me-1 to 10 gf-podium

10
At 1000 mmx600 mm 1000 mmx600 mm 1000 mmx700 mm 1000 mmx700 mm 1300 mmx700 mm 1300 mmx700 mm EF / GF-07.1 EF / GF-07.2 1100 mmx300 mm EF / GF-05 1100mm x 300mm 750mm x 300mm 1300 mmx700 mm 1300 mmx700 mm 1300 mmx700 mm 10 NOS. 1200 x 300 EAG C/W VC @ 700 l/s 1400 mmx600 mm 4 NOS. 1300 x 600 EAG @ 1700 l/s EF / GF-09.2 EF / GF-09.1 FULLY INTAKE LOUVERED WALL & DOOR C/W FIRE DAMPER 150 mmx150 mm 150 x 150 EAG 800 x 400 SAR @ 820 l/s 1000 mmx700 mm 1000 mmx600 mm 900 mmx500 mm 400 mmx250 mm 500 mmx300 mm 500 x 200 EAD RISER (TYP. TO 5), (TO LOW LEVEL OF PUMP RM.) 5 NOS. 400 x 200 EAG C/W VD @ 200 l/s (LOW LEVEL OF PUMP RM.) 2000 x 500 EAL 700 x 350 PROPOSED STP EAD (STUB-OUT AT BASEMENT STP ROOM CEILING LEVEL) 700 x 350 PROPOSED STP FAD (STUB-OUT AT BASEMENT STP ROOM CEILING LEVEL) EF / GF-08 700 mmx300 mm BDD BDD STP-EF / GF-01 BDD PROPOSED STP VENTILATION FAN LOCATION PROPOSED 700 x 350 EAD RISER T/A FOR STP PROPOSED 1500 x 400 INTAKE AIR LOUVER FOR STP 1100 mmx300 mm 2500 2500 AIRWELL Ap Bp Cp C'p Dp D'p Ep Fp Gp Hp 1p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 5p 9'p 10p E'p 445 978 813 1485 360 VD VD VD VD VD VD 820 VD VD VD VD VD VD VD VD 1895 3510 1560 385 1910 4700 EF / GF-04.1 EF / GF-04.2 1000 x 1000 INTAKE AIR LOUVER 3500 1460 3465 1685 830 1795 1285 240 470 250 1950 5160 2130 5410 1 ATI-ME-7 2 ATI-ME-7 3 ATI-ME-7 1 ATI-ME-9 2 ATI-ME-9 3 ATI-ME-9 1 ATI-ME-10 STP-SF / GF-01 BDD 2 ATI-ME-10 1240 2972 2972 1400 mmx600 mm 1400 mmx600 mm 300 x 900 EAL OR 5500 x 500 EAL EF / GF-05.2 FULLY LOUVERED WALL & DOOR 2824 1400 mmx600 mm 1400 mmx600 mm 700 mmx350 mm 700 mmx350 mm 700 mmx350 mm 1400 mmx600 mm 1400 mmx600 mm 1620 IE = 3703 IE = 3703 IE = 3703 IE = 3280 IE = 3585 IE = 3285 IE = 3700 IE = 3750 IE = 4000 IE = 4000 IE = 4025 IE = 3480 IE = 3585 IE = 3690 IE = 3540 IE = 3540 IE = 3540 IE = 3540 IE = 4228 IE = 4228 IE = 3700 IE = 3450 IE = 3450 IE = 3450 IE = 3450 IE = 3700 IE = 3700 IE = 4025 - --- - --- IE = 4350 700 mmx350 mm OWNER / DEVELOPER CORPORATION MAKATI DEVELOPMENT PROJECT MANAGER TAGUIG, METRO MANILA, PHILIPPINES 1/F BONIFACIO TECHNOLOGY CENTER TELEPHONE: 02.623.53.14 - 15 SHEET CONTENTS E-MAIL: [email protected] AVIDA TOWERS INTIMA SITE DEVELOPMENT PLAN MANILA PHILIPPINES 31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY MAKATI DEVELOPMENT CORPORATION BIM OFFICER MAKATI DEVELOPMENT CORPORATION TEAM LEADER NORTH S W E MAKATI DEVELOPMENT CORPORATION BIM MODELER AVIDA LAND CORPORATION PIPES VENT PIPE HOT WATER PIPE COLD WATER PIPE REFRIGERANT PIPE FIRE PROTECTION LINE WASTE PIPE DRAIN PIPE CONDENSATE DRAIN PIPE CONDUIT POWER LINE DUCTS AIR CONDITIONING DUCT EXHAUST DUCT BUS DUCT LEGEND REFERENCE PLANS: ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012 STRUCTURAL PLANS CD ISSUED JULY 31, 2012 - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013 MECHANICAL PLANS CD ISSUED JULY 31, 2012 ELECTRICAL PLANS CD ISSUED JULY 31, 2012 PLUMBING PLANS CD ISSUED JULY 31, 2012 FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012 DATE ISSUED: SHEET NO.: ROCHELLE MARIE M. BALUYOT EMMANUEL FRANCIS L. YUZON 1/29/2014 11:56:45 AM \\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt GROUND FLOOR MECHANICAL LAYOUT (PART 1 OF 2) EMMAN YUZON ATI-ME-1 1 : 100 GROUND FLOOR AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2) 1 OTHER CONCERNS LEGEND DESCRIPTION DATE ISSUED ISSUED TO NOTE: - REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BE RELATIVE TO THE CURRENT LEVEL ON THE INDICATED FLOOR PLAN - INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THE PIPE OR ELEMENTS - PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ON THE DRAWING.

