith o
ne ja
ck a
nd b
ore.
66,7
60.4
466
,760
.44
CO
N70
3000
/
1059
13S
afet
yU
S 9
0 A
t Fra
nklin
Cre
ek R
oad
1,82
7.08
141,
371.
64E
NG
1010
00/
1059
13S
afet
yU
S 9
0 A
t Fra
nklin
Cre
ek R
oad
[10-
13 G
RP
C S
AFE
TY V
-86]
3,39
2.38
1,48
6,95
0.05
CO
N30
1000
/
1059
36S
afet
yS
igna
ls &
Gat
es &
Ped
estri
an S
urfa
ce a
nd S
win
g G
ate,
MS
57/
Foun
tain
blea
u R
d22
2,94
0.42
278,
083.
04C
ON
3010
00/
1060
61S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Pas
cago
ula-
Bea
ch P
rom
enad
e P
edes
trian
pat
hway
with
ligh
ting
and
land
scap
ing
alon
g B
each
Blv
d. fr
om P
oint
Par
k to
Bea
ch P
ark.
57
1,74
4.01
745,
879.
30C
ON
7010
00/
1060
69S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Oce
an S
prin
gs-F
ront
Bea
ch D
rive
land
scap
e pr
ojec
t [10
-13
GR
PC
EN
HN
V-8
5]17
4,16
3.27
200,
000.
00C
ON
7010
00/
1061
54U
rban
City
of O
cean
Spr
ing
- Pub
lic S
afet
y C
ross
over
Impr
ovem
ent H
ighw
ay 9
0 at
Dea
na R
oad
inte
rsec
tion.
[10-
13 G
RP
C S
FTY
V-86
]4,
537.
4689
,705
.67
CO
N70
1000
/
1063
21S
afet
yC
ity o
f Oce
an S
prin
gs -
P.E
. for
O.S
. Mid
dle
Sch
ool
1,88
5.16
9,38
8.20
EN
G41
1000
/
1063
25S
tate
Pro
ject
sU
S 9
0 fro
m S
R 6
09 to
Dol
phin
Driv
e66
,044
.31
334,
083.
05E
NG
1000
/
1063
25N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 9
0 fro
m S
R 6
09 to
Dol
phin
Driv
e53
7,86
6.02
537,
866.
02E
NG
1010
00/
1064
48S
tate
Pro
ject
sC
ity o
f Pas
cago
ula
- wid
en to
incl
ude
thre
e la
nes
on H
ospi
tal R
oad
from
Old
Mob
ile H
ighw
ay to
Hig
hway
90
1,08
3.75
1,08
3.75
7990
00/
1064
64S
afet
yR
R U
pgra
de: F
lash
ers
and
Gat
es D
OT
# 34
0 16
9M T
horn
Rou
te in
Oce
an S
prin
gs5,
695.
5511
,024
.89
EN
G11
1000
/
1064
86Vi
sion
21
SR
63
Brid
ge In
spec
tion
over
Esc
ataw
pa R
iver
206,
500.
9720
6,50
0.97
EN
G10
1000
/
1065
21E
mer
genc
y R
elie
fFo
rt B
ayou
Brid
ge o
n S
R 6
09 in
Oce
an S
prin
gs.
Rep
air t
o C
ontro
l Con
sole
due
to d
amag
e fro
m H
urric
ane
Issa
c 30
4587
-301
15
2,57
6.00
152,
576.
0030
1000
/
1065
29E
mer
genc
y R
elie
fH
wy
613
- Driv
e sh
eet p
ile fo
r Brid
ge In
buttm
ents
369,
122.
3336
9,12
2.33
CO
N30
1000
/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
330]
22,5
03.2
522
,503
.25
3300
00/
1066
27S
afet
yM
S 6
3 @
MS
614
194.
2319
4.23
EN
G10
1000
/
1067
54P
avem
ent R
ehab
ilita
tion
SR
57
from
US
90
to O
cean
Spr
ings
Rd
1,68
6,00
6.45
1,68
6,00
6.45
CO
N30
1000
/
1067
68S
afet
yG
T-05
8 U
pgra
de R
ailro
ad C
ross
ings
- S
R 6
13 -
DO
T #
854
879W
nea
r Mos
s P
oint
- M
S E
xpor
t [95
% M
DA
Rai
l Fun
ds]
208.
0620
8.06
CO
N30
1000
/
1067
78S
afet
yU
S 9
0 fro
m P
asca
goul
a S
tr to
Che
vron
Dr
8,26
9.72
8,26
9.72
EN
G10
1000
/
Cou
nty
Tota
l31
,649
,474
.50
****
****
****
***
Jasp
er**
****
****
****
*
1006
85S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 1
5 R
EP
LAC
E 8
BR
IDG
ES
FR
OM
JO
NE
S C
L TO
NE
WTO
N [R
OW
104
135
CO
N 1
0245
5]8,
009.
751,
603,
265.
68E
NG
1000
/
1024
55Vi
sion
21
SR
15
RE
PL
8 B
RS
BTW
JO
NE
S C
L &
NE
WTO
N C
L (P
E 1
0068
5 R
OW
104
135)
[10-
13 B
R R
EP
L I-5
] G
ener
al O
blig
atio
n B
ond
Pro
ject
16,7
92.3
312
,788
,947
.53
CO
N30
1000
/
1024
92B
ridge
SR
513
RE
PL
BR
IDG
ES
19.
0, 1
9.1,
& 1
9.3
OV
ER
SO
UIN
LOV
EY
5,
290.
181,
292,
650.
64C
ON
3010
00/
1024
92B
ridge
SR
513
RE
PL
BR
IDG
ES
19.
0 A
ND
19.
3 O
VE
R4,
366,
851.
004,
378,
570.
75C
ON
3020
00/
1024
93B
ridge
SR
528
RE
PLA
CE
BR
IDG
E #
21.1
OV
ER
BO
GU
E H
OM
A C
RE
EK
114,
732.
3965
9,78
2.69
EN
G10
00/
1024
93B
ridge
SR
528
RE
PLA
CE
BR
IDG
E #
21.1
OV
ER
BO
GU
E H
OM
A C
RE
EK
7,07
3.65
759,
693.
72R
OW
2010
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
19
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Jasp
er**
****
****
****
*
1041
92Vi
sion
21
SR
15
FRO
M J
ON
ES
CO
UN
T LI
NE
TO
STR
ING
ER
3,55
2.61
27,5
42.4
6E
NG
1020
00/
1041
92S
tate
Pro
ject
sS
R 1
5 FR
OM
SR
18
TO T
HE
IND
US
TRIA
L PA
RK
112,
725.
1025
9,39
9.41
EN
G10
9000
/
1061
82In
ters
tate
I-59
Inte
rcha
nge
Ligh
ting
@ E
xit 1
13 (H
eide
berg
) [1
0-13
O&
M G
P P
G I-
6]72
6.80
410,
973.
77C
ON
3010
00/
1064
08P
avem
ent R
ehab
ilita
tion
I-59
FM J
ON
ES
CL
TO 5
.6 M
I NO
OF
SR
528
14
,566
.25
14,5
66.2
5E
NG
1020
00/
1064
08P
avem
ent R
ehab
ilita
tion
I-59
FRO
M J
ON
ES
CL
TO 5
.6 M
ILE
S N
OR
TH O
F S
R 5
281,
339,
022.
261,
339,
022.
26C
ON
3020
00/
Cou
nty
Tota
l5,
989,
342.
32
****
****
****
***
Jeffe
rson
_Dav
is**
****
****
****
*
1029
21N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 8
4 B
TW P
RE
NTI
SS
AN
D T
HE
CO
VIN
GTO
N C
L (S
TIP
PG
I-45
)68
5.26
222,
215.
04R
OW
2020
00/
1029
21N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 8
4 R
EC
ON
STR
UC
TIO
N O
F E
XIS
TIN
G L
AN
ES
BTW
PR
EN
TIS
S A
ND
TH
E C
OV
ING
TON
CL
(PE
101
176
RO
W &
CO
NS
101
826)
9,22
7.96
11,2
86,7
46.4
1C
ON
3020
00/
1064
33P
avem
ent R
ehab
ilita
tion
SR
13
FRO
M M
AR
ION
CO
UN
TY L
INE
NO
RTH
4.7
MIL
ES
98
8,39
1.11
997,
807.
40C
ON
3010
00/
Cou
nty
Tota
l99
8,30
4.33
****
****
****
***
Jone
s**
****
****
****
*
1007
12In
ters
tate
I-59
BE
TWE
EN
16T
H A
VE
AN
D 4
TH A
VE
IN L
AU
RE
L (C
ON
STR
UC
TIO
N O
F R
EP
LAC
EM
EN
T H
OU
SIN
G U
NIT
S)
C
ON
S 1
0234
0/30
124
,333
.24
5,83
3,64
3.08
RO
W20
1000
/
1029
64U
rban
U
S 1
1 FR
OM
IND
US
TRIA
L PA
RK
RD
TO
16T
H A
VE
IN L
AU
RE
L41
9.32
596,
141.
23E
NG
1010
00/
1029
65S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 5
90 F
RO
M U
S 1
1 TO
SR
29
42,4
41.4
21,
685,
614.
93E
NG
1010
00/
1029
65S
peci
al P
roje
cts(
Dem
o)S
R 5
90 F
RO
M U
S 1
1 TO
SR
29
67,9
99.9
03,
101,
329.
48R
OW
2010
00/
1029
65S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 5
90 F
RO
M U
S 1
1 TO
SR
29
[10
-13
STI
P I-4
4]2,
686,
401.
6115
,081
,111
.74
CO
N30
1000
/
1032
89S
afet
yS
R 1
5 @
US
84
---- I
N L
AU
RE
L (S
IGN
AL
UP
GR
AD
E A
ND
GE
OM
ETR
IC IM
PR
OV
EM
EN
TS A
T U
S 8
4 &
JE
FFE
RS
ON
ST
INTE
RS
EC
TIO
NS
)8,
611.
103,
430,
693.
13C
ON
3010
00/
1041
39S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 1
1 FR
OM
HO
WA
RD
IND
US
TRIE
S T
O E
LLIS
VIL
LE1,
035.
0019
6,87
5.02
EN
G10
1000
/
1041
39B
ridge
US
11
RE
PLA
CE
LIT
TLE
RO
CK
Y C
RE
EK
BR
IDG
E [P
AR
T O
F JO
NE
S C
OU
NTY
BO
S P
RO
JEC
T] 1,52
8.51
1,76
2,30
5.26
CO
N30
2000
/
1041
92Vi
sion
21
SR
15
FRO
M L
AU
RE
L TO
JA
SP
ER
CO
UN
TY L
INE
19,1
75.6
917
7,00
0.47
EN
G10
1000
/
1043
49S
peci
al P
roje
cts(
Dem
o)La
urel
Inte
rcha
nge
Feas
abili
ty S
tudy
60,2
37.7
160
,237
.71
EN
G10
00/
1051
20B
ridge
US
11
RE
PLA
CE
BR
IDG
E #
85.2
163,
158.
3767
1,56
6.38
EN
G10
1000
/
1051
20B
ridge
US
11
RE
PLA
CE
BR
IDG
E #
85.2
37,4
32.2
587
,622
.76
RO
W20
1000
/
1051
20Vi
sion
21
US
11
RE
PLA
CE
BR
IDG
E #
85.2
188,
048.
6018
8,04
8.60
CO
N30
1000
/
1057
35S
afet
yI-5
9 @
16t
h Av
enue
[10-
13 S
AFE
TY G
P P
G I-
7]99
8,73
3.34
1,47
0,59
8.41
CO
N30
1000
/
1059
42S
afet
yU
S 8
4 AT
MA
GN
OLI
A R
OA
D E
AS
T O
F LA
UR
EL
[10-
13 S
FTY
GP
PG
I-7]
1,37
4,99
0.07
1,64
7,40
2.61
CO
N30
1000
/
1060
06U
rban
City
of L
aure
l - M
illin
g, O
verla
y, A
DA
Upg
rade
s fo
r 1st
Ave
., 24
th S
t., 1
3th
St.,
10t
h S
t., A
irpor
t Driv
e an
d Vi
ctor
ia D
rive
[10-
13 S
TIP
Vol 4
IV-1
4, 1
5]35
,722
.76
578,
842.
82C
ON
7010
00/
1061
79P
avem
ent R
ehab
ilita
tion
I-59
FRO
M R
OC
KY
CR
EE
K T
O 1
3TH
AV
E -
PE
7,38
2.03
7,38
2.03
EN
G10
1000
/
1063
40S
afet
yC
ity o
f Lau
rel -
Con
stuc
t 5' s
idew
alks
, ins
tall
sign
age
& s
tripe
cro
ssw
alks
in th
e vi
cini
ty o
f Mad
dox
Ele
men
tary
& L
aure
l Mid
dle
Sch
ool
85,1
47.9
511
3,68
8.27
CO
N40
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
20
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Jone
s**
****
****
****
*
1063
40S
afet
yC
ity o
f Lau
rel-
P.E
. for
Mad
dox
Ele
m. &
Lau
rel M
id2,
770.
9416
,037
.50
EN
G41
1000
/
1064
08P
avem
ent R
ehab
ilita
tion
I-59
FM L
AU
RE
L TO
JA
SP
ER
CL
116,
538.
0011
6,53
8.00
EN
G10
1000
/
1064
08P
avem
ent R
ehab
ilita
tion
I-59
FRO
M L
AU
RE
L TO
JA
SP
ER
CL
1,16
0,29
0.48
1,16
0,29
0.48
CO
N30
1000
/
1065
23S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 1
5 in
Lau
rel @
Par
ker D
rive
- Tra
ffic
Sig
nal
24,8
63.8
831
,538
.79
EN
G10
1000
/
1065
23S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 1
5 in
Lau
rel @
Par
ker D
rive
- Tra
ffic
Sig
nal
24,8
67.7
724
,867
.77
CO
N30
1000
/
1065
61P
avem
ent R
ehab
ilita
tion
US
11
From
For
rest
CL
Nor
th 9
.8 m
iles
to In
dust
rial P
ark
Roa
d2,
716,
293.
132,
726,
572.
35C
ON
3010
00/
1065
63P
avem
ent R
ehab
ilita
tion
SR
15
From
1.6
Mile
s N
of B
ogue
Hom
a C
reek
to E
OS
M1,
785,
675.
561,
816,
348.
65C
ON
3010
00/
1067
29S
tate
Pro
ject
sC
ity o
f Lau
rel-G
rand
view
Driv
e Im
prov
emen
ts fr
om W
est D
rive
to 1
9 Av
enue
2,32
6.69
2,32
6.69
7990
00/
1067
55P
avem
ent R
ehab
ilita
tion
US
84
from
SR
28
to 1
200
ft W
est o
f SR
15
1,98
3,49
3.61
1,98
3,49
3.61
CO
N30
1000
/
1067
60S
tate
Pro
ject
sC
ity o
f Lau
rel -
Ped
Brid
ges
Rep
lace
men
t5,
235.
735,
235.
7379
9000
/
Cou
nty
Tota
l13
,625
,154
.66
****
****
****
***
Kem
per
****
****
****
***
1005
73S
tate
Pro
ject
sS
R 3
97 B
T S
R 1
6 &
WIN
STO
N C
L94
1,09
2.42
5,40
2,56
2.52
EN
G10
00/
1021
75S
tate
Pro
ject
sS
R 1
6 FM
SR
397
TO
3 L
N, E
OF
DE
KA
LB (A
DD
1 L
AN
E)
360.
0054
3,93
5.93
EN
G10
1000
/
1065
98B
ridge
Brid
ge J
oint
Rep
air -
Dis
trict
55,
814.
585,
814.
58C
ON
3051
00/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Geo
rge
McD
ade
in th
e C
ity o
f Ele
ctric
Mill
s D
OT#
303
906V
155.
8515
5.85
EN
G10
3000
/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Eno
ndal
e in
the
City
of L
aude
rdal
e D
OT#
303
897
Y15
5.85
155.
85E
NG
1070
00/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Dou
glas
Qua
rters
in th
e C
ity o
f Ele
ctric
Mill
s D
OT#
303
905
N15
5.80
155.
80E
NG
1080
00/
1066
07S
afet
yU
pgra
de R
R C
ross
ings
on
Suc
arno
chee
in th
e C
ity o
f Suc
arno
chee
DO
T#30
3 90
4G12
8.57
128.
57E
NG
1040
00/
1066
07S
afet
yU
pgra
de R
R C
ross
ings
on
Wah
alak
in th
e C
ity o
f Wah
alak
DO
T#30
3 91
4M12
8.57
128.
57E
NG
1050
00/
Cou
nty
Tota
l94
7,99
1.64
****
****
****
***
Lafa
yette
****
****
****
***
1002
97R
egul
ar-A
RR
A**
SR
331
RE
PLA
CE
BR
IDG
E B
T C
ALH
OU
N C
.L. &
SR
334
-36,
289.
653,
960,
000.
00C
ON
3020
00/
1002
97B
ridge
SR
331
RE
PLA
CE
BR
IDG
E B
T C
ALH
OU
N C
.L. &
SR
334
36,2
89.6
593
2,09
1.60
CO
N30
2100
/
1021
68Vi
sion
21
SR
7 B
TW S
R9
& 2
MI N
OR
TH O
F S
R6
W/ I
NTC
H64
1,30
7.16
4,15
2,00
5.37
EN
G10
1000
/
1021
68Vi
sion
21
SR
7, f
rom
1.5
mile
s so
uth
of S
R 9
W to
CR
414
.86
6,32
3.30
866,
323.
30R
OW
2010
00/
1021
68Vi
sion
21
SR
7, f
rom
CR
414
to 0
.4 m
iles
sout
h of
SR
6 ex
clud
ing
Sta
tion
num
bers
138
3+50
thro
ugh
1413
+00.
1,82
8,46
8.81
1,82
8,46
8.81
RO
W20
2000
/
1021
68Vi
sion
21
1,
759,
119.
271,
762,
033.
72R
OW
2021
00/
1021
68S
tate
Pro
ject
sA
PP
RA
ISA
L R
EV
IEW
SE
RV
ICE
S F
OR
SR
7 B
TW S
R9
& 2
MI N
OR
TH O
F S
R6
W/ I
NTC
H44
,144
.71
52,2
12.5
7R
OW
2030
00/
1022
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R6
@ J
AC
KS
ON
AV
EN
UE
OXF
OR
D
STP
-FY
00(0
01)
966.
2544
9,43
0.97
EN
G10
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
21
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Lafa
yette
****
****
****
***
1022
21S
tate
Pro
ject
sS
R 6
@ J
AC
KS
ON
AV
EN
UE
[DP
S P
roje
ct]
218,
774.
181,
144,
492.
92E
NG
1020
00/
1022
21Vi
sion
21
SR
6 @
JA
CK
SO
N A
VE
NU
E56
6,11
1.26
587,
976.
61R
OW
2020
00/
1022
21Vi
sion
21
SR
6 @
Jac
kson
Ave
nue
11,6
28.7
611
,628
.76
CO
N30
2000
/
1024
54B
ridge
SR
7 @
TA
LLA
HAT
CH
IE R
IVE
R P
E65
1.00
1,17
3,75
8.85
EN
G10
1000
/
1024
54Vi
sion
21
SR
7 o
ver T
alla
hatc
hie
Riv
er 1
32.4
70
,263
.73
109,
846.
41R
OW
2010
00/
1024
54Vi
sion
21
SR
7 o
ver T
alla
hatc
hie
Riv
er 1
32.4
16
,744
,983
.29
17,3
20,8
61.1
1C
ON
3010
00/
1033
26B
ridge
SR
328
FR
OM
SR
7 T
O S
R 3
15 B
R #
s. 4
.1, 5
. - G
ener
al O
blig
atio
n B
ond
133,
729.
5232
2,91
3.29
EN
G10
2000
/
1033
26Vi
sion
21
SR
328
FR
OM
SR
7 T
O S
R 3
15 B
R #
s 2.
4, 4
.1, 5
.3, 7
.8, 9
.2, 1
1.7,
10.
0, 1
0.3
225,
479.
591,
152,
969.
97R
OW
2010
00/
1033
26Vi
sion
21
SR
328
FR
OM
SR
7 T
O S
R 3
15 B
RID
GE
#s
2.4,
4.1
, 5.3
, 7.8
, 9.2
, 11.
7, 1
0.0,
10.
3
234,
023.
1423
4,02
3.14
CO
N30
1000
/
1051
87S
afet
yC
ity o
f Oxf
ord
- Dev
elop
and
Impl
emen
t Edu
catio
n, E
ncou
rage
men
t and
Eva
luat
ion
Pro
gram
s.2,
041.
4198
,581
.41
CO
N40
2000
/
1051
98S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Oxf
ord
- Con
stru
ctio
n of
BM
X B
ike
Trai
l, tra
il he
ad a
nd w
alki
ng tr
ails
at t
he O
xfor
d-La
faye
tte F
ield
s.4,
030.
1729
9,07
9.97
CO
N70
1000
/
1051
98S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Oxf
ord
- Con
stru
ctin
g bi
ke la
nes
on s
houl
ders
of e
xist
ing
city
stre
ets,
stri
ping
and
sig
ning
bik
e la
nes
on e
xist
ing
city
stre
ets,
inst
alla
tion
of li
ghts
& p
ocke
t par
k al
ong
exis
ting
bike
s la
nes
on th
e ab
ando
ned
railr
oad
bed.
58,5
76.7
31,
898,
267.
39C
ON
7020
00/
1052
49S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
STU
DIE
S20
,665
.40
78,5
04.4
5E
NG
1430
00/
1052
49S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
STU
DIE
S1,
366.
4744
,577
.64
EN
G14
5000
/
1062
70S
afet
yM
S 3
0 @
Woo
dson
Rid
ge/C
ampg
roun
d R
d (L
afay
ette
Cou
nty
Roa
ds 2
15/2
17)
11,5
24.8
452
,878
.24
EN
G10
1000
/
1062
70S
afet
yM
S 3
0 @
Woo
dson
Rid
ge/C
ampg
roun
d R
d17
5,83
1.84
284,
236.
28E
NG
1011
00/
1062
96S
peci
al P
roje
cts(
Dem
o)O
ld T
aylo
r Rd
Rou
nd-a
bout
@ S
R 6
inte
rcha
nge
96,3
10.3
563
5,59
1.13
EN
G10
1000
/
1062
96S
tate
Pro
ject
sO
ld T
aylo
r Rd
Rou
nd-a
bout
@S
R 6
inte
rchg
e20
,000
.00
20,0
00.0
0E
NG
1011
00/
1062
96S
peci
al P
roje
cts(
Dem
o)O
ld T
aylo
r Rd
Rou
nd-a
bout
@ S
R 6
inte
rcha
nge
879,
200.
701,
336,
061.
15R
OW
2010
00/
1062
96S
peci
al P
roje
cts(
Dem
o)O
ld T
aylo
r Rd
Rou
nd-a
bout
@ S
R 6
inte
rcha
nge
17,6
87.0
017
,687
.00
RO
W20
1100
/
1062
96S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)O
ld T
aylo
r Rd
Rou
nd-a
bout
@ S
R 6
inte
rcha
nge
4,99
7,62
0.71
4,99
7,62
0.71
CO
N30
1000
/
1063
14P
avem
ent R
ehab
ilita
tion
SR
7 F
M E
ND
OF
4 LN
S IN
OXF
OR
D T
O M
AR
SH
ALL
CL
[10-
13 O
&M
GP
PG
I-6]
43,7
60.3
13,
710,
610.
72C
ON
3010
00/
1064
06S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 6
und
er L
amar
Stre
et in
Oxf
ord
853.
9911
5,43
1.81
CO
N30
1000
/
1065
99P
avem
ent R
ehab
ilita
tion
SR
9W
, Cal
houn
Cnt
y Li
ne to
SR
72,
557,
586.
272,
570,
214.
42C
ON
3010
00/
1067
73P
avem
ent R
ehab
ilita
tion
US
278
from
Col
iseu
m D
rive
to S
R 7
1,25
6.83
1,25
6.83
CO
N30
1000
/
Cou
nty
Tota
l32
,234
,286
.99
****
****
****
***
Lam
ar**
****
****
****
*
1025
19B
ridge
US
11
RE
PLA
CE
5 B
RID
GE
S B
ETW
EE
N L
UM
BE
RTO
N &
PU
RV
IS
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct14
1,54
4.57
644,
492.
77R
OW
2010
00/
1025
19Vi
sion
21
US
11
RE
PLA
CE
5 B
RID
GE
S B
ETW
EE
N L
UM
BE
RTO
N &
PU
RV
IS
5,32
4,40
4.01
8,98
0,90
9.46
CO
N30
1000
/
1049
88S
tate
Pro
ject
sU
S 4
9 FR
OM
I-59
TO
FO
RR
ES
T C
OU
NTY
LIN
E11
,592
.13
291,
831.
30E
NG
2000
/
1054
13S
afet
yU
S 9
8 FR
OM
WE
STO
VE
R D
R T
O I-
59 [I
NC
LUD
ING
TH
E S
OU
THB
OU
ND
EXI
T R
AM
P]
[1
0-13
SA
FETY
GP
PG
I-7]
6.61
3,59
4,66
7.66
CO
N30
1000
/
1055
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 1
1 R
ailro
ad O
verp
ass
Nor
th o
f Lum
berto
n [1
0-13
GR
PC
O&
M P
G V
-85]
1,24
0.43
4,49
2,01
9.52
CO
N30
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
22
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Lam
ar**
****
****
****
*
1057
86U
rban
Lam
ar C
ount
y B
oard
of S
uper
viso
rs -
(2) S
igna
lizat
ion
proj
ects
. Sig
nal I
nsta
llatio
ns a
t (1
) Hw
y 11
and
Lin
coln
Rd
Ext
., (2
) Lin
coln
Rd
Ext
and
San
dy R
un R
d.
5,86
8.20
507,
404.
52C
ON
7010
00/
1060
39U
rban
Lam
ar C
ount
y B
oard
of S
uper
viso
rs -
Traf
fic S
igna
lizat
ion
and
Inte
rsec
tion
Impr
ovem
ents
on
Old
Hw
y 11
at O
ak G
rove
Roa
d an
d O
ld H
wy
245,
196.
5548
6,74
1.06
CO
N70
1000
/
1063
22S
tate
Pro
ject
sP
earl
& L
eaf R
iver
s R
ails
to T
rails
Rec
reat
iona
l Dis
trict
- P
relim
inar
y E
ngin
eerin
g - f
or D
enbu
ry B
eave
r Pon
d Im
prov
emen
t1,
734.
011,
734.
0179
9000
/
1063
22S
peci
al P
roje
cts(
Dem
o)P
earl
& L
eaf R
iver
s R
ails
to T
rails
Rec
reat
iona
l Dis
trict
- P
relim
inar
y E
ngin
eerin
g - f
or D
enbu
ry B
eave
r Pon
d Im
prov
emen
t43
,989
.17
43,9
89.1
7E
NG
8110
00/
1064
24S
afet
yS
CO
OT
sign
al c
ontro
l on
US
98
and
US
49
129.
2318
,873
.27
EN
G10
2000
/
1064
24S
afet
yS
CO
OT
sign
al c
ontro
l on
US
98
and
US
49
966,
172.
0796
6,17
2.07
CO
N30
2000
/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
337]
1,97
7.16
1,97
7.16
3370
00/
1065
94In
ters
tate
I-59
Des
ign
Bui
ld B
ridge
Wid
enin
g29
,001
.78
29,0
01.7
8E
NG
1020
00/
1065
94In
ters
tate
I-59
Des
ign
Bui
ld B
ridge
Wid
enin
g31
7,28
7.24
317,
287.
24C
ON
3020
00/
Cou
nty
Tota
l6,
850,
143.
16
****
****
****
***
Laud
erda
le**
****
****
****
*
1005
89S
tate
Pro
ject
sS
R 4
93 F
M B
RO
AD
MO
OR
TO
BA
ILE
Y (P
E)
9,65
4.08
2,54
9,07
1.28
EN
G10
00/
1005
89U
rban
S
R 4
93 F
M B
RO
AD
MO
OR
TO
BA
ILE
Y (R
EA
LIG
N) (
6.2,
6.4
, 8.2
)5,
041.
1411
,958
,820
.52
RO
W20
1000
/
1016
48Vi
sion
21
* S
R 1
9 FR
OM
CO
LLIN
SV
ILLE
TO
NE
WTO
N C
.L.
-4,7
80.6
16,
698,
350.
81R
OW
2010
00/
1016
48Vi
sion
21
* S
R 1
9 FR
OM
CO
LLIN
SV
ILLE
TO
NE
WTO
N C
.L.
523,
181.
3732
,629
,011
.82
CO
N30
1000
/
1023
75S
tate
Pro
ject
sS
R 8
95 (T
om B
aile
y La
ke) n
orth
of
US
80
@ B
R #
0.7
, 0.9
29
1.21
291.
21E
NG
1010
00/
1024
82B
ridge
SR
19
BT
ALA
. LN
AN
D S
R 4
96 (6
.0, 9
.5)
272,
963.
8778
8,71
3.92
EN
G10
1000
/
1024
82B
ridge
SR
19
BT
ALA
. LN
AN
D S
R 4
96 (6
.0, 9
.5)
9,30
0.32
145,
444.
97R
OW
2010
00/
1046
43S
tate
Pro
ject
sS
R 1
9 La
uder
dale
Cou
nty
772.
7589
6.26
EN
G11
7000
/
1049
09S
afet
yI-2
0 W
ES
TBO
UN
D O
N-R
AM
P AT
LO
ST
GA
P16
,580
.78
286,
558.
17E
NG
1010
00/
1049
09S
afet
yI-2
0 W
ES
TBO
UN
D O
N-R
AM
P AT
LO
ST
GA
P [1
0-13
SA
FETY
GP
PG
I-7]
2,18
7,74
2.93
3,06
4,90
7.50
CO
N30
1000
/
1058
66S
afet
yC
ity o
f Mer
idia
n - S
choo
l Saf
ety
Pro
gram
s.7,
044.
007,
044.
00C
ON
4020
00/
1059
97S
tate
Pro
ject
sC
ity o
f Mer
idia
n - R
epla
ce e
xist
ing
brid
ges
No.
10
on 3
5th
Ave
& N
o. 7
7 on
40t
h S
treet
, con
stru
ctio
n ex
tend
ing
up to
150
feet
eith
er d
irect
ion
from
brid
ge e
nds
resp
ectiv
ely.
[10-
13 S
TIP
Vol 4
IV-1
7]1,
048.
979,
006.
16E
NG
1010
00/
1059
99U
rban
City
of M
erid
ian
- Mill
& O
verla
y ap
prox
imat
ely
3.76
mile
s of
var
ious
city
stre
ets
(7th
St.,
29t
h Av
e., 8
th S
t., 1
4th
St.,
Cou
ntry
Clu
b D
r., &
Gra
nd V
iew
Ave
.35
,622
.27
1,03
2,26
5.72
CO
N70
1000
/
1061
87P
avem
ent R
ehab
ilita
tion
I-20
FM N
EW
TON
CL
TO I-
59 S
PLI
T - P
E2,
036.
062,
036.
06E
NG
1020
00/
1064
93P
avem
ent R
ehab
ilita
tion
SR
854
Fro
m S
R 3
9 To
Nav
al A
ir S
tatio
n1,
768,
660.
471,
775,
928.
50C
ON
3010
00/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Lock
hart
Trai
ler C
ourt
in th
e C
ity o
f Lau
derd
ale
DO
T#30
3 87
5Y15
5.85
155.
85E
NG
1050
00/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Ext
ensi
on in
the
City
of L
aude
rdal
e D
OT#
303
883R
155.
8515
5.85
EN
G10
6000
/
1066
07S
afet
yU
pgra
de R
R C
ross
ings
on
Eth
el C
layt
on in
the
City
of L
aude
rdal
e D
OT#
303
878U
128.
5712
8.57
EN
G10
1000
/
1066
07S
afet
yU
pgra
de R
R C
ross
ings
on
Hen
ry W
edge
wor
th in
the
City
of L
aude
rdal
e D
OT#
303
892P
128.
5712
8.57
EN
G10
2000
/
1066
07S
afet
yU
pgra
de R
R C
ross
ings
on
Ken
Dav
is in
the
City
of L
aude
rdal
e D
OT#
303
871W
128.
5712
8.57
EN
G10
3000
/
1066
07S
afet
yU
pgra
de R
R C
ross
ings
on
Ala
mut
cha
in th
e C
ity o
f Mar
ion
DO
T#30
3 86
5T85
.72
85.7
2E
NG
1080
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
23
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Laud
erda
le**
****
****
****
*
1066
86S
tate
Pro
ject
sC
ity o
f Mer
idia
n In
stal
l Tra
ffic
Sig
nals
on
HW
Y 39
at t
he in
ters
ectio
ns o
f Win
dmill
Driv
e an
d O
ld C
ount
ry C
lub
Driv
e26
9.41
269.
4179
9000
/
Cou
nty
Tota
l4,
836,
212.
15
****
****
****
***
Law
renc
e**
****
****
****
*
1052
86S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)To
wn
of M
ontic
ello
- In
stal
latio
n of
two
high
way
sig
ns to
exh
ibit
hist
oric
info
rmat
ion
on th
e "E
l Cam
ino
Rea
l" al
ong
Hw
y 84
and
a w
alki
ng tr
ail a
t the
Spo
rts C
ompl
ex.
19.0
216
2,99
5.53
CO
N70
1000
/
1062
42S
afet
yU
S 8
4 @
Fer
guso
n M
ill R
oad
311.
7810
5,86
0.32
EN
G10
1000
/
1062
42S
afet
yU
S 8
4 @
Fer
guso
n M
ill R
oad
1,
144,
971.
441,
508,
753.
22C
ON
3010
00/
1062
55S
peci
al P
roje
cts(
Dem
o)To
wn
of M
ontic
ello
- H
wy.
27 fr
om L
A st
ate
line
in W
alth
all C
ount
y th
roug
h La
wre
nce
Cou
nty
to C
ryst
al S
prin
g in
Cop
iah
Cou
nty.
Hur
rican
e ev
acua
tion
rout
e st
udy
adm
inis
tere
d by
Tow
n of
Mon
ticel
lo.
34,1
96.7
876
,434
.12
EN
G81
1000
/
1065
52E
mer
genc
y R
elie
fD
ist 7
Hur
rican
e Is
sac
Em
erge
ncy
Ope
ratio
ns [
3045
68 3
39]
372.
009,
266.
4733
9000
/
Cou
nty
Tota
l1,
179,
871.
02
****
****
****
***
Leak
e**
****
****
****
*
1004
90B
ridge
SR
16
BT
MA
DIS
ON
CL
AN
D S
R 2
5 (9
8.7,
101
.0, 1
01.5
) [10
-13
BR
RE
PL
I-5]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct66
,508
.37
9,28
4,86
4.12
CO
N30
2000
/
1005
92B
ridge
SR
429
AT
YO
CK
AN
OO
KA
NY
RIV
ER
- G
ener
al O
blig
atio
n B
ond
Pro
ject
31,3
98.7
731
0,61
2.22
EN
G10
1000
/
1005
92B
ridge
SR
429
AT
YO
CK
AN
OO
KA
NY
RIV
ER
(3.6
)68
,162
.40
163,
063.
