measure j & measure n€¦ · measure j • new 21st-century classrooms at thomas edison,...

13
Bond Construction Update Measure J & Measure N

Upload: others

Post on 04-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Bond Construction Update Measure J & Measure N

Page 2: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

San Juan Unified continues to build!

• Successful 2015 summer build season

• Signature Projects

• Churchill Middle School open

• Sylvan Middle School’s future campus

• Class size reduction projects

• Safety projects

• Innovation & Efficiency

Page 3: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Summer Construction • Started more than

$84 million in projects (construction and design) from Measure N and Measure J

• New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly

• Wireless upgrades at 54 schools

• LED lighting retrofit • Paving, landscaping • Restroom

renovations at five schools

• Signature Project Design

• Future Sylvan Middle School groundbreaking

Page 4: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

High School Signature Projects

• Rio Americano Performance and Academic Center & Bella Vista Science Wing to break ground in 2016

• Completion of Rio and BV in Q1 of 2017

• Round 2 of signature project planning in 2016

Page 5: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Rio Americano Performance & Academic Center

• Two music classrooms

• 350-seat auditorium

• Floor level stage

• Used for music and

academic programs like

Civitas

• Lobby

• Displays student artwork

• Box office

Page 6: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Bella Vista High science wing

• Scheduled for March 2017 completion

• Innovative 10,000-square foot “flex space”

• 11 Classrooms • Biology • Chemistry • Anatomy • Technology

Page 7: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

• Scheduled for fall of 2018 completion

• Still in early programming phase – Early concept

design – 500+ seats – Raised stage – Lighting with

catwalk

El Camino performing arts

center

Page 8: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Churchill Middle School

• Opened to students Jan. 6

• Nine 21st-century classrooms

– Two 70” flat screens in each room

– Flexible furniture

– Writing surfaces on multiple walls

• Media room

• Computer lab

• Physical education studio

• Grand opening event for public on Jan. 21, 2016

Page 9: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Future Sylvan Middle School campus

• Library • Music room • STEAM Lab • Resource center • Science labs • PE & Outdoor space • Entry improvements • Current classroom

renovations

www.sanjuan.edu/futuresylvan

New and modernized classrooms to accommodate Science, Technology, Engineering, Arts & Math curriculum include:

Page 10: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Class Size Reduction

• New buildings to accommodate smaller class sizes:

– Mariemont

– Del Dayo

– Greer

– Cowan

– Edison

– Sierra Oaks

– Thomas Kelly

Page 11: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

• Fencing installed at Skycrest, Coyle, Thomas Kelly & Woodside

• Three more fencing projects being planned with input from Safe Schools

Safety projects

Page 12: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Innovation & Efficiency

• LED lighting project replacing 39,000 bulbs at all nine comprehensive high schools

• $400,000 SMUD rebate • $233,000 annual savings on utility

bills • Negotiating SMUD rebate for

middle school project this summer

• Technology standards that include 70” flat screen monitors and furniture standards that promote flexible learning spaces

• Wireless infrastructure

Page 13: Measure J & Measure N€¦ · Measure J • New 21st-century classrooms at Thomas Edison, Churchill, Pasadena and Dyer-Kelly • Wireless upgrades at 54 schools • LED lighting retrofit

Questions?