measured progress ©2013 1 new mexico itest system training fall 2013 scott duquette technical...
TRANSCRIPT
Measured Progress ©2013
1
New MexicoiTest System Training Fall 2013
Scott Duquette
Technical Product Support
Measured Progress ©2013
2
Training Topics
What to Expect from Computer-Based Online Testing
Introduction to iTest Components Important Considerations
Technical Requirements Resource Availability NM PED Tech Footprint Site Best Practices
Preparedness Online Resources Help Desk Information Key Dates & Scheduling
Q&A
Measured Progress ©2013
3
What to Expect from Computer-Based Online Testing
Measured Progress ©2013
4
Three web-based components requiring secure logins:Data Administration System (DAS)
Proctor Test Workstation (PTW)
Student Test Workstation (STW)
Introduction to iTest Components
Measured Progress ©2013
5
Data Administration System (DAS)Manage staff and student dataAssign tests to staff and studentsPrint student login ticketsAccess reportsAccess documentationAccess technical requirements and kiosk installers
iTest Components – DAS
Measured Progress ©2013
6
Proctor Test Workstation (PTW)Used by Test Administrators to administer tests to students
Start, pause, and end test sessions Monitor student progress during test Print test receipts
iTest Components – PTW
Measured Progress ©2013
7
Student Test Workstation (STW)Accessed via a kiosk that must be installed onto each student computer
Prevents access to other programs or websitesUsed by students to take tests
Requires a secure login using Student Login Tickets
Use of virtual tools such as rulers, calculators, and/or Text-to-Speech
NOTE: A paper answer document will be used in conjunction with the STW for math
iTest Components – STW
Measured Progress ©2013
8
Important Considerations
Measured Progress ©2013
9
Operating System Microsoft® Windows® XP®, Vista®, or Windows 7 Macintosh® 10.5, 10.6, 10.7, or 10.8
Internet Browser – DAS/PTW Firefox® 17 ESR (Extended Support Release) Windows: Internet Explorer® 7, 8, 9, or 10 Macintosh: Safari® 5 or 6
Internet Browser – STW Firefox Portable Kiosk is installed with STW software
Memory Configurations 512 MB or greater minimum,
1 GB or greater recommended Internet Speed
Upload: 15 kbps per student Download: 55 kbps per student
Technical Requirements
Measured Progress ©2013
10
Technical Resources Lab meeting technical requirements including
network specifications Staff Engagement
Availability of Test Administrator(s) Technical Rep available during testing
Resource Availability
Measured Progress ©2013
11
NM PED Tech Footprint Site
http://webapp.ped.state.nm.us/TechFootPrint
Used to determine if schools will participate in CBT or PBT testing for the 2014 SBA
NM PED Webinar: https://www4.gotomeeting.com/register/964556087
Measured Progress ©2013
12
Best Practices
Configure network and download kiosk from the DAS
Simulate testing in advance Schedule labs in advance Take advantage of practice tests for both staff
and students
Measured Progress ©2013
13
Preparedness
Measured Progress ©2013
14
Online Resources
DAS Welcome pageQuick Start GuideShow Me VideosOnline HelpTechnical RequirementsTechnology page – installation files and instructionsSystem AnnouncementsAdministration Manuals (DFAs and TCM)
Measured Progress ©2013
15
New Mexico Help DeskFor questions relating to policy or the New Mexico Standards Based Assessment in generalMonday–Friday, 7 AM to 3 PM MTExtended hours: March 3, 2014 – April 11, 2014, 7 AM to 5 PM [email protected]
Measured Progress Technical Product SupportFor questions relating to the iTest software or any technical issuesMonday–Friday, 7 AM to 3 PM MTExtended hours: December 10, 2013 – April 11, 2014, 7 AM to 5 PM MT877-676-6722 [email protected]
Help Desk Information
Measured Progress ©2013
16
Key Dates & Scheduling
August 21, 2013 Introductory Training
September 19, 2013 Second Introductory Training
September 30, 2013 Technology Readiness Tool (TRT) and School Speed Test (SST) Deadline;Footprint Snapshot Collected by PED
October 14, 2013 iServices opens
October 14, 2013 – October 18, 2013
On-Site Technical Support & Training
October 16, 2013 DAS opens for Practice Testing
October 21, 2013 Practice Test Training
November 4, 2013 – November 8, 2013
On-Site Technical Support & Training
November 15, 2013 CBT or PBT Decision Deadline
February 3, 2014 Final Training prior to 2014 SBA Administration
March 3, 2014 – April 4, 2014
Operational Testing
Measured Progress ©2013
17
Q&A
Measured Progress ©2013
18
P.O. Box 1217, Dover, NH 03821-1217 | Web: MeasuredProgress.org | Office: 603.749.9102 It’s all about student learning. Period.
Thank you!