Upload: kristina-ormacido

Post on 06-Nov-2015

224 views

Category:

Documents


1 download

TRANSCRIPT

  • At B

    1

    1000 mmx600 mm1000 mmx600 mm1000 mmx700 mm1000 mmx700 mm1300 mmx700 mm1300 mmx700 mm

    EF /GF-07.1

    EF /GF-07.2

    1100

    mm

    x300

    mm

    EF /GF-05

    1100mm x 300mm

    750mm x 300mm

    1300 mmx700 mm

    1300 mmx700 mm

    1300 mmx700 mm

    10 NOS.1200 x 300 EAGC/W VC @ 700 l/s

    1400 mmx600 mm

    4 NOS.1300 x 600 EAG@ 1700 l/s

    EF /GF-09.2

    EF /GF-09.1

    FULLY INTAKE LOUVEREDWALL & DOOR C/W FIREDAMPER

    150

    mm

    x150

    mm

    150 x 150 EAG

    800 x 400 SAR @820 l/s

    1000 mmx700 mm 1000 mmx600 mm 900 mmx500 mm

    400

    mm

    x250

    mm

    500

    mm

    x300

    mm

    500 x 200 EAD RISER(TYP. TO 5),(TO LOW LEVEL OF PUMPRM.)

    5 NOS.400 x 200 EAGC/W VD @ 200 l/s(LOW LEVEL OF PUMP RM.)

    2000 x 500 EAL

    700 x 350 PROPOSED STP EAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)

    700 x 350 PROPOSED STP FAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)