77R
OW
2010
00/
1017
07S
tate
Pro
ject
sS
R 4
88 F
R S
R 3
5 TO
NE
SH
OB
A C
O L
N (P
E)
8,56
0.69
8,56
0.69
EN
G10
1000
/
1024
03S
tate
Pro
ject
sS
R 4
87 F
M T
US
CO
LA T
O S
R 3
5 (B
ridge
#s
6.7,
7.1,
7.6)
18,9
24.8
018
,924
.80
EN
G10
1000
/
1042
11B
ridge
SR
35
betw
een
Sco
tt C
ount
y Li
ne &
Wal
nut G
rove
- B
R #
122.
2 - G
ener
al O
blig
atio
n B
ond
9,63
4.78
186,
810.
81E
NG
1020
00/
1042
11Vi
sion
21
SR
35
BT
SC
OTT
CL
AN
D W
ALN
UT
GR
OV
E (1
22.2
) 2,
233.
7214
3,38
0.53
RO
W20
2000
/
1063
65S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Car
thag
e D
ownt
own
Squ
are
Impr
ovem
ent P
roje
ct
255.
8625
5.86
CO
N70
1000
/
1063
65S
tate
Pro
ject
sC
ity o
f Car
thag
e D
ownt
own
Squ
are
Impr
ovem
ent P
roje
ct
206.
1520
6.15
7990
00/
Cou
nty
Tota
l20
5,88
5.54
****
****
****
***
Lee
****
****
****
***
1000
78S
peci
al P
roje
cts(
Dem
o)S
R 6
FR
PO
NTO
TOC
CL
TO S
R 1
45 IN
TU
PE
LO
PE
100
079/
1000
&20
0023
3.38
11,4
18,4
47.0
2R
OW
2020
00/
1000
78Vi
sion
21
* M
S 6
FR
MS
PO
NTO
TOC
CL
TO N
ATC
HE
Z TR
AC
E [E
AR
MA
RK
]78
6.70
6,39
5,71
4.53
CO
N30
3000
/
1000
78Vi
sion
21
* S
R 6
FR
OM
NAT
CH
EZ
TRA
CE
TO
SR
145
[EA
RM
AR
K]
PE
100
079/
1000
&20
0037
3,41
2.80
34,9
30,8
60.3
5C
ON
3040
00/
1000
78Vi
sion
21
* M
S 6
FR
MS
PO
NTO
TOC
CL
TO S
R 1
45 (G
LOS
TER
ST.
) PA
VIN
G F
OR
303
& 3
04 [E
AR
MA
RK
]
9,13
8,46
2.15
20,2
57,5
41.5
0C
ON
3060
00/
1000
78Vi
sion
21
MS
6 F
R M
S P
ON
TOTO
C C
L TO
SR
145
(GLO
STE
R S
T.)
16,5
88.6
534
,206
.25
CO
N30
7000
/
1020
83S
afet
yU
S45
@ E
CU
LAU
TUB
BA
RD
(AD
D IN
T)37
,288
.54
2,72
3,53
5.12
RO
W20
1000
/
1024
26Vi
sion
21
SR
245
RE
PL
3 B
R B
TW C
HIC
KA
SAW
CL
& S
288,
862.
3432
8,64
9.03
EN
G10
1000
/
1042
89S
peci
al P
roje
cts(
Dem
o)Tu
pelo
Rai
lroad
Rel
ocat
ion
Stu
dy.
Fund
s tra
nfer
red
from
FH
WA
to F
RA
. D
emo
# M
S06
0. F
RA
has
also
giv
en fu
nds
for t
his
proj
ect.
28,1
94.8
61,
781,
545.
9210
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
24
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Lee
****
****
****
***
1050
59S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)
36,8
19.3
051
2,00
0.00
CO
N70
1000
/
1054
00S
tate
Pro
ject
sC
ity o
f Tup
elo
- Ove
rpas
s 3,
509.
023,
509.
0279
9000
/
1054
00U
rban
City
of T
upel
o - O
verp
ass
at th
e in
ters
ectio
n of
Bar
nes
Cro
ssin
g R
oad
Ext
ensi
on a
nd th
e N
atch
ez T
race
Par
kway
.2,
967,
615.
724,
128,
595.
96C
ON
8010
00/
1054
20S
tate
Pro
ject
sU
S 7
8 at
Col
ey R
d. E
xten
ded
in T
upel
o-in
terc
hang
e16
,994
.70
645,
612.
93E
NG
1010
00/
1054
20S
tate
Pro
ject
sU
S 7
8 at
Col
ey R
d. in
Tup
elo-
inte
rcha
nge
190.
4444
3,88
1.34
RO
W20
1000
/
1054
20Vi
sion
21
US
78
at C
oley
Rd.
Ext
ende
d in
Tup
elo-
Con
stru
ct n
ew in
terc
hang
e5,
258,
791.
345,
258,
791.
34C
ON
3010
00/
1056
91U
rban
City
of T
upel
o - W
iden
, dra
in, p
ave
Sou
th G
lost
er S
treet
from
the
inte
rsec
tion
of S
outh
Gre
en S
treet
@ p
ropo
sed
MS
Hw
y 76
to G
arfie
ld S
treet
. [IV
-21]
5,14
0.22
2,06
4,35
4.78
CO
N70
1000
/
1060
07S
afet
yC
ity o
f Bal
dwyn
- R
epai
r and
con
stru
ct s
idew
alks
alo
ng M
ain
Stre
et fr
om C
emet
ery
Stre
et to
Jon
es S
treet
and
alo
ng S
econ
d S
treet
from
Cla
yton
Stre
et to
Cox
Stre
et48
,364
.80
118,
127.
33C
ON
4020
00/
1060
67S
tate
Pro
ject
sC
ity o
f Tup
elo-
Mai
n S
treet
Bik
e/P
ed T
E p
roje
ct-la
ndsc
apin
g, li
ghtin
g, ro
adw
ay re
vita
lizat
ion
from
Gre
en S
t. to
Elv
is P
resl
ey D
rive.
app
rox.
2.1
mile
s [1
0-13
EN
H G
RP
PG
I-5]
7,29
8.13
7,29
8.13
7990
00/
1062
74S
afet
yM
S 1
45 @
3rd
Ave
/Euc
laut
ubba
Roa
d [1
0-13
SFT
Y G
P P
G I-
7]1,
975.
0487
,607
.53
EN
G10
1000
/
1063
51P
avem
ent R
ehab
ilita
tion
SR
145
FM
BA
RN
S X
-ING
TO
SO
UTH
OF
SR
348
[10
-13
O&
M G
P P
G I-
6]35
,700
.42
2,82
8,14
7.24
CO
N30
1000
/
1063
56S
afet
yC
ity o
f Ver
ona
-Ver
ona
Ele
men
tary
Sch
ool -
3,3
50 li
near
feet
of s
idew
alk,
dra
inag
e im
prov
emen
ts a
nd o
ther
rela
ted
appu
rtena
nces
on
Ray
mon
d Av
enue
& T
enth
Stre
et22
2,63
2.77
222,
632.
77C
ON
4010
00/
1063
56S
afet
yC
ity o
f Ver
ona
- P.E
. for
Ver
ona
Ele
men
tary
Sch
ool
4,74
9.57
25,4
19.3
3E
NG
4110
00/
1063
56S
tate
Pro
ject
sC
ity o
f Ver
ona
-Ver
ona
Ele
men
tary
Sch
ool
203.
4120
3.41
7990
00/
1063
83S
afet
yU
pgra
de R
R C
ross
ings
- P
lant
ersv
ille
[Rou
te -
Ruf
f/Pop
lar D
OT
# 66
7 36
1Y..B
NS
F R
R]
124,
680.
6412
4,68
0.64
CO
N30
1000
/
1063
86S
afet
yC
ity o
f Tup
elo
- Con
stru
ct n
ew s
idew
alks
and
mak
e in
ters
ectio
n im
prov
emen
ts n
ear P
ierc
e S
treet
Ele
men
tary
and
Tup
elo
Mid
dle
Sch
ool
83,5
98.6
383
,598
.63
CO
N40
1000
/
1063
86S
tate
Pro
ject
sC
ity o
f Tup
elo
- Con
stru
ct n
ew s
idew
alks
and
mak
e in
ters
ectio
n im
prov
emen
ts n
ear P
ierc
e S
treet
Ele
men
tary
and
Tup
elo
Mid
dle
Sch
ool
1,87
4.50
1,87
4.50
7990
00/
1064
16S
afet
yU
S 4
5 C
able
Bar
rier
1,45
8,98
0.60
3,22
8,20
8.01
CO
N30
1000
/
1066
78S
tate
Pro
ject
sC
ity o
f Tup
elo-
Mill
& O
verla
y E
ason
Blv
d be
ginn
ing
250
feet
nor
th o
f int
erse
ctio
n w
ith S
tate
Rou
te 6
, nor
th to
the
inte
rsec
tion
of S
tate
Rou
te 2
78.
1,18
2.45
1,18
2.45
7990
00/
1066
80S
tate
Pro
ject
sC
ity o
f Tup
elo-
pro
ject
will
pro
vide
sid
ewal
ks o
n th
e so
uth
side
of G
reen
Stre
et fr
om th
e in
ters
ectio
n w
ith G
lost
er to
Mad
ison
Stre
et &
the
east
sid
e of
Nor
th G
lost
er S
treet
from
the
Gre
en/L
akes
hire
inte
rsec
tion
to C
omm
onw
ealth
Blv
d 1,
774.
601,
774.
6079
9000
/
1066
89S
tate
Pro
ject
sC
ity o
f Tup
elo-
repa
ir &
con
stru
ct s
idew
alks
& p
edes
train
cro
ssin
g al
ong
Lake
St.
adja
cent
to L
awho
n E
lem
enta
ry S
choo
l, co
nstru
ct n
ew s
idew
alks
alo
ng C
anal
St.
sout
h of
sch
ool t
o M
artin
St.,
con
stru
ct n
ew s
idew
alks
alo
ng M
onum
ent S
t. 1,
487.
421,
487.
4279
9000
/
Cou
nty
Tota
l20
,167
,393
.14
****
****
****
***
Leflo
re**
****
****
****
*
1021
29S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 4
9E F
RO
M S
IDO
N T
O U
S 8
212
,240
.40
1,63
5,16
4.21
EN
G10
00/
1021
29Vi
sion
21
US
49E
FR
OM
SID
ON
TO
US
82
683,
099.
413,
754,
585.
74R
OW
2010
00/
1033
27B
ridge
SR
7 F
RO
M T
HE
HU
MP
HR
EY
S C
L TO
US
82
[BR
IDG
E #
s 15
.9,2
1.5,
22.
2 &
22.
4]60
,133
.69
817,
319.
82E
NG
1010
00/
1033
27Vi
sion
21
SR
7 F
RO
M T
HE
HU
MP
HR
EY
S C
L TO
US
82
[BR
IDG
E #
s 15
.9,2
1.5,
22.
2 &
22.
4]11
1,04
3.19
665,
378.
25R
OW
2010
00/
1033
27Vi
sion
21
SR
7 F
RO
M T
HE
HU
MP
HR
EY
S C
L TO
US
82
[BR
IDG
E #
s 8.
2, 1
5.9,
21.
5, 2
2.2
& 2
2.4]
24,7
14.8
424
,714
.84
CO
N30
1000
/
1051
97S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Gre
enw
ood
- His
toric
ligh
ting,
bric
k si
dew
alk
and
cros
swal
k pa
ving
, Int
erpr
etiv
e E
duca
tion
Tran
spor
tatio
n ki
osks
on
How
ard
Stre
et a
nd J
ohns
on S
treet
from
Riv
er to
Rai
ls.
55,1
53.5
51,
078,
126.
31C
ON
7010
00/
1052
90S
afet
yC
ity o
f Gre
enw
ood
- Sid
ewal
ks a
long
Cot
ton
Stre
et b
etw
een
Chu
rch
and
Gib
bs S
treet
.55
,701
.27
55,7
01.2
7C
ON
4010
00/
1057
56U
rban
City
of G
reen
woo
d - M
ill &
Ove
rlay
of S
trong
Ave
, Syc
amor
e Av
e, A
ve F
(McL
aurin
- C
arro
lton
Ave)
, Cla
ibor
ne A
ve, &
Car
rollt
on A
ve.
305.
2177
2,92
0.54
CO
N70
1000
/
1060
59S
tate
Pro
ject
sC
ity o
f Gre
enw
ood
- Gre
enw
ood
Line
ar P
ark.
Wal
king
Pat
h, L
ands
capi
ng a
nd o
ther
Impr
ovem
ents
.1,
505.
191,
505.
1979
9000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
25
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Leflo
re**
****
****
****
*
1060
59S
peci
al P
roje
cts(
Dem
o)C
ity o
f Gre
enw
ood
- Pre
limin
ary
Eng
inee
ring
- Gre
enw
ood
Line
ar P
ark
53,6
80.9
215
1,85
0.29
EN
G81
1000
/
1061
01B
ridge
SR
442
Brid
ge R
epla
cem
ent -
5 b
ridge
s15
4,33
3.99
296,
694.
39E
NG
1010
00/
1063
66S
tate
Pro
ject
sC
ity o
f Gre
enw
ood
Pha
se II
Lin
ear P
ark
3,53
6.09
3,53
6.09
7990
00/
1066
83S
tate
Pro
ject
sC
ity o
f Gre
enw
ood
- Mai
n S
treet
Stre
etsc
ape
- will
incl
ude
AD
A-a
cces
sibl
e si
dew
alks
and
cro
ssw
alks
, his
toric
ligh
ting,
bik
e ra
cks,
land
scap
ing,
and
sig
nage
on
Mai
n S
treet
from
Joh
nson
St t
o Fr
ont S
t.44
5.78
445.
7879
9000
/
Cou
nty
Tota
l1,
215,
893.
53
****
****
****
***
Linc
oln
****
****
****
***
1018
40B
ridge
US
51
betw
een
Pik
e C
L - U
S84
40
,342
.83
665,
301.
75E
NG
1000
/
1018
40B
ridge
US
51
betw
een
Pik
e C
L - U
S84
83
2.03
192,
453.
77R
OW
2010
00/
1024
87B
ridge
SR
550
BTW
HO
MO
CH
ITTO
RIV
ER
AN
D W
ES
T JC
T U
S 5
1,R
EP
LAC
E B
RID
GE
S N
O. 1
7.30
AN
D 2
1.30
.74
.20
603,
588.
91E
NG
1010
00/
1024
87B
ridge
SR
550
BTW
HO
MO
CH
ITTO
RIV
ER
AN
D W
ES
T JC
T U
S 5
1,R
EP
LAC
E B
RID
GE
S N
O. 1
7.30
AN
D 2
1.30
. G
ener
al O
blig
atio
n B
ond
Pro
ject
1,45
6,97
8.00
5,01
2,06
2.10
CO
N30
1000
/
1054
44In
ters
tate
I-55
Wid
en B
ridge
Sho
ulde
rs -
DE
SIG
N B
UIL
D23
,008
.69
46,0
24.8
0E
NG
1040
00/
1054
44In
ters
tate
I-55
Wid
en B
ridge
Sho
ulde
rs -
DE
SIG
N B
UIL
D65
8,99
7.82
660,
090.
32C
ON
3040
00/
1055
61S
afet
yU
S 5
1 @
Bog
ue C
hitto
Rd.
- R
econ
stru
ct in
ters
ectio
n to
elim
inat
e sk
ew.
245,
785.
7365
1,91
4.30
EN
G10
1000
/
1058
77In
ters
tate
I-55
Brid
ge W
iden
ing
- Dis
trict
7 [D
esig
n B
uild
]6,
366.
8410
,854
,448
.04
CO
N30
1000
/
1062
75S
afet
yM
S 5
83 fr
om U
S 8
4 to
Hun
ters
Roa
d S
E
3,82
7.62
158,
095.
91E
NG
1010
00/
1062
75S
afet
yM
S 5
83 fr
om U
S 8
4 to
Hun
ters
Roa
d S
E14
2,82
5.01
142,
825.
01E
NG
1020
00/
1065
52E
mer
genc
y R
elie
fD
ist 7
Hur
rican
e Is
sac
Em
erge
ncy
Ope
ratio
ns [
3045
68 3
43]
261.
0019
,839
.25
3430
00/
1066
34S
afet
yI-5
5 C
able
Bar
rier I
nsta
llatio
n4,
745.
344,
745.
34C
ON
3010
00/
1066
68E
mer
genc
y R
elie
fH
urric
ane
Isaa
c I-5
5 Fe
nce
Rep
air (
PE
304
600)
23,8
75.4
523
,875
.45
CO
N30
1000
/
1066
76S
tate
Pro
ject
sC
ity o
f Bro
okha
ven-
Bro
okw
ay B
oule
vard
from
U.S
. 51
to M
ontic
ello
Stre
et1,
794.
581,
794.
5879
9000
/
1066
77S
tate
Pro
ject
sC
ity o
f Bro
okha
ven-
Ale
xand
er M
iddl
e S
choo
l 29
7.05
297.
0579
9000
/
1066
99S
afet
yU
S 8
4 at
Aub
urn
Roa
d8,
441.
238,
441.
23E
NG
1010
00/
Cou
nty
Tota
l2,
618,
453.
42
****
****
****
***
Low
ndes
****
****
****
***
1000
94S
tate
Pro
ject
sU
S 4
5 FR
NO
XUB
EE
CL
TO U
S 8
2
R
OW
102
089/
201,
102
087,
102
090
CO
NS
100
094/
301&
302,
102
087/
301,
102
090/
301
402.
932,
596,
288.
29E
NG
1000
/
1000
94Vi
sion
21
US
45
FRO
M N
OXU
BE
E C
L TO
CA
RS
ON
RO
AD
INC
LUD
ING
BR
145
.4
RO
W 1
0208
9/20
1 10
0487
- D
ist 5
[I-1
7] G
ener
al O
blig
atio
n B
ond
Pro
ject
4,75
7,25
7.76
14,4
18,8
32.9
4C
ON
3010
00/
1020
87S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 4
5 FR
4.0
MIL
ES
S. O
F U
S 8
2 TO
US
82
PE
100
094
11,7
03.1
46,
026,
424.
02R
OW
2010
00/
1020
87N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
5 FR
OM
4 M
ILE
S S
OU
TH O
F U
S 8
2 TO
US
82
P.E
. # IS
100
094
322.
6624
,221
,463
.53
CO
N30
1000
/
1020
89S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S45
BTW
NO
XUB
EE
CL
& C
AR
SO
N R
D
PE
100
976/
1000
, 100
094/
1000
C
ON
S 1
0009
4/30
120
,690
.80
2,49
2,94
9.54
RO
W20
1000
/
1020
90Vi
sion
21
AR
RA
US
45
FRO
M C
AR
SO
N R
D. T
O 4
MI.
SO
. OF
US
82
P
. E. 1
0097
6/10
00, 1
0009
432
2,25
4.85
5,75
5,38
0.21
CO
N30
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
26
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Low
ndes
****
****
****
***
1020
90Vi
sion
21
US
45
FRO
M C
AR
SO
N R
OA
D T
O 4
MI S
OU
TH O
F U
S 8
2 &
RE
PLA
CE
3 B
RID
GE
S [1
51.1
, 153
.7, 1
55.6
] P
E#
1000
948,
494,
811.
148,
736,
192.
32C
ON
3020
00/
1020
90Vi
sion
21
US
45
FRO
M C
AR
SO
N R
D. T
O 4
MI.
SO
. OF
US
-323
,091
.60
6,09
8,44
2.33
CO
N30
3000
/
1020
91S
peci
al P
roje
cts(
Dem
o)U
S 4
5 B
TW U
S 8
2 A
ND
RA
D 9
- M
S16
7 (R
ELO
CAT
E) E
AR
MA
RK
PR
OJE
CT[
ALL
AVA
ILA
BLE
FU
ND
S A
RE
IN T
HE
ES
TIM
ATE
D C
OS
T]1,
285,
380.
524,
001,
978.
86E
NG
1010
00/
1053
72S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Col
umbu
s - O
ld H
wy
182
Riv
er B
ridge
Stru
ctur
al A
sses
smen
t55
.00
140,
911.
17E
NG
7110
00/
1053
72S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Col
umbu
s - B
ridge
Ass
essm
ent -
to a
djus
t fed
eral
to 8
0%-5
5.00
-55.
00E
NG
7111
00/
1054
23U
rban
City
of C
olum
bus
- Sig
naliz
atio
n an
d Tu
rn L
anes
at t
he In
ters
ectio
n of
Blu
ecut
t Roa
d an
d M
ilita
ry R
oad
and
Blu
ecut
t Roa
d an
d 7t
h S
treet
..7,
330.
1091
5,34
7.62
CO
N70
1000
/
1059
56S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Col
umbu
s - O
ld H
wy
182
Riv
er B
ridge
Res
tora
tion.
The
stru
ctur
e w
ill s
erve
as
a w
alki
ng a
rea
and
park
and
will
tie
into
the
exis
ting
Riv
er W
alk.
57
8,92
1.69
2,03
8,40
5.26
CO
N70
1000
/
1060
57S
tate
Pro
ject
sLo
wnd
es C
ount
y B
oard
of S
uper
viso
rs -
Arte
sia
Roa
d ap
prox
imat
ely
4.0
mile
s fro
m G
uerry
Roa
d to
0.6
mile
s w
est o
f Ind
ustri
al R
oad
5,30
7.10
5,30
7.10
7990
00/
1060
57S
peci
al P
roje
cts(
Dem
o)Lo
wnd
es C
ount
y B
oard
of S
uper
viso
rs -
P.E
. Arte
sia
Roa
d ap
prox
imat
ely
6.4
mile
s of
two
lane
road
from
Hw
y 45
A to
Hw
y 78
974
,189
.27
216,
909.
95E
NG
8110
00/
1064
02P
avem
ent R
ehab
ilita
tion
SR
69
FM G
RA
ND
ER
SO
N C
RK
TO
SR
182
5,55
7.79
1,05
9,74
9.18
CO
N30
1000
/
1064
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)Te
nn-T
om W
ater
way
Dev
elop
men
t Aut
horit
y M
useu
m E
xhib
its15
,559
.61
15,5
59.6
1E
NG
7010
00/
1064
39S
tate
Pro
ject
sU
S 8
2/U
S 4
5 A
INTE
RC
HA
NG
E A
DD
A L
OO
P9,
189.
6623
2,93
6.84
EN
G10
1000
/
1064
39S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 8
2/U
S 4
5 A
INTE
RC
HA
NG
E A
DD
A L
OO
P1,
251,
477.
671,
251,
477.
67C
ON
3010
00/
1064
43S
tate
Pro
ject
sLo
wnd
es C
ount
y C
onne
ctio
n of
an
exis
ting
bike
/ped
trai
l to
publ
ic s
occe
r com
plex
and
und
er H
wy
182.
1,36
1.37
1,36
1.37
7990
00/
1066
06S
afet
yU
pgra
de R
R C
ross
ings
in M
ayhe
w in
the
City
of M
ayhe
w D
OT#
303
959U
116.
8911
6.89
EN
G10
1000
/
Cou
nty
Tota
l16
,518
,743
.35
****
****
****
***
Mad
ison
****
****
****
***
1004
86Vi
sion
21
I-55
FRO
M O
LD A
GE
NC
Y TO
SR
463
W/H
IGH
LAN
D C
OLO
NY
CO
NN
EC
TIO
N P
HA
SE
S I
& II
[Add
4 L
anes
, Spl
it In
terc
hang
e, F
ront
age
Roa
ds]
216,
133.
276,
314,
139.
82E
NG
1010
00/
1004
86Vi
sion
21
I-55
FRO
M O
LD A
GE
NC
Y TO
SR
463
W/H
IGH
LAN
D C
OLO
NY
CO
NN
EC
TIO
N P
HA
SE
S I
& II
[Add
4 L
anes
, Spl
it In
terc
hang
e, F
ront
age
Roa
ds]
1,33
9.21
20,5
07.2
4E
NG
1011
00/
1004
86Vi
sion
21
I-55
'SP
LIT-
DIA
MO
ND
' IN
TER
CH
AN
GE
FR
OM
OLD
AG
EN
CY
TO S
R 4
63 W
/HIG
HLA
ND
CO
LON
Y C
ON
NE
CTI
ON
PH
AS
E II
[Add
2 L
anes
, Spl
it In
terc
hang
e, F
ront
age
Roa
ds]
301,
795.
3652
,104
,819
.87
RO
W20
1000
/
1004
86Vi
sion
21
I-55
FRO
M O
LD A
GE
NC
Y TO
SR
463
W/H
IGH
LAN
D C
OLO
NY
CO
NN
EC
TIO
N P
HA
SE
II [A
dd 2
Lan
es, S
plit
Inte
rcha
nge,
Fro
ntag
e R
oads
]30
,348
,837
.63
66,3
23,5
68.7
6C
ON
3010
00/
1004
86Vi
sion
21
I-55
FRO
M O
LD A
GE
NC
Y TO
SR
463
W/H
IGH
LAN
D C
OLO
NY
CO
NN
EC
TIO
N P
HA
SE
II [A
dd 2
Lan
es, S
plit
Inte
rcha
nge,
Fro
ntag
e R
oads
]10
4,65
5.25
270,
350.
74C
ON
3011
00/
1005
54N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 B
ETW
EE
N F
LOR
A A
ND
TH
E Y
AZO
O C
OU
NTY
LIN
E B
RID
GE
RE
PLA
CE
ME
NT
AN
D O
VE
RLA
Y (1
82.9
B, 1
83.3
B)
44.3
017
,644
,519
.71
CO
N30
1000
/
1023
15N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-5
5 FM
CO
UN
TY L
INE
RO
AD
TO
OLD
AG
EN
CY
RO
AD
[AD
D 4
LA
NE
S]
439,
395.
751,
934,
100.
31E
NG
1000
/
1030
63S
tate
Pro
ject
sI-5
5 AT
GLU
CK
STA
DT
INTE
RC
HA
NG
E (E
NV
DO
C]
7,88
1.98
479,
277.
09E
NG
1000
/
1030
63N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-5
5 AT
GLU
CK
STA
DT
INTE
RC
HA
NG
E D
ES
IGN
752.
5692
3,17
3.95
EN
G10
2000
/
1030
63In
ters
tate
I-55
AT G
LUC
KS
TAD
T IN
TER
CH
AN
GE
- Fi
nal D
esig
n84
,587
.97
887,
634.
43E
NG
1030
00/
1030
63Vi
sion
21
I-55
AT G
LUC
KS
TAD
T IN
TER
CH
AN
GE
1,
139,
022.
239,
827,
642.
49R
OW
2010
00/
1030
63Vi
sion
21
I-55
AT G
LUC
KS
TAD
T IN
TER
CH
AN
GE
8,
492,
758.
478,
492,
758.
47C
ON
3010
00/
1041
37S
peci
al P
roje
cts(
Dem
o)U
S51
/SR
43 C
ON
NE
CTO
R IN
CA
NTO
N1,
797.
091,
468,
670.
32E
NG
1010
00/
1041
37S
peci
al P
roje
cts(
Dem
o)U
S51
/SR
43 C
ON
NE
CTO
R IN
CA
NTO
N6,
448.
322,
179,
602.
86R
OW
2010
00/
1041
37S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S51
/SR
43 C
ON
NE
CTO
R IN
CA
NTO
N
36,0
73.8
621
,601
,560
.50
CO
N30
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
27
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Mad
ison
****
****
****
***
1045
17S
peci
al P
roje
cts(
Dem
o)W
ATE
R T
AXI
STU
DY
BA
RN
ETT
RE
SE
RV
OIR
2,21
2.70
23,1
48.1
1E
NG
8110
00/
1048
31S
tate
Pro
ject
sI-5
5 W
ES
T FR
ON
TAG
E R
OA
D F
RO
M O
LD A
GE
NC
Y R
OA
D T
O S
TEE
D R
OA
D53
.10
2,80
4,54
7.67
CO
N30
1000
/
1048
40U
rban
City
of R
idge
land
- La
ke H
arbo
ur D
r fro
m in
ters
ectio
n w
ith U
S H
wy
51 e
ast t
o in
ters
ectio
n of
Nor
thpa
rk D
rive.
5,62
1,77
6.68
7,57
3,90
8.08
CO
N70
1000
/
1048
59S
peci
al P
roje
cts(
Dem
o)C
ity o
f Rid
gela
nd -
Lake
Har
bor D
r Ext
ensi
on
319,
551.
8477
4,60
4.40
EN
G81
1000
/
1048
59S
peci
al P
roje
cts(
Dem
o)La
ke H
arbo
r Dr E
xten
sion
Rid
gela
nd -
Sur
veyi
ng &
Map
ping
Ser
vice
s32
,871
.35
32,8
71.3
5E
NG
8120
00/
1049
78U
rban
City
of R
idge
land
- In
ters
ectio
n Im
prov
emen
ts.
Pea
r Orc
hard
Rd.
and
Ric
e R
d. In
stal
ling
an a
ctua
ted
traffi
c si
gnal
and
add
ing
turn
lane
s to
Ric
e R
d. a
nd P
ear O
rcha
rd R
d.48
,577
.22
360,
245.
70C
ON
7010
00/
1050
66S
peci
al P
roje
cts(
Dem
o)B
OB
AN
THO
NY
PAR
KW
AY O
VE
RLA
Y10
.58
412,
546.
12C
ON
8020
00/
1052
76S
afet
yC
ity o
f Mad
ison
- Im
prov
e In
frast
ruct
ure
arou
nd M
adis
on A
venu
e Lo
wer
and
Upp
er E
lem
enta
ry S
choo
ls, w
ill in
clud
e si
dew
alks
, stri
ping
, bik
e ra
cks,
& s
igna
ge.
68,4
01.1
545
9,22
6.34
CO
N40
1000
/
1054
45In
ters
tate
I-55/
I-220
Sig
n A
nd T
russ
Rep
lace
men
ts36
8.07
439,
951.
47C
ON
3020
00/
1058
87U
rban
City
of R
idge
land
- A
spha
lt ov
erla
y an
d pa
vem
ent s
tripi
ng fo
r the
exi
stin
g pa
rkin
g lo
t at t
he M
S C
raft
Cen
ter.
14,6
72.6
314
,672
.63
CO
N70
1000
/
1058
87S
tate
Pro
ject
sC
ity o
f Rid
gela
nd-c
onst
ruct
ion
of tw
o pa
rkin
g lo
ts o
n th
e N
E c
orne
r & S
W o
f the
MS
Cra
ft C
ente
r pro
perty
pro
vidi
ng 5
0 ne
w s
pace
s, c
ircul
ar e
ntra
nce,
han
dica
p ac
cess
ibili
ty, d
rain
age
impr
ovem
ents
& s
idew
alk
conn
ectiv
ity.
838.
8883
8.88
7990
02/
1064
82S
tate
Pro
ject
sM
adis
on C
ount
y B
ooar
d of
Sup
ervi
sors
- S
ectio
ns o
f Yan
dell
Roa
d, R
euni
on P
arkw
ay P
hase
2 a
nd H
ighl
and
Col
ony
Par
kway
68
7.91
687.
9179
9000
/
1065
73S
tate
Pro
ject
sC
ity o
f Rid
gela
nd -
Jack
son
St M
ulti
Use
Tra
il - B
ike
path
alo
ng J
acks
on S
treet
to in
terc
onne
ct to
exi
stin
g fa
cilit
ies
at te
h in
ters
ectio
n of
US
Hw
y 51
and
Jac
kson
Stre
et a
nd ru
n ea
st c
onne
ctin
g to
Tra
ce R
idge
Sub
divi
sion
.29
0.18
290.
1879
9000
/
1065
77S
afet
yU
S 5
1, M
S 4
63 F
lash
ing
Yello
w A
rrow
Sig
nal U
pgra
des
121,
530.
9712
1,53
0.97
EN
G10
1000
/
1065
77S
afet
yU
S 5
1, M
S 4
63 F
lash
ing
Yello
w A
rrow
Sig
nal U
pgra
de-U
S 5
1 Te
rmin
i: R
idge
woo
d R
oad
to O
lym
pic
Way
/Oak
Par
k D
rive
and
MS
463
Ter
min
i: U
S 5
1 to
Ann
adal
e P
arkw
ay/R
euni
on P
arkw
ay17
4,30
0.82
174,
300.
82C
ON
3010
00/
1065
88S
tate
Pro
ject
sC
olon
y P
ark
Pub
lic Im
prov
emen
t Dis
trict
- M
ulti
use
trail
proj
ect a
long
Hig
hlan
d C
olon
y P
arkw
ay b
etw
een
Old
Age
ncy
Roa
d an
d S
teed
Roa
d in
Rid
gela
nd in
clud
ing
5,90
0 lin
ear f
eet o
f 10'
wid
e m
ulti-
use
trail.
310.
0831
0.08
7990
00/
1065
98B
ridge
Brid
ge J
oint
Rep
air -
Dis
trict
516
,151
.60
16,1
51.6
0C
ON
3052
00/
1067
49S
tate
Pro
ject
sI-5
5 S
lide
Rep
air
319,
104.
1431
9,10
4.14
CO
N30
1000
/
1067
82S
tate
Pro
ject
sC
ity o
f Can
ton
- Wat
ford
Par
kway
Mill
& O
verla
y56
7.87
567.
8779
9000
/
1067
83S
tate
Pro
ject
sC
ity o
f Can
ton
- Woo
dlan
d D
rive
Ext
ensi
on -
exte
nsio
n of
Can
ton
Par
kway
866.
3186
6.31
7990
00/
Cou
nty
Tota
l47
,924
,667
.33
****
****
****
***
Mar
ion
****
****
****
***
1024
71S
tate
Pro
ject
sS
R 1
98 a
t 119
.0 P
earl
Riv
er R
elie
f and
119
.3 L
yas
Lake
- B
ridge
Hyd
raul
ic R
ecom
men
datio
ns a
nd P
relim
inar
y B
ridge
Lay
outs
82,6
06.0
090
,966
.00
EN
G10
1000
/
1040
04S
peci
al P
roje
cts(
Dem
o)S
R 4
4 FR
OM
SR
198
TO
PIE
RC
E R
OA
D [E
AR
MA
RK
]28
3,05
2.48
1,69
0,13
3.32
EN
G10
1000
/
1040
04S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
4 FR
OM
SR
198
TO
PIE
RC
E R
OA
D [E
AR
MA
RK
]1,
066,
205.
734,
917,
078.
29R
OW
2010
00/
1040
04S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
4 FR
OM
SR
198
TO
PIE
RC
E R
D [E
AR
MA
RK
]36
,329
.84
36,3
29.8
4C
ON
3010
00/
1060
10U
rban
City
of C
olum
bia
- Mill
, Ove
rlay,
AD
A, &
Stri
ping
of S
econ
d S
treet
and
a s
ectio
n of
Hon
ey A
lley
for a
tota
l pro
ject
leng
ht o
f 0.1
4 m
ile.
-8,0
01.3
022
0,67
0.74
CO
N70
1000
/
1062
65P
avem
ent R
ehab
ilita
tion
SR
13
FRO
M T
HE
LA
MA
R C
L N
OR
TH 7
.0 M
ILE
S T
O G
AM
E R
ES
ER
VE
RO
AD
28
9,96
2.21
1,46
6,13
4.46
CO
N30
1000
/
1064
37S
tate
Pro
ject
sU
S 9
8 R
epla
ce B
ridge
No.
117
.0A
, ove
r Silv
er C
reek
& C
NIC
RR
- R
EM
OVA
L O
F P
EA
RL
RIV
ER
RE
LIE
F B
RID
GE
15
8,22
4.96
693,
187.
