MEANS OFFICE BUILDINGPRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL
Eddie Aquino, Jimmy Fu, Alvin Sarmiento
Spring 2011
Civil Engineering 239
![Page 2: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/2.jpg)
PROJECT TEAM
Eddie AQUINO PROJECT MANAGER/3D MODELLER
Jimmy FU PROJECT ENGINEER/
CONSTRUCTION SITE LOGISTICS
Alvin SARMIENTO PROJECT ESTIMATOR/SCHEDULER
2
![Page 3: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/3.jpg)
PROJECT REQUIREMENTS Three-story office building w/ underground
garage Concrete waffle slab Spread footings Structural Steel framing with steel deck Penthouse structure CMU Steel joist roof Construction budget 10.5 million – 12 million
![Page 4: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/4.jpg)
PROJECT LOCATION
COMPONENT StreetLooking Southeast
COMPONENT StreetLooking Southwest
![Page 5: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/5.jpg)
PROJECT LOCATION
2.60 Acres IP (PD) URBAN Freeways
![Page 6: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/6.jpg)
3D MODEL
PDF Simulation
![Page 7: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/7.jpg)
Cost Estimates
Timberline Sage Ranked most used estimating software by
ENR
AutoCAD Timberline
Primavera
MS Project
![Page 8: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/8.jpg)
Cost Estimates
Features CSI MasterFormat Provides detailed labor, material, and
equipment cost estimates Provides total cost/unit and total amount
per item
![Page 9: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/9.jpg)
Cost Estimates
Problems Encountered Can not access Division 10-16
Mechanical and Electrical Systems
![Page 10: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/10.jpg)
Cost Estimates
Problems Encountered Final cost estimates from Timberline does
not match cost estimates given in excel sheet
![Page 11: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/11.jpg)
Schedule
MS Project Timeline: January 27, 2011 – January 6,
2012 RS Means 2002 and Golden Bear
Construction Inc. RS Means Office Building Schedule
Superstructure
GarageMeasurement
Daily Output based on RS Means production
Approximate Completion
Structural Steel Columns/Beams 114 Tons 14.4 Tons 8 days
1st FloorMeasurement
Daily Output based on RS Means production
Approximate Completion
Structural Steel Columns/Beams 114 Tons 14.4 Tons 8 days
Metal Deck 18,900 SF 3,500 SF 6 daysConcrete Fill Over Metal Deck 18,900 SF 8,640 SF 3 daysWaffle Slab 18,900 SF 2,380 SF 8 daysFire Proofing 18,900 SF 3,000 SF 7 days
![Page 12: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/12.jpg)
Schedule
![Page 13: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/13.jpg)
Schedule Accuracy of schedule and duration of project
Each activity has a predecessor At any time during schedule, one or more
activities can occur Advantages
Simple to use Disadvantages
Activities may not have any predecessor or successor
![Page 14: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/14.jpg)
CONSTRUCTION SITE
![Page 15: MEANS OFFICE BUILDING PRE-CONSTRUCTION & CONTRACTING SERVICES PROPOSAL Eddie Aquino, Jimmy Fu, Alvin SarmientoSpring 2011](https://reader036.vdocument.in/reader036/viewer/2022081602/551bb9d2550346af588b45e6/html5/thumbnails/15.jpg)
CONSTRUCTION EQUIPMENT
ACTION MOBILE INDUSTRYMODEL 1250 (46’x12’)
LINDEN COMANSALC 500 Series