    EF /GF-08

    700 mmx300 mm

    BDD

    BDD

    STP-EF /GF-01

    BDD

    PROPOSED STPVENTILATIONFAN LOCATION

    PROPOSED700 x 350 EADRISER T/A FOR STP

    PROPOSED1500 x 400 INTAKEAIR LOUVER FOR STP

    1100 mmx300 mm

    2500

    2500

    AIRWELL

    Ap Bp Cp C'p Dp D'p Ep Fp Gp Hp

    1p2p

    2'p

    3p

    3'p

    1t

    4p

    4'p

    5'p

    6p

    6'p

    7p

    8p

    8'p

    5p

    9'p

    10p

    E'p

    445

    978

    813

    1485

    360

    VD VDVD VD VD VD

    820

    VD

    VD

    VD

    VD

    VD

    VD VD

    VD

    1895 3510 1560 385

    1910 4700

    EF /GF-04.1

    EF /GF-04.2

    1000 x 1000INTAKE AIR LOUVER

    3500

    1460

    3465 1685

    830

    1795

    1285

    240

    470

    250

    19505160

    21305410

    1

    ATI-ME-7

    2

    ATI-ME-7

    3

    ATI-ME-7

    1

    ATI-ME-9

    2

    ATI-ME-9

    3

    ATI-ME-9

    1

    ATI-ME-10

    STP-SF /GF-01

    BDD

    2

    ATI-ME-10

    1240

    2972

    2972

    1400 mmx600 mm

    1400

    mm

    x600

    mm

    300 x 900 EALOR 5500 x 500 EAL

    EF /GF-05.2

    FULLY LOUVEREDWALL & DOOR

    2824

    1400 mmx600 mm

    1400 mmx600 mm

    700 mmx350 mm 700 mmx350 mm

    700 mmx350 mm

    1400 mmx600 mm

    1400

    mm

    x600

    mm16

    20

    IE = 3703

    IE = 3703

    IE = 3703

    IE = 3280

    IE = 3585

    IE = 3285

    IE = 3700

    IE = 3750

    IE = 4000

    IE = 4000

    IE = 4025

    IE = 3480

    IE = 3585

    IE = 3690

    IE = 3540

    IE = 3540

    IE = 3540

    IE = 3540

    IE = 4228

    IE = 4228IE = 3700

    IE = 3450

    IE = 3450

    IE = 3450

    IE = 3450

    IE = 3700

    IE = 3700

    IE = 4025

    -

    ---

    -

    ---

    IE = 4350

    700 mmx350 mm

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:56:45AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    GROUND FLOOR MECHANICALLAYOUT (PART 1 OF 2)

    EMMAN YUZON

    ATI-ME-1 1 : 100GROUND FLOOR AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2)

    1

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

    NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.

  • Hp

    1p

    2p

    2'p

    3p

    3'p

    1t

    4p

    4'p

    5'p

    6p

    6'p

    7p

    8p

    8'p

    5p

    9'p

    10p

    1000 mmx600 mm1000 mmx600 mm1000 mmx700 mm

    1400 mmx600 mm

    FULLY INTAKE LOUVEREDWALL & DOOR C/W FIREDAMPER

    900 mmx500 mm

    400

    mm

    x250

    mm

    500

    mm

    x300

    mm

    500 x 200 EAD RISER(TYP. TO 5),(TO LOW LEVEL OF PUMPRM.)

    5 NOS.400 x 200 EAGC/W VD @ 200 l/s(LOW LEVEL OF PUMP RM.)

    700 mmx300 mm

    Jp Kp Lp Mp Np

    900 mmx500 mm 900 mmx500 mm

    800

    mm

    x350

    mm

    700 x 300 EAD RISER

    600 x 800 EAG(TOP LEVEL OF GF)

    EF /GF-06

    800 mmx350 mm

    800 x 400 SAR @ 820 l/s

    900

    mm

    x500

    mm

    1000 x 600 KEADRISER, T/A

    350 mmx300 mmVDVDVD

    VD

    VD

    VD

    MD

    MD

    MD

    MD

    800

    mm

    x400

    mm

    500 mmx350 mm

    400 mmx350 mm

    KSF /GF-01

    600 x 350 KSADSTUB-OUT(TYP. TO 4)

    4 NOS. 1800 x 300INTAKE AIR GRILLE

    KSF /GF-01

    KSF /GF-01

    KSF /GF-01

    RP RISERTO ROOF DECK

    RP RISERTO ROOF DECK

    400 x 350 KEADSTUB-OUT

    FULLY LOUVEREDDOOR

    VD

    VD

    VD

    VD

    VD

    VD

    250 x 200 DL

    200 x 200 EAG

    200 mmx150 mm

    EF /GF-02

    EF /GF-03

    500

    mm

    x250

    mm

    300

    mm

    x250

    mm

    4 NOS.1200 x 100 SUPPLYLINEAR GRILLE C/W VDDEFLECTOR

    VD

    VD

    VD

    VDVD

    VD

    VD

    VD

    FCU /GF-01.1

    FCU /GF-01.2

    700 x 300700 x 300

    300

    x 25

    0

    700 x250

    300 x

    250

    300 x

    250

    200 mmx200 mm

    250 x 200 EAG

    EF /GF-01

    150 x 150 EAG

    150 x 150 TEAD

    5000x100RETURN LINEAR GRILLE

    RP RISERTO ROOF DECK

    500 x 350 KEADSTUB-OUT

    RP RISERTO ROOF DECK

    RP RISERTO ROOF DECK

    2000 x 1000RETURN LINEAR DIFFUSER

    25 CDP TAP TOTHE NEAREST CDP (TYP.)

    4 NOS.1200 x 100SUPPLY LINEAR GRILLEC/W VD DEFLECTOR

    600 x 350 KEADSTUB-OUT

    4000x100RETURN LINEAR GRILLE

    WAC /GF-03.02

    WAC /GF-03.01

    WAC /GF-02.01

    WAC /GF-02.02

    WAC /GF-02.03

    WAC /GF-02.04

    (ONE ON TOP OF THEOTHER)

