NTS
KEY PLAN
KEY PLAN
AREA OFWORK
EXISTING ELECTRICAL PANELSQUARE D #NQOD454L225CU225A, 120/240V, 3PH, 4W54 CCTS
12x8
8"Ø
12x8
RA
SA SUPPLY AIR
RETURN AIR
DUCT SIZE, RECTANGULAR,
ELBOW, RECTANGULAR(r=1.5W)
ACOUSTICAL INSULATION LINING
HVAC LEGEND
DUCT SIZE, ROUND
DUCT SECTION, SUPPLY
DUCT SECTION, RETURN OR EXHAUST
FIRST FIGURE IS SIDE SHOWN
EA EXHAUST AIR
ACOUSTICAL INSULATION LINING
TEE, RECTANGULAR MAIN AND TAP,
FOT - FLAT ON TOP, FOB - FLAT ON BOTTOM
TEE, RECTANGULAR MAIN AND TAP
TEE RECTANGULAR
TRANSITIONS
WITH DAMPER
WYE, RECTANGULAR
TYPE
CFM
SIZECEILING OR REGISTER DESIGNATION
CEILING RETURN GRILLE
FD
WALL SUPPLY GRILLE OR REGISTER
FIRE DAMPER
WALL EXHAUST/RETURN GRILLE OF REGISTER
CEILING SUPPLY DIFFUSER
24"x24"'S1' 100
T THERMOSTAT
MECHANICAL NOTES
MECHANICAL DRAWINGS SHALL BE READ IN CONJUNCTIONWITH ALL OTHER DRAWINGS FOR THIS PROJECT.
1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE
MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTHAND SAFETY ACT AND REGULATIONS FOR CONSTRUCTIONPROJECTS.
.2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THEFOLLOWING:.1 ONTARIO BUILDING CODE (OBC);.2 NATURAL GAS AND PROPANE INSTALLATION CODE
(GAS CODE)/INSTALLATION CODE FOR OIL BURNINGEQUIPMENT;
.3 ASHRAE;
.4 SMACNA;
.5 NFPA;
.6 ALL OTHER RELEVANT CODES AND STANDARDS, ASAPPLICABLE.
.3 OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATIONOF MECHANICAL TRADES WORK, ARRANGE FORINSPECTIONS AND TESTS, AND PAY ALL FEES AND COSTSFOR THE PERMITS, INSPECTIONS AND FEES. OBTAINPERMITS IMMEDIATELY AFTER NOTIFICATION OF AWARDOF CONTRACT.
.4 PROVIDE THREE COPIES OF COMPLETE OPERATING ANDMAINTENANCE INSTRUCTIONS FOR EQUIPMENTFURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONSIN 3-RING BINDERS. INCLUDE THE FOLLOWING:.1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS..2 CONTROL SHOP DRAWINGS AND OPERATING
SEQUENCE INCLUDING WIRING OF COMPONENTS..3 WIRING DIAGRAM OF CONTROL PANELS..4 OPERATING INSTRUCTIONS, INCLUDING START-UP
AND SHUT-DOWN PROCEDURE..5 MAINTENANCE INSTRUCTIONS INCLUDING
PREVENTIVE MAINTENANCE INSTRUCTIONS FORCOMPONENTS OF THE EQUIPMENT.
.6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIRCOMPONENT PARTS, SHOWING MANUFACTURER'SNAME, CATALOGUE NUMBER, AND NEARESTREPLACEMENT SOURCE.
.7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITYOF EACH ITEM TO BE STOCKED.
.8 MANUFACTURERS' WARRANTIES AND GUARANTEES..5 CLEAN ALL MECHANICAL SYSTEMS AT PROJECT
COMPLETION..6 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES
AS WORK PROGRESSES.