83E
NG
1010
00/
1064
37S
tate
Pro
ject
sU
S 9
8 R
epla
ce B
ridge
Ove
r Silv
er C
reek
23
,564
.34
23,5
64.3
4R
OW
2010
00/
1064
37Vi
sion
21
US
98
Rep
lace
Brid
ge O
ver S
ilver
Cre
ek -
Rem
oval
of P
earl
Riv
er R
elie
f Brid
ge
BR
#'s
118
.4, 1
17.0
A59
3.82
593.
82C
ON
3010
00/
1064
41S
tate
Pro
ject
sC
ity o
f Col
umbi
a P
earl
Riv
er In
terp
retiv
e P
laza
land
scap
e pr
ojec
t1,
136.
441,
136.
4479
9000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
28
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Mar
ion
****
****
****
***
1067
13S
tate
Pro
ject
sC
ity o
f Col
umbi
a-U
pgra
ding
two
traffi
c si
gnal
s at
the
inte
rsec
tion
of M
ain
Stre
et a
nd S
econ
d S
treet
and
the
inte
rsec
tion
of M
ain
Stre
et a
nd C
hurc
h S
treet
3,15
7.61
3,15
7.61
7990
00/
1067
87B
ridge
US
98/
SR
35
Pea
rl R
iver
Drif
t Iss
ues
118
5 A
&B
and
194
034
3.63
343.
63E
NG
1010
00/
Cou
nty
Tota
l1,
937,
175.
76
****
****
****
***
Mar
shal
l**
****
****
****
*
1001
74S
peci
al P
roje
cts(
Dem
o)U
S 7
2 FR
TE
NN
STA
TE L
INE
TO
PR
OP
OS
ED
SR
111,
239.
101,
040,
143.
60E
NG
1000
/
1001
74S
tate
Pro
ject
sU
S 7
2/M
RIM
F In
terc
hang
e31
4,45
6.34
666,
345.
84E
NG
1020
00/
1001
74S
peci
al P
roje
cts(
Dem
o)U
S 7
2 FR
TE
NN
STA
TE L
INE
TO
PR
OP
OS
ED
SR
51,0
32.3
331
3,04
5.57
EN
G10
2100
/
1001
74S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 7
2 FR
OM
302
TO
TE
NN
STA
TE L
INE
LE
SS
TH
E IN
TER
CH
AN
GE
8,61
3.66
339,
871.
69R
OW
2010
00/
1001
74N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 7
2 FR
302
TO
TN
STA
TE L
INE
Incl
udin
g Th
e U
S 7
2/M
RIM
F In
terc
hang
e 6,
261,
833.
0212
,297
,334
.04
RO
W20
2000
/
1002
99B
ridge
SR
309
BT
SR
4 &
SR
302
- G
ener
al O
blig
atio
n B
ond
Pro
ject
26,7
21.7
364
5,76
0.18
EN
G11
00/
1002
99Vi
sion
21
SR
309
BT
SR
4 &
US
78
[BR
IDG
E #
s 8.
4, 8
.5, 8
.7, 1
2, 1
2.8,
13.
0 &
15.
4]99
,307
.25
198,
133.
71E
NG
1020
00/
1002
99Vi
sion
21
SR
309
BE
TWE
EN
US
78
and
BA
RTO
N [B
RID
GE
#s
22.0
, 22.
1 A
ND
22.
3]20
7,73
0.28
563,
780.
42R
OW
2010
00/
1002
99Vi
sion
21
SR
309
BE
TWE
EN
US
78
AN
D B
AR
TON
[BR
IDG
E #
s 22
.0, 2
2.1
AN
D 2
2.3]
378,
635.
5037
8,63
5.50
CO
N30
1000
/
1022
07S
tate
Pro
ject
sS
R 4
RE
PLA
CE
BR
IDG
E #
59.
0 45
,839
.75
45,8
39.7
5E
NG
1020
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M T
HE
DE
SO
TO C
L TO
US
78
[incl
udin
g IN
TER
CH
AN
GE
]14
5.08
788,
133.
37E
NG
1030
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M U
S 7
8 TO
SR
302
5,39
7.04
5,84
8,10
6.63
EN
G10
4000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
02 T
O T
EN
N S
T LI
NE
[inc
ludi
ng IN
TER
CH
AN
GE
]28
0,15
4.10
2,23
0,91
9.42
EN
G10
5000
/
1025
56G
amin
gS
R 3
04 F
RO
M E
AS
T O
F M
AS
ON
RO
AD
TO
SR
302
13,6
07.4
616
7,61
1.46
EN
G11
7000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M T
HE
DE
SO
TO C
L TO
US
78
[incl
udin
g IN
TER
CH
AN
GE
]1,
221,
188.
2311
,837
,027
.57
RO
W20
3000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M U
S 7
8 TO
SR
302
3,31
0,63
5.64
26,0
85,8
27.4
9R
OW
2040
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
02 T
O T
EN
N S
T LI
NE
[inc
ludi
ng IN
TER
CH
AN
GE
]26
8.24
14,5
45,7
80.2
0R
OW
2050
00/
1025
56G
amin
gS
R 3
04/I-
269
TO M
ITIG
ATE
WE
TLA
ND
S F
RO
M S
R 3
05 T
O M
AR
SH
ALL
CL
IN M
AR
SH
ALL
CO
UN
TY4,
980.
9151
6,02
9.30
RO
W20
6000
/
1025
56G
amin
gS
R 3
04 F
RO
M E
AS
T O
F M
AS
ON
RO
AD
TO
SR
302
23,6
73,7
45.8
823
,684
,158
.52
CO
N30
4000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
02 T
O T
EN
N S
T LI
NE
[inc
ludi
ng IN
TER
CH
AN
GE
]1,
448,
145.
2619
,576
,040
.95
CO
N30
5000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
R 3
02 T
O T
EN
NE
SS
EE
SL
[incl
INTE
RC
HA
NG
E]
136,
373.
0513
6,37
3.05
CO
N30
8000
/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M T
HE
DE
SO
TO C
L TO
STA
835
+00
865,
046.
311,
486,
759.
60C
ON
3140
00/
1025
56G
amin
gS
R 3
04/I-
269
FRO
M S
TA 8
35+0
0 TO
EA
ST
OF
MA
SO
N R
OA
D14
,073
,782
.27
30,8
31,7
91.1
2C
ON
3150
00/
1031
62B
ridge
SR
178
Ove
r Che
wal
lah
Cre
ek a
nd T
ippa
h R
iver
Brid
ge N
o 40
.2, 4
1.2
& 4
1.4
17,8
35.9
596
6,56
5.66
EN
G10
1000
/
1031
62Vi
sion
21
SR
178
Ove
r Che
wal
lah
Cre
ek a
nd T
ippa
h R
iver
Brid
ge N
o 40
.2, 4
1.2
& 4
1.4
37,6
51.7
652
4,22
4.36
RO
W20
1000
/
1031
62Vi
sion
21
SR
178
Ove
r Che
wal
lah
Cre
ek a
nd T
ippa
h R
iver
Brid
ge N
o 40
.2, 4
1.2
& 4
1.4
5,69
8,75
0.43
6,17
0,03
3.41
CO
N30
1000
/
1033
17B
ridge
SR
349
FR
OM
MA
CE
DO
NIA
RO
AD
TO
US
78
BR
NO
S. 8
.5,1
0.70
,14.
0066
.64
1,28
1,87
8.59
EN
G10
1000
/
1048
68S
tate
Aid
N. M
emph
is S
t., H
olly
Spr
ings
, MS
53,0
66.2
888
9,67
8.24
CO
N30
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
29
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Mar
shal
l**
****
****
****
*
1051
89B
ridge
SR
7 B
RID
GE
RE
PLA
CE
ME
NTS
- G
ener
al O
blig
atio
n B
ond
142,
094.
9535
0,53
0.41
EN
G10
1100
/
1051
89Vi
sion
21
SR
7 B
RID
GE
RE
PLA
CE
ME
NT
[BR
IDG
E #
s 15
4.0,
154
.8 &
155
.0]
28,4
94.2
250
0,58
8.28
RO
W20
1000
/
1051
89Vi
sion
21
SR
7 B
RID
GE
RE
PLA
CE
ME
NT
[BR
IDG
E #
s 15
4.0,
154
.8 &
155
.0]
4,12
3,44
4.56
4,12
3,44
4.56
CO
N30
1000
/
1053
33Vi
sion
21
SR
4 R
EP
LAC
E B
RID
GE
# 7
5.3
OV
ER
BN
RR
186,
122.
9946
3,47
6.76
EN
G10
1000
/
1055
10N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 7
8 FR
OM
DE
SO
TO C
OU
NTY
LIN
E T
O T
HE
WE
ST
HO
LLY
SP
RIN
GS
BY
PAS
S1,
940,
787.
3440
,879
,916
.29
CO
N30
2000
/
1055
10N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 7
8 FR
OM
WE
ST
HO
LLY
SP
RIN
GS
BY
PAS
S T
O T
HE
BE
NTO
N C
OU
NTY
LIN
E [1
0-13
O&
M G
P P
G I-
6]86
,616
.06
19,3
77,9
60.6
4C
ON
3030
00/
1061
03B
ridge
SR
178
Brid
ge R
epla
cem
ents
- 8
brid
ges
[Brid
ge #
s 14
.5, 1
5.4,
33.
6, 3
5.6,
35.
4, 3
5.2,
34.
1 &
18.
0]10
2,95
0.08
197,
324.
96E
NG
1010
00/
1063
82S
afet
yU
pgra
de R
R C
ross
ings
- C
ity o
f Byh
alia
(Rou
te -
Shi
naul
t) (D
OT
# 66
4 49
0D)B
NS
F R
R]
154,
254.
5115
4,25
4.51
CO
N30
1000
/
1066
09P
avem
ent R
ehab
ilita
tion
SR
178
,from
the
Hol
ly S
prin
g E
ast C
orp.
Lim
it to
app
roxi
mat
ely
1 m
ile W
est o
f US
78
2,16
2,59
4.24
2,16
2,59
4.24
CO
N30
1000
/
1067
19S
tate
Pro
ject
sS
R 1
78 fo
r dec
k re
plac
emen
t Brid
ge #
35.4
439.
7743
9.77
EN
G10
1000
/
1067
19B
ridge
SR
178
for d
eck
repl
acem
ent B
ridge
#35
.412
1,17
5.53
121,
175.
53C
ON
3010
00/
1067
41S
tate
Pro
ject
sC
ity o
f Hol
ly S
prin
gs-W
oodw
ard
Ave
1,28
6.83
1,28
6.83
7990
00/
Cou
nty
Tota
l67
,396
,510
.57
****
****
****
***
Mon
roe
****
****
****
***
1016
34Vi
sion
21
SR
25
FRO
M U
S 2
78 T
O N
OR
TH C
OR
P LI
MIT
OF
SM
ITH
VIL
LE64
,131
.05
1,76
1,78
2.67
EN
G10
00/
1016
35Vi
sion
21
SR
25
FRO
M S
R 8
TO
US
278
AT
AM
OR
Y56
,999
.43
4,62
6,95
6.79
EN
G10
00/
1016
35Vi
sion
21
SR
25
FRO
M S
R 8
TO
US
278
136,
923.
8517
,780
,010
.20
RO
W20
1000
/
1016
35Vi
sion
21
SR
25
FR 2
.5 M
I S. O
F B
EC
KE
R T
O U
S 2
786,
454,
651.
6811
,142
,947
.07
CO
N30
1000
/
1021
98S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 2
78 A
MO
RY
BY-
PAS
S(R
ELO
CAT
ION
4LN
)39
,619
.96
1,70
8,36
8.07
EN
G10
1000
/
1021
98S
tate
Pro
ject
sU
S 2
78 A
MO
RY
BY-
PAS
S(R
ELO
CAT
ION
4LN
) [$5
M in
MD
A Fu
nds
to b
e ap
plie
d]89
,210
.32
13,3
81,9
84.1
7R
OW
2010
00/
1052
07S
afet
yC
ity o
f Am
ory-
Saf
tey
Edu
catio
n an
d E
ncou
rage
men
t Pro
gram
s (N
onin
frast
ruct
ure
proj
ect).
Tw
o S
afte
y/ed
ucat
ion
train
ers
to c
omm
unic
ate
safte
y ro
ute
to s
tude
nts,
teac
hers
and
com
mun
icty
and
to p
rovi
de in
-sch
ool a
nd c
omm
unity
trai
ning
.6,
738.
009,
745.
56C
ON
4020
00/
1060
87Vi
sion
21
SR
25
Brid
ge R
epla
cem
ent #
134.
024
,613
.57
45,7
19.4
5E
NG
1010
00/
1063
50P
avem
ent R
ehab
ilita
tion
SR
41
FM U
S 4
5 TO
CH
ICK
AS
AW C
L1,
626,
698.
851,
642,
462.
85C
ON
3010
00/
1063
81S
afet
yU
pgra
de R
R C
ross
ing
- Pec
an D
OT
No.
854
038
F - O
utsi
de o
f Sm
ithvi
lle -
MS
Rai
lway
s9,
941.
009,
941.
00C
ON
3010
00/
1063
81S
afet
yU
pgra
de R
R C
ross
ing
- Cal
dwel
l DO
T N
o. 8
54 0
37Y
- Out
side
of S
mith
ville
- M
S R
ailw
ays
9,94
1.00
9,94
1.00
CO
N30
2000
/
1063
81S
afet
yU
pgra
de R
R C
ross
ing
- Mt.
Zion
- O
utsi
de o
f Sm
ithvi
lle -
MS
Rai
lway
s9,
941.
009,
941.
00C
ON
3030
00/
1063
81S
afet
yU
pgra
de R
R C
ross
ing
- Phi
llips
Sch
oolh
ouse
- O
utsi
de o
f Sm
ithvi
lle -
MS
Rai
lway
s9,
941.
009,
941.
00C
ON
3040
00/
1065
16S
afet
y30
4 00
4U is
a ra
ilroa
d cr
ossi
ng lo
cate
d on
SR
8 in
Pra
irie,
MS
1,10
4.00
1,10
4.00
EN
G10
1000
/
1065
16S
afet
y30
4 00
4U is
a ra
ilroa
d cr
ossi
ng lo
cate
d on
SR
8 in
Pra
irie,
MS
5,50
3.64
5,50
3.64
CO
N30
1000
/
1065
89S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)B
ike
& P
edes
trian
pat
h in
Sm
ithvi
lle, M
S
44,5
99.7
944
,599
.79
EN
G10
1000
/
1065
89S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)R
ailro
ad w
ork
for t
he B
ike
& P
edes
trian
pat
h in
Sm
ithvi
lle, M
S -
Rai
lroad
1,29
2.31
1,29
2.31
CO
N30
2000
/
1066
02S
afet
yU
pgra
de R
R C
ross
ings
- in
Par
chm
an in
the
City
of A
mor
y D
OT
# 66
7 39
4L1,
448.
951,
448.
95C
ON
3020
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
30
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Mon
roe
****
****
****
***
1066
06S
afet
yU
pgra
de R
R C
ross
ings
on
SR
382
in th
e C
ity o
f Pra
irie
DO
T#30
3 99
1M77
.92
77.9
2E
NG
1090
00/
1066
06S
afet
yU
pgra
de R
R C
ross
ings
on
Old
Mag
nolia
in th
e C
ity o
f Pra
irie
DO
T# 3
03 9
98K
299.
9929
9.99
EN
G11
0000
/
1067
70P
avem
ent R
ehab
ilita
tion
US
45A
FR
OM
WIL
SO
N-H
ILL
LOO
P TO
SO
UTH
OF
SR
8.
1,95
7,98
7.81
1,95
7,98
7.81
CO
N30
1000
/
1067
71P
avem
ent R
ehab
ilita
tion
SR
371
FR
OM
SR
6 T
O T
HE
ITAW
AM
BA
CL
14,3
32.3
314
,332
.33
CO
N30
1000
/
Cou
nty
Tota
l10
,565
,997
.45
****
****
****
***
Mon
tgom
ery
****
****
****
***
1026
62P
hase
III
US
82
FRO
M K
ILM
ICH
AE
L TO
WE
BS
TER
CL
(PAV
E A
ND
RE
HA
B) P
. E. I
S 1
0104
765
9.01
21,3
40,9
39.2
4C
ON
3010
00/
1044
10P
avem
ent R
ehab
ilita
tion
* I5
5 - C
AR
RO
LL/M
ON
TGO
ME
RY
CO
LIN
E T
O 0
.5 M
ILE
S S
OU
TH O
F U
S 8
246
,069
.47
3,41
0,88
8.53
CO
N30
2000
/
1046
43S
tate
Pro
ject
sI-5
5 in
Mon
tg. C
arro
li, &
Gre
nada
Cou
ntie
s (lo
g m
ile 1
1.58
2 in
Mon
tgom
ery
to 7
.349
in G
rena
da) 10
,592
.83
16,4
81.0
3E
NG
1100
00/
1046
43S
tate
Pro
ject
sI-5
5 in
Car
roll
& M
ontg
omer
y C
ount
y6,
236.
488,
118.
85E
NG
1160
00/
Cou
nty
Tota
l63
,557
.79
****
****
****
***
Nes
hoba
****
****
****
***
1016
48Vi
sion
21
AR
RA
**S
R 1
9 FR
OM
NE
WTO
N C
L TO
SR
492
2,26
6,81
9.00
24,8
82,4
81.3
9C
ON
3030
00/
1016
48Vi
sion
21
SR
19
FRO
M C
OLL
INS
VIL
LE T
O S
R 4
92-2
,266
,819
.00
6,56
4,90
1.93
CO
N30
3100
/
1016
49Vi
sion
21
* S
R 1
9 FR
OM
SR
492
TO
PH
ILA
DE
LPH
IA56
4.91
1,02
8,76
7.36
EN
G10
00/
1016
49Vi
sion
21
* S
R 1
9 FR
OM
SR
492
TO
PH
ILA
DE
LPH
IA1,
183,
689.
1411
,167
,926
.44
RO
W20
1000
/
1025
04S
tate
Pro
ject
sS
R 3
95 B
T S
R 1
9 A
ND
WIN
STO
N C
L (1
.4, 2
.6)
5,01
8.51
5,01
8.51
EN
G10
1000
/
1038
96S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 1
6 FR
OM
SR
15
TO S
R 1
9 [P
hila
delp
hia
Byp
ass]
131,
250.
133,
830,
570.
02E
NG
1010
00/
1057
95U
rban
City
of P
hila
delp
hia
- Mill
and
ove
rlay
with
bas
e re
pairs
, sid
ewal
k up
grad
es, s
igna
l loo
p re
pair,
& d
rain
age
reha
b P
ecan
Ave
nue
from
Col
umbu
s Av
e to
Stri
blin
g S
treet
.1,
621.
3726
6,73
6.83
CO
N70
1000
/
1068
24S
tate
Pro
ject
sC
ity o
f Phi
lade
lphi
a - M
ill &
Ove
rlay
mul
tiple
rout
es: K
osci
usko
Rd
FA 9
587,
Pec
an A
ve F
A 26
, Pec
an A
ve F
A 95
79 &
Her
man
Alfo
rd M
emor
ial H
ighw
ay F
A 26
510.
1151
0.11
7990
00/
Cou
nty
Tota
l1,
322,
654.
17
****
****
****
***
New
ton
****
****
****
***
1010
94Vi
sion
21
SR
15
BT
NE
WTO
N A
ND
DE
CAT
UR
32,1
02.0
049
9,30
4.13
EN
G10
00/
1016
48Vi
sion
21
AR
RA
**S
R 1
9 FR
OM
LA
UD
ER
DA
LE C
.L. T
O N
ES
HO
BA
CL.
316,
838.
0012
,194
,591
.28
CO
N30
2000
/
1016
48Vi
sion
21
SR
19
FRO
M C
OLL
INS
VIL
LE T
O S
R 4
92-3
16,8
38.0
091
,689
.60
CO
N30
2100
/
1023
67S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)
US
80
BT
NE
WTO
N A
ND
CH
UN
KY
(7B
R, 1
10.8
- 12
1.4)
STP
-FY
00(0
01)
27,6
76.1
622
6,23
6.69
EN
G10
1000
/
1023
67S
tate
Pro
ject
sU
S 8
0 B
T N
EW
TON
AN
D C
HU
NK
Y (4
Brid
ges,
110
.8, 1
11.7
, 114
.8, 1
21.4
)5,
670.
555,
670.
55E
NG
1011
00/
1024
91B
ridge
SR
503
BT
JAS
PE
R C
L A
ND
US
80
(29.
6, 2
9.9)
[10
-13
BR
DG
RE
PL
I-5]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct-1
,984
.55
5,07
8,92
5.53
CO
N30
1000
/
1025
90Vi
sion
21
* S
R 1
5 FR
OM
0.5
MIL
ES
N. O
F U
S 8
0 TO
S. E
ND
UN
ION
B24
,589
.95
449,
504.
28E
NG
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
31
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
New
ton
****
****
****
***
1054
44In
ters
tate
I-20
Wid
en B
ridge
Sho
ulde
rs -
DE
SIG
N B
UIL
D13
0,21
2.22
9,75
6,97
4.44
CO
N30
1000
/
1061
87P
avem
ent R
ehab
ilita
tion
I-20
FM 2
MI E
A O
F C
HU
NK
Y R
IVE
R T
O L
AU
DE
RD
ALE
CL
- PE
1,71
0.39
1,71
0.39
EN
G10
1000
/
1063
74P
avem
ent R
ehab
ilita
tion
US
80
Frm
3.5
Mi E
of 4
Ln
to L
aud
CL
201,
002.
894,
060,
800.
31C
ON
3010
00/
1066
96S
tate
Pro
ject
s
383.
8938
3.89
7990
00/
1067
74S
tate
Pro
ject
sTo
wn
of D
ecat
ur -
Pre
vent
ativ
e m
aint
enan
ce re
stor
atio
n, g
rind
dow
n at
cur
b, o
verla
y, re
strip
e an
d ad
d A
DA
requ
ired
side
wal
ks o
n w
est B
road
Stre
et fr
om a
ppro
xim
atel
y H
WY
15 to
app
roxi
mat
ely
Nor
th N
inth
Ave
2,13
3.90
2,13
3.90
7990
00/
Cou
nty
Tota
l42
3,49
7.40
****
****
****
***
Nox
ubee
****
****
****
***
1004
87Vi
sion
21
US
45
FRO
M B
RO
OK
SV
ILLE
TO
LO
WN
DE
S C
L (P
E 1
0110
3) -
[for D
istri
ct 1
- 10
0094
] [I-3
2]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct1,
678,
926.
566,
277,
302.
70C
ON
3010
00/
1020
89S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S45
BTW
NO
XUB
EE
CL
& C
AR
SO
N R
D [R
OW
TO
PU
RC
HA
SE
SIL
T B
AS
INS
]7,
384.
8531
,501
.72
RO
W20
2000
/
1052
56S
afet
yN
oxub
ee C
ount
y B
OS
-Pla
n fo
r a S
afe
Rou
tes
to S
choo
l Pro
gram
6,26
6.60
6,26
6.60
CO
N40
2000
/
1052
56S
afet
yN
oxub
ee C
ount
y B
OS
-Sid
ewal
ks in
the
Tow
n of
Bro
oksv
ille.
Saf
e R
oute
s P
lan
18,9
70.2
518
,970
.25
EN
G41
1000
/
1065
13P
avem
ent R
ehab
ilita
tion
SR
792
Fro
m S
R 3
88 to
Low
ndes
CL
948,
953.
8694
9,08
9.56
CO
N30
1000
/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Bug
gs F
erry
in th
e C
ity o
f Mac
on D
OT#
303
932K
233.
7623
3.76
EN
G10
2000
/
1066
04S
afet
yU
pgra
de R
R C
ross
ings
on
Pea
rl in
the
City
of M
acon
DO
T#30
3 93
0W15
5.85
155.
85E
NG
1040
00/
1067
69P
avem
ent R
ehab
ilita
tion
SR
14
from
13.
368
Mile
s E
ast o
f W
inst
on C
L to
Ala
bam
a S
L (
Om
it LM
15.
220
- 15.
614)
3,
972,
138.
393,
972,
138.
39C
ON
3010
00/
Cou
nty
Tota
l6,
633,
030.
12
****
****
****
***
Okt
ibbe
ha**
****
****
****
*
1048
38S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi S
tate
Uni
vers
ity -
MS
U R
esea
rch
& T
ech
Par
k/S
tark
ville
155,
225.
472,
149,
117.
49C
ON
8010
00/
1048
57S
tate
Pro
ject
sM
issi
ssip
pi S
tate
Uni
vers
ity -
Sou
th E
ntra
nce
Loop
8,
159.
818,
159.
8179
9000
/
1048
57S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi S
tate
Uni
vers
ity -
Sou
th E
ntra
nce
Loop
286,
653.
111,
148,
676.
37E
NG
8110
00/
1051
34S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)M
SU
- C
onst
ruct
a s
even
(7) f
oot f
ence
in v
ario
us lo
catio
ns a
long
MS
U m
ain
cam
pus
boun
dary
. 80/
20 fu
ndin
g5,
352.
0320
3,64
9.88
CO
N70
1000
/
1052
96S
afet
yC
ity o
f Sta
rkvi
lle -
cons
truct
ion
of s
idew
alks
& o
ther
ass
ocia
ted
appu
rtena
nces
on
Whi
tfiel
d S
t. fro
m A
ve. o
f Pat
riots
to S
cale
s S
t. &
the
inte
rsec
tion
of L
ong
St /
Ern
est H
. Jon
es D
r. w
ith H
ighw
ay 1
82
12,9
41.5
022
5,16
5.55
CO
N40
1000
/
1055
27S
tate
Pro
ject
sC
ity o
f Sta
rkvi
lle -
Lynn
Lan
e P
edes
trian
/Bik
e P
ath.
App
roxi
mat
ely
15,0
00 L
F or
igin
atin
g in
McK
ee P
ark,
pro
ceed
ing
east
war
d al
ong
Lynn
Lan
e to
Mon
tgom
ery
St.,
pro
ceed
ing
north
to L
ocks
ley
Way
, pro
ceed
ing
east
war
d to
Bla
ckja
ck R
oad.
2,16
3.44
2,16
3.44
7990
00/
1059
87U
rban
City
of S
tark
ville
- W
iden
ing
(for c
ente
r lan
e) m
illin
g an
d ov
erla
y, d
rain
age
impr
ovem
ents
and
sid
ewal
k in
stal
latio
n, fr
om L
ynn
Lane
to Y
ello
w J
acke
t Driv
e ap
prox
. 0.6
0 of
a m
ile.
29,1
19.9
41,
448,
800.
08C
ON
7010
00/
1066
24S
afet
yN
. Jac
kson
Stre
et (H
wy
389)
and
E. G
arra
rd R
oad
277,
268.
3527
7,26
8.35
EN
G10
1000
/
1066
62S
tate
Pro
ject
sM
issi
ssip
pi S
tate
Uni
vers
ity -
Bla
ckja
ck R
oad
Fenc
e P
roje
ct -
cons
truct
140
8 fe
et o
f fen
ce a
long
Bla
ckja
ck R
oad
desi
gn o
f bric
k co
lum
ns s
pace
d at
32
(32)
feet
on
cetn
er w
ith a
7 fo
ot h
igh
met
al fe
ncin
g m
ater
ial b
etw
een
colu
mns
130.
5713
0.57
7990
00/
Cou
nty
Tota
l77
7,01
4.22
****
****
****
***
Pano
la**
****
****
****
*
1016
43Vi
sion
21
SR
6 - F
rom
The
Wes
t End
Of T
he B
ates
ville
Byp
ass
to W
est o
f I-5
5 - W
est B
ypas
s P
roje
ct17
,926
.84
1,82
7,23
2.29
EN
G10
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
32
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Pano
la**
****
****
****
*
1016
43Vi
sion
21
SR
6 Fr
om I-
55 E
ast f
or 3
.11m
iles
- Eas
t Byp
ass
Pro
ject
35
,697
.70
367,
802.
78E
NG
1030
00/
1016
43Vi
sion
21
SR
6/I-5
5 ex
istin
g in
terc
hang
e - f
inal
des
ign
25,4
33.6
834
3,59
9.18
EN
G10
5000
/
1016
43Vi
sion
21
SR
6/I-
55 e
xist
ing
inte
rcha
nge
2,75
7,22
2.69
3,33
4,34
0.28
CO
N30
5000
/
1016
43S
tate
Pro
ject
sM
ast A
rm U
pgra
de to
the
Sig
nal L
ocat
ed a
t 278
/Wal
mar
t Driv
e10
3,38
0.14
104,
196.
39C
ON
3060
00/
1020
98N
atio
nal H
ighw
ay S
yste
m(N
HS
)I-5
5 TR
UC
K S
CA
LES
IN P
AN
OLA
/TAT
E C
OU
NTI
ES
(NO
RTH
& S
OU
TH)
446.
7733
4,12
4.09
EN
G10
1000
/
1020
98N
atio
nal H
ighw
ay S
yste
m(N
HS
)I5
5 C
ON
STR
UC
T TR
UC
K S
CA
LES
IN P
AN
OLA
/TAT
E C
OU
NTI
ES
(NO
RTH
& S
OU
TH)
212,
712.
1926
7,06
0.74
RO
W20
1000
/
1021
07S
tate
Pro
ject
sS
R 6
BE
TWE
EN
TU
BB
S R
OA
D A
ND
BAT
ES
STR
EE
T [B
RID
GE
#50
.4]
2,75
7.42
2,75
7.42
EN
G10
2000
/
1021
65S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)
SR
35
FRO
M U
S 5
1 TO
I-55
(R
OW
TO
WID
EN
)STP
-FY
00(0
01)
PE
100
239
5,60
1.84
497,
382.
00R
OW
2010
00/
1027
33Vi
sion
21
SR
6 F
RO
M P
AN
OLA
CO
UN
TY L
INE
TO
TH
E W
ES
T E
ND
OF
THE
BAT
ES
VIL
LE B
YPA
SS
[101
643]
168.
0326
2,09
9.93
EN
G10
3000
/
1031
64Vi
sion
21
SR
6 O
VE
R T
ALL
AH
ATC
HIE
RIV
ER
& R
ELI
EF
[BR
IDG
E #
44.
3]70
,132
.80
205,
590.
78E
NG
1010
00/
1033
24B
ridge
SR
315
FR
OM
TU
NIC
A C
L-5
MIL
ES
EA
ST
OF
BR
IDG
E #
19.
2 @
IND
IAN
CR
EE
K13
2,04
4.35
451,
722.
33E
NG
1010
00/
1033
24B
ridge
SR
315
FR
OM
TU
NIC
A C
L-5
MIL
ES
EA
ST
OF
BR
IDG
E #
19.
2 @
IND
IAN
CR
EE
K27
8,04
1.13
507,
312.
81R
OW
2010
00/
1033
33B
ridge
US
51
FR P
OP
E T
O C
OU
RTL
AN
D B
R. N
OS
. 242
.9 &
243
.2.
24,2
32.2
116
9,98
0.85
EN
G10
1000
/
1045
24P
avem
ent R
ehab
ilita
tion
I-55
FRO
M T
HE
YA
LOB
US
HA
CO
UN
TY L
INE
TO
SR
6.
2011
IMD
$2M
3,83
6,15
5.11
3,83
6,15
5.11
CO
N30
1000
/
1050
73P
avem
ent R
ehab
ilita
tion
I-55
FRO
M S
R 6
TO
1.8
MIL
ES
NO
RTH
OF
SR
35
[10-
13 O
& M
& R
econ
I-6]
626.
9712
,473
,406
.12
CO
N30
1000
/
1057
54U
rban
Bat
esvi
lle-H
wy
6 S
igna
l Upg
rade
s at
inte
rsec
tions
of B
ates
Stre
et a
nd E
urek
a S
treet
.10
,733
.36
278,
145.
73C
ON
7010
00/
1058
17In
ters
tate
I55-
Bat
esvi
lle R
est A
rea
NB
&S
B-L
ands
cap
5,19
9.26
191,
711.
89C
ON
3011
00/
1058
17N
atio
nal H
ighw
ay S
yste
m(N
HS
)I5
5-B
ates
ville
Res
t Are
a S
B-L
ands
cape
3,21
2.79
475,
738.
03C
ON
3020
00/
1063
76S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Bat
esvi
lle D
ownt
own
Squ
are
68.9
768
.97
CO
N70
1000
/
1063
76S
tate
Pro
ject
sC
ity o
f Bat
esvi
lle D
ownt
own
Squ
are
139.
8013
9.80
7990
00/
Cou
nty
Tota
l7,
521,
934.
05
****
****
****
***
Pear
l_R
iver
****
****
****
***
1021
86S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
3 B
TW P
ICAY
UN
E A
ND
HE
NLE
YFI
ELD
.
PE
100
744
23,8
53.0
22,
488,
957.
81R
OW
2010
00/
1022
46S
tate
Pro
ject
sU
S 1
1 FR
OM
I 59
TO
MIL
L C
RE
EK
96,0
90.2
785
0,87
6.10
EN
G10
1000
/
1022
46B
ridge
US
11
Rep
lace
Brid
ge #
11.3
at H
obol
ochi
tto C
reek
in P
icay
une
84,5
86.8
097
,786
.10
EN
G10
2000
/
1022
46S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 1
1 FR
OM
HO
BO
LOC
HIT
TO C
RE
EK
TO
HID
E-A
-WAY
LA
KE
RO
AD
PE
100
757
20,2
23.9
038
7,65
0.25
RO
W20
1000
/
1022
46S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 1
1 FR
OM
HO
BO
LOC
HIT
TO C
RE
EK
TO
HID
E-A
-WAY
LA
KE
RO
AD
2,66
3,61
7.57
4,04
9,78
7.14
RO
W20
4000
/
1033
97P
avem
ent R
ehab
ilita
tion
I-59
FRO
M M
CN
EIL
TO
HIL
LSD
ALE
INTE
RC
HG
E4,
809.
6214
,077
,104
.42
CO
N30
1000
/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
5930
1.04
411,
977.
15E
NG
1020
00/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
59
1,22
1.44
2,70
0,79
1.35
RO
W20
2000
/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
59 P
earl
Riv
er C
ount
y55
3,42
9.48
553,
637.
13C
ON
3020
00/
1054
25Vi
sion
21
SR
607
FR
OM
NA
SA
TO I-
59 -
Pha
se C
Ove
rsig
ht -
Sta
te F
unds
7,
280.
207,
280.
20C
ON
3030
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
33
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Pear
l_R
iver
****
****
****
***
1054
47In
ters
tate
I-59
Wid
en B
ridge
Sho
ulde
rs59
5.70
452,
834.
59C
ON
3011
00/
1061
81S
afet
yS
R 4
3 S
igna
l @ B
eech
St i
n P
icay
une
[10-
13 S
FTY
GP
PG
I-7]
17,5
94.6
156
7,19
6.08
CO
N30
1000
/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
355]
78,7
20.9
378
,720
.93
3550
00/
1065
94In
ters
tate
I-59
Des
ign
Bui
ld B
ridge
Wid
enin
g
47,3
22.2
047
,322
.20
EN
G10
1000
/
1065
94In
ters
tate
I-59
Des
ign
Bui
ld B
ridge
Wid
enin
g33
6,68
8.37
336,
688.
37C
ON
3010
00/
Cou
nty
Tota
l3,
936,
335.
15
****
****
****
***
Perr
y**
****
****
****
*
1024
56B
ridge
SR
15
RE
PL
4 B
RID
GE
S F
RO
M B
EA
UM
ON
T TO
RIC
HTO
N15
1,18
2.99
880,
424.