    WAC /GF-04.01

    WAC /GF-04.02

    150 x 150 DL

    BDD

    BDD

    PROPOSED PLATFORM

    1400 mmx600 mm

    1130

    1077

    2785

    445

    1185 410

    1020

    3775

    135

    50

    170

    800

    1845

    900

    430

    3336 1685 600

    1215

    410

    685

    1795

    1

    ATI-ME-8

    2

    ATI-ME-8

    445

    1

    ATI-ME-9

    2

    ATI-ME-9

    3

    ATI-ME-9

    1

    ATI-ME-10

    2

    ATI-ME-10

    700 x 450 INTAKE AIRDOOR LOUVER

    IE = 3700

    IE = 3750

    IE = 3750

    IE = 3800

    IE = 3800

    IE = 3875

    IE = 3875

    IE = 4000

    IE = 4000

    IE = 4000

    IE = 4025

    IE = 4025

    IE = 3380

    IE = 3480

    IE = 3630

    IE = 4025

    IE = 4000

    IE = 3700

    IE = 3700

    IE = 3675

    IE = 3700

    IE = 3682

    IE = 3707

    IE = 3707

    IE = 3480

    IE = 3480

    IE = 3455

    IE = 3480

    IE = 3455

    IE = 3430

    IE = 3480

    IE = 3430

    IE = 3405

    IE = 3505

    IE = 3600

    -

    ---

    IE = 4343

    IE = 3624

    LPG VENTTERMINAL C/WLOUVER

    D25 LPG STUB-OUT

    50 LPG VENT PIPESTUB-OUT

    25 LPGVENT PIPE

    25 LPG PIPE C/WSECONDARY

    CONTAINMENT H/L

    25 LPGSTUB-OUT

    50 LPGVENT PIPESTUB-OUT

    25 LPGSTUB-OUT

    50 LPG VENT PIPESTUB-OUT

    50 LPG VENTPIPE STUB-OUT

    50 LPG VENT PIPESTUB-OUT

    50 LPG VENTPIPE STUB-OUT

    IE = 3306

    IE = 3306

    IE = 4035 IE = 3306

    IE = 3866

    IE = 3866

    IE = 4035

    IE = 3879

    IE = 4035

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:09AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    GROUND FLOOR MECHANICALLAYOUT (PART 2 OF 2)

    EMMAN YUZON

    ATI-ME-2 1 : 100

    GROUND FLOOR AIR-CONDITIONING & VENTILATION LAYOUT (PART 2 OF 2)1

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

    NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.

  • AtAp Bp Cp C'p Dp D'p Ep Fp Gp Hp

    1p

    2p

    2'p

    3p

    3'p

    1t

    4p

    4'p

    5'p

    6p

    6'p

    7p

    8p

    8'p

    9p

    5p

    9'p

    10p

    1

    ATI-ME-7

    2

    ATI-ME-7

    3

    ATI-ME-7

    PROPOSED 700 x 350 EADT/A, F/B W/ GOOSENECK TERMINATION

    & INSECT SCREEN FOR STP(CEILING LEVEL OF 1ST PODIUM)

    1

    ATI-ME-9

    2

    ATI-ME-9

    3

    ATI-ME-9

    1

    ATI-ME-10

    2

    ATI-ME-10

    -

    ---

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:17AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    1ST PODIUM LEVEL MECHANICALLAYOUT (PART 1 OF 2)

    EMMAN YUZON

    ATI-ME-3 1 : 1001ST PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2)

    1

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

    NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.