2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE
“TRADE QUALIFICATION AND APPRENTICESHIP ACT”AND REGULATIONS, BY PERSONS WHO HOLD THEFOLLOWING CERTIFICATES OF QUALIFICATION (ASAPPLICABLE):.1 REFRIGERATION & AIR CONDITIONING SYSTEMS
MECHANIC;.2 RESIDENTIAL AIR CONDITIONING SYSTEMS
MECHANIC;.3 SHEET METAL WORKER.
.2 ALL FUELS-RELATED WORK TO BE CARRIED OUT INACCORDANCE WITH TSSA REQUIREMENTS AND ONTARIO REGULATION 215/01, “FUEL INDUSTRY CERTIFICATES” BYPERSONS WHO HOLD THE APPROPRIATE CERTIFICATES FORTHE WORK BEING PERFORMED.
3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE
SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES
AND BUILDING FABRIC. MAKE GOOD ANY AND ALLDAMAGE RESULTING FROM THIS WORK.
.3 CONNECTIONS TO EXISTING SERVICES SHALL BECOORDINATED WITH THE OWNER.
.4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE ORDISTURBANCE TO NORMAL USE OF THE EXISTINGBUILDING.
.5 DESIGNATED SUBSTANCES:.1 DESIGNATED SUBSTANCES SHALL BE TREATED IN
ACCORDANCE WITH THE REQUIREMENTS OF THEOCCUPATIONAL HEALTH AND SAFETY ACT ANDREGULATIONS.
.2 SHOULD ANY DESIGNATED SUBSTANCES BEENCOUNTERED IN THE AREA OF CONSTRUCTION, ALLWORK SHALL STOP IMMEDIATELY, AND THE OWNERAND ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
.3 IF APPLICABLE, ASBESTOS REMOVAL SHALL BECOMPLETED IN ACCORDANCE WITH THEOCCUPATIONAL HEALTH AND SAFETY ACT ANDONTARIO REGULATION 278 “DESIGNATED SUBSTANCE- ASBESTOS ON CONSTRUCTION PROJECTS AND INBUILDINGS AND REPAIR OPERATIONS”.
.6 DISPOSAL OF MATERIALS:.1 REMOVE AND DISPOSE OF ALL WASTE MATERIALS.
.2 RECYCLE MATERIALS WHERE POSSIBLE..3 HANDLE WASTE MATERIALS NOT REUSED, SALVAGED,
OR RECYCLED IN ACCORDANCE WITHAPPROPRIATE REGULATIONS AND CODES.
.4 DO NOT BURY RUBBISH OR WASTE MATERIALS, ORDISPOSE OF MATERIALS INTO WATERWAYS, STORM,OR SANITARY SEWERS.
.5 KEEP RECORDS OF CONSTRUCTION WASTE INCLUDINGNUMBER AND SIZE OF BINS, WASTE TYPE OF EACHBIN, TOTAL TONNAGE GENERATED, TONNAGE REUSEDOR RECYCLED, REUSED OR RECYCLED WASTEDESTINATION.
.6 REMOVE MATERIALS FROM DECONSTRUCTION ASDECONSTRUCTION/DISASSEMBLY WORK PROGRESSES.
.7 PREPARE PROJECT SUMMARY TO VERIFYDESTINATION AND QUANTITIES ON AMATERIAL_BY_MATERIAL BASIS.
4 FIXTURES AND EQUIPMENT:.1 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL
MECHANICAL FIXTURES AND EQUIPMENT FOR APPROVAL,PRIOR TO PROCUREMENT.
.2 INSTALL ALL MECHANICAL FIXTURES AND EQUIPMENT INACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
.3 LOCATE ALL EQUIPMENT WITH CLEARANCES, AS REQUIREDBY THE MANUFACTURER, THE FUEL CODES, AND ALLOTHER CODES AND REGULATIONS, INCLUDING THEFOLLOWING CLEARANCES:.1 TO PERMIT PROPER EQUIPMENT OPERATION;.2 TO PERMIT SUFFICIENT AIRFLOW AROUND
EQUIPMENT;.3 FOR EQUIPMENT SERVICE;.4 SUFFICIENT DISTANCE FROM COMBUSTIBLE
MATERIAL;.5 WITH SUFFICIENT VENT CLEARANCES;.6 SUFFICIENT DISTANCE FROM ROOF EDGES OR OTHER
HAZARDS.