51R
OW
2010
00/
1024
56B
ridge
SR
15
RE
PL
4 B
RID
GE
S F
RO
M B
EA
UM
ON
T TO
RIC
HTO
N [1
0-13
BR
DG
RE
PL
I-5]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct17
0,30
6.48
6,73
1,88
1.40
CO
N30
1000
/
1034
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)B
lack
Cre
ek M
itiga
tion
Ban
k - Y
ork
Trac
t74
9.37
189,
749.
37R
OW
2090
00/
1064
19S
afet
yU
S 9
8 O
ver S
R19
8/C
NIC
RR
Con
stru
ct C
rash
Wal
ls74
.14
137,
036.
66C
ON
3010
00/
1064
59S
tate
Pro
ject
sTo
wn
of R
icht
on p
edes
trian
trai
ls in
dow
ntow
n R
icht
on2,
123.
322,
123.
3279
9000
/
Cou
nty
Tota
l32
4,43
6.30
****
****
****
***
Pike
****
****
****
***
1008
06S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)R
EC
ON
STR
UC
T U
S 9
8 B
T U
RB
AN
LIM
ITS
OF
McC
OM
B T
O W
ALT
HA
LL C
OU
NTY
LIN
E W
ES
T B
OU
ND
LA
NE
4,54
1.10
886,
068.
15E
NG
1000
/
1008
06Vi
sion
21
RE
CO
NS
TRU
CT
US
98
BT
UR
BA
N L
IMIT
S O
F M
cCO
MB
TO
WA
LTH
ALL
CO
UN
TY L
INE
WE
ST
BO
UN
D L
AN
E [I
-6]
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct72
,318
.19
15,3
40,1
49.9
4C
ON
3010
00/
1023
84Vi
sion
21
SR
570
BTW
TH
OM
PS
ON
RO
AD
AN
D P
IKE
CO
UN
TY-4
52,5
88.7
10.
00C
ON
3021
00/
1023
84Vi
sion
21
SR
570
BTW
TH
OM
PS
ON
RO
AD
AN
D P
IKE
CO
UN
T37
6,22
4.41
376,
224.
41C
ON
3022
00/
1023
84Vi
sion
21
SR
570
BTW
TH
OM
PS
ON
RO
AD
AN
D P
IKE
CO
UN
T-U
TIL
AD
J9,
433.
6928
2,87
4.04
CO
N30
3100
/
1027
12Vi
sion
21
SR
24
FM A
MIT
E C
L TO
I-55
20,0
92.2
11,
937,
634.
41R
OW
2020
00/
1045
25P
avem
ent R
ehab
ilita
tion
I-55
FRO
M T
HE
LO
UIS
IAN
A S
TATE
LIN
E T
O S
R 5
68. [
10-1
3 O
&M
GP
PG
I-6]
48,8
32.6
37,
162,
870.
19C
ON
3010
00/
1051
36S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Mag
nolia
- R
esto
re H
isto
ric D
epot
for f
unct
ions
of c
ity g
over
nmen
t and
key
civ
ic m
inde
d or
gani
zatio
ns.
9,66
8.66
476,
534.
82C
ON
7010
00/
1054
44In
ters
tate
I-55
Wid
en B
ridge
Sho
ulde
rs -
DE
SIG
N B
UIL
D90
,387
.06
207,
164.
41E
NG
1030
00/
1054
44In
ters
tate
I-55
Wid
en B
ridge
Sho
ulde
rs -
DE
SIG
N B
UIL
D4,
523,
727.
094,
524,
150.
96C
ON
3030
00/
1055
31S
tate
Pro
ject
sS
R 5
70 @
I-55
in M
cCom
b24
,469
.73
293,
084.
42E
NG
1010
00/
1061
90S
tate
Pro
ject
sU
S 9
8 R
ehab
ilita
te B
ridge
@ C
NIC
RR
[#78
.3]
100,
914.
8915
1,40
0.76
EN
G10
1000
/
1064
04N
atio
nal H
ighw
ay S
yste
m(N
HS
)S
R 5
70 @
I-55
in M
cCom
b81
,060
.39
115,
818.
36R
OW
2010
00/
1065
52E
mer
genc
y R
elie
fD
ist 7
Hur
rican
e Is
sac
Em
erge
ncy
Ope
ratio
ns [3
0456
8 35
7]34
,119
.52
34,1
19.5
235
7000
/
1065
91S
tate
Pro
ject
sC
ity o
f McC
omb
- Rai
lroad
Mus
eum
Impr
ovem
ent i
nclu
ding
can
opy
inst
alla
tion,
bric
k pa
ver s
idew
alks
with
land
scap
ing,
ben
ches
, and
tras
h re
cept
able
s.74
1.02
741.
0279
9000
/
1066
68E
mer
genc
y R
elie
fH
urric
ane
Isaa
c I-5
5 Fe
nce
Rep
air
92,6
04.7
692
,604
.76
CO
N30
2000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
34
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Pike
****
****
****
***
1066
71S
tate
Pro
ject
sP
ike
Cou
nty
- Mul
ti-P
urpo
se R
ec T
rail
- bet
wee
n th
e C
ity o
f Mag
nolia
and
the
City
McC
omb
bord
ered
by
I-55
to th
e w
est a
nd Q
uinl
ivan
Roa
d to
the
east
825.
7282
5.72
7990
00/
1067
01S
tate
Pro
ject
sC
ity o
f McC
omb-
Mill
& O
verla
y on
Del
ewar
e Av
enue
from
Cho
ctaw
Driv
e to
Vet
eran
s B
lvd
and
Pea
rl R
iver
Ave
from
Arg
yle
Stre
et to
Loc
ust S
treet
1,94
6.15
1,94
6.15
7990
00/
Cou
nty
Tota
l5,
039,
318.
51
****
****
****
***
Pont
otoc
****
****
****
***
1000
78Vi
sion
21
* M
S 6
FR
MS
342
TO
LE
E C
.L.
[EA
RM
AR
K]
[I-21
]3,
810,
024.
229,
142,
594.
40C
ON
3050
00/
1016
29Vi
sion
21
SR
15
from
SR
41
to S
R 3
3614
5,47
5.57
604,
680.
99E
NG
1030
00/
1026
07Vi
sion
21
SR
15
AP
D C
OR
R"V
" TO
UN
ION
CL
401,
613.
002,
436,
702.
79E
NG
1010
00/
1026
07Vi
sion
21
SR
15
FRO
M A
PD
CO
RR
"V" [
SR
6]T
O U
NIO
N C
L [I-
21] [
10-1
3 S
TIP
Am
end#
24]
954,
835.
7012
,928
,351
.26
RO
W20
1000
/
1029
35Vi
sion
21
SR
15
FRO
M C
OR
R "V
" TO
TE
NN
ST
LIN
E79
5.34
803,
711.
43E
NG
1000
/
1046
43S
tate
Pro
ject
sS
R 9
- P
onto
toc/
Uni
on C
ount
ies
2,74
4.87
2,74
4.87
EN
G12
0000
/
1050
94Vi
sion
21
SR
9 fr
om P
onto
toc
to U
S 7
8 at
She
rman
44,6
85.0
13,
095,
122.
34E
NG
1010
00/
1050
94Vi
sion
21
SR
9 fr
om P
onto
toc
to U
S 7
8 at
She
rman
-Esc
row
onl
y12
5,80
3.36
10,7
90,3
53.0
7R
OW
2010
00/
1050
94Vi
sion
21
SR
9 fr
om P
onto
toc
to U
S 7
8 at
She
rman
67,6
78.6
52,
247,
704.
37R
OW
2011
00/
1050
94Vi
sion
21
SR
9 fr
om P
onto
toc
to U
S 7
8 at
She
rman
[D
esig
n B
uild
]65
,738
.62
97,6
21,9
00.9
4C
ON
3010
00/
1063
11P
avem
ent R
ehab
ilita
tion
SR
15
FM S
R 6
/278
TO
UN
ION
CL
[10-
13 O
&M
GP
PG
I-6]
55,2
41.9
01,
510,
700.
01C
ON
3010
00/
1064
03P
avem
ent R
ehab
ilita
tion
SR
9 F
M N
OF
278/
6 TO
N O
F E
AD
S C
RK
RD
34,6
40.6
82,
228,
894.
14C
ON
3010
00/
Cou
nty
Tota
l5,
709,
276.
92
****
****
****
***
Pren
tiss
****
****
****
***
1001
33S
tate
Pro
ject
sS
R 1
45 B
T B
OO
NE
VIL
LE &
ALC
OR
N C
L23
0.00
482,
968.
36E
NG
1000
/
1001
53B
ridge
SR
145
BTW
BA
LDW
YN
& B
OO
NE
VIL
LE (R
EP
LAC
E7,
938.
1649
0,26
6.90
EN
G10
00/
1001
53S
tate
Pro
ject
sS
R 1
45 B
TW B
ALD
WY
N &
BO
ON
EV
ILLE
(RE
PLA
CE
359,
744.
2159
5,99
0.92
EN
G10
1000
/
1018
00S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 3
0 B
T U
S 4
5 &
SR
364
(BO
ON
EV
ILLE
PA
SS
3,04
7.50
4,08
0,02
2.02
EN
G10
00/
1018
00S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 3
0 B
T U
S 4
5 &
SR
364
(BO
ON
EV
ILLE
PA
SS
19,6
97.6
311
,965
,266
.11
RO
W20
1000
/
1018
00S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 3
0 B
T U
S 4
5 &
SR
364
(BO
ON
EV
ILLE
BY
PAS
S]
10,5
86.1
524
,093
,970
.46
CO
N30
2000
/
1058
85U
rban
Boo
nevi
lle -
upgr
ade
traffi
c S
igna
ls a
t int
erse
ctio
n of
Nor
th S
econ
d S
treet
and
Par
ker D
rive.
1,56
8.52
156,
691.
86C
ON
7010
00/
1059
79U
rban
City
of B
oone
ville
- M
ill a
nd O
verla
y, S
torm
Dra
inag
e &
Han
dica
pp A
cces
s al
ong
Jeffe
rson
St.
from
Elli
s Av
enue
to C
unni
ngha
m B
lvd
[10-
13 S
TIP
Vol 4
IV-4
2]1,
957.
0170
,762
.16
CO
N70
1000
/
1060
07S
afet
yC
ity o
f Bal
dwyn
- R
epai
r and
con
stru
ct s
idew
alks
alo
ng M
ain
Stre
et fr
om C
emet
ery
Stre
et to
Jon
es S
treet
and
alo
ng S
econ
d S
treet
from
Cla
yton
Stre
et to
Cox
Stre
et. [
10-1
3 S
FTY
GP
PG
I-7]
94,9
43.0
019
9,48
6.33
CO
N40
1000
/
Cou
nty
Tota
l49
9,71
2.18
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
35
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Qui
tman
****
****
****
***
1026
24B
ridge
SR
6 R
epla
ce 9
Brid
ges
from
SR
316
to P
anol
a C
L17
2,25
8.57
267,
948.
81E
NG
1010
00/
1026
25B
ridge
SR
6 R
epla
ce 3
Brid
ges
from
Coa
hom
a16
,388
.31
377,
682.
43E
NG
1000
/
1026
25B
ridge
SR
6 R
epla
ce 4
Brid
ges
from
Coa
hom
a 24
7,30
1.52
555,
689.
91E
NG
1010
00/
1026
25Vi
sion
21
SR
6 R
epla
ce 4
Brid
ges
from
Coa
hom
a C
L to
SR
316
(BR
IDG
E #
s 22
.3, 2
2.5,
27.
9 &
23.
5)
240,
479.
2536
1,90
1.06
RO
W20
1000
/
1027
33Vi
sion
21
SR
6 F
RO
M Q
UIT
MA
N C
OU
NTY
LIN
E T
O P
AN
OLA
CO
UN
TY L
INE
641.
3660
9,47
5.60
EN
G10
2000
/
1033
19B
ridge
SR
315
PA
NO
LA C
L TO
TU
NIC
A C
L [B
RID
GE
# 1
3] -
Gen
eral
Obl
igat
ion
Bon
d47
,747
.78
223,
294.
72E
NG
1020
00/
1033
19B
ridge
SR
315
FR
TH
E P
AN
OLA
CL
TO T
HE
TU
NIC
A C
L [B
RID
GE
# 1
3.2]
54,7
07.6
725
2,84
1.27
RO
W20
1000
/
Cou
nty
Tota
l77
9,52
4.46
****
****
****
***
Ran
kin
****
****
****
***
1005
51S
peci
al P
roje
cts(
Dem
o)A
CC
ES
S R
OA
D B
ETW
EE
N I
-55
& S
R 4
75 [P
E F
OR
NE
W C
ON
STR
UC
TIO
N] R
AN
KIN
10,8
74.6
34,
141,
693.
16E
NG
2000
/
1005
51S
peci
al P
roje
cts(
Dem
o)A
IRP
OR
T PA
RK
WAY
BE
TWE
EN
I-55
& S
R 4
75 [P
E &
RO
W F
OR
NE
W B
RID
GE
S] R
AN
KIN
11,1
65.0
051
8,69
3.00
EN
G10
5000
/
1005
51S
peci
al P
roje
cts(
Dem
o)A
CC
ES
S R
OA
D B
ETW
EE
N I-
55 T
HR
U S
R 4
68 [P
E &
RO
W F
OR
NE
W C
ON
STR
UC
TIO
N] R
AN
KIN
1,89
0.96
16,7
72,1
66.6
2R
OW
2020
00/
1005
79S
tate
Pro
ject
sS
R 4
71 F
RO
M U
S 8
0 TO
SR
25
27,8
18.8
34,
031,
900.
44E
NG
1000
/
1005
79S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
71 fr
om U
S 8
0 to
Nor
th o
f Hill
cres
t Driv
e63
8,08
6.44
1,51
5,01
8.80
EN
G10
1000
/
1005
79S
tate
Pro
ject
sS
R 4
71 fr
om H
illcr
est D
rive
to S
R 2
573
,676
.72
350,
829.
89E
NG
1020
00/
1005
79S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
71 F
RO
M U
S 8
0 T
O J
ust N
orth
of H
ILLC
RE
ST
DR
IVE
(CO
NS
T 5
LN)[
sta
175+
45.9
3]73
6,58
2.35
14,1
51,9
45.5
5R
OW
2010
00/
1005
88S
tate
Pro
ject
sS
R 4
3 FM
CR
OS
SR
OA
DS
TO
I-20
RE
ALI
GN
4,94
9.92
945,
815.
24E
NG
1000
/
1005
88S
afet
yS
R 4
3 FM
CR
OS
SR
OA
DS
TO
I-20
(RE
ALI
GN
- 3R
)35
,707
.60
3,17
1,17
0.45
RO
W20
1000
/
1005
88S
afet
yS
R 4
3 FM
CR
OS
SR
OA
DS
TO
I-20
(RE
ALI
GN
- 3R
) 3,
739,
405.
053,
775,
110.
37C
ON
3010
00/
1006
15S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 8
0 B
T B
RA
ND
ON
AN
D M
OR
TON
-PE
FO
R B
R R
E13
,995
.79
1,36
0,70
8.39
EN
G10
00/
1006
15B
ridge
US
80
BT
BR
AN
DO
N A
ND
SC
OTT
CL
( 7
BR
, 60.
8-72
.9)
3,66
4.56
1,37
0,95
7.28
RO
W20
1000
/
1006
15Vi
sion
21
US
80
BT
BR
AN
DO
N A
ND
SC
OTT
CL
( 6
BR
, 66.
9-72
.9)
5,
705,
280.
4111
,571
,113
.24
CO
N30
1000
/
1020
46S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
HO
RT
RA
NG
E S
TUD
Y A
ND
PE
FR
OM
US
49
FM F
LOR
EN
CE
TO
SC
ALE
AR
EA
[EA
RM
AR
K]
735,
857.
983,
183,
053.
35E
NG
1010
00/
1020
46S
tate
Pro
ject
sU
S 4
9 FM
FLO
RE
NC
E T
O S
CA
LE A
RE
A80
,669
.48
81,3
21.3
5E
NG
1020
00/
1020
46N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 4
9 B
ETW
EE
N S
TEE
N C
RE
EK
SO
UTH
OF
FLO
RE
NC
E A
ND
GU
NTE
R R
OA
D [E
AR
MA
RK
] -- I
NC
IDE
NTI
ALS
AN
D F
ULL
RO
W36
7,49
0.76
3,66
8,54
8.05
RO
W20
1000
/
1020
46Vi
sion
21
* U
S 4
9 FR
OM
GU
NTE
R R
OA
D N
OR
TH T
O S
TATI
ON
813
+20
93,1
48.9
87,
645,
826.
49R
OW
2020
00/
1020
46Vi
sion
21
* U
S 4
9 FR
OM
STA
TIO
N 8
13+2
0 TO
100
0 FT
NO
RTH
OF
RIC
HLA
ND
CR
EE
K (S
CA
LE A
RE
A) 29
,131
.60
15,6
01,3
74.4
3R
OW
2030
00/
1020
46Vi
sion
21
US
49
FM F
LOR
EN
CE
TO
SC
ALE
AR
EA
361,
205.
6536
1,20
5.65
RO
W20
4000
/
1021
70Vi
sion
21
I 20
FRO
M S
R 4
68 T
O G
RE
EN
FIE
LD/C
RO
SS
GAT
ES
IN B
RA
ND
ON
(AD
D 2
LA
NE
S)
602,
153.
4736
,201
,813
.63
CO
N30
1000
/
1032
15S
peci
al P
roje
cts(
Dem
o)
E M
etro
Cor
ridor
Fm
I 20
to S
r 25
PE
- D
emo
MS
015
31,3
69.0
01,
801,
497.
40E
NG
1010
00/
1032
15S
tate
Pro
ject
sE
ast M
etro
Cor
ridor
Com
mis
sion
- S
outh
Con
nect
or R
oad
to E
l Dor
ado/
Coo
per R
oad
Inte
rsec
tion. 1
54.5
515
4.55
7990
02/
1032
15S
peci
al P
roje
cts(
Dem
o)E
ast M
etro
Cor
ridor
Com
mis
sion
- E
l Dor
ado/
Coo
per R
oad
Inte
rsec
tion
to M
S 2
5.11
6,72
1.20
8,82
1,77
3.52
CO
N80
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
36
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Ran
kin
****
****
****
***
1034
08S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
68 F
M 2
.6 M
I N O
F U
S 8
0 TO
SR
475
(FLO
WO
OD
) (H
B 1
449)
13,8
60.8
588
2,81
2.11
EN
G10
1000
/
1034
08S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
68 F
M 2
.6 M
I N O
F U
S 8
0 TO
SR
475
3,74
8,48
0.37
3,74
8,48
0.37
CO
N30
1000
/
1034
08S
tate
Pro
ject
sS
R 4
68 F
M 2
.6 M
I N O
F U
S 8
0 TO
SR
475
(CE
&I)
559,
129.
1755
9,12
9.17
CO
N30
1100
/
1034
08S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 4
68 F
M 2
.6 M
I N O
F U
S 8
0 TO
RIV
ER
OA
K (f
or U
tility
Item
s pa
id b
y C
ity)
373,
896.
7037
3,89
6.70
CO
N30
1200
/
1034
08S
tate
Pro
ject
sS
R 4
68 F
M 2
.6 M
I N O
F U
S 8
0 TO
SR
475
[RE
MO
VAL
RR
TR
AC
KS
AN
D C
ON
STR
UC
T R
R S
IDIN
G, B
Y IC
RR
]20
,547
.49
460,
181.
90C
ON
3020
00/
1034
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
TATE
WID
E W
ETL
AN
DS
BA
NK
- LU
CK
NE
Y P
LOT
166,
563.
8914
,003
,822
.67
RO
W20
6000
/
1041
01S
peci
al P
roje
cts(
Dem
o)S
R 2
5 FR
SR
475
TO
SR
471
(AD
D 2
LA
NE
S)-E
AR
MA
RK
- E
NV
IRO
NM
EN
TAL
DO
CU
ME
NT
39,6
36.8
842
4,75
2.69
EN
G10
00/
1041
01Vi
sion
21
SR
25
FR S
R 4
75 T
O S
R 4
71 (A
DD
2 L
AN
ES
)14
0,64
3.12
1,78
7,51
1.22
EN
G10
1000
/
1041
01Vi
sion
21
SR
25
FR S
R 4
75 T
O S
R 4
71 (A
DD
2 L
AN
ES
)3,
060.
2815
,574
.05
EN
G10
1100
/
1041
01S
tate
Pro
ject
sS
R 2
5 FR
SR
475
TO
GR
AN
TS F
ER
RY
(AD
D 2
LA
NE
S)
820,
074.
9282
0,07
4.92
RO
W20
1000
/
1044
22S
tate
Pro
ject
sC
ity o
f Pea
rl - S
R 4
77 F
R U
S 8
0 TO
SR
25
(HB
144
9-W
RP
)48
5.02
485.
0279
9000
/
1045
17S
peci
al P
roje
cts(
Dem
o)W
ATE
R T
AXI
STU
DY
BA
RN
ETT
RE
SE
RV
OIR
2,21
2.72
23,1
48.1
5E
NG
8120
00/
1045
59S
tate
Aid
ER
LIC
H R
OA
D O
VE
RPA
SS
NE
AR
FLO
RE
NC
E.
STA
TE A
ID H
AVE
EXT
ER
NA
L P
RO
JEC
T N
UM
BE
R
STP
D-0
061(
24)B
1,42
9.90
1,68
4,00
7.74
CO
N30
1000
/
1046
26S
tate
Pro
ject
sR
anki
n C
ount
y B
oard
of S
uper
viso
rs -
Old
Fan
nin
Roa
d be
twee
n S
pillw
ay R
oad
and
Flow
ood
Cor
p Li
mit
wid
en fr
om 3
to 5
Lan
es.
1,94
2.48
1,94
2.48
7990
00/
1046
26S
peci
al P
roje
cts(
Dem
o)R
anki
n C
ount
y B
oard
of S
uper
viso
rs -
Old
Fan
nin
Roa
d be
twee
n S
pillw
ay R
oad
and
Flow
ood
Cor
p Li
mit
wid
en fr
om 3
to 5
Lan
es.
2,56
7,66
9.89
4,21
2,68
7.12
CO
N80
1000
/
1049
89S
tate
Pro
ject
sU
S 4
9 FR
OM
SIM
PS
ON
CO
UN
TY L
INE
TO
SO
UTH
OF
FLO
RE
NC
E38
,794
.62
210,
934.
05E
NG
3000
/
1050
66S
peci
al P
roje
cts(
Dem
o)P
EA
RL
RIV
ER
VA
LLE
Y W
ATE
R S
UP
PLY
DIS
TRIC
T - B
OB
AN
THO
NY
PAR
KW
AY O
VE
RLA
Y A
ND
HA
RB
OR
WA
LK B
IKE
PAT
H.
12.4
248
4,29
3.27
CO
N80
1000
/
1050
68S
tate
Pro
ject
sP
earl-
Ric
hlan
d In
term
odal
Con
nect
or-S
49
to P
ears
on R
d.
( P
E fo
r Env
ironm
enta
l Ass
essm
ent)
(MS
085)
1,68
0.16
1,68
0.16
7990
00/
1050
68S
peci
al P
roje
cts(
Dem
o)P
earl-
Ric
hlan
d In
term
odal
Con
nect
or C
ont -
Pre
limin
ary
Eng
inee
ring
for D
esig
n32
1,09
6.25
683,
660.
91E
NG
8120
00/
1050
68S
peci
al P
roje
cts(
Dem
o)P
earl-
Ric
hlan
d In
term
odal
Con
nect
or-U
S 4
9 TO
PE
AR
SO
N R
OA
D25
,187
.25
25,1
87.2
5R
OW
8200
00/
1051
37S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)P
earl
Riv
er V
alle
y W
ater
Sup
ply
Dis
trict
-Bik
e &
Ped
estri
an P
ath
on S
pillw
ay R
oad
from
Wat
er W
ood
Sub
divi
sion
to H
ighw
ay 4
71.
Bik
e la
ne fr
om S
pillw
ay R
oad
north
on
Hig
hway
471
to N
orth
shor
e P
arkw
ay.
14,9
74.4
31,
305,
772.
53C
ON
7010
00/
1051
65S
tate
Pro
ject
sC
ity o
f Flo
renc
e- R
econ
stur
ct W
illia
ms
Roa
d fro
m H
ighw
ay 4
68 to
Flo
renc
e C
ity L
imits
.18
4.62
184.
6279
9000
/
1051
68S
tate
Pro
ject
sC
ity o
f Pel
ahat
chie
- C
onst
ruct
ion
of B
ike
Pat
hs a
long
Bro
oks
Aven
ue a
nd L
ake
Roa
d to
the
entra
nce
of Y
ogi B
ear's
Jel
lyst
one
Par
k.95
.98
95.9
879
9000
/
1052
16S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Flo
woo
d - B
ike
Trai
ls a
long
Flo
woo
d D
rive,
Old
Fan
nin
Roa
d an
d W
irtz
Roa
d.16
1,53
9.58
727,
376.
71C
ON
7010
00/
1052
74S
peci
al P
roje
cts(
Dem
o)C
ity o
f Ric
hlan
d - H
ighw
ay 1
49 O
verp
ass
impr
ovem
ents
and
upg
rade
/hig
hway
149
impr
ovem
ents
31
,558
.55
172,
183.
72E
NG
8110
00/
1052
97Vi
sion
21
SR
475
FR
OM
OLD
BR
AN
DO
N R
OA
D T
O U
S 8
0 [I-
6] G
ener
al O
blig
atio
n B
ond
Pro
ject
39,7
36.1
09,
333,
784.
76C
ON
3010
00/
1054
45In
ters
tate
I-20/
I-55/
Sig
n &
Tru
ss R
epla
cem
ents
-2,2
06.6
19,
357.
90C
ON
3030
00/
1054
58P
avem
ent R
ehab
ilita
tion
US
80
FR 0
.1 M
I E O
F S
R 1
8 TO
SC
OTT
CL
3,87
1,59
9.47
3,87
4,84
6.01
CO
N30
1000
/
1055
36S
afet
yI-2
0 W
est B
rand
on In
terc
hang
e in
Ran
kin
432,
641.
0166
6,61
9.73
EN
G10
1000
/
1055
36S
tate
Pro
ject
sI-2
0 W
est B
rand
on In
terc
hang
e in
Ran
kin
56.2
856
.28
EN
G10
2000
/
1055
36S
afet
yI-2
0 W
est B
rand
on In
terc
hang
e in
Ran
kin
Cou
nty,
relo
catio
n of
on-
ram
p.
86,2
96.7
23,
001,
702.
45R
OW
2010
00/
1055
55S
peci
al P
roje
cts(
Dem
o)C
ity o
f Bra
ndon
- C
onst
ruct
Eas
t Bra
ndon
By-
Pas
s R
oad
betw
een
Hw
y 80
and
Hw
y 18
- P
E -
Ran
kin
Cou
nty.
82,2
39.5
082
,239
.50
EN
G81
1000
/
1056
17P
avem
ent R
ehab
ilita
tion
I-20
FRO
M E
AS
T B
RA
ND
ON
TO
SC
OTT
CL
8,57
1.04
8,57
1.04
EN
G10
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
37
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Ran
kin
****
****
****
***
1057
15U
rban
Tow
n of
Pel
ahat
chie
- O
verla
y B
rook
s Av
e fro
m M
S H
wy
43 to
US
Hw
y 80
.38
2,18
8.02
382,
188.
02C
ON
7010
00/
1058
63S
tate
Pro
ject
sTo
wn
of P
elah
atch
ie -
Sid
ewal
k im
prov
emen
ts a
long
Col
lege
Stre
et, J
acks
on A
venu
e, W
arre
n Av
enue
and
Sec
ond
Stre
et13
7.45
137.
4579
9000
/
1059
27In
ters
tate
Inte
rsta
te S
lide
in B
rand
on a
t Hig
hway
80.
-351
.00
95,2
36.6
0C
ON
3030
00/
1063
41S
tate
Pro
ject
sC
ity o
f Bra
ndon
Dow
ntow
n S
treet
scap
e68
.66
68.6
679
9000
/
1063
47S
tate
Pro
ject
sC
ity o
f Flo
woo
d W
irtz
Roa
d B
ike
Trai
l pro
ject
1,49
9.40
1,49
9.40
7990
00/
1064
26S
afet
yU
S 4
9 at
Erli
ch R
d in
Flo
renc
e - S
igna
l Pro
ject
156,
824.
1515
6,82
4.15
CO
N30
1000
/
1064
88S
afet
yM
S 2
5 fro
m S
R 4
75 to
Hig
hlan
d B
luff
Ele
m S
choo
l13
5,09
8.16
159,
315.
07E
NG
1010
00/
1066
33S
afet
yS
R 2
5 fro
m S
R 4
75 to
SR
471
50,7
98.1
350
,798
.13
EN
G10
1000
/
1068
17S
tate
Pro
ject
sC
ity o
f Pea
rl - O
ld B
rand
on R
oad
Sig
nals
at H
WY
80 a
nd a
t Pea
rson
Roa
d66
.64
66.6
479
9000
/
Cou
nty
Tota
l27
,721
,021
.59
****
****
****
***
Scot
t**
****
****
****
*
1023
62B
ridge
SR
501
RE
PLA
CE
BR
. AT
LEA
F R
IVE
R (1
8.7
) - G
ener
al O
blig
atio
n B
ond
153,
377.
6465
4,19
5.41
EN
G10
1000
/
1023
62B
ridge
SR
501
RE
PLA
CE
BR
. AT
LEA
F R
IVE
R (1
8.7
)27
,949
.89
114,
369.
23R
OW
2010
00/
1042
11B
ridge
SR
35
betw
een
Har
perv
ille
& L
eake
Cou
nty
Line
BR
#12
1.9
- Gen
eral
Obl
igat
ion
Bon
d34
,434
.12
279,
798.
12E
NG
1010
00/
1042
11Vi
sion
21
SR
35
BT
HA
RP
ER
VIL
LE A
ND
LE
AK
E C
L (1
21.9
) -1
9,81
1.27
241,
842.
36R
OW
2010
00/
1050
57P
avem
ent R
ehab
ilita
tion
I-20
from
Ran
kin
Cou
nty
Line
to S
R 4
81 [
10-1
3 O
&M
GP
PG
I-6]
4,08
1,94
7.62
5,77
1,38
2.83
CO
N30
1000
/
1053
46S
afet
yK
CS
Sur
face
at H
errin
g R
oad
Mor
ton
MS
305
097
U S
cott
Cou
nty
-3,4
01.5
20.
00E
NG
1010
00/
1053
46S
afet
yS
urfa
ce H
errin
g R
oad
Mor
ton
MS
305
097
U3,
401.
5239
,660
.52
CO
N30
1000
/
1055
67R
egul
ar-A
RR
A**
I-20
Res
t Are
as in
Sco
tt C
ount
y - E
ast
-40,
396.
0852
4,60
0.00
CO
N30
1000
/
1055
67In
ters
tate
I-20
Res
t Are
as in
Sco
tt C
ount
y-7
,994
.84
0.00
CO
N30
1100
/
1055
67In
ters
tate
I-20
Res
t Are
as in
Sco
tt C
ount
y -E
ast
48,3
90.9
22,
226,
290.
82C
ON
3020
00/
1055
67R
egul
ar-A
RR
A**
I-20
Res
t Are
as in
Sco
tt C
ount
y - W
est
-24,
367.
0653
1,50
0.00
CO
N30
3000
/
1055
67In
ters
tate
I-20
Res
t Are
as in
Sco
tt C
ount
y-3
3,00
4.60
0.00
CO
N30
3100
/
1055
67In
ters
tate
I-20
Res
t Are
as in
Sco
tt C
ount
y - W
est
57,3
71.6
645
7,87
2.27
CO
N30
4000
/
1058
70In
ters
tate
I-20
FRO
M S
R 4
81 T
O T
HE
NE
WTO
N C
OU
NTY
LIN
E [I
-6]
5,12
6,55
1.84
70,6
18,2
57.7
9C
ON
3010
00/
1058
70S
afet
yIn
stal
latio
n of
a tr
affic
sig
nal a
nd IT
S e
lem
ents
at M
S 3
5 &
I-20
EB
Ram
p.27
9,09
5.91
370,
612.
91C
ON
3011
00/
1059
96U
rban
City
of F
ores
t - R
epla
cem
ent o
f tra
ffic
sign
als
at th
e in
ters
ectio
n of
Hw
y 80
and
Dav
is S
treet
3,45
8.29
157,
372.
71C
ON
7010
00/
1061
61P
avem
ent R
ehab
ilita
tion
SR
35 F
RO
M S
MIT
H C
L TO
BE
G 4
LN
S. O
F I2
0 [
10-1
3 O
& M
GP
PG
I-6]
283.
943,
033,
791.
36C
ON
3010
00/
1063
57S
afet
yM
S 3
5 @
I-20
EB
Ram
ps3,
764.
4568
,418
.04
EN
G10
1000
/
Cou
nty
Tota
l9,
691,
052.
43
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
38
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Shar
key
****
****
****
***
1030
51S
tate
Pro
ject
sU
S 6
1 B
R N
O. 1
68.3
AT
NIT
TA Y
UM
A12
9,19
0.29
1,69
4,62
5.23
EN
G10
1000
/
1030
51B
ridge
US
61
BR
NO
. 168
.3 A
T N
ITTA
YU
MA
500.
8026
4,09
3.27
RO
W20
1000
/
1058
36B
ridge
SR
16
BR
IDG
E R
EP
LAC
EM
EN
T #1
4.4
79,9
37.8
621
3,14
4.24
EN
G10
1000
/
1064
46S
tate
Pro
ject
sS
R 1
4 fro
m Is
saqu
ena
CL
to S
R 8
268,
489.
238,
895.
00E
NG
1020
00/
1066
87S
tate
Pro
ject
sS
R 8
26 F
RO
M S
R 1
4 TO
US
61
28,8
16.3
028
,816
.30
EN
G10
1000
/
Cou
nty
Tota
l24
6,93
4.48
****
****
****
***
Sim
pson
****
****
****
***
1008
81S
tate
Pro
ject
s
SR
28
at S
trong
Riv
er, B
ig C
reek
, and
Qui
nn C
reek
Brid
ge H
ydra
ulic
Rec
omm
enda
tions
and
Pre
limin
ary
Brid
ge L
ayou
ts13
9,45
4.95
139,
454.
95E
NG
1011
00/
1018
38S
tate
Pro
ject
sS
R 1
49 th
ree
(3) b
ridge
s be
twee
n S
R 1
3 &
US
49
- 128
.2, 1
28.6
, 131
.724
1,78
2.06
241,
782.
06E
NG
1010
00/
1046
43S
tate
Pro
ject
sU
S 4
9 S
OU
TH
58.4
82,
337.
40E
NG
1120
00/
1049
89S
tate
Pro
ject
sU
S 4
9 FR
OM
CO
VIN
GTO
N C
OU
NTY
LIN
E T
O R
AN
KIN
CO
UN
TY L
INE
162,
937.
3288
5,92
2.98
EN
G20
00/
1066
98P
avem
ent R
ehab
ilita
tion
US
49
FRO
M S
R 1
49 S
OU
TH IN
MA
GE
E N
OR
TH 1
0.23
5 M
ILE
S T
O S
R 1
49 S
OU
TH IN
ME
ND
EN
HA
LL (S
B L
AN
E O
NLY
)1,
189,
092.