  • Hp

    1p

    2p

    2'p

    3p

    3'p

    1t

    4p

    4'p

    5'p

    6p

    6'p

    7p

    8p

    8'p

    9p

    5p

    9'p

    10p

    Jp Kp Lp Mp Np

    1

    ATI-ME-8 2

    ATI-ME-8

    200

    mm

    x200

    mm

    EF /1FR-01

    KEF /2F-01

    LMCP-KEF-2F-01

    1000 x 600 KEADTERMNATED @ GOOSENECKC/W INSECT SCREEN

    1000 x 600 KEADRISER T/A

    900 x 500 KEAD

    LMCP-ACCU-GF-R-04

    ACCU /GF-R-04

    ACCU /GF-R-03.2

    ACCU /GF-R-03.1

    LMCP-ACCU-GF-R-03.2

    LMCP-ACCU-GF-R-03.1

    RP DOWN TO TENANT'S FCU

    ACCU /GF-R-02.2

    ACCU /GF-R-02.1

    ACCU /GF-R-01.2

    ACCU /GF-R-01.1

    ACCU /GF-01.2

    ACCU /GF-01.1

    RP DOWN TO TENANT'S FCU

    LMCP-ACCU-GF-R-02.2

    LMCP-ACCU-GF-R-02.1

    LMCP-ACCU-GF-R-01.2

    LMCP-ACCU-GF-R-01.1

    LMCP-ACCU-GF-01.2

    LMCP-ACCU-GF-01.1

    RP DOWN TO TENANT'S FCU1

    ATI-ME-9

    2

    ATI-ME-9

    3

    ATI-ME-9

    1

    ATI-ME-10

    2

    ATI-ME-10

    RP DOWN TO TENANT'S FCU

    RP DOWN TO TENANT'S FCU

    -

    ---

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:24AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    1ST PODIUM LEVEL MECHANICALLAYOUT (PART 2 OF 2)

    EMMAN YUZON

    ATI-ME-4

    1 : 100

    1ST PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 2 OF 2)1

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

    NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.

  • UP

    AtAp Bp Cp C'p Dp D'p Ep Fp Gp Hp

    1p

    2p

    2'p

    3p

    3'p

    1t

    4p

    4'p

    5'p

    6p

    6'p

    7p

    8p

    8'p

    9p

    5p

    9'p

    10p

    E'p

    1

    ATI-ME-7

    2

    ATI-ME-7

    3

    ATI-ME-7

    1000 mmx550 mm

    SPF /2P-01

    LMCP-SPF-2P-01

    FIRE RATED DUCT

    2000 x 1000 OR 4000 x 500INTAKE AIR LOUVER

    1000

    mm

    x550

    mm

    1

    ATI-ME-9

    2

    ATI-ME-9

    3

    ATI-ME-9

    1

    ATI-ME-10

    2

    ATI-ME-10

    IE = 2865

    IE = 2270

    -

    ---

    3546 1000

    1000

    2937 698

    302

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:27AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    2ND PODIUM LEVEL MECHANICALLAYOUT (PART 1 OF 2)

    EMMAN YUZON

    ATI-ME-5

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

    1 : 100

    2ND PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 1 OF 2)1

    NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.

  • UP

    Hp

    1p

    2p

    2'p

    3p

    3'p

    1t

    4p

    4'p

    5'p

    6p

    6'p

    7p

    8p

    8'p

    9p

    5p

    Jp Kp Lp Mp Np

    1

    ATI-ME-8

    2

    ATI-ME-8

    SPF /2P-01

    2000 x 1000 OR 4000 x 500INTAKE AIR LOUVER

    2000 x 1000 OR 4000 x 500INTAKE AIR LOUVER

    FIRE RATED DUCT

    200 mmx200 mm

    EF /2FP-01

    SPF /2FP-01

    1000

    mm

    x550

    mm

    LMCP-SPF-2P-02

    250 x 200 EAG

    1

    ATI-ME-9

    2

    ATI-ME-9

    3

    ATI-ME-9

    1

    ATI-ME-10

    -

    ---

    1000

    mm

    x550

    mm

    1000

    mm

    x550

    mm

    2328

    1000

    2006 1000

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:27AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    2ND PODIUM LEVEL MECHANICALLAYOUT (PART 2 OF 2)

    EMMAN YUZON

    ATI-ME-6

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

    1 : 100

    2ND PODIUM LEVEL AIR-CONDITIONING & VENTILATION LAYOUT (PART 2 OF 2)1

    NOTE:- REFERENCE 0.0 FOR INVERT/SPOT ELEVATIONS WILL BERELATIVE TO THE CURRENT LEVEL ON THE INDICATEDFLOOR PLAN- INVERT/SPOT ELAVATIONS INDICATE THE BOTTOM OF THEPIPE OR ELEMENTS- PAPERSIZE IS A0 TO ATTAIN THE INDICATED SCALE ONTHE DRAWING.