5 ACCESS DOORS:.1 SUPPLY ACCESS DOORS, AS REQUIRED IN DUCTWORK AND
WALL/CEILING ASSEMBLIES, TO ALL CONCEALEDMECHANICAL EQUIPMENT AND OPERATING DEVICES.ACCESS DOORS IN WALL/CEILING ASSEMBLIES TO BEINSTALLED BY OTHER TRADES.
.2 ACCESS DOORS SHALL BE FIRE-RATED TYPE, WHERE USEDIN FIRE-RATED ASSEMBLIES, AND SHALL MATCH THERATING OF THE ASSEMBLY.
6 NATURAL GAS PIPING:.1 STEEL PIPE, SCHEDULE 40, SEAMLESS, SCREWED FITTINGS..2 SLOPE PIPING DOWN IN DIRECTION OF FLOW TO LOW
POINTS.
.3 TEST SYSTEM IN ACCORDANCE WITH NATURAL GAS ANDPROPANE INSTALLATION CODE.
7 DUCTWORK:.1 RECTANGULAR DUCT:
.1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITYTO ASTM A653/A653M
.2 THICKNESS, FABRICATION, REINFORCEMENT ANDSUPPORT/ATTACHMENT TO ASHRAE OR SMACNA.
.2 ROUND DUCT:.1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY
TO ASTM A653/A653M.2 THICKNESS, FABRICATION, REINFORCEMENT AND
SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA..3 SEAL CLASSIFICATION:
.1 CLASS A: LONGITUDINAL SEAMS, TRANSVERSE JOINTS,DUCT WALL PENETRATIONS AND CONNECTIONSMADE AIRTIGHT WITH SEALANT AND TAPE.
.4 FITTINGS.1 FABRICATION: TO SMACNA..2 RADIUSED ELBOWS.
.1 RECTANGULAR: STANDARD WITH CENTRELINERADIUS 1.5 TIMES DUCT DIMENSION, WITHSINGLE THICKNESS TURNING VANES.
.2 ROUND: FIVE PIECE WITH CENTRELINE RADIUS1.5 TIMES DIAMETER.
.3 MITRED ELBOWS, RECTANGULAR: WITH DOUBLETHICKNESS TURNING VANES.
.5 BRANCHES:.1 RECTANGULAR MAIN AND BRANCH: WITH RADIUS ON
BRANCH 1.5 TIMES WIDTH OF DUCT 45 DEGREESENTRY ON BRANCH.
.2 ROUND MAIN AND BRANCH: ENTER MAIN DUCT AT 45DEGREES WITH CONICAL CONNECTION.
.3 PROVIDE VOLUME CONTROL DAMPER IN BRANCHDUCT NEAR CONNECTION TO MAIN DUCT.
.6 TRANSITIONS:.1 DIVERGING: 20 DEGREES MAXIMUM INCLUDED
ANGLE..2 CONVERGING: 30 DEGREES MAXIMUM INCLUDED
ANGLE..7 FIRE STOPPING
.1 RETAINING ANGLES AROUND DUCT, ON BOTH SIDESOF FIRE SEPARATION IN ACCORDANCE WITH SECTION.
.2 FIRE STOPPING MATERIAL AND INSTALLATION MUSTNOT DISTORT DUCT.
.8 DAMPERS:.1 MANUFACTURE TO SMACNA STANDARDS.
.2 SINGLE BLADE DAMPERS:.1 FABRICATE FROM SAME MATERIAL AS DUCT,
BUT ONE SHEET METAL THICKNESS HEAVIER.V_GROOVE STIFFENED.
