\Mth reference to our checking based on the mechanical proof print, we hereby made comments on the follottring:(See also the attached comments on proof print)
Hope to be noted on these changes and corrections, thank you.
Prepared by;
Noted by:
Arch.
Paoe # CommentsM{1 1. We trave submitted our criteria and plans that we have air duc{s (for heat exhaust), as shown on the
plans, and the dimensions are 0.45m x 0.90m. There is also a detailed drawing of the said air duclsleeves, pages M-7 & M-9 of the plans we have submitted.
a. Question: ls the size we gave for ihe air duct chase/sleeve enough for each store at alfresco areato exhaust heat?
b. Provide standard detail of air ducl for heat exhaust, section and isometric.
Please reflect the details of our air-duct sleever/chase drawings we have submitted.Regarding Mechanical General Notes #8b., we don't have floor mounled ACCU, we only have wallmounted ACCU and we have submitted our detail drawings for this. Kindly refer it on pages M-5, M-
6, M-8, & A-94 of the plans we have submitted before. Please follow the drawing details to prevent
leak.Regarding Mechanical General Notes #14, omit this section since there is no elevator for this projec{.
Comment on drawing 2lC-M01, please refer to the mechanical plan drawing inputs we havesubmitted on Daoes M-5 (3/M-5). M-6 (2/M-6), l/.7 (2lM'7\, & M-9 (4/M-9),
2.3.
4.5.
M-02 Regarding riser iocations through roof deck, please refer to the mechanical drawing inputs we have
submitted on pages M-1 (Ground Floor), and M-5 (Second Floor). The small circles represent thssleeves. Do nol use allotted air duct chase/sleeve which is for heat exhaust.
1_
M{3 Riser sleeves from ground floor, please refer to the mechanical drawing inputs we have submitted onpages M-1 (Ground Floor) and M-5 (Second Floor). The small circles represent the sleeves.Do not use the air duct chase/sleeve as sleeves for refrigerant risers.Use the baseolan we oave on M-5 (1/M-5) Buildins 1 Second Floor Plan.
1.
2.3.
M-04 @sthroughroofdeck,pleaserefertothemechanicaldrawinginputswehavesubmitted on pages M-2 (Ground Floor), and M-6 (Second Floor). The small circles represent the
sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust.
1.
M{5 r,pleaserefertothemechanicaldrararinginputswehavesubmittedonpages M-2 (Ground Floor) and M-6 (Second Floor). The small circles represent the sleeves.
2. Do not use the air duct chase/sleeve as sleeves for refrigerant rises.3. Use the baseplan we gave on M-6 (1/M'6) Building 2 Second Floor Plan
M{6 1 @1hroughroofdeck,pleaserefertothemechanicaldrawinginputswehavesubmitted on pages M-3 (Ground Floor), and M-7 (Second Floor). The small circles represent the
sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust.M{7 REei steeves from ground floor, please refer to the mechanical drawing inputs we have submitted on
pages M-3 (Ground Floor) and M-7 (Second Floor). The small circles represent the sleeves.Do not use the air duct chase/sleeve as sleeves for refrigerant risers.Use the baseolan we qave on M-7 (1/M-5) Building 3 Second Floor Plan"
1.
2.3.
M{t8 @roofdeck,pleaserefertothemechanicaldrawinginputswehavesubmitted on pages M-4 (Ground Floor), and M-8 (Second Floor). The small circles represent the
sleeves. Do not use allotted air duct chase/sleeve which is for heat exhaust.
1.
M-09 aserefertothemechanicaldrawinginputswehavesubmittedonpages M-4 (Ground Floor) and M-8 (Second Floor). The small circles represent the sleeves.
Do not use the air duct chase/sleeve as sleeves for refrigerant risers.Use the baseplan we gave on M-8 (1/M-8) Building 5 Second Floor Plan
1.
2.3.