  • SIDEWALK1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL

    8410

    2ND PODIUM FFL

    11610

    AMENITY LVL

    16110

    11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p

    3285 3600

    3600

    4500

    3200

    5500

    1200

    1300 mmx700 mm 1300 mmx700 mm 700 mmx350 mm

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p

    3450

    33503700

    3450

    363

    1100 mmx300 mm

    1300 mmx700 mm700 mmx350 mm

    300 mmx750 mm

    4500

    3200

    5500

    SIDEWALK

    1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL8410

    2ND PODIUM FFL

    11610

    AMENITY LVL

    16110

    11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p

    3700

    353040

    25

    4000

    3900

    635 360 1165 2495

    300 mmx500 mm 250 mmx400 mm 600 mmx1400 mm

    1000 mmx550 mm

    4500

    3200

    5500

    1200

    3015

    2420

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:36AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID

    EMMAN YUZON

    ATI-ME-7

    1 : 100

    SECTION ALONG GRIDLINE Ap-Cp1

    1 : 100

    SECTION ALONG GRIDLINE D'p-Ep2

    1 : 100

    SECTION ALONG GRIDLINE Gp-Hp3

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

  • SIDEWALK

    1710

    GROUND FLOOR FFL2910

    1ST PODIUM FFL

    8410

    2ND PODIUM FFL

    11610

    AMENITY LVL16110

    11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p

    4000

    3875

    3800

    3866

    4035

    500 mmx900 mm 350 mmx800 mm 350 mmx800 mm

    1000 mmx550 mm

    200 mmx200 mm

    200 mmx200 mm

    2320

    4500

    3200

    5500

    1200

    2410

    3306

    3015

    2430

    550 mmx1000 mm

    550 mmx1000 mm

    SIDEWALK1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL

    8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    11p 2p 2'p 3p 3'p 1t 4p 4'p 5'p 6p 6'p 7p 8p 8'p 9p5p 9'p 10p

    300037

    00

    3480

    3455

    3430

    3405

    400

    500 mmx900 mm

    450 mmx900 mm 400 mmx800 mm 350 mmx500 mm

    250 mmx500 mm 250 mmx300 mm

    3000

    KEF /2F-01

    KSF /GF-01

    4500

    3200

    5500

    1200

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:41AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID

    EMMAN YUZON

    ATI-ME-8

    1 : 100

    SECTION ALONG GRIDLINE Kp1

    1 : 100

    SECTION ALONG GRIDLINE Lp2

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

  • SIDEWALK1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL

    8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    At BBp Cp C'p Dp D'p Ep Fp Gp HpE'p Jp Kp Lp Mp Np

    700 mmx1300 mm 700 mmx1300 mm 700 mmx1000 mm 700 mmx1000 mm 600 mmx1000 mm 600 mmx1000 mm 500 mmx900 mm 500 mmx900 mm

    800 mmx300 mm

    314035053800

    3700

    3700

    4500

    3200

    5500

    1200

    SIDEWALK

    1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    Ap Bp Cp C'p Dp D'p Gp Hp Jp Kp Lp Mp Np

    700 mmx1300 mm700 mmx1300 mm

    EF /GF-07.1

    328537

    03

    4000

    EF /GF-06

    300 mmx700 mm

    3875

    3480

    KSF /GF-01

    2980

    4500

    3200

    5500

    1200

    SIDEWALK1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL

    8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    At BAp Bp Cp C'p Dp D'p Ep Fp Gp HpE'p Jp Kp Lp Mp

    EF /GF-07.2

    3703

    3280

    3380

    3480

    3630

    700 mmx1300 mm 700 mmx1300 mm 600 mmx1000 mm 500 mmx900 mm 350 mmx800 mm

    550 mmx1000 mm

    2260

    3280

    700 mmx1000 mm

    700 mmx350 mm

    3585

    4500

    3200

    5500

    1200

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:57:50AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID

    EMMAN YUZON

    ATI-ME-9

    1 : 100

    SECTION ALONG GRIDLINE 2p1

    1 : 100

    SECTION ALONG GRIDLINE 3'p-4p2

    1 : 100

    SECTION ALONG GRIDLINE 5p3

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO

  • SIDEWALK

    1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    At BAp Bp Cp C'p Dp D'p Ep Fp GpE'p Jp Kp Lp Mp Np

    358543

    50

    SPF /2FP-01

    2865

    3690

    350 mmx700 mm

    3000

    700 x 350 PROPOSED STP EAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)

    700 x 350 PROPOSED STP FAD(STUB-OUT AT BASEMENTSTP ROOM CEILING LEVEL)

    STP-SF /GF-01

    2300

    4500

    3200

    5500

    1200

    1000 mmx550 mm

    3700

    4000

    2600

    SIDEWALK

    1710

    GROUND FLOOR FFL

    2910

    1ST PODIUM FFL8410

    2ND PODIUM FFL11610

    AMENITY LVL

    16110

    At BAp Bp Cp C'p Dp D'p Ep Fp Gp HpE'p Jp Kp Lp Mp Np

    3200

    EF /GF-05

    EF /GF-04.2

    600 mmx1400 mm

    3000 x 900 EALOR 5500 x 500 EAL

    4500

    3200

    5500

    1200

    OWNER / DEVELOPER

    CORPORATIONMAKATI DEVELOPMENT

    PROJECT MANAGER

    TAGUIG, METRO MANILA, PHILIPPINES

    1/F BONIFACIO TECHNOLOGY CENTER

    TELEPHONE: 02.623.53.14 - 15

    SHEET CONTENTS

    E-MAIL: [email protected]

    AVIDA TOWERSINTIMA

    SITE DEVELOPMENT PLAN

    MANILA PHILIPPINES

    31ST STREET 2ND AVENUE, BONIFACIO GLOBAL CITY

    MAKATI DEVELOPMENT CORPORATIONBIM OFFICER

    MAKATI DEVELOPMENT CORPORATIONTEAM LEADER

    NORTH

    S

    W E

    MAKATI DEVELOPMENT CORPORATIONBIM MODELER

    AVIDA LANDCORPORATION

    PIPESVENT PIPEHOT WATER PIPECOLD WATER PIPEREFRIGERANT PIPEFIRE PROTECTION LINEWASTE PIPE

    DRAIN PIPECONDENSATE DRAIN PIPE

    CONDUITPOWER LINE

    DUCTS

    AIR CONDITIONING DUCTEXHAUST DUCT

    BUS DUCT

    LEGEND

    REFERENCE PLANS:

    ARCHITECTURAL PLANS CD ISSUED JULY 31, 2012STRUCTURAL PLANS CD ISSUED JULY 31, 2012

    - REVISED FOUNDATION LAYOUT S-3 TO S-7 ISSUED FEBRUARY 14, 2013MECHANICAL PLANS CD ISSUED JULY 31, 2012ELECTRICAL PLANS CD ISSUED JULY 31, 2012PLUMBING PLANS CD ISSUED JULY 31, 2012FIRE PROTECTION PLANS CD ISSUED JULY 31, 2012

    DATE ISSUED:

    SHEET NO.:

    ROCHELLE MARIE M. BALUYOT

    EMMANUEL FRANCIS L. YUZON

    1/29/2014 11:58:03AM\\10.14.8.14\ad files b\RESIDENTIAL\AVIDA TOWERS INTIMA\3. Working Files\3.1 Current\3.1.2 Mechanical\INTIMA-MECHANICAL GROUND-2ND PODIUM LEVEL.rvt

    GROUND FLOOR - PODIUM LEVELMECHANICAL SECTION ALONG GRID

    Author

    ATI-ME-10

    1 : 100

    SECTION ALONG GRIDLINE 6p-6'p1

    1 : 100

    SECTION ALONG GRIDLINE 8'p-9'p2

    OTHER CONCERNS

    LEGEND DESCRIPTIONDATE

    ISSUED ISSUED TO