171,
189,
092.
17C
ON
3010
00/
Cou
nty
Tota
l1,
733,
324.
98
****
****
****
***
Smith
****
****
****
***
1060
78S
tate
Pro
ject
sIn
ters
ectio
n of
SR
28
at S
R 3
7 in
Tay
lors
ville
.42
6,94
1.50
605,
076.
78E
NG
1010
00/
1065
76S
tate
Pro
ject
sTo
wn
of T
aylo
rsvi
lle -
Bic
ycle
& P
edes
trian
pat
h in
the
dow
ntow
n ar
ea a
djac
ent t
o an
aba
ndon
ed ra
ilway
and
par
alle
l to
Sta
te H
WY
28.
3,51
3.21
3,51
3.21
7990
00/
Cou
nty
Tota
l43
0,45
4.71
****
****
****
***
Ston
e**
****
****
****
*
1016
50Vi
sion
21
SR
15
FRO
M R
AM
SE
Y TO
1.3
MIL
ES
NO
RTH
OF
STO
NE
CO
UN
TY L
INE
(see
pro
ject
100
686)
679.
1564
5,68
1.19
EN
G11
00/
1062
35S
afet
yU
S 4
9 @
Hal
l Stre
et &
US
49
@ M
agno
lia D
rive
56,0
95.5
014
6,54
8.88
EN
G10
2000
/
1062
35S
tate
Pro
ject
sU
S 4
9 @
Hal
l Stre
et16
0,17
2.44
160,
172.
44R
OW
2010
00/
1062
35S
afet
yU
S 4
9 @
Hal
l Stre
et, M
agno
lia D
r. an
d W
al-M
art D
r.62
5,12
6.76
625,
126.
76C
ON
3010
00/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
366]
99,1
01.3
299
,101
.32
3660
00/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - W
m M
cHen
ry R
oad
- 305
232K
28,0
00.0
028
,000
.00
CO
N31
6000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - T
en M
ile R
oad
- 305
238B
28,0
00.0
028
,000
.00
CO
N31
8000
/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - I
nda
Roa
d - 3
0524
2R28
,000
.00
28,0
00.0
0C
ON
3210
00/
1067
28S
afet
yK
CS
Rai
lroad
Pro
ject
s - P
ine
Aven
ue -
3052
46T
57.2
157
.21
CO
N32
3000
/
Cou
nty
Tota
l1,
025,
232.
38
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
39
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Sunf
low
er**
****
****
****
*
1021
55O
ther
SR
8 F
RO
M B
OLI
VAR
C.L
. TO
RU
LEV
ILLE
(AD
D 2
LN
S)
59,5
00.0
04,
448,
274.
14R
OW
2020
00/
1021
55Vi
sion
21
AR
RA
**S
R 8
FR
OM
BO
LIVA
R C
.L. T
O R
ULE
VIL
LE (A
DD
2 L
NS
)1,
787.
306,
992,
837.
07C
ON
3020
00/
1021
55Vi
sion
21
SR
8 F
RO
M C
LEV
ELA
ND
TO
RU
LEV
ILLE
AD
D 2
L89
3.65
893.
65C
ON
3021
00/
1021
55Vi
sion
21
SR
8 F
RO
M B
OLI
VAR
C.L
. TO
RU
LEV
ILLE
AD
D 2
LA
NE
S [I
-36]
5,30
8,22
2.11
9,76
5,07
3.76
CO
N30
4000
/
1052
13S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
ity o
f Ind
iano
la-H
isto
ric B
lues
& S
ceni
c B
ayou
Ped
estri
an W
alk
Con
tiguo
us w
ith D
ownt
own
and
Flet
cher
Par
k.15
1,38
6.96
516,
967.
53C
ON
7010
00/
1063
12P
avem
ent R
ehab
ilita
tion
US
49W
from
Sun
flow
er to
Rul
evill
e [1
0-13
O&
M G
P P
G I-
6]71
,016
.03
2,63
3,30
6.24
CO
N30
1000
/
Cou
nty
Tota
l5,
592,
806.
05
****
****
****
***
Talla
hatc
hie
****
****
****
***
1023
83B
ridge
SR
32
BE
TWE
EN
WE
BB
AN
D C
HA
RLE
STO
N -
Gen
eral
Obl
igat
ion
Bon
d59
3,67
1.94
1,20
1,47
0.61
EN
G10
1000
/
1059
68S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 3
2 AT
TH
E C
N R
AIL
RO
AD
145,
294.
6315
5,07
0.06
EN
G10
1000
/
Cou
nty
Tota
l73
8,96
6.57
****
****
****
***
Tate
****
****
****
***
1002
54S
tate
Pro
ject
sS
R 4
FR
OM
SR
305
TO
MA
RS
HA
LL C
OU
NTY
LIN
E
RO
W&
CO
NS
102
207/
201/
301
50,1
54.7
11,
400,
833.
54E
NG
1000
/
1002
85S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 B
T C
OLD
WAT
ER
& S
EN
ATO
BIA
CO
NS
102
251/
301
6,06
2.89
1,34
3,05
9.64
EN
G10
00/
1002
85S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 B
T C
OLD
WAT
ER
& S
EN
ATO
BIA
CO
NS
102
251/
301
8,12
2.90
974,
113.
31R
OW
1200
/
1002
85S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 B
T C
OLD
WAT
ER
& S
EN
ATO
BIA
56.0
04,
873,
118.
02R
OW
2000
/
1002
85S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 B
T C
OLD
WAT
ER
& S
EN
ATO
BIA
4,23
5,30
9.72
4,25
4,70
6.13
CO
N30
2000
/
1002
85S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
S 5
1 B
T C
OLD
WAT
ER
& S
EN
ATO
BIA
1,30
1.64
7,05
5,11
8.37
CO
N30
3000
/
1013
76G
amin
gS
R 4
FR
OM
US
61
TO I-
55
R
OW
101
184/
1000
CO
NS
101
184/
301
724.
891,
118,
437.
96E
NG
2000
/
1020
98N
atio
nal H
ighw
ay S
yste
m(N
HS
)I5
5 C
ON
STR
UC
T TR
UC
K S
CA
LES
IN P
AN
OLA
CO
UN
TY12
.00
3,84
3.06
EN
G10
2000
/
1020
98N
atio
nal H
ighw
ay S
yste
m(N
HS
)I5
5 C
ON
STR
UC
T TR
UC
K S
CA
LES
IN P
AN
OLA
CO
UN
TY16
,571
.72
23,8
88.7
8R
OW
2020
00/
1022
07S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)
SR
4 F
RO
M S
R 3
05 T
O M
AR
SH
ALL
C/L
STP
-FY
00(0
01)
527.
2652
9,44
7.79
RO
W20
1000
/
1033
18B
ridge
SR
305
FR
OM
SR
4 T
O T
HE
DE
SO
TO C
L B
R N
OS
. 1.4
, 1.5
, 1.6
, 2.0
, 8.5
100,
919.
261,
386,
311.
94E
NG
1010
00/
1033
18Vi
sion
21
SR
305
FR
OM
SR
4 T
O T
HE
DE
SO
TO C
L B
R N
OS
. 1.4
, 1.5
, 1.6
, 2.0
, 8.5
153,
024.
9484
1,51
1.10
RO
W20
1000
/
1033
18Vi
sion
21
SR
305
FR
OM
SR
4 T
O T
HE
DE
SO
TO C
L B
R N
OS
. 1.4
, 1.5
, 1.6
, 2.0
, 8.5
4,
666,
419.
809,
724,
894.
18C
ON
3010
00/
1033
30Vi
sion
21
SR
3 F
RO
M T
HE
PA
NO
LA C
L TO
TH
E T
UN
ICA
CL
[BR
IDG
E #
s 18
1.6,
181
.9, 1
83.8
& 1
84.2
] 188,
299.
5521
7,81
7.40
EN
G10
1000
/
1033
61B
ridge
Br R
epl-S
R4-
Ark
abut
la C
k an
d R
elie
f-Br N
os 3
5.1
& 3
5.7
1,
226,
318.
176,
409,
236.
64C
ON
3010
00/
1034
05P
avem
ent R
ehab
ilita
tion
I-55
FRO
M P
AN
OLA
CO
UN
TY L
INE
TO
DE
SO
TO C
OU
NTY
LIN
E -
CO
NC
RE
TE R
EH
AB
14,3
72,7
64.0
118
,401
,658
.54
CO
N30
1000
/
1053
35B
ridge
US
51 R
EP
LAC
E B
RID
GE
#27
8.3
86,9
29.9
232
2,54
4.56
EN
G10
2000
/
1053
35B
ridge
US
51
RE
PLA
CE
BR
IDG
E -
Gen
eral
Obl
igat
ion
Bon
d P
roje
ct96
,339
.89
289,
106.
95E
NG
1030
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
40
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Tate
****
****
****
***
1057
91In
ters
tate
I-55
From
The
Pan
ola
Cou
nty
Line
To
The
Des
oto
Cou
nty
Line
169,
166.
682,
367,
998.
37C
ON
3010
00/
1064
15S
afet
yR
oadw
ay W
eath
er In
form
atio
n S
yste
ms
Inst
alla
tions
153,
712.
2115
3,71
2.21
CO
N30
2000
/
1066
82S
tate
Pro
ject
sC
ity o
f Sen
atob
ia65
9.75
659.
7579
9000
/
Cou
nty
Tota
l25
,533
,397
.91
****
****
****
***
Tipp
ah**
****
****
****
*
1016
31Vi
sion
21
SR
15 F
rom
Uni
on c
l to
1 m
i N o
f SR
4 @
Rip
ley
1,00
9,10
0.46
3,78
1,48
7.23
EN
G10
00/
1016
31Vi
sion
21
SR
15
FRO
M 1
.7 M
ILE
S N
OR
TH O
F TH
E U
NIO
N C
L TO
1 M
ILE
NO
RTH
OF
SR
4 &
RIP
LEY 8
92,3
17.3
619
,009
,776
.12
RO
W20
1000
/
1016
32Vi
sion
21
SR
15
FRO
M 1
MIL
E N
OR
TH O
F S
R 4
TO
NO
RTH
CO
RP
LIM
IT O
F FA
LKN
ER
213,
102.
913,
786,
169.
89E
NG
1000
/
1016
32Vi
sion
21
SR
15 fr
m 1
mile
N o
f SR
4 to
N o
f Fal
kner
566,
232.
1667
8,81
3.78
EN
G10
1000
/
1016
32Vi
sion
21
SR
15
FRO
M 1
MIL
E N
OF
SR
4 T
O N
OF
FALK
NE
R [1
0-13
STI
P A
men
d #2
4]46
9,10
6.74
19,1
14,5
43.1
6R
OW
2010
00/
1040
98S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
R 1
5: R
EP
L B
OX
CU
LV 1
.2 M
I S O
F U
S 7
239
1.12
87,6
81.4
7E
NG
1010
00/
1056
28S
tate
Pro
ject
sS
outh
Tip
pah
Sch
ool D
istri
ct -
Rep
air a
nd c
onst
ruct
sid
ewal
ks a
long
Mill
Stre
et, S
outh
Firs
t Stre
et, S
outh
Sec
ond
Stre
et, S
outh
Mou
ntai
n S
treet
and
Col
lege
Stre
et.
738.
9273
8.92
7990
00/
1066
85S
tate
Pro
ject
sC
ity o
f Rip
ley-
Mai
n S
treet
-Sid
ewal
ks-R
epai
r and
Con
stru
ctio
n of
Sid
ewal
ks o
n M
ain
Stre
et fr
om a
poi
nt b
etw
een
Hog
hway
15
and
Wes
t 3rd
Stre
et a
nd e
xten
d no
rth to
Eas
t Jef
fers
on S
treet
4,06
2.88
4,06
2.88
7990
00/
1067
47S
tate
Pro
ject
sS
R 1
5 @
Rip
ley
42,8
48.4
942
,848
.49
EN
G10
1000
/
1067
47S
tate
Pro
ject
sS
R 1
5 @
Rip
ley
270,
034.
1327
0,03
4.13
RO
W20
1000
/
1067
47S
tate
Pro
ject
sS
R 1
5 @
Rip
ley
86,3
77.2
886
,377
.28
CO
N30
1000
/
Cou
nty
Tota
l3,
554,
312.
45
****
****
****
***
Tuni
ca**
****
****
****
*
1013
76G
amin
gS
R 4
FR
OM
US
61
TO I-
55-7
24.8
960
1,43
1.69
EN
G10
00/
1059
14U
rban
Tuni
ca C
ount
y B
OS
- G
atew
ay to
the
Blu
es V
isito
r Cen
ter a
nd B
lues
Tra
nspo
rtatio
n M
useu
m.
17,8
81.9
117
,881
.91
CO
N70
1000
/
1059
14S
tate
Pro
ject
sTu
nica
Cou
nty
BO
S -
Gat
eway
to th
e B
lues
Vis
itor C
ente
r and
Blu
es T
rans
porta
tion
Mus
eum
.30
1.42
301.
4279
9000
/
1061
08S
tate
Pro
ject
sS
R 4
Brid
ge R
epla
cem
ent [
Brid
ge #
12.
1]13
,677
.63
13,6
77.6
3E
NG
1010
00/
Cou
nty
Tota
l31
,136
.07
****
****
****
***
Uni
on**
****
****
****
*
1016
30Vi
sion
21
SR
15
FRO
M K
ING
SC
RE
EK
SO
UTH
OF
NE
W A
LBA
NY
TO T
IPPA
H C
.L.
41,5
02.6
14,
730,
501.
17E
NG
1000
/
1016
30Vi
sion
21
SR
15
FRO
M K
ING
S C
R S
OU
TH O
F N
EW
ALB
AN
Y TO
TH
E T
IPPA
H C
L-1
7,46
6.44
16,3
79,6
73.4
1R
OW
2010
00/
1016
30Vi
sion
21
SR
15
FRO
M K
ING
S C
R S
OU
TH O
F N
EW
ALB
AN
Y TO
6 M
ILE
S S
OU
TH O
F TH
E T
IPPA
H C
L 82,2
91.1
722
,684
,356
.91
CO
N30
1000
/
1016
30Vi
sion
21
SR
15
FRO
M 7
MIL
ES
SO
UTH
OF
THE
TIP
PAH
CL
TO T
HE
TIP
PAH
CL
9,32
1,76
2.36
9,59
0,36
3.32
CO
N30
2000
/
1016
30Vi
sion
21
SR
15
FRO
M 6
MIL
ES
SO
UTH
OF
THE
TIP
PAH
CL
TO T
HE
TIP
PAH
CL
[I-2
5] G
ener
al O
blig
atio
n B
ond
Pro
ject
145,
533.
186,
979,
547.
77C
ON
3030
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
41
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Uni
on**
****
****
****
*
1026
07Vi
sion
21
SR
15
PO
NTO
TOC
CL
TO K
ING
S C
R S
. OF
NE
W A
LBA
NY
609.
7030
5,57
8.18
EN
G10
2000
/
1026
07Vi
sion
21
SR
15
Pon
toto
c C
L to
Kin
g's
Cre
ek S
outh
of N
ew A
lban
y98
,512
.79
8,20
8,34
8.49
RO
W20
2000
/
1026
07Vi
sion
21
SR
15
Pon
toto
c C
L to
Kin
g's
Cre
ek S
outh
of N
ew A
lban
y46
7,38
4.14
596,
031.
89R
OW
2021
00/
1040
95N
atio
nal H
ighw
ay S
yste
m(N
HS
)U
S 7
8 FM
E. O
F M
YR
TLE
TO
E. O
F N
EW
ALB
AN
Y1,
578.
971,
046,
707.
40E
NG
1020
00/
1040
95Vi
sion
21
* U
S 7
8 FR
OM
SR
30
TO S
R 1
5 - I
-22
UP
GR
AD
E6,
385,
803.
9318
,994
,887
.53
CO
N30
2000
/
1049
69S
tate
Pro
ject
sU
S 7
8 FR
OM
WE
ST
OF
SR
9 @
BLU
E S
PR
ING
S T
O S
HE
RM
AN
194.
461,
835,
669.
85E
NG
1010
00/
1059
84U
rban
City
of N
ew A
lban
y - R
epla
cing
exi
stin
g cr
oss-
drai
n w
ith a
box
cul
vert,
und
er C
arte
r Ave
nue,
that
lies
bet
wee
n H
WY
78 a
nd S
Cam
p Av
e [1
0-13
STI
P Vo
l 4 IV
-47]
4,29
3.72
106,
146.
36C
ON
7010
00/
1064
11S
tate
Pro
ject
sC
ity o
f New
Alb
any-
Exp
ansi
on o
f exi
stin
g tra
ils a
nd u
pagr
ade
from
5 ft
to 1
0 ft
wid
th
273.
7027
3.70
7990
00/
1066
06S
afet
yU
pgra
de R
R C
ross
ings
on
CR
216
in th
e C
ity o
f Blu
e S
prin
gs D
OT#
667
309U
286.
0828
6.08
CO
N30
6000
/
Cou
nty
Tota
l16
,532
,560
.37
****
****
****
***
Wal
thal
l**
****
****
****
*
1051
27S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)Ty
lerto
wn
- Enh
ance
men
ts to
Tow
n S
quar
e (C
ente
nnia
l Squ
are)
, inc
ludi
ng la
ndsc
apin
g, ir
rigat
ion,
stre
et li
ghtin
g, b
rick/
conc
rete
sid
ewal
ks, b
ench
es a
nd o
ther
impr
ovem
ents
.34
,476
.77
421,
993.
91C
ON
7010
00/
1065
52E
mer
genc
y R
elie
fD
ist 7
Hur
rican
e Is
sac
Em
erge
ncy
Ope
ratio
ns [
3045
68 3
74]
11,1
31.5
211
,131
.52
3740
00/
Cou
nty
Tota
l45
,608
.29
****
****
****
***
War
ren
****
****
****
***
1003
67S
peci
al P
roje
cts(
Dem
o)*
I-20
FRO
M M
ISS
RIV
ER
TH
RU
VIC
KS
BU
RG
- E
AR
MA
RK
21,3
26.2
92,
688,
918.
47E
NG
2000
/
1042
99S
peci
al P
roje
cts(
Dem
o)I-2
0 S
FR
ON
TAG
E R
D E
XTE
NS
ION
TO
US
80
[EA
RM
AR
K M
S 0
51]
884.
1474
9,84
9.36
EN
G10
00/
1042
99S
peci
al P
roje
cts(
Dem
o)*
I-20
SO
UTH
FR
ON
TAG
E R
OA
D E
XTE
NS
ION
TO
US
80
[EA
RM
AR
K M
S 0
51 a
nd M
S 1
85]
3,49
5.81
59,0
53.3
6E
NG
1010
00/
1042
99S
peci
al P
roje
cts(
Dem
o)I-2
0 S
outh
Fro
ntag
e R
d E
xten
sion
to U
S 8
056
,224
.41
5,79
0,43
9.88
RO
W20
1000
/
1061
10S
tate
Pro
ject
sS
R 4
65 B
ridge
Rep
lace
men
t # 1
5.7
3,24
7.68
3,24
7.68
EN
G10
1000
/
1061
75P
avem
ent R
ehab
ilita
tion
I-20
FM M
ISS
ISS
IPP
I RIV
ER
TO
TH
E B
EG
INN
ING
OF
AS
PH
ALT
NE
AR
TH
E R
R B
RID
GE
.
985,
969.
6398
7,54
3.83
CO
N30
1000
/
1062
62N
atio
nal H
ighw
ay S
yste
m(N
HS
)W
arre
n C
ount
y P
ort C
omm
issi
on -
Indu
stria
l Driv
e sl
ope
stab
iliza
tion
and
road
repa
ir fro
m H
aini
ng R
oad
to th
e N
orth
end
of I
ndus
trial
Driv
e fo
r app
rox.
.80
mile
. 1,
478.
981,
313,
416.
39C
ON
7010
00/
1063
97S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi R
iver
Brid
ges
ITS
- TI
GE
R II
I Gra
nt [V
icks
burg
Brid
ge]
2,45
0,33
4.49
2,45
1,03
2.29
CO
N30
1000
/
1064
18S
afet
yU
S 6
1 @
Oak
Rid
ge R
oad
68,8
59.1
811
1,70
0.78
EN
G10
1000
/
1064
18S
afet
yU
S 6
1 @
Oak
Rid
ge R
oad
377,
991.
6537
7,99
1.65
CO
N30
1000
/
1066
59S
tate
Pro
ject
sB
enef
it/C
ost A
naly
sis:
I-20
Brid
ge O
ver M
issi
ssip
pi R
iver
at V
icks
burg
78
,414
.96
78,4
14.9
6E
NG
1010
00/
Cou
nty
Tota
l4,
048,
227.
22
****
****
****
***
Was
hing
ton
****
****
****
***
1003
32S
peci
al P
roje
cts(
Dem
o)G
RE
EN
VIL
LE B
R O
VE
R M
S R
IVE
R O
N U
S 8
223
,270
.71
4,33
7,55
7.70
EN
G10
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
42
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Was
hing
ton
****
****
****
***
1003
32S
tate
Pro
ject
sU
S 8
2 M
issi
ssip
pi R
iver
Brid
ge -
Rep
air o
f Tra
vele
r Rai
l Sys
tem
3,72
6.40
120,
321.
38E
NG
1080
00/
1003
32S
peci
al P
roje
cts(
Dem
o)M
ISS
ISS
IPP
I RIV
ER
BR
IDG
E @
GR
EE
NV
ILLE
- S
UR
FAC
ING
, SIG
NS
, STR
IPIN
G A
ND
DE
MO
LITI
ON
OF
OLD
BR
IDG
E -
MIS
SIS
SIP
PI P
OR
TIO
N2,
046.
5013
,210
,824
.58
CO
N30
6000
/
1003
32Vi
sion
21
US
82
Mis
siss
ippi
Riv
er B
ridge
- R
epai
r of T
rave
ler R
ail S
yste
m1,
813,
450.
461,
813,
450.
46C
ON
3080
00/
1021
34Vi
sion
21
US
82
GV
L B
YPA
SS
FR
MS
RV
R B
R T
O S
R 1
. [E
AR
MA
RK
] N
OTE
P. E
. # IS
100
340/
1000
& 2
000
3,57
9.32
38,4
87,4
23.0
4C
ON
3010
00/
1063
97S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi R
iver
Brid
ges
ITS
- TI
GE
R II
I Gra
nt [G
reen
ville
Brid
ge]
2,11
8,56
6.36
2,11
8,56
6.36
CO
N30
3000
/
1064
10S
tate
Pro
ject
sC
ity o
f Gre
envi
lle -
Rep
air s
idew
alks
at A
rmst
rong
Ele
men
tarty
Sch
ool
149.
8414
9.84
7990
00/
1065
15P
avem
ent R
ehab
ilita
tion
SR
1 F
RO
M S
R 4
54 IN
TER
S. T
O 2
.2 M
ILE
S N
72,5
59.5
21,
596,
036.
81C
ON
3010
00/
1065
32S
tate
Pro
ject
sH
wy
82 a
band
oned
RR
brid
ge re
mov
al in
Lel
and
148,
295.
9614
8,29
5.96
EN
G10
1000
/
1065
60S
tate
Pro
ject
sC
ity o
f Gre
envi
lle -
Reh
abili
tatio
n of
the
Yazo
o &
Mis
siss
ippi
Val
ley
1910
Rai
lroad
Dep
ot.
596.
1659
6.16
7990
00/
1067
61P
avem
ent R
ehab
ilita
tion
US
82
FRO
M M
S R
IVE
R B
RID
GE
TO
GR
EE
NV
ILLE
2,65
9,69
9.66
2,65
9,69
9.66
CO
N30
1000
/
1067
75S
tate
Pro
ject
sC
ity o
f Lel
and
- Mill
& O
verla
y N
orth
Dee
r Cre
ek b
etw
een
Mai
n to
Sou
th B
lvd,
3rd
Stre
et b
etw
een
Mai
n to
Sou
th B
lvd,
4th
Stre
et b
etw
een
Mai
n an
d S
outh
Blv
d an
d 7t
h S
treet
bet
wee
n M
ain
and
Sou
th B
lvd
987.
3898
7.38
7990
00/
Cou
nty
Tota
l6,
846,
928.
27
****
****
****
***
Way
ne**
****
****
****
*
1011
31P
hase
IIU
S 4
5 FR
WIN
CH
ES
TER
TO
EXI
ST
US
84-
Sup
plem
enta
l pm
ts25
,600
.46
44,3
12.5
1R
OW
2010
00/
1011
39P
hase
IIU
S 4
5 FR
OM
STA
TE L
INE
TO
WIN
CH
ES
TER
-2,4
85.0
08,
346,
656.
35R
OW
1000
/
1018
23P
hase
III
US
84
BT
Way
nesb
oro&
Ala
Sta
te li
ne-4
0,01
8.25
4,17
2,32
2.09
RO
W10
00/
1052
54U
rban
City
of W
ayne
sbor
o- P
atto
n C
reek
Brid
ge re
plac
emen
t.2,
228.
6240
3,12
4.92
CO
N70
1000
/
1060
03U
rban
City
of W
ayne
sbor
o - S
prin
g S
treet
Mai
nten
ance
Ove
rlay
from
MS
184
to C
ity L
imits
[10-
13 S
TIP
Vol 4
PG
IV-5
2]4,
921.
5827
1,36
0.50
CO
N70
1000
/
1062
34S
afet
yU
S 4
5 at
Buc
katu
nna
Roa
d
2,06
4.26
90,9
43.2
5E
NG
1010
00/
1062
34S
tate
Pro
ject
sU
S 4
5 at
Buc
katu
nna
Roa
d62
.30
62.3
0E
NG
1020
00/
1065
06E
mer
genc
y R
elie
fU
S 8
4 fro
m 2
mile
s W
est o
f the
Ala
bam
a S
L to
Ala
bam
a S
L91
,103
.61
91,1
03.6
1E
NG
1010
00/
1065
06E
mer
genc
y R
elie
fU
S 8
4 fro
m 2
mile
s W
est o
f the
Ala
bam
a S
L to
Ala
bam
a S
L (W
estb
ound
Onl
y)14
9,00
3.25
172,
516.
06R
OW
2010
00/
1065
06E
mer
genc
y R
elie
fU
S 8
4 fro
m 2
mile
s W
est o
f the
Ala
bam
a S
L to
Ala
bam
a S
L (W
B O
nly)
236.
6323
6.63
CO
N30
1000
/
1065
06E
mer
genc
y R
elie
fU
S 8
4 fro
m 2
mile
s fro
m A
laba
ma
SL
to A
laba
ma.
Wor
k by
Sta
te F
orce
s 30
4743
-301
180,
895.
8419
0,21
0.84
3020
00/
1065
30E
mer
genc
y R
elie
fS
R 1
84 @
Way
nesb
oro
- Slid
e re
pair
53,1
50.3
453
,150
.34
EN
G10
1000
/
1065
34E
mer
genc
y R
elie
fD
ebris
Rem
. Dis
t. 6
Hur
r. Is
aac
2012
[304
567
377]
59,3
74.0
459
,374
.04
3770
00/
Cou
nty
Tota
l52
6,13
7.68
****
****
****
***
Web
ster
****
****
****
***
1017
50P
hase
IIU
S 8
2 FR
.5M
W O
F S
R 1
5 TO
OK
TIB
BE
HA
CL
8,45
9.00
2,19
5,73
4.58
RO
W10
00/
1059
26S
tate
Pro
ject
sTo
wn
of M
ante
e - D
epot
Rel
ocat
ion
and
Ren
ovat
ion.
2,71
5.56
2,71
5.56
7990
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
43
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Web
ster
****
****
****
***
1063
80S
tate
Pro
ject
sVi
llage
of W
alth
all C
ourth
ouse
Squ
are
Impr
ovem
ents
3,25
8.07
3,25
8.07
7990
00/
Cou
nty
Tota
l14
,432
.63
****
****
****
***
Wilk
inso
n**
****
****
****
*
1055
37S
tate
Pro
ject
sH
ospi
talit
y S
tatio
n U
S 6
1 at
Woo
dvill
e6,
675.
7268
,303
.54
EN
G10
2000
/
1055
37S
peci
al P
roje
cts(
Dem
o)**
Hos
pita
lity
Sta
tion
US
61
at W
oodv
ille-
Site
impr
ovem
ents
24
,080
.11
2,45
4,47
0.51
CO
N30
1000
/
1064
34P
avem
ent R
ehab
ilita
tion
US
61
FRO
M J
US
T S
OU
TH O
F B
UFF
ALO
RO
AD
NO
RTH
7.5
9 M
ILE
S
686,
578.
763,
059,
492.
22C
ON
3010
00/
1065
52E
mer
genc
y R
elie
fD
ist 7
Hur
rican
e Is
sac
Em
erge
ncy
Ope
ratio
ns [
3045
68 3
79]
70,4
06.7
070
,406
.70
3790
00/
1066
23E
mer
genc
y R
elie
fS
R 3
3 S
LID
E R
EPA
IR H
UR
R IS
AA
C C
ON
STR
UC
TI (
This
pro
ject
was
ME
P-7
033-
79(0
05)/3
0459
8)88
5,37
7.52
886,
488.
26C
ON
3010
00/
1066
53S
tate
Pro
ject
sU
S 6
1 &
Col
d S
prin
g in
ters
ectio
n 1
mile
Nor
th11
6,38
2.03
117,
744.
50E
NG
1010
00/
1066
53S
tate
Pro
ject
sU
S61
& C
old
Spr
ing
inte
rsec
tion
1mi N
8,89
1.14
8,89
1.14
RO
W20
1000
/
Cou
nty
Tota
l1,
798,
391.
98
****
****
****
***
Win
ston
****
****
****
***
1018
17P
hase
III
SR
25
FR S
R 1
9 TO
NO
XAPA
TER
CR
EE
K
P
E 1
0100
2/10
0012
,455
.68
4,48
0,64
5.12
RO
W10
00/
1059
83U
rban
City
of L
ouis
ville
- M
ill, O
verla
y, S
tripe
and
pro
vide
AD
A up
grad
es to
Col
umbu
s Av
enue
from
Joh
n C
. Ste
nnis
to P
arks
St.
11,1
81.9
419
7,70
6.15
CO
N70
1000
/
Cou
nty
Tota
l23
,637
.62
****
****
****
***
Yalo
bush
a**
****
****
****
*
1025
27B
ridge
SR
32
RE
PLA
CE
5 B
R B
TW O
LD S
R 7
& C
ALH
OU
N C
/L12
6.25
508,
405.
20E
NG
1010
00/
1025
27B
ridge
SR
32
RE
PLA
CE
5 B
R B
TW O
LD S
R 7
& C
ALH
O17
4,17
3.93
1,03
5,38
9.89
CO
N30
1100
/
1033
32S
tate
Pro
ject
sU
S 5
1 B
ridge
Rep
lace
men
t at #
224.
7 Ti
llato
ba C
reek
, 227
.0 N
. Till
atob
a C
reek
, 228
.6 T
ilato
ba C
reek
93,0
19.4
810
5,22
8.17
EN
G10
1000
/
1048
35S
tate
Pro
ject
sG
UA
RD
RA
ILS
- AT
SIT
E #
13
IN Y
ALO
BU
SH
A C
OU
NTY
- 2N
D D
IST
-730
.00
11,3
30.0
0R
OW
2010
00/
1053
38S
tate
Pro
ject
sU
S 5
1 R
EP
LAC
E 5
BR
IDG
ES
5,
669.
955,
669.
95E
NG
1010
00/
1059
18P
avem
ent R
ehab
ilita
tion
I-55
FM S
R 3
30 T
O P
AN
OLA
CL
[10-
13 O
&M
GP
PG
I-6]
201
1 IM
D E
arm
ark
$2M
11,0
42,2
92.1
912
,148
,358
.91
CO
N30
1000
/
1063
69P
avem
ent R
ehab
ilita
tion
Hw
y. 5
1 - G
rena
da C
o. L
ine
to T
illat
oba
14,9
15.2
01,
797,
036.
37C
ON
3010
00/
1067
97S
tate
Pro
ject
sU
S 5
1 B
etw
een
MS
330
& M
S 3
2(B
R#2
27.6
)9,
587.
089,
587.
08E
NG
1010
00/
1067
97S
tate
Pro
ject
sU
S 5
1 B
etw
een
MS
330
& M
S 3
2 (B
RID
GE
RE
PLA
CE
ME
NT
#227
.6)
190,
279.
8319
0,27
9.83
CO
N30
1000
/
Cou
nty
Tota
l11
,529
,333
.91
****
****
****
***
Yazo
o**
****
****
****
*
1033
21B
ridge
SR
433
@ B
LUFF
CR
EE
K &
PIN
EY
CR
EE
K T
RIB
UTA
RY
BR
NO
. 15.
782
,314
.77
1,57
0,49
7.67
EN
G10
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
44
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Yazo
o**
****
****
****
*
1033
21B
ridge
SR
433
RE
PLA
CE
3 B
RID
GE
S 1
5.7,
17.
4 ,1
9.1
69,5
49.2
626
8,88
6.69
RO
W20
1000
/
1033
21Vi
sion
21
SR
433
RE
PLA
CE
3 B
RID
GE
S #
s 15
.7, 1
7.4
,19.
120
0,17
3.66
200,
173.
66C
ON
3010
00/
1052
34S
afet
yC
ross
ing
at S
R 4
33,B
ento
nia,
Yazo
o C
ount
y47
1.41
93,3
30.9
5C
ON
3010
00/
1061
76P
avem
ent R
ehab
ilita
tion
I-55
FM M
AD
ISO
N C
L TO
HO
LME
S C
L N
OR
THB
OU
ND
LA
NE
S O
NLY
1,
490,
270.
451,
490,
270.
45C
ON
3010
00/
1064
17S
afet
yI-5
5 C
able
Bar
rier
73,7
42.9
51,
276,
255.
51C
ON
3010
00/
Cou
nty
Tota
l1,
916,
522.
50
****
****
****
***
Dis
tric
twid
e - D
istr
ict 1
****
****
****
***
1038
12P
avem
ent R
ehab
ilita
tion
VAR
IOU
S R
TES
IN D
IST
1 - P
RE
VE
NTI
VE
MTC
E5,
924.
3988
5,60
7.19
EN
G10
1000
/
1066
41P
avem
ent R
ehab
ilita
tion
DIS
TRIC
T W
IDE
RA
ISE
D P
AVE
ME
NT
MA
RK
ER
244,
906.
4224
4,90
6.42
CO
N30
1000
/
1066
47B
ridge
Brid
ge J
oint
Rep
air -
Dis
trict
154
7,66
0.16
547,
660.
16C
ON
3050
00/
Cou
nty
Tota
l79
8,49
0.97
****
****
****
***
Dis
tric
twid
e - D
istr
ict 2
****
****
****
***
1047
54S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)R
AIS
ED
PAV
EM
EN
T M
AR
KE
RS
- D
ISTR
ICT
246
2.30
230,
649.
95C
ON
3040
00/
1047
54P
avem
ent R
ehab
ilita
tion
RA
ISE
D P
AVE
ME
NT
MA
RK
ER
S -
DIS
TRIC
T 2
- FY
2012
[1
0-13
O &
M G
P P
G I-
6]1,
746.