.2 SIZE AND CONFIGURATION TORECOMMENDATIONS OF SMACNA.
.3 LOCKING QUADRANT (WITH SHAFT EXTENSIONTO ACCOMMODATE INSULATION THICKNESS, IFREQUIRED).
.4 INSIDE AND OUTSIDE NYLON END BEARINGS.
.5 CHANNEL FRAME OF SAME MATERIAL ASADJACENT DUCT, COMPLETE WITH ANGLE STOP.
.9 DUCT LEAKAGE: IN ACCORDANCE WITH SMACNA HVAC AIRDUCT LEAKAGE TEST MANUAL.
.10 ALL DUCT AND SEAL MATERIALS TO HAVE A FLAME SPREADRATING OF LESS THAN 25 AND A SMOKE DEVELOPEDCLASSIFICATION OF LESS THAN 50.
.11 PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENTDUCT CONNECTION POINTS.
8 DUCT INSULATION:.1 REFER TO DRAWING FOR DUCT THAT IS IDENTIFIED TO BE
INSULATED..2 INSTALL IN ACCORDANCE WITH THERMAL INSULATION
ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS..3 MAX. FLAME SPREAD RATING: 25..4 MAX. SMOKE DEVELOPED RATING: 50..5 ACOUSTIC DUCT LINING:
.1 1” (R4.3) ACOUSTIC QUALITY MINERAL FIBRE DUCTLINER, WITH MAT FACING, BACTERIA AND FUNGUSRESISTANT.
.2 FASTEN TO INTERIOR SHEET METAL SURFACE WITH100% COVERAGE OF ADHESIVE AND 5/16” WELDPINS NOT LESS THAN 2 ROWS PER SURFACE AND NOTMORE THAN 16 IN ON CENTRES.
.3 SEAL BUTT JOINTS, EXPOSED EDGES, WELD PIN ANDCLIP PENETRATIONS AND DAMAGED AREAS OF LINERWITH 2” JOINT TAPE AND SEALER.
9 MECHANICAL FIRE PROTECTION:.1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY
LOCATION OF ALL FIRE SEPARATIONS AND FIRE-RATEDMEMBRANES.
.2 ALL PIPING SHALL BE TIGHTLY FITTED AND SEALED WITHFIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS ANDFIRE-RATED MEMBRANES.
.3 FIRE DAMPERS:.1 FIRE DAMPERS SHALL BE CAN/ULC-S112 (STANDARD
METHOD OF FIRE TEST OF FIRE DAMPER ASSEMBLIES)LISTED AND LABELLED.
.2 FIRE DAMPERS SHALL BE NFPA 80 (STANDARD FORFIRE DOORS AND OTHER OPENING PROTECTIVES),NFPA 90A (STANDARD FOR THE INSTALLATION OFAIR-CONDITIONING AND VENTILATING SYSTEMS),AND NFPA 101 (LIFE SAFETY CODE) COMPLIANT.
.3 DUCTWORK SHALL BE FITTED WITH FIRE DAMPERS ATALL FIRE SEPARATIONS AND FIRE-RATEDMEMBRANES.
.4 SUPPLY AND INSTALL ACCESS DOORS INARCHITECTURAL FINISH (WALL, CEILING OR FLOOR)TO ACCESS DUCT, IN COMMON AREA WHEREPOSSIBLE.
.5 SUPPLY AND INSTALL TIGHTLY-FITTED ACCESS DOORIN DUCT TO ACCESS, INSPECT AND RESET FIREDAMPER.
.4 FIRE DAMPER AND DUCT SHALL BE INSTALLED INACCORDANCE WITH MANUFACTURERS REQUIREMENTS,AND SHALL BE SEALED WITH FIRESTOPPING MATERIAL.