5044
1,49
9.13
CO
N30
5000
/
1058
19In
ters
tate
I55-
Roa
dway
NB
&S
B-L
ands
cape
-3
50.5
115
8,87
4.82
CO
N30
1100
/
1064
20P
avem
ent R
ehab
ilita
tion
Dis
trict
Tw
o D
istri
ct W
ide
Stri
ping
30,6
52.9
560
0,38
6.02
CO
N30
1000
/
1064
63S
tate
Pro
ject
sM
S P
ortio
n of
the
Sou
ther
n G
atew
ay S
tudy
-208
,849
.24
0.00
EN
G10
1000
/
1066
47B
ridge
Brid
ge J
oint
Rep
air -
Dis
trict
234
4,68
6.78
344,
686.
78C
ON
3060
00/
Cou
nty
Tota
l16
8,34
8.78
****
****
****
***
Dis
tric
twid
e - D
istr
ict 3
****
****
****
***
1066
47B
ridge
Brid
ge P
reve
ntat
ive
Mai
nten
ance
Dis
trict
343
3,72
6.91
433,
726.
91C
ON
3020
00/
Cou
nty
Tota
l43
3,72
6.91
****
****
****
***
Dis
tric
twid
e - D
istr
ict 5
****
****
****
***
1050
28P
avem
ent R
ehab
ilita
tion
D 5
- P.
E. F
OR
DIS
TRIC
TWID
E P
M P
RO
JEC
TS2,
069,
587.
169,
390,
735.
75E
NG
1010
00/
1052
49S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
TATE
WID
E T
RA
FFIC
STU
DIE
S/S
IGN
AL
INV
EN
TOR
Y - N
EW
TON
AN
D N
ES
HO
BA
CO
UN
TIE
S 2,90
5.62
99,9
61.0
7E
NG
1530
00/
1064
74S
tate
Pro
ject
sS
IGN
AL
INV
EN
TOR
Y11
2,79
0.96
166,
025.
48E
NG
1010
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
45
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
Dis
tric
twid
e - D
istr
ict 5
****
****
****
***
1066
47B
ridge
Brid
ge J
oint
Rep
air o
n 13
brid
ges-
Dis
trict
537
4,10
9.09
374,
109.
09C
ON
3040
00/
Cou
nty
Tota
l2,
559,
392.
83
****
****
****
***
Dis
tric
twid
e - D
istr
ict 6
****
****
****
***
1064
13P
avem
ent R
ehab
ilita
tion
Chi
p S
eal V
ario
us R
oute
s in
Dis
trict
617
,092
.82
8,65
2,88
6.43
CO
N30
1000
/
1064
95S
tate
Pro
ject
sS
ign
Trus
s In
spec
tion-
Hur
rican
e Is
sac
9,65
8.41
176,
591.
73E
NG
1010
00/
1064
95S
tate
Pro
ject
sS
ign
Trus
s R
epla
cem
ent-H
urric
ane
Issa
c33
9,43
6.21
360,
442.
28E
NG
1020
00/
Cou
nty
Tota
l36
6,18
7.44
****
****
****
***
Dis
tric
twid
e - D
istr
ict 7
****
****
****
***
1066
47B
ridge
Brid
ge J
oint
Rep
air -
Dis
trict
743
4,48
4.87
434,
484.
87C
ON
3030
00/
Cou
nty
Tota
l43
4,48
4.87
****
****
****
***
STAT
EWID
E**
****
****
****
*
1017
16P
hase
III
PU
RC
HA
SE
LA
ND
TO
BE
US
ED
AS
WE
TLA
ND
BA
NK
9,70
5.15
647,
712.
76R
OW
1000
/
1034
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
TATE
WID
E W
ETL
AN
DS
BA
NK
- R
ED
CR
EE
K T
RA
CT
401,
516.
778,
423,
016.
77R
OW
2020
00/
1034
21S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
TATE
WID
E W
ETL
AN
DS
BA
NK
- B
UTT
AH
ATA
CH
IE T
RA
CT
- MO
NR
OE
CO
UN
TY2,
196.
1513
,327
,312
.65
RO
W20
3000
/
1037
76S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
SFW
S R
EIM
BU
RS
AB
LE M
DO
T P
OS
ITIO
N10
2,39
6.00
1,06
1,09
2.00
EN
G10
1000
/
1039
26S
afet
yS
AFE
TY A
NA
LYS
IS S
YS
TEM
- FU
ND
ED
W/ .
08B
AC
INC
EN
TIV
E G
RA
NT
THR
U F
HW
A Q
0827
7,70
5.91
3,13
1,13
1.47
EN
G10
1000
/
1039
79O
ther
US
GS
INV
ES
TIG
ATE
WAT
ER
RE
SO
UR
CE
S28
5,11
0.00
570,
220.
0011
1000
/
1040
86S
peci
al P
roje
cts(
Dem
o)FY
201
0 A
CS
Sta
te &
Loc
al S
olut
ions
for t
he e
-filin
g an
d au
dit s
yste
m fo
r Pet
role
um T
axes
55,4
37.5
135
0,31
1.40
3030
00/
1041
03S
tate
Pro
ject
sP
UB
LIC
AFF
AIR
S R
IDE
S P
rogr
am F
Y 20
11-2
015
7,00
0.00
669,
637.
17E
NG
1030
00/
1041
13O
ther
DB
E &
SU
PP
OR
TIV
E S
ER
VIC
ES
FFY
201
331
3,83
6.14
521,
564.
5710
8000
/
1043
13S
afet
y N
HTS
A A
CTI
VIT
IES
BY
GO
VE
RN
OR
'S S
AFE
6,69
7.68
945,
040.
00E
NG
1010
00/
1046
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)P
RO
GR
AM
MA
NA
GE
ME
NT
AN
D C
OO
RD
INAT
ION
- IT
S IN
TER
GR
ATO
R -
INTE
LLIG
EN
T TR
AN
S S
YS
CO
NTR
AC
T TA
SK
136
5,06
6.52
3,14
7,34
8.75
EN
G10
1000
/
1046
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)D
EV
ELO
P C
ON
CE
PT
OF
OP
ER
ATIO
NS
-- IT
S IN
TER
GR
ATO
R -
INTE
LLIG
EN
T TR
AN
S S
YS
1,42
6.57
165,
184.
56E
NG
1040
00/
1046
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)D
EFI
NE
SY
STE
M R
EQ
UIR
EM
EN
TS --
ITS
INTE
RG
RAT
OR
- IN
TELL
IGE
NT
TRA
NS
SY
S11
,620
.67
305,
752.
56E
NG
1060
00/
1046
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)D
ES
IGN
MD
OT'
S A
TMS
SO
FTW
AR
E --
ITS
INTE
RG
RAT
OR
- IN
TELL
IGE
NT
TRA
NS
SY
S43
5,75
3.42
2,04
6,57
8.58
EN
G10
7000
/
1046
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)P
RO
VID
E T
MC
RE
VIE
W --
ITS
INTE
RG
RAT
OR
- IN
TELL
IGE
NT
TRA
NS
SY
S32
1,18
1.88
2,74
6,04
0.09
EN
G10
8000
/
1046
51S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)IT
S F
IELD
DE
VIC
E D
ES
IGN
& S
PE
CIF
ICAT
ION
S --
ITS
INTE
RG
RAT
OR
- IN
TELL
IGE
NT
TRA
NS
SY
S19
8,23
0.99
3,83
0,52
7.77
EN
G11
0000
/
1046
52S
afet
yP
RO
JEC
T M
AN
AG
EM
EN
T C
ON
TRA
CT
FOR
SA
FE R
OU
TES
TO
SC
HO
OL
- SA
FETE
A-L
U10
,724
.00
471,
616.
00E
NG
1010
00/
1048
24S
peci
al P
roje
cts(
Dem
o)N
ATC
HE
Z TR
AC
E C
OM
PAC
T 71
,323
.45
175,
689.
0570
5000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
46
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1049
34S
peci
al P
roje
cts(
Dem
o)LT
AP
BY
CY
2009
31,1
41.9
128
0,30
6.74
EN
G10
3000
/
1049
34S
peci
al P
roje
cts(
Dem
o)LT
AP
BY
CY
2010
137,
937.
6427
6,12
5.21
EN
G10
4000
/
1049
34S
peci
al P
roje
cts(
Dem
o)LT
AP
BY
CY
2012
Pro
gram
at M
S C
ente
r for
Tec
h Tr
ansf
er a
t JS
U12
,738
.45
130,
410.
21E
NG
1060
00/
1050
05O
ther
MS
08(0
01)M
DW
FP R
EC
TR
AIL
S P
RO
GR
AM
(net
pai
d to
MD
WFP
)41
4,69
9.00
2,58
4,11
6.00
CO
N30
2000
/
1050
05O
ther
MS
10(0
01) M
issi
ssip
pi D
epar
tmen
t of W
ildlif
e Fi
sher
ies
& P
arks
Rec
Tra
ils P
rogr
am46
6,80
2.00
774,
038.
00C
ON
3030
00/
1050
05O
ther
FY 1
1 M
issi
ssip
pi W
ildlif
e Fi
sher
ies
and
Par
ks R
ecre
atio
nal T
rails
Pro
gram
241,
568.
001,
334,
740.
00C
ON
3040
00/
1050
05O
ther
FY 1
2 M
issi
ssip
pi W
ildlif
e Fi
sher
ies
and
Par
ks R
ecre
atio
nal T
rails
Pro
gram
29,1
52.0
029
,152
.00
CO
N30
5000
/
1050
11O
ther
FY11
Nat
. Sum
mer
Tra
ns. I
nstit
ute
(NS
TI) -
Jac
kson
Sta
te U
nive
rsity
.3,
355.
008,
630.
75E
NG
1100
00/
1050
11O
ther
Nat
. Sum
mer
Tra
ns. I
nstit
ute
(NS
TI) -
Alc
orn
Sta
te U
nive
rsity
59,1
41.7
359
,141
.73
EN
G11
4000
/
1050
11S
peci
al P
roje
cts(
Dem
o)N
at. S
umm
er T
rans
. Ins
titut
e (N
STI
) - J
acks
on S
tate
Uni
vers
ity47
,893
.41
47,8
93.4
1E
NG
1150
00/
1050
11S
peci
al P
roje
cts(
Dem
o)N
at. S
umm
er T
rans
. Ins
titut
e (N
STI
) - M
SU
54,4
36.6
054
,436
.60
EN
G11
6000
/
1050
23S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
EN
G F
OR
QC
/QA
SIG
NIN
G P
LAN
S5,
168.
7097
,814
.60
EN
G10
4000
/
1050
23S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
EN
G F
OR
QC
/QA
PLA
NS
26,9
29.9
499
,333
.77
EN
G10
5000
/
1050
23S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
EN
G F
OR
QC
/QA
PLA
NS
- S
igni
ng P
lans
36,7
66.1
936
,766
.19
EN
G10
6000
/
1050
23S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
EN
G F
OR
QC
/QA
PLA
NS
- Q
C/Q
A of
Sig
ning
Pla
ns a
nd S
hop
Dra
win
gs
39,4
83.3
839
,483
.38
EN
G10
7000
/
1050
23S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
EN
G F
OR
QC
/QA
PLA
NS
54,8
27.0
854
,827
.08
EN
G10
8000
/
1050
48S
peci
al P
roje
cts(
Dem
o)Im
plem
ent C
orrid
or M
anag
emen
t Pla
n-Lo
wer
MS
Gre
at R
iver
Roa
d - Y
ear 2
2,10
0.00
21,9
81.8
0E
NG
7120
00/
1050
81S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)M
S D
evel
opm
ent A
uth.
& M
S B
lues
Com
m. -
Cou
ntry
Mus
ic T
rails
.[V-2
3]69
,104
.92
637,
744.
12C
ON
7020
00/
1052
49S
tate
Pro
ject
sTr
affic
Sig
nal S
tand
ards
(Pha
se 1
) Sta
tew
ide.
49,8
89.1
498
,707
.14
EN
G11
4000
/
1052
49S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
STU
DIE
S4,
559.
7985
,272
.47
EN
G14
6000
/
1052
49S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
STU
DIE
S7,
655.
8187
,657
.91
EN
G14
8000
/
1052
49S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
TATE
WID
E T
RA
FFIC
STU
DIE
S -
Qua
rterly
Upd
ates
to th
e P
oste
d W
eigh
t Brid
ge S
igni
ng P
lans 30
,901
.13
100,
222.
71E
NG
1520
00/
1052
49S
tate
Pro
ject
sS
TATE
WID
E T
RA
FFIC
STU
DIE
S -
Dev
elop
men
t of S
igni
ng p
lans
for t
he M
S 5
11 S
yste
m17
,277
.75
70,3
25.7
6E
NG
1560
00/
1052
49S
tate
Pro
ject
sQ
uarte
rly U
pdat
es to
Pos
ted
Wei
ght B
ridge
Sig
ning
Pla
ns41
,468
.88
41,4
68.8
8E
NG
1590
00/
1053
19O
ther
Sta
tew
ide
Inve
ntor
y an
d In
spec
tion
of B
ridge
s - P
E -
3 Ye
ar P
rogr
am.
2,78
1,34
1.82
6,80
6,64
9.84
EN
G10
1000
/
1053
24B
ridge
Sta
tew
ide
Und
erw
ater
Brid
ge In
spec
tions
16
7,84
0.10
167,
840.
10E
NG
1020
00/
1053
95S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)C
OR
P O
F E
NG
INE
ER
S R
EIM
BU
RS
AB
LE M
DO
T P
OS
ITIO
N12
6,33
0.00
586,
883.
36E
NG
1010
00/
1054
21S
tate
Pro
ject
sM
DO
T S
uppo
rt fo
r LPA
pro
ject
s S
tate
wid
e46
9,84
2.03
2,73
4,04
9.00
EN
G71
1000
/
1054
21S
tate
Pro
ject
sM
DO
T S
uppo
rt fo
r LPA
pro
ject
s S
tate
wid
e14
,095
.49
43,5
57.8
1R
OW
7200
00/
1056
92S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)IT
S M
AIN
TEN
AN
CE
& S
IGN
ALS
201
1 - 2
013
148,
930.
1514
8,93
0.15
EN
G10
2000
/
1056
92S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)IT
S M
AIN
TEN
AN
CE
& S
UP
PO
RT
SE
RV
ICE
S (R
epai
r Wor
k)45
,738
.00
45,7
38.0
0E
NG
1021
00/
1057
61S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)S
tate
wid
e TM
C O
pera
tions
187,
554.
353,
779,
966.
26E
NG
1010
00/
1057
62S
peci
al P
roje
cts(
Dem
o)S
tate
wid
e 51
122
8,04
7.13
479,
681.
5030
1000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
47
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1057
62S
peci
al P
roje
cts(
Dem
o)S
tate
wid
e 51
1 - S
witc
h Fe
es
577.
693,
801.
8730
2000
/
1057
62S
peci
al P
roje
cts(
Dem
o)S
tate
wid
e 51
1- P
ublic
Edu
catio
n10
6,03
5.91
106,
035.
9130
3000
/
1058
23S
tate
Pro
ject
s
Cra
sh D
ata
Cle
ansi
ng C
ontra
ctor
s FF
Y 20
11 D
PS
11-
HE
-417
5 Lu
mp
sum
gra
nt49
0,42
5.19
1,00
7,87
2.38
EN
G10
1000
/
1058
23S
tate
Pro
ject
sC
rash
Dat
a C
lean
sing
Con
tract
ors
FFY
2010
DP
S 1
0-H
E-4
175
Lum
p su
m g
rant
-201
,690
.58
201,
993.
15E
NG
1030
00/
1058
41S
tate
Pro
ject
sS
TOR
M W
ATE
R M
AN
AG
EM
EN
T R
EV
IEW
AN
D C
OM
PLI
AN
CE
STA
TEW
IDE
2,39
7,92
4.04
7,73
2,22
6.28
EN
G10
1000
/
1058
88S
tate
Pro
ject
sU
pdat
e R
WD
Man
ual T
o C
urre
nt A
AS
HTO
Std
s47
,279
.45
229,
127.
38E
NG
1010
00/
1059
75S
afet
yS
trate
gic
Hig
hway
Saf
ety
Pla
n up
date
or S
HS
P up
date
.7,
064.
8013
6,19
9.48
EN
G10
1000
/
1060
00O
ther
FY11
-12
SP
R P
LAN
NIN
G F
EA
SIB
ILIT
Y S
TUD
IES
585.
281,
249,
296.
2011
0000
/
1060
71S
tate
Pro
ject
sTr
affic
Mon
itorin
g S
yste
ms
FY20
1359
6.00
299,
854.
8010
3000
/
1060
71S
tate
Pro
ject
sTr
affic
Mon
itorin
g S
yste
ms
FY20
1469
,054
.00
69,0
54.0
010
4000
/
1060
79S
tate
Pro
ject
sD
evel
op R
WD
Sta
ndar
d D
raw
ings
255.
8087
,311
.60
EN
G10
1000
/
1062
32A
dmin
Pro
ject
MA
GIC
Impl
emen
tatio
n89
4,67
3.72
1,64
2,63
0.15
1020
00/
1062
43B
ridge
LRFD
Des
ign
Che
ck o
f Box
Cul
verts
783,
088.
6782
0,95
8.01
EN
G10
1000
/
1062
44S
tate
Pro
ject
sM
isc
Sur
vey
Wor
k S
tate
wid
e.7,
567.
8794
,720
.32
RO
W20
1000
/
1062
48S
tate
Pro
ject
sP
rep
of C
ost/B
enef
it A
naly
sis/
Eco
nom
ic P
lans
17,7
42.2
013
4,34
2.79
EN
G10
1000
/
1062
48S
tate
Pro
ject
sP
rep
of C
ost/B
enef
it A
naly
sis/
Eco
n P
lans
201
349
,235
.46
55,1
67.0
9E
NG
1020
00/
1062
48S
tate
Pro
ject
sP
rep
of C
ost/B
enef
it A
naly
sis/
Eco
n P
lans
14,0
23.0
414
,023
.04
EN
G10
3000
/
1062
51S
tate
Pro
ject
sS
W U
tility
Pro
cess
Eva
luat
ion
1,11
9.77
64,4
37.5
5R
OW
2010
00/
1062
63S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)E
PA S
taff
Pos
ition
- E
nv P
lann
ing
[10-
13 O
& M
GP
PG
I-6]
486,
253.
0048
6,25
3.00
EN
G10
00/
1062
66O
ther
FY12
SP
R R
ES
EA
RC
H S
S20
8 E
FFE
CT
OF
CO
AR
SE
AG
GR
EG
ATE
CLE
AN
LIN
ES
S9,
801.
4427
,886
.49
1310
00/
1062
66O
ther
FY12
SP
R R
ES
EA
RC
H S
S23
8 E
VAL
CR
US
HE
D C
ON
CR
ETE
80,6
56.4
680
,656
.46
1600
00/
1063
03S
tate
Pro
ject
sC
onst
ruct
ion
Aca
dem
y Tr
aini
ng M
ater
ials
236,
861.
6738
8,31
6.38
EN
G10
1000
/
1063
19O
ther
FY12
Hat
tiesb
urtg
MP
O U
rban
ized
Are
a TR
AN
SIT
Met
ro P
lann
ing
60,3
41.0
160
,341
.01
1020
00/
1063
20O
ther
FY12
Gul
f Coa
st M
PO
Urb
aniz
ed A
rea
TRA
NS
IT M
etro
Pla
nnin
g86
,886
.00
269,
640.
0010
2000
/
1063
24O
ther
Cra
sh E
dit T
ool
87,9
22.7
518
7,82
3.25
1010
00/
1063
43U
rban
Jack
son
MP
O -
Traf
fic R
efle
ctiv
ity P
rogr
am. M
PO
Pla
nnin
g A
rea
incl
udin
g H
inds
, Ran
kin
and
Mad
ison
Cou
ntie
s4,
253.
0054
,261
.40
CO
N70
1000
/
1063
97S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi R
iver
Brid
ges
ITS
- TI
GE
R II
I Gra
nt7,
533.
3046
0,65
8.86
EN
G10
1000
/
1063
97S
peci
al P
roje
cts(
Dem
o)M
issi
ssip
pi R
iver
Brid
ges
ITS
- S
oftw
are,
Inte
grat
ion
and
Ope
ratio
nal P
rogr
ams.
280,
322.
5928
0,32
2.59
CO
N30
5000
/
1064
22S
tate
Pro
ject
sH
ydra
ulic
Rev
iew
s64
,240
.51
138,
895.
72E
NG
1010
00/
1064
23S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)In
dian
Mou
nd T
rail
56,6
55.2
856
,655
.28
EN
G10
1000
/
1064
23S
tate
Pro
ject
sIn
dian
Mou
nd T
rail
6,62
1.09
6,62
1.09
7990
00/
1064
31B
ridge
Sei
smic
brid
ge d
esig
n, m
anua
ls/tr
aini
ng16
3,62
8.99
182,
046.
20E
NG
1010
00/
1064
31S
tate
Pro
ject
sB
ridge
Hyd
raul
ics
Man
ual
111,
907.
2011
1,90
7.20
EN
G10
5000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
48
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1064
32S
afet
yS
afet
y C
lass
for L
ocal
Roa
d O
wne
rs65
,612
.74
147,
197.
64E
NG
1010
00/
1064
45S
peci
al P
roje
cts(
Dem
o)TR
AC
/Rid
es P
rogr
am O
JT/S
uppo
rt36
,268
.53
36,2
68.5
310
3000
/
1064
45S
peci
al P
roje
cts(
Dem
o)20
14 T
RA
C/R
ides
Pro
gram
OJT
/Sup
port
101,
322.
6410
1,32
2.64
1040
00/
1064
60A
dmin
Pro
ject
- C
apita
l Out
lay
Eqt
FY13
-14
SP
R P
LAN
NIN
G A
DM
IN E
QU
IPM
EN
T20
9,14
1.96
210,
241.
8610
1000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G M
etro
polit
an P
lann
ing
Org
aniz
atio
n M
PO
80,8
54.0
014
4,07
9.71
1020
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G M
PO
OP
ER
ATIO
N A
SS
ISTA
NC
E10
5,83
9.39
150,
339.
8710
3000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G A
DM
IN (W
P, B
UD
GE
T, S
TRA
PLA
N)
310,
218.
4656
7,05
1.24
1040
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G IN
TELL
IGE
NT
TRA
NS
PO
RTA
TIO
N S
YS
TEM
S19
,983
.27
30,8
64.0
810
6000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G IN
STI
TUTE
OF
TRA
DE
& T
RA
NS
PO
RTA
TIO
N-2
85.5
00.
0010
7000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G F
ED
HW
Y IN
ITIA
TIV
ES
(CO
F, N
HI..
ETC
)26
7,22
3.20
275,
366.
1210
8000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G P
LN D
IV IN
FOR
MAT
ION
SY
STE
MS
(IS
LR
P)
17,3
57.5
364
,879
.32
1090
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G F
EA
SIB
ILIT
Y S
TUD
IES
403,
441.
4692
1,40
4.48
1100
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G T
RA
FFIC
OFF
ICE
1,07
0,29
8.69
1,52
0,77
9.75
1110
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G T
RA
FFIC
FIE
LD1,
251,
779.
081,
986,
113.
1711
2000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G T
RA
FFIC
CO
UN
TIN
G C
MP
DD
90,4
98.5
912
9,07
0.59
1121
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G T
RA
FFIC
CO
UN
TIN
G G
RP
C88
,480
.00
128,
970.
0011
2200
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G -
Inst
all s
even
(7) p
erm
anen
t tra
ffic
coun
ters
512,
625.
0351
2,62
5.03
CO
N11
2300
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G N
OIS
E S
TUD
IES
38,7
10.1
159
,840
.62
1130
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G A
IR Q
UA
LITY
30,9
97.2
662
,548
.43
1140
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G30
4,66
6.24
437,
188.
0611
5000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G A
PPA
LAC
HIA
N R
EG
ION
AL
CO
MM
ISS
ION
40,9
20.0
041
,215
.00
1160
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G M
AP
PIN
G32
2,28
9.33
497,
424.
1311
7000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G L
ON
G R
AN
GE
TR
AN
SP
OR
TATI
ON
PLA
N16
,128
.98
116,
395.
8211
8000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G V
ISIO
N 2
126
0.30
260.
3011
9000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G S
TATE
WID
E T
RA
NS
PO
RTA
TIO
N P
LAN
3,75
0.46
30,6
07.8
812
0000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G G
IS50
6,60
6.30
576,
489.
1312
1000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G L
RS
246,
004.
8642
6,81
4.94
1211
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G R
OU
TE C
LAS
SIF
ICAT
ION
81,7
13.8
213
4,42
3.51
1220
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G IS
LO
NG
RA
NG
E P
LAN
29,0
83.7
929
,083
.79
1230
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G S
TATI
STI
CS
BO
OK
(ES
TIM
ATE
)1,
619.
013,
181.
0112
4000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G D
ATA
BA
SE
MA
NA
GE
ME
NT
679,
663.
901,
083,
575.
2512
6000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G F
IELD
INV
EN
TOR
Y21
3,04
9.43
358,
282.
5112
7000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G H
IGH
WAY
PE
RFO
RM
AN
CE
MA
NA
GE
ME
NT
SY
S10
1,28
5.74
207,
121.
2712
8000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
49
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G N
CH
RP
TRB
& O
THE
R D
UE
S18
,000
.00
18,0
00.0
012
9000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G F
INA
NC
IAL
RE
PO
RTI
NG
82,1
35.7
113
5,60
2.06
1300
00/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G F
UE
L TA
X R
EP
OR
TIN
G19
,501
.95
36,9
14.8
913
2000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G T
ITLE
VI
961.
952,
478.
9313
3000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G B
ICY
CLE
TR
AIL
S10
,877
.32
16,6
92.3
513
4000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G S
CE
NIC
BY
WAY
S12
,997
.11
21,8
65.2
613
5000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G J
AC
KS
ON
STA
TE/L
TAP
/SP
R M
ATC
H P
RO
G33
3,47
7.46
481,
018.
1613
6000
/
1064
60O
ther
FY13
-14
SP
R P
LAN
NIN
G M
ULT
IMO
DA
L S
TUD
IES
539,
150.
6157
0,38
0.40
1370
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H IM
PLE
ME
NTA
TIO
N O
F P
RO
JEC
TS11
8,06
8.57
413,
516.
0810
2000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H T
EC
HN
OLO
GY
TRA
NS
FER
25,2
29.2
312
3,44
0.89
1030
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H P
AVE
ME
NT
MA
NA
GE
ME
NT
120,
862.
6233
8,93
8.32
1040
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H S
KID
CO
LLE
CTI
ON
6,55
0.15
11,1
76.0
110
5000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H IN
FOR
MAT
ION
AN
D D
ATA
CO
LLE
CTI
ON
TE
CH
NO
LOG
Y34
,604
.38
117,
114.
2010
6000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H M
INO
R S
TUD
IES
3,99
2.87
4,69
2.87
1070
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H 2
002
MD
OT
DE
SIG
N G
UID
E P
H II
SS
170
27,8
07.0
552
,821
.42
1080
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H P
ER
FOR
MA
NC
E M
EA
SU
RE
S40
,435
.93
90,4
02.9
011
0000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H C
ON
TRA
CT
LIA
ISO
N25
,322
.34
85,1
05.8
111
1000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H L
T M
ON
ITO
R P
AVIN
G F
AB
RIC
SS
184
94,0
15.5
994
,015
.59
1140
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H IN
HO
US
E S
UP
PO
RT
TO S
S18
4 S
S 1
851,
581.
551,
581.
5511
5000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H P
ER
FOR
MA
NC
E S
PE
CIF
ICAT
ION
FO
R C
HE
MIC
ALL
Y S
TAB
ILIZ
ED
LAY
ER
S S
S 2
0625
,164
.24
55,9
46.4
012
9000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H F
RIC
TIO
N C
OU
RS
E F
OR
HM
A PA
VE
ME
NTS
SS
207
875.
472,
302.
8913
0000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H L
AB
TE
ST
AN
D E
VAL
PR
OP
ER
TIE
S O
F FL
EX
PAV
E S
S 2
1151
,840
.52
78,6
96.6
013
4000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H I5
5 IN
TEG
RAT
ED
DIV
ER
SIO
N T
RA
FFIC
MG
MT
STU
DY
SS
223
12,8
78.8
726
,841
.58
1460
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H E
VAL
MO
WIN
G/U
SE
OF
NAT
IVE
GR
AS
SE
S/W
ILD
FLO
WE
RS
SS
228 1
3,76
9.01
35,6
25.2
215
1000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H E
VALU
ATE
WAT
ER
WAY
BR
IDG
E S
UB
STR
UC
TUR
ES
SS
229
13,0
41.8
413
,041
.84
1520
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H E
VAL
SH
OR
T S
TATU
RE
D S
PE
CIE
S F
OR
RO
AD
SID
ES
SS
234
13,2
65.6
733
,764
.14
1560
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H T
RIP
LE B
OTT
OM
LIN
E A
SS
ES
S O
F FU
TUR
E IN
TER
MO
DA
L FA
CIL
ITY
SS
235
17,3
87.0
948
,775
.60
1570
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H E
VAL
CR
US
HE
D C
ON
CR
ETE
BA
SE
STR
EN
GTH
SS
238
292.
6429
2.64
1600
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H C
EM
EN
T IN
FLU
EN
CE
ON
GR
AVE
L A
GG
RE
GAT
E C
ON
CR
ETE
SS
239 5
,471
.87
5,47
1.87
1610
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H E
VAL
FER
TILI
TY P
RA
CTI
CE
S T
O M
INIM
IZE
PO
LLU
TAN
TS S
S 2
4076
,592
.99
117,
822.
7316
2000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H A
GG
RE
GAT
E A
BS
OR
PTI
ON
IN H
MA
MIX
TUR
ES
SS
245
38,2
52.5
049
,610
.46
1650
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H D
EV
ELO
P LA
B M
IX D
ES
IGN
PR
OC
FO
R R
AP
MIX
ES
SS
246
30,4
64.1
341
,367
.77
1660
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H F
ULL
DE
PTH
RE
CLA
MAT
ION
FO
R H
IGH
TR
AFF
IC A
PP
S S
S 2
5026
,891
.88
53,4
96.2
416
9000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
50
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H A
CC
EP
TAB
LE V
IBR
ATIO
NS
ON
GR
EE
N C
ON
CR
ETE
SS
252
5,23
6.14
47,3
81.2
917
1000
/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H S
TUD
Y TO
P D
OW
N A
SP
HA
LT C
RA
CK
ING
SS
255
14,1
04.8
244
,580
.08
1740
00/
1064
61O
ther
FY13
SP
R R
ES
EA
RC
H T
EN
N T
OM
TR
AN
SP
OR
TS S
TEM
ED
UC
ATIO
N S
S 2
5825
,000
.00
25,0
00.0
017
8000
/
1064
81S
tate
Pro
ject
sB
arco
de T
rack
ing
Sys
tem
for S
ign
Sho
p52
1.07
521.
07E
NG
1010
00/
1065
07S
tate
Pro
ject
sC
OM
ME
RC
IAL
VE
HIC
LE IN
FOR
MAT
ION
SY
STE
M &
NE
TWO
RK
- C
VIS
N 2
011-
-bill
Fed
Mot
or C
arrie
r Saf
ety
Adm
in33
4,94
1.98
1,00
0,00
0.00
1010
00/
1065
07La
w E
nfor
cem
ent
CO
MM
ER
CIA
L V
EH
ICLE
INFO
RM
ATIO
N S
YS
TEM
& N
ETW
OR
K -
CV
ISN
201
1--S
TATE
MAT
CH
OP
ER
ATIN
G E
XPE
NS
E31
6,34
5.43
714,
108.
8020
1000
/
1065
07E
quip
men
t & F
urni
ture
CO
MM
ER
CIA
L V
EH
ICLE
INFO
RM
ATIO
N S
YS
TEM
& N
ETW
OR
K -
CV
ISN
201
1--S
TATE
MAT
CH
EQ
UIP
ME
NT
-309
,986
.00
285,
893.
0020
2000
/
1065
26S
tate
Pro
ject
sS
tate
wid
e M
ater
ials
Res
earc
h58
,094
.95
58,8
14.4
010
1000
/
1065
68B
ridge
Dev
elop
& D
esig
n LR
FD S
tand
ard
Roa
dway
& B
ridge
Bar
riers
17,3
30.9
747
,663
.18
EN
G10
1000
/
1065
69O
ther
FY13
-14
Jack
son
MP
O U
rban
ized
Are
a M
etro
Pla
nnin
g62
9,36
8.00
738,
962.
0010
1000
/
1065
69O
ther
FY13
-14
Jack
son
MP
O U
rban
ized
Are
a TR
AN
SIT
Met
ro P
lann
ing
191,
658.
0027
7,43
9.00
1020
00/
1065
69O
ther
FY13
-14
PL
Jack
son
MP
O U
rban
ized
Are
a - T
ask
in th
e U
PW
P ut
ilizi
ng S
TP fu
nds
- Pav
emen
t Man
agem
ent S
yste
m, R
ides
harin
g P
rogr
am &
Sig
n R
etro
-Ref
lect
ivet
y.17
,892
.80
17,8
92.8
010
3000
/
1065
70O
ther
FY13
-14
Gul
f Coa
st M
PO
Urb
aniz
ed A
rea
Met
ro P
lann
ing
575,
647.
0076
6,80
4.00
1010
00/
1065
70O
ther
FY13
-14
Gul
f Coa
st M
PO
Urb
aniz
ed A
reaT
RA
NS
IT M
etro
Pla
nnin
g28
6,35
1.64
298,
741.
2210
2000
/
1065
71O
ther
FY 1
3-14
Mem
phis
MP
O U
rban
ized
Are
a M
etro
Pla
nnin
g13
5,71
4.24
191,
549.
4910
1000
/
1065
72O
ther
FY13
-14
Hat
tiesb
urg
MP
O U
rban
ized
Are
a M
etro
Pla
nnin
g12
2,09
3.11
122,
093.
1110
1000
/
1065
72O
ther
FY13
-14
Hat
tiesb
urg
MP
O U
rban
ized
Are
a TR
AN
SIT
Met
ro P
lann
ing
111,
675.
9111
1,67
5.91
1020
00/
1065
74S
tate
Pro
ject
sM
S P
ort E
cono
mic
Impa
ct S
tudy
58,8
48.4
758
,848
.47
EN
G10
1000
/
1065
75S
tate
Pro
ject
sP
ort N
eeds
& M
arke
ting
Stu
dy24
2,71
2.10
242,
712.
10E
NG
1010
00/
1065
92S
tate
Pro
ject
sG
EO
PAK
3D
Mod
elin
g A
ssis
tanc
e 76
,047
.84
99,7
05.9
8E
NG
1010
00/
1065
93O
ther
GR
PC
Saf
ety
Trai
ning
, Wor
kfor
ce D
evel
opm
ent a
nd E
duca
tion
Act
iviti
es38
5.83
385.
8310
1000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Can
ton
35,0
00.0
035
,000
.00
CO
N30
1000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Col
umbu
s35
,000
.00
35,0
00.0
0C
ON
3020
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Cor
inth
23,7
54.4
023
,754
.40
CO
N30
3000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Gau
tier
33,2
73.3
933
,273
.39
CO
N30
4000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Gre
envi
lle35
,000
.00
35,0
00.0
0C
ON
3050
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Gre
enw
ood
32,3
52.6
932
,352
.69
CO
N30
6000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Gul
fpor
t26
,628
.99
26,6
28.9
9C
ON
3070
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Hat
tiesb
urg
28,4
27.6
528
,427
.65
CO
N30
8000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Indi
anol
a28
,014
.30
28,0
14.3
0C
ON
3090
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Jack
son
28,9
27.7
828
,927
.78
CO
N31
0000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
McC
omb
28,5
85.9
428
,585
.94
CO
N31
1000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Mos
s P
oint
22,4
08.2
622
,408
.26
CO
N31
2000
/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
51
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Nat
chez
27,8
81.7
027
,881
.70
CO
N31
3000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Oce
an S
prin
gs35
,000
.00
35,0
00.0
0C
ON
3140
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Oxf
ord
15,9
30.5
415
,930
.54
CO
N31
5000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Pas
cago
ula
30,7
12.6
430
,712
.64
CO
N31
6000
/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Pic
ayun
e31
,323
.81
31,3
23.8
1C
ON
3170
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Sta
rkvi
lle27
,161
.88
27,1
61.8
8C
ON
3180
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Wes
t Poi
nt35
,000
.00
35,0
00.0
0C
ON
3190
00/
1066
38S
urfa
ce T
rans
porta
tion
Pro
gram
(STP
)U
rban
You
th C
orps
Pro
ject
for F
Y 20
13 -
Yazo
o C
ity25
,299
.60
25,2
99.6
0C
ON
3200
00/
1066
48S
tate
Pro
ject
sP
ropo
sal f
or R
ight
of W
ay A
naly
sis
158,
677.
1115
8,67
7.11
EN
G10
1000
/
1066
49S
tate
Pro
ject
sE
quip
men
t Man
agem
ent R
evie
w92
,541
.01
92,5
41.0
1E
NG
1010
00/
1066
52S
afet
yS
FY 2
013-
2014
adv
ertis
ing
for d
rivin
g an
d hi
ghw
ay s
afet
y fo
r stu
dent
s in
sch
ools
thro
ugho
ut th
e st
ate.
124,
298.
3014
9,29
8.30
EN
G10
1000
/
1066
56S
tate
Pro
ject
sC
OM
ME
RC
IAL
VE
HIC
LE IN
FOR
MAT
ION
SY
STE
M &
NE
TWO
RK
- C
VIS
N 2
012-
-bill
Fed
Mot
or C
arrie
r Saf
ety
Adm
in18
3,94
7.69
183,
947.
6910
1000
/
1066
56La
w E
nfor
cem
ent
CO
MM
ER
CIA
L V
EH
ICLE
INFO
RM
ATIO
N S
YS
TEM
& N
ETW
OR
K -
CV
ISN
201
2--S
tate
Mat
ch O
pera
ting
Exp
ense
s-2
94,0
21.7
271
,663
.28
2010
00/
1066
75S
tate
Pro
ject
sS
torm
Wat
er M
anag
emen
t Pla
n (S
WM
P)
624.
7162
4.71
EN
G10
1000
/
1066
81S
tate
Aid
Insp
ecte
ch S
etup
cos
ts (b
ridge
sof
twar
e)13
1,58
0.00
131,
580.
00E
NG
1010
00/
1067
16S
tate
Pro
ject
sR
OW
une
cono
mic
rem
nant
par
cels
(X-d
eeds
)4,
818.
234,
818.
23R
OW
2010
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H L
ON
G T
ER
M P
AVE
ME
NT
PE
RFO
RM
AN
CE
LTP
P1,
954.
621,
954.
6210
1000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H IM
PLE
ME
NT
PR
OJE
CTS
306,
131.
3630
6,13
1.36
1020
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H T
EC
HN
OLO
GY
TRA
NS
FER
107,
143.
8810
7,14
3.88
1030
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H P
AVE
ME
NT
MA
NA
GE
ME
NT
266,
370.
3426
6,37
0.34
1040
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H S
KID
CO
LLE
CTI
ON
4,41
1.22
4,41
1.22
1050
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H IN
FOR
MAT
ION
AN
D D
ATA
CO
LLE
CTI
ON
TE
CH
12,8
95.4
012
,895
.40
1060
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H M
INO
R S
TUD
IES
11,6
83.1
011
,683
.10
1070
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H IM
PLE
ME
NT
2002
MD
OT
DE
SIG
N G
UID
E S
S17
014
4,55
0.81
144,
550.
8110
8000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H P
ER
FOR
MA
NC
E M
EA
SU
RE
S98
,379
.02
98,3
79.0
211
0000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H C
ON
TRA
CT
LIA
ISO
N47
,804
.66
47,8
04.6
611
1000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H L
T M
ON
ITO
R P
AVIN
G F
AB
RIC
SY
STE
M S
S18
429
,873
.47
29,8
73.4
711
4000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H IN
HO
US
E S
UP
PO
RT
SS
184
BY
SS
185
463.
7946
3.79
1150
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H P
ER
F S
PE
C F
OR
CH
EM
STA
BIL
IZE
D L
AYE
RS
SS
206
13,5
59.2
213
,559
.22
1290
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H L
AB
TE
ST
AN
D E
VAL
NE
AR
SU
RFA
CE
PR
OP
FLE
X PA
VE
SS
211
16,5
59.1
516
,559
.15
1340
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H I5
5 TR
AFF
IC M
AN
AG
EM
EN
T S
TUD
Y S
S22
34,
763.
924,
763.
9214
6000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H N
ATIV
E G
RA
SS
AN
D W
ILD
FLO
WE
RS
SS
228
6,99
5.49
6,99
5.49
1510
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H E
VAL
BR
IDG
E S
UB
STR
UC
TUR
E O
VE
R W
ATE
RW
AYS
SS
229
256.
0425
6.04
1520
00/
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
MS
DEP
ARTM
ENT
OF
TRAN
SPO
RTA
TIO
NC
onst
ruct
ion
Proj
Exp
endi
ture
s by
Cou
nty
Req
uest
er:
MH
AYD
EN
Rep
ort I
D:
DR
0001
5111
/03/
2014
03:
13:5
0 pm
Page
52
of 5
2
Proj
ect #
Prog
ram
Proj
ect D
escr
iptio
nEx
pend
iture
sEx
pend
iture
sFi
scal
Yea
rTo
tal
Proj
ect
Type
For F
isca
l Yea
r:20
14
****
****
****
***
STAT
EWID
E**
****
****
****
*
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H E
VAL
SH
OR
T S
PE
CIE
S F
OR
RA
PID
ES
TAB
SS
234
7,12
5.79
7,12
5.79
1560
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H E
VAL
FER
TILI
TY P
RA
CTI
CE
TO
MIN
IMIZ
E P
OLL
UTA
NTS
SS
240
46,3
24.5
346
,324
.53
1620
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H A
BS
OR
PTI
ON
IN H
MA
MIX
TUR
ES
SS
245
14,6
42.9
614
,642
.96
1650
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H D
EV
LA
B M
IX D
ES
IGN
FO
R R
AP
MIX
ES
SS
246
5,34
7.18
5,34
7.18
1660
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H F
ULL
DE
PTH
RE
CLA
MAT
ION
HIG
H T
RA
FFIC
AP
PS
SS
250
25,3
37.5
025
,337
.50
1690
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H IN
HO
US
E S
UP
PO
RT
TO S
S25
0 B
Y S
S25
11,
529.
521,
529.
5217
0000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H A
CC
EP
TAB
LE V
IBR
ATIO
NS
ON
GR
EE
N C
ON
CR
ETE
SS
252
292.
6429
2.64
1710
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H S
PE
ED
LIM
IT IN
SC
HO
OL
ZON
ES
SS
253
507.
5350
7.53
1720
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H E
VAL
TOP
DO
WN
CR
AC
KIN
G S
S25
527
,112
.58
27,1
12.5
817
4000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H A
AS
HTO
TS
PS
87,2
00.0
087
,200
.00
1770
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H A
NA
LYZE
RIS
K T
O B
IOFU
EL
SU
PP
LY C
HA
IN S
S25
922
,913
.86
22,9
13.8
617
9000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H T
UR
BID
ITY
MO
NIT
OR
AN
D Q
UIP
EVA
L C
ON
ST
SIT
ES
SS
261
49,5
28.9
549
,528
.95
1810
00/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H E
VAL
WAT
CH
DO
G W
EAT
HE
R R
ED
UC
E S
PR
AY D
RIF
TS S
S26
223
,146
.07
23,1
46.0
718
2000
/
1067
30O
ther
FY14
SP
R R
ES
EA
RC
H D
IVIS
ION
SU
PP
OR
T M
EP
DG
SS
263
BY
SS
265
5,63
2.62
5,63
2.62
1850
00/
1067
86B
ridge
Prio
ritiz
atio
n lis
t & s
cour
pro
cedu
res
for b
ridge
mai
nten
ance
27,2
38.3
927
,238
.39
EN
G10
1000
/
1068
07S
tate
Pro
ject
sB
ridge
Ele
men
t Qua
ntity
Cal
cula
tion
by D
istri
ct p
erso
nnel
12
9,16
0.66
129,
160.
66E
NG
1010
00/
1068
25S
tate
Pro
ject
sC
omm
erci
al V
ehic
le In
fo S
yste
m &
Net
wor
k - C
VIS
N 2
013
- Bill
Fed
Mot
or C
arrie
r Saf
ety
Adm
in 55,
000.
0055
,000
.00
1010
00/
1068
74O
ther
LTA
P FF
Y 20
149,
653.
999,
653.
9910
2000
/
Cou
nty
Tota
l29
,959
,882
.10
Rep
ort T
otal
s71
8,35
7,07
3.84
dw_c
onst
_pro
ject
_exp
s_by
_cou
nty
Summary of Contracts Let and Bids Received for Fiscal Year 2014
MDOT Contract Administration Division
Table of Contents
Commission District I ........................................................................................................2
Total Commission District I ..............................................................................................8
Commission District II ......................................................................................................9
Total Commission District II ..........................................................................................17
Commission District III ...................................................................................................18
Total Commission District III .........................................................................................28
Statewide Projects ............................................................................................................29
Total Statewide Projects ..................................................................................................29
FY 2014 TOTALS ............................................................................................................29
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 1 of 29
June 25, 2013 Letting
NH-0055-02(214) / 103063301 Madison Construction necessary to reconstruct the Gluckstadt Interchange
1 Joe McGee Construction Company, Inc. - Lake, MS (A+B 28,281,610.05) 18,951,610.05$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS (A+B 29,284,141.78) 19,384,141.78$3 N. L. Carson Construction Co., Inc. - Carthage, MS (A+B 29,877,095.21) 19,527,095.21$4 Key, LLC - Madison, MS (A+B 29,882,029.96) 22,832,029.96$5 Tanner Construction Company, Inc. - Ellisville, MS (A+B 30,643,309.11) 21,268,309.11$6 Eutaw Construction Company, Inc. - Aberdeen, MS (A+B 30,976,142.14) 21,826,142.14$
STATE ESTIMATE 17,678,512.00$OVER STATE ESTIMATE 7.20%
MP-5000-00(075) / 304826301 District 5Raised Pavement Marker Removal and Replacement on various routes
1 Akca, Inc. - Plant City, FL 198,350.00$ Awarded2 Traffic Control Products Company, Inc. - Brandon, MS 320,335.10$
STATE ESTIMATE 224,052.00$UNDER STATE ESTIMATE 11.47%
MP-5021-50(018) / 304808301 & MP-5021-51(001) / 304808302 Neshoba & Newton Scrub Seal & Overlay approximately 9 miles of SR 21 from Newton County Line to south of Dixonand from Scott County Line to Neshoba County Line
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 2,190,653.26$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 2,390,944.00$3 APAC - Mississippi, Inc. - Jackson, MS 2,524,575.08$4 Superior Asphalt, Inc. - Jackson, MS 2,657,726.00$
STATE ESTIMATE 2,249,284.23$UNDER STATE ESTIMATE 2.61%
July 23, 2013 Letting
BR-9205-00(009) / 100332308 Washington Repairing the Traveler Rail System on the Mississippi River Bridge on US 82
1 Granite Construction Company - Tampa, FL 1,796,500.00$ Awarded2 Gibson & Associates, Inc. - Balch Springs, TX 5,389,865.00$
STATE ESTIMATE 1,636,290.00$OVER STATE ESTIMATE 9.79%
Commission District I
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 2 of 29
BR-9999-05(015) / 106647304 District 5Bridge Joint Repair on Bridges in Hinds and Madison Counties
1 Olympus Painting Contractors, Inc. - Tarpon Springs, FL 321,831.70$ Awarded2 Sunbelt Sealing, Inc. - Jackson, MS 338,166.84$3 American Field Service Corporation - Madison, MS IRREGULAR 459,775.40$
STATE ESTIMATE 219,914.00$OVER STATE ESTIMATE 46.34%
MP-5043-45(009) / 304807301 Madison Overlay approximately 9 miles of SR 43 from Rankin County Line to Dinkins Street
1 Dickerson & Bowen, Inc. - Brookhaven, MS 2,045,765.34$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 2,137,643.36$3 Superior Asphalt, Inc. - Jackson, MS 2,416,013.71$
STATE ESTIMATE 2,178,332.46$UNDER STATE ESTIMATE 6.09%
MP-5080-62(018) / 304793301 Scott Mill and Overlay approximately 5 miles of US 80 from east of SR 35 to Newton County Line
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,679,328.48$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 1,705,232.81$3 Superior Asphalt, Inc. - Jackson, MS 1,933,288.35$
STATE ESTIMATE 1,531,236.20$OVER STATE ESTIMATE 9.67%
August 27, 2013 Letting
BR-9999-03(006) / 106647302 District 3Bridge Joint Repair on various routes in Yazoo & Holmes Counties
1 Topcor Services, LLC - Baton Rouge, LA IRREGULAR 395,852.50$2 A-1 Sealing, Inc. - Richton, MS 432,855.50$ Awarded3 Sunbelt Sealing, Inc. - Jackson, MS 442,912.20$4 Olympus Painting Contractors, Inc. - Tarpon Springs, FL 523,544.46$5 Century Construction & Realty, Inc. - Tupelo, MS 588,158.00$6 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 792,160.00$
STATE ESTIMATE 476,809.00$UNDER STATE ESTIMATE 9.22%
September 24, 2013 Letting
STP-2177-00(011) / 106693301 Copiah Overlay approximately 3 miles of US 51 from S. Pat Harrison Drive to SR 27
1 Dickerson & Bowen, Inc. - Brookhaven, MS 867,714.50$ Awarded2 Superior Asphalt, Inc. - Jackson, MS 888,088.50$3 W. E. Blain & Sons, Inc. - Mount Olive, MS 913,421.00$
STATE ESTIMATE 922,098.75$UNDER STATE ESTIMATE 5.90%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 3 of 29
October 22, 2013 Letting
IM-0055-02(219) / 106176301 & 106176302 Yazoo & Holmes Mill and Overlay approximately 17 miles of I-55 from Madison County Line to Holmes County Line
1 APAC - Mississippi, Inc. - Jackson, MS 7,624,439.83$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 8,203,830.45$3 Superior Asphalt, Inc. - Jackson, MS 8,221,166.65$4 Lehman-Roberts Company - Memphis, TN 8,378,147.71$
STATE ESTIMATE 8,806,002.96$UNDER STATE ESTIMATE 13.42%
November 8, 2013 Letting
SP-9999-05(018) / 106749301 Madison Construction necessary to install piling on I-55 Southbound Collector-Distributor Road at Soldier Colony Road
1 Eutaw Construction Company, Inc. - Aberdeen, MS 311,800.00$ Awarded2 Joe McGee Construction Company, Inc. - Lake, MS 349,100.00$3 Key, LLC - Madison, MS 398,776.00$4 T. L. Wallace Construction, Inc. - Columbia, MS 399,220.00$
STATE ESTIMATE 349,920.00$UNDER STATE ESTIMATE 10.89%
November 26, 2013 Letting
HSIP-0009-02(078) / 106418301 Warren Intersection Improvements on US 61 at Oak Ridge Road
1 Simmons Erosion Control, Inc. - Lake, MS 688,653.41$ Awarded2 Hemphill Construction Company, Inc. - Florence, MS 796,477.84$
STATE ESTIMATE 708,593.39$UNDER STATE ESTIMATE 2.81%
HSIP-6928-00(011) / 106577301 Madison Traffic Signal Modifications at various intersections on US 51 and SR 463
1 Killen Contractors, Inc. - Brandon, MS 374,487.00$ Awarded2 Powell Construction Services, Inc. - Vancleave, MS 432,604.00$3 Lewis Electric, Inc. - Flowood, MS 444,202.00$4 Simmons Erosion Control, Inc. - Lake, MS 486,047.25$5 Webster Electric Company, Inc. - Meridian, MS 491,920.00$
STATE ESTIMATE 397,016.25$UNDER STATE ESTIMATE 5.67%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 4 of 29
January 28, 2014 Letting
STP-0038-01(034) / 106769301 Noxubee Mill and Overlay approximately 17 miles of SR 14
1 Falcon Contracting Company, Inc. - Columbus, MS 4,607,727.00$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 4,627,706.55$
STATE ESTIMATE 4,243,407.34$OVER STATE ESTIMATE 8.59%
NH-0055-02(236) / 106483301 Hinds Intersection Improvements at I-55/Lakeland Drive
1 Hemphill Construction Company, Inc. - Florence, MS 1,735,830.95$ Awarded2 Southern Rock, LLC - Brandon, MS 2,278,107.25$
STATE ESTIMATE 1,582,091.54$OVER STATE ESTIMATE 9.72%
MP-3027-15(007) / 305096301 Copiah Overlay approximately 6 miles of SR 27 from I-55 to Hinds County Line
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 965,919.27$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 989,629.27$3 APAC - Mississippi, Inc. - Jackson, MS 1,066,631.77$
STATE ESTIMATE 1,127,781.55$UNDER STATE ESTIMATE 14.35%
MP-5025-61(009) / 305116301 Rankin Overlay Cross-overs on SR 25 between SR 475 & SR 471
1 APAC - Mississippi, Inc. - Jackson, MS 1,250,625.45$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 1,271,096.29$
STATE ESTIMATE 1,213,515.50$OVER STATE ESTIMATE 3.06%
February 25, 2014 Letting
BR-0510-00(009) / 103321301 Yazoo Replace Bridge Nos. 15.7, 17.4, & 19.1 on SR 433
1 Joe McGee Construction Company, Inc. - Lake, MS 5,480,610.66$ Awarded2 N. L. Carson Construction Company, Inc. - Carthage, MS 5,669,391.82$3 Key, LLC - Madison, MS 6,034,251.78$4 Tanner Construction Company, Inc. - Ellisville, MS 6,144,716.81$5 Eutaw Construction Company, Inc. - Aberdeen, MS 6,170,079.42$6 Dozer, LLC - Natchez, MS 7,032,685.62$7 L & A Contracting Company - Hattiesburg, MS 7,196,615.21$
STATE ESTIMATE 6,067,816.64$UNDER STATE ESTIMATE 9.68%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 5 of 29
STP-9205-00(012) / 106761301 Washington Overlay approximately 7 miles of US 82 from the MS River Bridge to Greenville
1 APAC - Mississippi, Inc. - Jackson, MS 3,976,838.00$ Awarded
STATE ESTIMATE 3,773,090.50$OVER STATE ESTIMATE 5.40%
March 25, 2014 Letting
BR-0055-02(237) / 106533301 & MRP-5055-25(201) / 304990301 Hinds Bridge Maintenance on I-55 at Riverside Drive on Bridge No. 96.7A&B
1 Century Construction & Realty, Inc. - Tupelo, MS 889,170.76$ Awarded
STATE ESTIMATE 652,633.95$OVER STATE ESTIMATE 36.24%
BR-9999-05(016) / 1065983050, 1065983051 & 1065983052 Hinds, Kemper & Madison Construction Necessary for Joint Seal on Various Bridges in District 5
1 Sunbelt Sealing, Inc. - Jackson, MS 307,623.31$ Awarded2 Interstate Improvement, Inc. - Faribault, MN 440,489.00$3 Proshot Concrete, Inc. - Florence, AL 454,539.00$
STATE ESTIMATE 293,855.00$OVER STATE ESTIMATE 4.69%
MP-3448-67(001) / 305165301 Sunflower Overlay approximately 14 miles on SR 448 from Sunflower County Line to North of US 82
1 APAC - Mississippi, Inc. - Jackson, MS 1,082,670.00$ Awarded
STATE ESTIMATE 1,002,918.00$OVER STATE ESTIMATE 7.95%
MP-5000-00(079) / 305141301 District 5Installing Raised Pavement Markers throughout the District
1 Traffic Control Products Company, Inc. - Brandon, MS 240,795.65$ Awarded
STATE ESTIMATE 220,057.60$OVER STATE ESTIMATE 9.42%
MP-5487-40(014) / 305174301 Leake Overlay on SR 487 from Rosebud to Sebastopol
1 Dickerson & Bowen, Inc. - Brookhaven, MS 1,325,182.35$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 1,380,407.80$3 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,598,227.80$
STATE ESTIMATE 1,314,587.50$OVER STATE ESTIMATE 0.81%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 6 of 29
BWO-5123-35(001) / 502587301, BWO-5214-35(001) / 502587302, BWO-5067-35(003) / 502587303, BWO-5221-35(001) / 502587304 & LWO-5035-35(002) / 502587305 Kemper
Construction necessary to build Headquarters Building, Equipment Shed, and Storage Bins at Dekalb
1 Ralph McKnight & Son Construction, Inc. - Kosciusko, MS 1,414,540.18$ Awarded2 Quality Design & Construction, LLC - Woodville, MS 1,663,536.40$3 Perry Construction Company - Philadelphia, MS IRREGULAR 1,920,314.00$4 Renrock Construction, LLC - Starkville, MS IRREGULAR 2,103,418.26$
STATE ESTIMATE 1,357,994.00$OVER STATE ESTIMATE 4.16%
April 22, 2014 Letting
IM-0020-01(212) / 106651301 & 106651302 Hinds Mill & Overlay, Bridge Repair,& Landscaping approximately 7 miles of I-20 from Natchez Trace to SR 18
1 Superior Asphalt, Inc. - Jackson, MS 14,816,980.30$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 15,667,643.99$3 W. E. Blain & Sons, Inc. - Mount Olive, MS 15,677,111.64$4 APAC - Mississippi, Inc. - Jackson, MS 17,647,093.43$
STATE ESTIMATE 15,756,259.32$UNDER STATE ESTIMATE 5.96%
IM-0055-02(239) / 106613301 Hinds Sign Truss Removal and Replacement on I-55 Northbound at Atkins-Beasley exit ramp
1 RMD Holdings, LTD dba Nationwide Construction Group - New Haven, MI 214,359.78$ Awarded2 J. C. Cheek Contractors, Inc. - Kosciusko, MS 224,593.12$3 Atwood Fence Company, Inc. - Kosciusko, MS 244,478.75$
STATE ESTIMATE 216,118.00$UNDER STATE ESTIMATE 0.81%
MP-5021-62(010) / 305111301 Scott Mill & Overlay approximately 7 miles of SR 21 from Steele to Sebastopol
1 Superior Asphalt, Inc. - Jackson, MS 1,957,016.50$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 2,079,052.75$3 W. E. Blain & Sons, Inc. - Mount Olive, MS 2,562,289.50$
STATE ESTIMATE 2,126,826.84$UNDER STATE ESTIMATE 7.98%
MP-5503-51(004) / 305114301 Newton Overlay approximately 11 miles on SR 503 beginning just south of the railroad tracks in Hickory and ending at the intersection of SR 15 in Decatur
1 Superior Asphalt, Inc. - Jackson, MS 2,406,135.75$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 2,644,836.05$3 W. E. Blain & Sons, Inc. - Mount Olive, MS 3,047,216.95$
STATE ESTIMATE 2,552,295.85$UNDER STATE ESTIMATE 5.73%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 7 of 29
May 28, 2014 Letting
MP-3000-00(096) / 305215301 District 3Level and Seal on Various Routes throughout the District
1 APAC - Mississippi, Inc. - Richland, MS 3,616,044.25$ Awarded2 J. J. Ferguson Sand & Gravel, Inc. - Greenwood, MS 3,699,468.65$
STATE ESTIMATE 3,235,781.86$OVER STATE ESTIMATE 11.75%
MP-5080-62(019) / 305113301 Scott Mill & Overlay approximately 3 miles of US 80 from the East end of the 3-Lane Section in Forest to the West end of the 3-Lane Section at Raytheon
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,048,979.25$ Awarded2 APAC - Mississippi, Inc. - Richland, MS 1,104,970.75$3 Superior Asphalt, Inc. - Byram, MS 1,108,111.75$
STATE ESTIMATE 988,669.84$OVER STATE ESTIMATE 6.10%
MP-5469-61(011) / 305112301 Rankin Overlay approximately 7 miles of SR 469 from Simpson County Line to Florence City Limits
1 Dickerson & Bowen, Inc. - Brookhaven, MS 1,237,660.45$ Awarded2 Superior Asphalt, Inc. - Byram, MS 1,351,880.00$3 APAC - Mississippi, Inc. - Richland, MS 1,375,671.57$4 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,383,746.40$
STATE ESTIMATE 1,478,347.15$UNDER STATE ESTIMATE 16.28%
Total Awarded Commission District I $86,058,698.93
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 8 of 29
June 25, 2013 Letting
ER-0003-01(187) / 106528301 Harrison Remove & Replace damaged concrete sidewalk between US 90 & the seawall from Henderson Point to Gulfport
1 Landmark Contracting, Inc. - Gulfport, MS 130,178.00$ Awarded2 Lane Construction Company of Mississippi, Inc. - Ocean Springs, MS 136,817.00$3 RJM-McQueen Contracting, Inc. - Collins, MS 148,616.00$4 Simmons Erosion Control, Inc. - Lake, MS 164,650.00$5 Land Shaper, Inc. - Gulfport, MS 203,697.00$6 Mowa Development, LLC - Gautier, MS 240,636.81$
STATE ESTIMATE 144,146.00$UNDER STATE ESTIMATE 9.69%
MP-6011-18(009) / 304813301 Forrest Overlay approximately 1 mile of US Highway 11 from Leaf River Bridge to Evelyn Gandy Parkway Intersection
1 Dunn Roadbuilders, LLC - Laurel, MS 598,793.70$ Awarded
STATE ESTIMATE 545,432.15$OVER STATE ESTIMATE 9.78%
MP-6011-55(020) / 304816301 Pearl River Widen & Overlay approximately 5 miles of US 11 from I-59 Overpass Bridge north to Hobolochitto Creek Bridge
1 Huey Stockstill, Inc. - Picayune, MS 1,374,966.80$ Awarded
STATE ESTIMATE 1,324,989.85$OVER STATE ESTIMATE 3.77%
MP-6015-34(015) / 304814301 & MP-6015-31(008) / 304814302 Jones & Jasper Widen and Overlay approximately 9 miles of SR 15 from 200 feet South of Lyon Drive to 2.5 miles North of the Jasper County Line
1 Dunn Roadbuilders, LLC - Laurel, MS 2,850,724.80$ Awarded2 W. E. Blain & Sons, Inc. - Mount Olive, MS 3,201,148.40$
STATE ESTIMATE 2,582,381.98$OVER STATE ESTIMATE 10.39%
MP-6018-31(010) / 304810301 Jasper Overlay SR 18 from Smith County Line East approximately 9 miles
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 2,436,027.00$ Awarded2 Dunn Roadbuilders, LLC - Laurel, MS 2,660,732.45$
STATE ESTIMATE 2,273,981.75$OVER STATE ESTIMATE 7.13%
Commission District II
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 9 of 29
MP-6026-66(010) / 304812301 Stone Overlay approximately 8 miles of SR 26 from Steven Moore Road to 450 feet West of SR 15
1 Huey Stockstill, Inc. - Picayune, MS 884,812.25$ Awarded2 Warren Paving, Inc. - Hattiesburg, MS 913,143.75$3 Mallette Brothers Construction Company, Inc. - Gautier, MS 1,131,933.25$
STATE ESTIMATE 1,059,149.45$UNDER STATE ESTIMATE 16.46%
MP-6613-30(024) / 304817301 Jackson Widen and Overlay approximately 7 miles of SR 613 from SR 63 to the Railroad Crossing at Big Point
1 Mallette Brothers Construction Company, Inc. - Gautier, MS 1,584,478.00$ Awarded2 Warren Paving, Inc. - Hattiesburg, MS 1,627,527.70$
STATE ESTIMATE 1,778,504.75$UNDER STATE ESTIMATE 10.91%
MP-7000-00(150) / 304805301 District 7Chip Seal on Various routes throughout the District
1 RJM-McQueen Contracting, Inc. - Collins, MS 294,822.20$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 350,383.27$3 T. L. Wallace Construction, Inc. - Columbia, MS 351,047.10$4 Kimes & Stone Construction Company, Inc. - Booneville, MS 379,832.80$
STATE ESTIMATE 396,203.70$UNDER STATE ESTIMATE 25.59%
July 12, 2013 Letting
DB/IM-0055-02(226) / 105444303 & 304 Pike & LincolnDesign and Construction of Improvements to I-55
1 Key, LLC - Madison, MS 9,525,000.00$ Awarded2 Joe McGee Construction Co., Inc. - Lake, MS 9,840,000.00$3 L & A Contracting Company - Hattiesburg, MS 9,750,000.00$
STATE ESTIMATE 10,000,000.00$UNDER STATE ESTIMATE 4.75%
July 23, 2013 Letting
STP-0014-03(065) / 106424301 & 106424302 Forrest & Lamar Adaptive Signal System on US 98 and US 49
1 Chain Electric Company - Hattiesburg, MS 1,863,836.55$ Awarded2 Gannett Fleming Project Development Corporation - Camp Hill, PA 1,891,835.13$3 Webster Electric Company, Inc. - Meridian, MS 1,907,461.85$4 McInnis Electric Company - Byram, MS 1,992,578.62$
STATE ESTIMATE 1,992,400.30$UNDER STATE ESTIMATE 6.45%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 10 of 29
ER-0231-00(004) / 106529301 Jackson Bridge Abutment Repair on SR 613 at Bridge No. 10.4
1 Gulf Equipment Corporation - Theodore, AL 300,608.00$ Awarded
STATE ESTIMATE 274,400.25$OVER STATE ESTIMATE 9.55%
August 27, 2013 Letting
IM-0110-01(029) / 105922301 Harrison Pavement Restoration of approximately 5 miles of I-110 from US 90 to I-10
1 Warren Paving, Inc. - Hattiesburg, MS 1,863,382.09$ Awarded2 Huey Stockstill, Inc. - Picayune, MS 1,889,603.50$
STATE ESTIMATE 1,760,930.00$OVER STATE ESTIMATE 5.82%
September 24, 2013 Letting
NHS-0010-01(145) / 105281302 Harrison Interchange Construction on I-110 at Popps Ferry Rd. and Boney Ave.
1 Mallette Brothers Construction Company, Inc. - Gautier, MS 11,407,522.42$ Awarded2 Tanner Construction Company, Inc. - Ellisville, MS 11,886,839.18$3 Gulf Equipment Corporation - Theodore, AL 11,988,130.28$4 T. L. Wallace Construction, Inc. - Columbia, MS 12,280,556.50$5 N. L. Carson Construction Company, Inc. - Carthage, MS 12,370,841.91$6 Huey Stockstill, Inc. - Picayune, MS 12,840,981.44$7 Eutaw Construction Company, Inc. - Aberdeen, MS 13,445,212.40$8 Superior Asphalt, Inc. - Jackson, MS 13,596,950.70$
STATE ESTIMATE 11,036,747.44$OVER STATE ESTIMATE 3.36%
November 26, 2013 Letting
HSIP-0008-01(130) / 106235301 Stone Traffic Signal installation on US 49 at Hall Street and Magnolia Drive
1 Warren Paving, Inc. - Hattiesburg, MS 927,756.60$ Awarded2 Huey Stockstill, Inc. - Picayune, MS 1,014,443.95$3 Gulf Equipment Corporation - Theodore, AL 1,030,221.42$4 Simmons Erosion Control, Inc. - Lake, MS 1,199,134.33$
STATE ESTIMATE 1,081,995.81$UNDER STATE ESTIMATE 14.26%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 11 of 29
SP-9392-00(008) / 100710302 Jackson Reconstruction of SR 611 from US 90 to the end of the route
1 Mallette Brothers Construction Company, Inc. - Gautier, MS 13,595,433.56$ Awarded2 Tanner Construction Company, Inc. - Ellisville, MS 15,065,376.83$3 Gulf Equipment Corporation - Theodore, AL 16,394,162.03$4 Superior Asphalt, Inc. - Jackson, MS 17,734,392.60$
STATE ESTIMATE 13,982,606.10$UNDER STATE ESTIMATE 2.77%
ER-0055-01(106) / 106668301 & 106668302 Lincoln & Pike Fence Repair along I-55 from the Louisiana State Line to the Copiah County Line
1 RMD Holdings, LTD dba Nationwide Construction Group - New Haven, MI 119,972.64$ Awarded2 J. C. Cheek Contractors, Inc. - Kosciusko, MS 235,579.64$3 Columbus Fence Company, LLC - Columbus, MS 261,732.71$4 Edge Construction, LLC - Tremont, MS 290,605.00$5 Bush Construction Company, Inc. - Laurel, MS 315,355.54$
STATE ESTIMATE 124,738.40$UNDER STATE ESTIMATE 3.82%
January 28, 2014 Letting
STP-0008-02(101) / 106698301 Simpson Overlay approximately 11 miles of the Southbound Lane of US 49 from SR 149 in Magee to SR 149 in Mendenhall
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 2,277,855.00$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 2,438,620.48$3 APAC - Mississippi, Inc. - Jackson, MS 2,757,763.85$
STATE ESTIMATE 2,506,480.60$UNDER STATE ESTIMATE 9.12%
HSIP-0008-02(102) / 106502301 Covington Traffic Signal Modifications at various intersections on US 49 in Collins
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,115,054.90$ Awarded
STATE ESTIMATE 1,019,467.25$OVER STATE ESTIMATE 9.38%
HSIP-0014-03(063) / 106223301 George Traffic Signal on US 98 Intersection at Rocky Creek Road and Beaver Dam Road
1 Warren Paving, Inc. - Hattiesburg, MS 1,849,471.50$ Awarded
STATE ESTIMATE 1,689,013.12$OVER STATE ESTIMATE 9.50%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 12 of 29
NH-0014-03(067) / 106753301 George Mill and Overlay approximately 6 miles of US 98 from the Greene County Line to SR 63
1 Warren Paving, Inc. - Hattiesburg, MS 3,061,785.06$ Awarded
STATE ESTIMATE 2,802,550.20$OVER STATE ESTIMATE 9.25%
IM-0059-02(103) / 106408301 Jones Mill & Overlay approximately 7 miles of I-59 from Laurel to Jasper County Line
1 Dunn Roadbuilders, LLC - Laurel, MS 13,072,174.15$ Awarded
STATE ESTIMATE 11,933,196.92$OVER STATE ESTIMATE 9.54%
STP-0066-01(013) / 106754301 Jackson Mill and Overlay approximately 3 Miles of SR 57 from US 90 to Ocean Springs Road
1 Mallette Brothers Construction Company, Inc. - Gautier, MS 1,686,000.00$ Awarded
STATE ESTIMATE 1,543,908.00$OVER STATE ESTIMATE 9.20%
BR-2170-00(021) / 105120301 Jones Bridge Replacement on US 11 at Waterfall Creek, Bridge #85.2
1 T. L. Wallace Construction, Inc. - Columbia, MS 999,578.87$ Awarded2 N. L. Carson Construction Company, Inc. - Carthage, MS 1,016,365.53$3 Joe McGee Construction Company, Inc. - Lake, MS 1,085,063.91$4 Key, LLC - Madison, MS 1,577,278.45$
STATE ESTIMATE 1,071,336.41$UNDER STATE ESTIMATE 6.70%
BR-9999-07(008) / 106647303 Lincoln & Pike Bridge Joint Repairs on I-55 between Louisiana State Line and Copiah County Line
1 Interstate Improvement, Inc. - Faribault, MN 415,497.00$ Awarded2 Sunbelt Sealing, Inc. - Jackson, MS 576,809.08$3 Proshot Concrete, Inc. - Florence, AL IRREGULAR 917,867.00$
STATE ESTIMATE 493,382.50$UNDER STATE ESTIMATE 15.79%
February 25, 2014 Letting
STP-0014-01(061) / 106748301 Amite Mill and Overlay approximately 2 miles of SR 24 from Tanyard Creek Bridge to Liberty
1 Dickerson & Bowen, Inc. - Brookhaven, MS 713,398.01$ Awarded2 W. E. Blain & Sons, Inc. - Mount Olive, MS 814,272.00$
STATE ESTIMATE 785,099.16$UNDER STATE ESTIMATE 9.13%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 13 of 29
NH-0015-02(096) / 106755301 Jones Mill and Overlay approximately 4 miles of US 84 from SR 28 to SR 15
1 Dunn Roadbuilders, LLC - Laurel, MS 2,218,774.00$ Awarded
STATE ESTIMATE 2,033,652.93$OVER STATE ESTIMATE 9.10%
IM-0059-02(104) / 106408302 Jasper Mill & Overlay approximately 13 miles of I-59 from Jones County Line to Vossburg
1 Dunn Roadbuilders, LLC - Laurel, MS 16,595,716.50$ Awarded
STATE ESTIMATE 15,155,630.80$OVER STATE ESTIMATE 9.50%
February 28, 2014 Letting
DB/IM-9999-06(016) / 106594301, 302 & 303 Pearl River, Forrest & LamarDesign and Construction of Improvements to I-59
1 Key, LLC - Madison, MS 8,980,000.00$ Awarded2 Joe McGee Construction Co., Inc. - Lake, MS 9,400,000.00$3 T. L. Wallace Construction, Inc. - Columbia, MS 9,799,941.00$
STATE ESTIMATE 10,000,000.00$UNDER STATE ESTIMATE 10.20%
March 25, 2014 Letting
STP-0022-01(076) / 106523301 Jones Traffic Signal Installation at SR 15 and Parker Drive in Laurel
1 Simmons Erosion Control, Inc. - Lake, MS 243,324.61$ Awarded2 Powell Construction Services, Inc. - Vancleave, MS 250,288.00$3 Lewis Electric, Inc. - Flowood, MS 256,629.00$
STATE ESTIMATE 197,815.05$OVER STATE ESTIMATE 23.01%
STP-9553-00(001) / 104004301 Marion Reconstruction on SR 44 from US 98 to Pierce Road
1 Joe McGee Construction Company, Inc. - Lake, MS 8,323,496.70$ Awarded2 Tanner Construction Company, Inc. - Ellisville, MS 8,723,932.45$3 Dickerson & Bowen, Inc. - Brookhaven, MS 8,811,509.35$4 T. L. Wallace Construction, Inc. - Columbia, MS 8,850,687.55$5 Dunn Roadbuilders, LLC - Laurel, MS 8,912,938.46$6 Eutaw Construction Company, Inc. - Aberdeen, MS 9,396,279.78$
STATE ESTIMATE 9,119,716.74$UNDER STATE ESTIMATE 8.73%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 14 of 29
HSIP-9999-07(007) / 106634301 Lincoln Cable Barrier Installation on I-55
1 Simmons Erosion Control, Inc. - Lake, MS 183,935.00$ Awarded2 C & H Construction Services, LLC - Daphne, AL 217,058.95$3 RMD Holdings, LTD dba Nationwide Construction Group - New Haven, MI 242,874.49$
STATE ESTIMATE 140,880.00$OVER STATE ESTIMATE 30.56%
MP-6607-23(006) / 305169301 Hancock Overlay approximately 7 miles of SR 607 from Rifle Range Road to the Hancock County Welcome Center
1 Warren Paving, Inc. - Hattiesburg, MS 2,452,452.93$ Awarded2 Huey Stockstill, Inc. - Picayune, MS 2,475,385.00$
STATE ESTIMATE 2,722,399.25$UNDER STATE ESTIMATE 9.92%
MP-7567-03(006) / 304706301 Amite Overlay approximately 16 miles of SR 567 from SR 24 to the end of State Maintenance
1 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,634,517.15$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 1,637,779.40$
STATE ESTIMATE 1,859,568.95$UNDER STATE ESTIMATE 12.10%
April 22, 2014 Letting
BR-0014-02(068) / 106437301 Marion Bridge Replacement on US 98 over Silver Creek
1 T. L. Wallace Construction, Inc. - Columbia, MS 5,343,299.15$ Awarded2 Tanner Construction Company, Inc. - Ellisville, MS 6,022,940.09$3 Key, LLC - Madison, MS 6,596,306.08$4 Eutaw Construction Company, Inc. - Aberdeen, MS 7,095,360.36$5 L & A Contracting Company - Hattiesburg, MS 7,340,815.27$
STATE ESTIMATE 6,141,543.84$UNDER STATE ESTIMATE 13.00%
BR/STP-0049-01(039) /106298302 Franklin Bridge Lengthening on SR 33 over the Homochitto River
1 T. L. Wallace Construction, Inc. - Columbia, MS 5,249,042.05$ Awarded2 Key, LLC - Madison, MS 5,743,214.90$3 L & A Contracting Company - Hattiesburg, MS 5,791,661.84$4 Tanner Construction Company, Inc. - Ellisville, MS 5,795,226.03$5 Eutaw Construction Company, Inc. - Aberdeen, MS 6,365,178.50$
STATE ESTIMATE 5,843,737.60$UNDER STATE ESTIMATE 10.18%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 15 of 29
MP-6026-66(011) / 305194301 Stone Overlay approximately 7 miles of SR 26 from SR 15 to George County Line
1 Huey Stockstill, Inc. - Picayune, MS 949,965.00$ Awarded2 Warren Paving, Inc. - Hattiesburg, MS 978,056.25$
STATE ESTIMATE 946,511.50$OVER STATE ESTIMATE 0.36%
MP-6057-21(007) / 305186301 Greene Overlay approximately 8 miles of SR 57 from George County Line to SR 198
1 Warren Paving, Inc. - Hattiesburg, MS 747,959.20$ Awarded
STATE ESTIMATE 682,928.00$OVER STATE ESTIMATE 9.52%
MP-7000-00(177) / 305157301 District 7Scrub Seal of various routes in District 7
1 T. L. Wallace Construction, Inc. - Columbia, MS 1,399,399.59$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 1,536,319.63$3 RJM-McQueen Contracting, Inc. - Collins, MS 1,541,093.83$4 Kimes & Stone Construction Co., Inc. - Booneville, MS IRREGULAR 1,571,746.20$
STATE ESTIMATE 1,648,149.82$UNDER STATE ESTIMATE 15.09%
MP-7184-39(001) / 305148301 Lawrence Mill and Overlay approximately 7 miles of SR 184 from US 84 through Monticello to US 84
1 Dickerson & Bowen, Inc. - Brookhaven, MS 1,379,436.56$ Awarded2 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,455,422.15$3 Dunn Roadbuilders, LLC - Laurel, MS 1,569,174.95$
STATE ESTIMATE 1,611,640.96$UNDER STATE ESTIMATE 14.41%
May 28, 2014 Letting
BR-0008-01(132) / 106791302 Forrest Maintenance Painting of Bridge No. 49.3A on US 49 at Black Creek
1 Gulf Coast Contracting, LLC - Holiday, FL 203,910.00$ Awarded
STATE ESTIMATE 675,010.00$UNDER STATE ESTIMATE 69.79%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 16 of 29
ER-0015-03(009) / 106506301 Wayne Slide Repair on US 84 Westbound near Big Rock Road / Gretna Drive
1 Dunn Roadbuilders, LLC - Laurel, MS 972,544.90$ Awarded2 Bush Construction Company, Inc. - Laurel, MS 1,046,339.30$3 Tanner Construction Company, Inc. - Laurel, MS 1,130,425.50$4 Cornerstone Civil Contractors, LLC - Tuscaloosa, AL 1,132,008.40$5 T. L. Wallace Construction, Inc. - Columbia, MS 1,136,309.65$
STATE ESTIMATE 1,185,125.40$UNDER STATE ESTIMATE 17.94%
MP-6000-00(246) / 305225301 District 6Level and Seal Various Routes throughout the District
1 Dunn Roadbuilders, LLC - Laurel, MS 3,866,450.00$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS 4,044,732.00$3 Dickerson & Bowen, Inc. - Brookhaven, MS 4,060,976.40$
STATE ESTIMATE 4,011,440.00$UNDER STATE ESTIMATE 3.61%
MP-6000-00(247) / 305226301 District 6Raised Pavement Marker Installation on various routes districtwide
1 Akca, Inc. - Plant City, FL 204,190.00$ Awarded2 J. L. McCool Contractors, Inc. - Moss Point, MS 270,468.00$3 Traffic Control Products Company, Inc. - Pearl, MS 317,716.40$
STATE ESTIMATE 227,412.50$UNDER STATE ESTIMATE 10.21%
MP-6098-56(004) / 305201301 Perry Overlay approximately 6 miles of US 98 from 1 mile east of SR 29 to 1 mile west of Lake Perry Road
1 Warren Paving, Inc. - Hattiesburg, MS 3,559,499.50$ Awarded
STATE ESTIMATE 3,283,210.50$OVER STATE ESTIMATE 8.42%
MP-7049-16(015) / 305149301 Covington Overlay approximately 6 miles of US 49 from Forrest County Line to SR 598
1 Dunn Roadbuilders, LLC - Laurel, MS 1,075,779.85$ Awarded2 W. E. Blain & Sons, Inc. - Mount Olive, MS 1,108,689.15$3 Warren Paving, Inc. - Hattiesburg, MS 1,154,098.10$
STATE ESTIMATE 1,098,048.70$UNDER STATE ESTIMATE 2.03%
Total Awarded Commission District II $140,532,821.79
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 17 of 29
June 25, 2013 Letting
STP-9999-01(025) / 106641301 District 1Installation of Raised Pavement Markers on various routes throughout the District
1 Akca, Inc. - Plant City, FL 163,350.00$ Awarded2 Riverside Traffic Systems, Inc. - New Albany, MS 168,660.00$3 Traffic Control Products Company, Inc. - Brandon, MS 294,033.50$
STATE ESTIMATE 195,982.90$UNDER STATE ESTIMATE 16.65%
MP-1012-44(006) / 304800301 Lowndes Scrub Seal and Overlay of approximately 16 miles of SR 12 from SR 50 to the Alabama State Line
1 Falcon Contracting Company, Inc. - Columbus, MS 2,732,193.00$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 2,764,658.00$
STATE ESTIMATE 2,487,881.30$OVER STATE ESTIMATE 9.82%
MP-1041-09(001) / 304797301 Chickasaw Level and Seal approximately 9 miles of SR 41 from SR 32 to Pontotoc County Line
1 Kimes & Stone Construction Company, Inc. - Booneville, MS 603,610.00$ Awarded2 J. J. Ferguson Sand & Gravel, Inc. - Greenwood, MS 632,495.00$
STATE ESTIMATE 602,545.00$OVER STATE ESTIMATE 0.18%
MP-1145-41(010) / 304801301 Lee Mill & Overlay approximately 5 miles of SR 145 from SR 348 to the Prentiss County Line
1 APAC - Mississippi, Inc. - Jackson, MS 1,046,655.00$ Awarded2 Rogers Group, Inc. - Tupelo, MS 1,199,761.38$
STATE ESTIMATE 988,292.00$OVER STATE ESTIMATE 5.91%
MP-1145-48(001) / 304802301 Monroe Mill & Overlay approximately 6 miles of SR 145 from US 45 South of Aberdeen to US 45 North of Aberdeen
1 Falcon Contracting Company, Inc. - Columbus, MS 1,575,525.80$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 1,630,874.92$
STATE ESTIMATE 1,434,975.31$OVER STATE ESTIMATE 9.79%
Commission District III
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 18 of 29
MP-1178-29(005) / 304798301 Itawamba Mill & Overlay approximately 6 miles of SR 178 from Lee County Line to SR 363
1 APAC - Mississippi, Inc. - Jackson, MS 1,493,670.50$ Awarded2 Rogers Group, Inc. - Tupelo, MS 1,766,017.28$
STATE ESTIMATE 1,382,852.00$OVER STATE ESTIMATE 8.01%
MP-1182-53(002) / 304796301 Oktibbeha Mill & Overlay approximately 3 miles of SR 182 from Stark Road to MSU Research Park
1 Falcon Contracting Company, Inc. - Columbus, MS 2,803,887.50$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 2,832,307.50$
STATE ESTIMATE 2,382,320.00$OVER STATE ESTIMATE 17.70%
MP-1348-73(005) / 304799301 Union Mill and Overlay of approximately 10 miles of SR 348 from CR 121 to the Lee County Line
1 APAC - Mississippi, Inc. - Jackson, MS 1,643,178.03$ Awarded2 Rogers Group, Inc. - Tupelo, MS 1,664,590.91$
STATE ESTIMATE 1,541,967.87$OVER STATE ESTIMATE 6.56%
June 28, 2013 Letting
DB/STP-0029-03(009) / 102556304 MarshallDesign and Construction of SR 304 / I-269 Project
1 James Construction Group, LLC - Baton Rouge, LA 68,511,578.53$ Awarded2 Archer Western Contractors, LLC - Arlington, TX 87,157,917.55$3 PCL Civil Constructors, Inc. - Tampa, FL 87,835,000.00$4 Eutaw Construction, Inc. / Key, LLC AJV - Aberdeen, MS 91,312,415.00$
STATE ESTIMATE N/AUNDER STATE ESTIMATE N/A
July 23, 2013 Letting
MP-2003-60(008) / 304821301 Quitman Mill and Overlay approximately 7 miles of SR 3 from Darling to Sledge
1 Lehman-Roberts Company - Memphis, TN 1,965,700.85$ Awarded2 Superior Asphalt, Inc. - Jackson, MS 2,065,116.70$
STATE ESTIMATE 2,054,513.00$UNDER STATE ESTIMATE 4.32%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 19 of 29
MP-2003-68(001) / 304824301 & MP-2003-60(009) / 304824302 Tallahatchie & Quitman Mill & Overlay approximately 6 miles of SR 3 from US 49 to Quitman County Line, and approximately 14 miles from Tallahatchie County Line to SR 6
1 Lehman-Roberts Company - Memphis, TN 5,293,452.07$ Awarded2 Superior Asphalt, Inc. - Jackson, MS 5,569,269.80$3 APAC - Mississippi, Inc. - Jackson, MS 5,713,583.89$
STATE ESTIMATE 5,787,753.95$UNDER STATE ESTIMATE 8.54%
August 27, 2013 Letting
STP-0011-03(079) / 106439301 Lowndes Interchange Improvements at US 82/US 45A
1 Joe McGee Construction Company, Inc. - Lake, MS 1,560,713.15$ Awarded2 Ellis Construction Company, Inc. - Columbus, MS 1,608,951.99$3 Tanner Construction Company, Inc. - Ellisville, MS 1,775,188.64$4 Edge Construction, LLC - Tremont, MS IRREGULAR 1,924,460.21$5 Phillips Contracting Co., Inc. - Columbus, MS 2,085,116.35$
STATE ESTIMATE 1,713,016.61$UNDER STATE ESTIMATE 8.89%
STP-2910-00(004) / 106609301 Marshall Widen and Overlay SR 178 From Holly Springs Eastern Corp Limit East approximately 9 miles to approximately 1 mile West of US 78
1 Lehman-Roberts Company - Memphis, TN 2,256,380.55$ Awarded2 Standard Construction Company, Inc. - Germantown, TN 2,540,034.23$
STATE ESTIMATE 2,308,477.40$UNDER STATE ESTIMATE 2.26%
MP-1004-59(009) / 304803301 Prentiss Level and Seal approximately 8 miles of SR 4 from East of MLK Dr. to SR 371
1 APAC - Mississippi, Inc. - Jackson, MS 861,956.00$ Awarded
STATE ESTIMATE 737,851.75$OVER STATE ESTIMATE 16.82%
MP-2032-68(006) / 304904301 Tallahatchie Widen and Overlay approximately 9 miles of SR 32 from the east end of the Tallahatchie River Bridge to SR 35
1 Superior Asphalt, Inc. - Jackson, MS 2,720,114.00$ Awarded2 APAC - Mississippi, Inc. - Jackson, MS 2,818,356.90$3 Lehman-Roberts Company - Memphis, TN 2,859,664.12$
STATE ESTIMATE 2,967,596.50$UNDER STATE ESTIMATE 8.34%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 20 of 29
MP-2332-22(002) / 304823301 Grenada Widen and Overlay approximately 3 miles of SR 332 from US 51 to the end of State Maintenance
1 Superior Asphalt, Inc. - Jackson, MS 968,567.50$ Awarded2 Lehman-Roberts Company - Memphis, TN 1,088,756.88$3 APAC - Mississippi, Inc. - Jackson, MS 1,125,695.00$
STATE ESTIMATE 1,248,124.25$UNDER STATE ESTIMATE 22.40%
August 30, 2013 Letting
BR-2910-00(007) / 106719301 Marshall Bridge deck replacement on State Route 178 approximately 5 miles east of Holly Springs
1 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 106,162.75$ Awarded2 Key, LLC - Madison, MS 297,932.00$
STATE ESTIMATE 138,045.16$UNDER STATE ESTIMATE 23.10%
September 24, 2013 Letting
BR-9999-01(026) / 106647305 Monroe Bridge Joint Repair on the US 45 bridges over The Tenn-Tom Waterway
1 Century Construction & Realty, Inc. - Tupelo, MS 494,835.00$ Awarded2 Gibson & Associates, Inc. - Balch Springs, TX 531,855.00$3 Key, LLC - Madison, MS 797,485.00$
STATE ESTIMATE 413,045.00$OVER STATE ESTIMATE 19.80%
October 22, 2013 Letting
BR-0019-02(041) / 105189301 Marshall Bridge Replacements on SR 7 at Bridge Nos. 154.0, 154.8, 155.0
1 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 9,061,764.13$ Awarded2 N. L. Carson Construction Company, Inc. - Carthage, MS 9,690,587.63$3 Key, LLC - Madison, MS 9,755,136.09$4 L & A Contracting Company - Hattiesburg, MS 9,769,879.57$5 Tanner Construction Company, Inc. - Ellisville, MS 9,838,978.70$6 T. L. Wallace Construction, Inc. - Columbia, MS 9,992,895.85$7 Eutaw Construction Company, Inc. - Aberdeen, MS IRREGULAR 10,321,264.56$8 Century Construction & Realty, Inc. - Tupelo, MS 10,385,939.89$9 Superior Asphalt, Inc. - Jackson, MS 12,983,611.50$
STATE ESTIMATE 10,678,064.39$UNDER STATE ESTIMATE 15.14%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 21 of 29
BR-9999-02(249) / 106647306 District 2Bridge Joint Repair on various locations throughout the District
1 Topcor Services, LLC - Baton Rouge, LA 485,645.00$ Awarded2 Century Construction & Realty, Inc. - Tupelo, MS 531,876.25$3 Sunbelt Sealing, Inc. - Jackson, MS 557,248.08$
STATE ESTIMATE 490,529.00$UNDER STATE ESTIMATE 1.00%
November 26, 2013 Letting
STP-0006-02(027) / 105420301 Lee Construction of Interchange on US 78 at Coley Road / Barnes Crossing Road
1 Century Construction & Realty, Inc. - Tupelo, MS (A+B 12,515,312.33) 10,515,312.33$ Awarded2 Eutaw Construction Company, Inc. - Aberdeen, MS (A+B 13,059,055.76) 10,969,055.76$3 Tanner Construction Company, Inc. - Ellisville, MS (A+B 13,893,521.72) 11,903,521.72$4 Key, LLC - Madison, MS (A+B 14,686,046.53) IRREGULAR 12,396,046.53$5 W. G. Yates & Son Construction Company - Philadelphia, MS (A+B 15,181,073.25) 12,891,073.25$6 N. L. Carson Construction Company, Inc. - Carthage, MS (A+B 20,707,677.37) 18,417,677.37$
STATE ESTIMATE 10,813,344.08$OVER STATE ESTIMATE 1.44%
January 28, 2014 Letting
STP-0029-03(011) / 102556308 Marshall Paving approximately 4 miles of SR 304/I-269 from SR 302 to the Tennessee Line
1 Lehman-Roberts Company - Memphis, TN 11,308,279.76$ Awarded2 Standard Construction Company, Inc. - Germantown, TN 11,815,448.88$
STATE ESTIMATE 13,347,107.45$UNDER STATE ESTIMATE 15.28%
STP-0070-04(018) / 106296301 Lafayette Interchange Reconstruction at Old Taylor Rd. and SR 6 Interchange
1 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 6,827,427.58$ Awarded2 Eutaw Construction Company, Inc. - Aberdeen, MS 7,288,632.75$3 Joe McGee Construction Company, Inc. - Lake, MS 8,349,622.95$
STATE ESTIMATE 5,348,096.34$OVER STATE ESTIMATE 27.66%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 22 of 29
BR-0914-00(007) / 100299301 Marshall Bridge Replacement on SR 309 between US 78 and Barton
1 N. L. Carson Construction Company, Inc. - Carthage, MS 8,103,039.28$ Awarded2 L & A Contracting Company - Hattiesburg, MS 8,445,869.15$3 T. L. Wallace Construction, Inc. - Columbia, MS 8,587,263.75$4 Tanner Construction Company, Inc. - Ellisville, MS 8,884,713.51$5 Eutaw Construction Company, Inc. - Aberdeen, MS 8,887,587.22$6 Bell And Associates Construction, LP - Brentwood, TN 8,934,675.85$7 Key, LLC - Madison, MS 9,396,764.76$8 Century Construction & Realty, Inc. - Tupelo, MS 9,713,647.11$9 Dement Construction Company, LLC - Jackson, TN 9,751,501.89$
10 James Construction Group, LLC - Baton Rouge, LA 10,627,179.85$
STATE ESTIMATE 8,582,054.51$UNDER STATE ESTIMATE 5.58%
SP-0016-02(036) / 106710302 Grenada Drainage Correction on SR 8 Between Jameson Drive and Hickory Road
1 Edge Construction, LLC - Tremont, MS 214,565.80$ Awarded2 Malouf Construction, LLC - Greenwood, MS 273,457.15$3 Hemphill Construction Company, Inc. - Florence, MS 307,238.00$4 Xcavators, Inc. - Falkner, MS 327,030.23$5 Dirtworks, Inc. of Vicksburg - Vicksburg, MS 397,468.00$6 Endevco, Inc. - Oxford, MS 427,625.00$7 Ausbern Construction Company, Inc. - Okolona, MS 498,685.00$8 J. J. Ferguson Sand & Gravel, Inc. - Greenwood, MS 501,004.00$9 Brocato Construction Co., Inc. - Batesville, MS 641,646.52$
10 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 788,167.00$
STATE ESTIMATE 346,882.45$UNDER STATE ESTIMATE 38.14%
February 25, 2014 Letting
STP-0018-02(053) / 106758301 Attala Widen and Overlay approximately 6 miles of SR 12 from the Holmes County Line to 0.03 miles West of SR 431
1 Lehman-Roberts Company - Memphis, TN 1,620,324.78$ Awarded2 Dickerson & Bowen, Inc. - Brookhaven, MS 1,756,034.70$3 APAC - Mississippi, Inc. - Jackson, MS 1,771,716.70$
STATE ESTIMATE 1,684,544.68$UNDER STATE ESTIMATE 3.81%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 23 of 29
STP-0071-01(015) / 106771301 Monroe Level and Seal approximately 6 miles of SR 371 from SR 6 to the Itawamba County Line
1 Dickerson & Bowen, Inc. - Brookhaven, MS 290,781.25$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS 297,987.00$3 Kimes & Stone Construction Company, Inc. - Booneville, MS 298,938.00$4 RJM-McQueen Contracting, Inc. - Collins, MS 320,372.20$
STATE ESTIMATE 314,757.00$UNDER STATE ESTIMATE 7.62%
STP-0079-02(016) / 106770301 & MP-1045-48(012) / 305115301 Monroe Base-Pave approximately 7 miles of US 45A from Wilson-Hill Loop to SR 8,
1 APAC - Mississippi, Inc. - Jackson, MS 7,315,878.00$ Awarded2 Falcon Contracting Company, Inc. - Columbus, MS 7,688,113.00$
STATE ESTIMATE 6,804,805.50$OVER STATE ESTIMATE 7.51%
BR-0845-00(006) / 103326301 Lafayette Replacing 8 Bridges on SR 328 from SR 7 to SR 315
1 Tanner Construction Company, Inc. - Ellisville, MS 8,630,903.17$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS 8,664,020.45$3 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 8,990,776.75$4 Century Construction & Realty, Inc. - Tupelo, MS 8,996,347.80$5 Key, LLC - Madison, MS 9,344,107.87$6 L & A Contracting Company - Hattiesburg, MS 9,633,347.12$7 Eutaw Construction Company, Inc. - Aberdeen, MS 9,801,427.03$
STATE ESTIMATE 7,970,158.11$OVER STATE ESTIMATE 8.29%
MP-1006-00(069) / 305105301 & 302 Lee & Pontotoc Mill & Overlay approximately 12 miles of SR 6 from SR 76 to just West of US 45
1 APAC - Mississippi, Inc. - Jackson, MS 3,245,855.50$ Awarded2 Lehman-Roberts Company - Memphis, TN 4,129,053.75$
STATE ESTIMATE 3,116,907.05$OVER STATE ESTIMATE 4.14%
February 25, 2014 Letting
SP-2901-00(033) / 106797301 YalobushaBridge repair on US Highway 51 Railroad Bridge (BR# 227.6) between SR 330 and SR 32
1 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 174,000.00$ Awarded2 Key, LLC - Madison, MS 188,500.00$
STATE ESTIMATE 130,000.00$OVER STATE ESTIMATE 33.85%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 24 of 29
March 25, 2014 Letting
HSIP-0007-01(078) / 106269301 Benton Intersection Improvements at US 72 and SR 7
1 J. M. Duncan, Inc. - Falkner, MS 599,807.86$ Awarded2 Simmons Erosion Control, Inc. - Lake, MS 666,667.00$
STATE ESTIMATE 565,426.16$OVER STATE ESTIMATE 6.08%
BR-0018-02(052) / 103325301 Attala Replacing 3 Bridges on SR 12 from Holmes County Line to Kosciusko
1 N. L. Carson Construction Company, Inc. - Carthage, MS 7,842,884.08$ Awarded2 Eutaw Construction Company, Inc. - Aberdeen, MS 7,865,128.60$3 T. L. Wallace Construction, Inc. - Columbia, MS 7,899,256.80$4 Joe McGee Construction Company, Inc. - Lake, MS 8,050,551.91$5 Tanner Construction Company, Inc. - Ellisville, MS 8,086,011.40$6 Key, LLC - Madison, MS 8,226,111.00$
STATE ESTIMATE 7,758,386.22$OVER STATE ESTIMATE 1.09%
HSIP-0033-02(004) / 106272301 Alcorn Signing & Pavement Marking on SR 2 between Tippah County Line and the Kossuth East City Limit
1 Michael Pittman Construction Co., Inc. - Corinth, MS 401,069.50$ Awarded2 Xcavators, Inc. - Falkner, MS 520,922.00$
STATE ESTIMATE 565,565.05$UNDER STATE ESTIMATE 29.09%
BR-0061-02(008) / 103327301 Leflore Replacing 5 Bridges on SR 7 from Humphreys County Line to US 82
1 Century Construction & Realty, Inc. - Tupelo, MS 5,616,382.11$ Awarded2 Malouf Construction, LLC - Greenwood, MS 5,698,096.38$3 J. J. Ferguson Sand & Gravel, Inc. - Greenwood, MS 6,184,987.87$4 T. L. Wallace Construction, Inc. - Columbia, MS 6,289,067.60$5 N. L. Carson Construction Company, Inc. - Carthage, MS 6,654,903.40$
STATE ESTIMATE 4,931,219.02$OVER STATE ESTIMATE 13.89%
NH-0070-04(022) / 106773301 Lafayette Mill & Overlay approximately 3 miles of US 278 from Coliseum Drive to SR 7
1 Lehman-Roberts Company - Memphis, TN 804,310.20$ Awarded2 Superior Asphalt, Inc. - Jackson, MS 870,559.00$
STATE ESTIMATE 816,790.00$UNDER STATE ESTIMATE 1.53%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 25 of 29
STP-2920-00(012) / 106757301 Desoto Widen and Overlay approximately 7 miles of US 51 from Tate/Desoto County Line to the Maintenance Headquarters
1 Lehman-Roberts Company - Memphis, TN 3,340,804.92$ Awarded2 Superior Asphalt, Inc. - Jackson, MS 3,950,140.00$
STATE ESTIMATE 3,519,065.50$UNDER STATE ESTIMATE 5.07%
SP-0022-04(059) / 106747301 Tippah Construction necessary to build a Turn Bay on SR 15 at Ripley
1 Xcavators, Inc. - Falkner, MS 345,514.79$ Awarded2 TLSL, Inc. - Walnut, MS 377,948.35$3 Colom Construction Company, Inc. - Ripley, MS IRREGULAR 491,483.23$
STATE ESTIMATE 393,165.60$UNDER STATE ESTIMATE 12.12%
MP-1000-78(071) / 305168301 & 305168302 Webster Scrub Seal on SR 403 & SR 404
1 Kimes & Stone Construction Company, Inc. - Booneville, MS 351,572.45$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS 379,703.74$3 J. J. Ferguson Sand & Gravel, Inc. - Greenwood, MS 467,988.58$
STATE ESTIMATE 438,400.85$UNDER STATE ESTIMATE 19.81%
MP-1000-80(070) / 305167301, 305167302, 305167303 & 305167304 Winston Chip Seal on SR 393, SR 395, & SR 490
1 Kimes & Stone Construction Company, Inc. - Booneville, MS 1,429,780.30$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS 1,453,658.00$3 J. J. Ferguson Sand & Gravel, Inc. - Greenwood, MS 1,509,335.00$4 Dickerson & Bowen, Inc. - Brookhaven, MS 1,586,150.30$
STATE ESTIMATE 1,458,952.00$UNDER STATE ESTIMATE 2.00%
MP-1354-70(005) / 305173301 Tippah Scrub Seal approximately 3 miles on SR 354 from SR 15 to End of State Maintenance
1 Kimes & Stone Construction Company, Inc. - Booneville, MS 99,439.40$ Awarded2 T. L. Wallace Construction, Inc. - Columbia, MS 116,569.80$
STATE ESTIMATE 132,908.30$UNDER STATE ESTIMATE 25.18%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 26 of 29
MP-2032-68(007) / 305155301 Tallahatchie Mill,Trench Widen & Overlay approximately 8 miles of SR 32 beginning at US 49 East to the end of the Tallahatchie River Bridge
1 Lehman-Roberts Company - Memphis, TN 2,279,319.80$ Awarded2 Superior Asphalt, Inc. - Jackson, MS 2,364,825.50$3 APAC - Mississippi, Inc. - Jackson, MS 2,406,042.50$
STATE ESTIMATE 2,427,572.05$UNDER STATE ESTIMATE 2.58%
MP-2161-14(002) / 304822301 Coahoma Mill & Overlay approximately 4 miles of SR 161 from the Sunflower River to US 61 Bypass
1 Lehman-Roberts Company - Memphis, TN 2,094,130.05$ Awarded
STATE ESTIMATE 1,906,395.40$OVER STATE ESTIMATE 9.85%
LWO-1033-41(005) / 501637302 Lee Lot Improvement at District 1 Headquarters in Tupelo
1 Michael Pittman Construction Co., Inc. - Corinth, MS 1,197,704.17$ Awarded2 J. M. Duncan, Inc. - Falkner, MS 1,224,842.74$3 Colom Construction Company, Inc. - Ripley, MS IRREGULAR 1,432,284.91$
STATE ESTIMATE 1,039,839.90$OVER STATE ESTIMATE 15.18%
April 22, 2014 Letting
STP-0241-00(013) / 106589301 Monroe Construction necessary to build a Walking Trail in Smithville
1 Ausbern Construction Company, Inc. - Okolona, MS 367,131.50$ Awarded2 Nitty Gritty Erosion, Inc. - Oxford, MS 369,515.30$3 Edge Construction, LLC - Tremont, MS 370,047.25$4 Parsons Earthworks, Inc. - Iuka, MS 374,963.35$
STATE ESTIMATE 382,319.05$UNDER STATE ESTIMATE 3.97%
May 28, 2014 Letting
NH-0070-04(013) / 102221302 Lafayette Intersection Improvements on SR 6 at Jackson Avenue
1 Talbot Bros Contr Co, Inc & Talbot Bros Grading Co, Inc, AJV - Nesbit , MS 5,565,898.93$ Awarded2 Endevco, Inc. - Oxford, MS 5,641,240.37$3 Eutaw Construction Company, Inc. - Madison, MS 5,884,551.37$
STATE ESTIMATE 5,029,525.88$OVER STATE ESTIMATE 10.66%
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 27 of 29
MP-1278-58(001) / 305199301 Pontotoc Reconstruction of SR 6/278/76 from Lafayette County Line to Old SR 6
1 APAC - Mississippi, Inc. - Richland, MS 5,622,875.25$ Awarded2 Lehman-Roberts Company - Memphis, TN 5,794,423.90$
STATE ESTIMATE 5,862,862.25$UNDER STATE ESTIMATE 4.09%
MP-2008-00(073) / 305156301 & 305156302 Leflore & Tallahatchie Widen & Overlay approximately 11 miles of SR 8 from US 49 to Tallahatchie County Line and from Leflore County Line to Grenada County Line
1 APAC - Mississippi, Inc. - Richland, MS 2,996,190.02$ Awarded2 Lehman-Roberts Company - Memphis, TN 3,064,949.70$
STATE ESTIMATE 3,110,825.20$UNDER STATE ESTIMATE 3.69%
Total Awarded Commission District III $205,550,122.14
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 28 of 29
September 24, 2013 Letting
SPR-0000-01(065)/106460112300 StatewideInstalling traffic recorder classification and WIM systems on various routes throughout the State
1 Killen Contractors, Inc. - Brandon, MS 451,045.00$ Awarded2 Southern Traffic Services, Inc. - Gulf Breeze, FL IRREGULAR 452,610.00$3 Powell Construction Services, Inc. - Vancleave, MS 487,160.00$4 Lewis Electric, Inc. - Flowood, MS 575,810.00$5 Desoto County Electric, Inc. - Horn Lake, MS 610,699.00$
STATE ESTIMATE 590,010.00$UNDER STATE ESTIMATE 23.55%
Total Awarded Statewide Projects $451,045.00
Total Commission District 1 $86,058,698.93
Total Commission District 2 $140,532,821.79
Total Commission District 3 $205,550,122.14
Total All Commission Districts $432,141,642.86
Total Statewide Projects $451,045.00
GRAND TOTAL $432,592,687.86
FY 2014 TOTALS
STATEWIDE PROJECTS
MDOT Contract Administration Division - Summary of Contracts Let & Bids Received for Fiscal Year 2014
Page 29 of 29