.5 ALL MECHANICAL MATERIALS USED WITHIN CEILINGRETURN AIR PLENUMS SHALL FLAME-SPREAD RATING NOTMORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATIONNOT MORE THAN 50 PER CAN/ULC-S102.2.
.6 MOCK-UPS:.1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP
INSTALLATION OF THE FOLLOWING, FOR REVIEW ANDAPPROVAL BY THE OWNER, ENGINEER ANDMUNICIPAL BUILDING INSPECTOR.
.2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETEDIN ACCORDANCE WITH THE APPROPRIATE PRODUCTINSTALLATION INSTRUCTIONS, AND THE REFERENCEDUL/ULC LISTING AND/OR TEST STANDARD.
.3 SUPPLY A COPY OF THE PRODUCT INSTALLATIONINSTRUCTIONS WITH ULC LISTING AND/OR TESTSTANDARD REFERENCE, FOR EACH INSTALLATION.
.4 MOCK-UP MAY REMAIN AS PART OF WORK.
10 EARTHQUAKE LOAD:.1 ALL MECHANICAL WORK SHALL BE COMPLETED IN
ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTSREQUIRED BY THE ONTARIO BUILDING CODE.
.2 MECHANICAL ELEMENTS AND COMPONENTS (EQUIPMENT,PIPES, DUCTS, ETC.), AND THEIR CONNECTIONS TO THEBUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITHTHE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OROTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDINGCODE.
11 EQUIPMENT AND MATERIALS SUPPORT:.1 ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND
RELATED ITEMS SHALL BE SECURELY SUPPORTED,ATTACHED AND FASTENED TO BUILDING STRUCTURE.
.2 PIPE HANGERS AND SUPPORTS SHALL BE FABRICATED ANDINSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58,PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN,MANUFACTURE, SELECTION, APPLICATION, ANDINSTALLATION.
.3 PLATFORMS SHALL BE FABRICATED FROM STRUCTURALGRADE STEEL MEETING THE REQUIREMENTS OF THEONTARIO BUILDING CODE, INCLUDING CSA STANDARDW59 WELDED STEEL CONSTRUCTION, AND THEREQUIREMENTS OF THE CANADIAN WELDING BUREAU.
12 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF
THE BUILDING SHALL BE TAKEN FROM SITE BYCONTRACTOR.
.2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TOCONVEY THE SCOPE OF WORK AND GENERALARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICALLOCATION OF ALL EQUIPMENT WITH OTHER TRADESAND ALLOW FOR ANY ADDITIONAL PIPING, DUCTING,FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOIDINTERFERENCE AND FACILITATE THE WORK.
.3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONSOR ADDITIONS, WITHOUT CHARGE, TOACCOMMODATE SITE CONDITIONS AND COORDINATION.
.4 COORDINATE ALL MECHANICAL EQUIPMENT WIRING,INCLUDING LOW VOLTAGE CONTROL WIRING, WITHELECTRICAL TRADES.
13 START-UP, COMMISSIONING AND TRAINING:.1 COMMISSIONING:
.1 START-UP AND COMMISSION THE FOLLOWINGSYSTEMS:.1 HVAC.
.2 PERFORM SYSTEMATIC TESTS, PROCEDURES ANDCHECKS ON SYSTEMS, AS FOLLOWS:.1 TO VERIFY OPERATION IN ACCORDANCE WITH
CONTRACT DOCUMENTS, DESIGN CRITERIA ANDINTENT, AND MANUFACTURER'SREQUIREMENTS;
.2 TO ENSURE APPROPRIATE DOCUMENTATION ISPROVIDED;
.3 TO EFFECTIVELY TRAIN BUILDING OPERATIONALSTAFF.
.3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY,WITH CORRECTION OF ALL DEFICIENCIES ANDADJUSTMENTS TO MEET OPTIMUM PERFORMANCE.
.4 PROVIDE WRITTEN REPORT AT END OFCOMMISSIONING OUTLINING EQUIPMENTOPERATIONAL CONDITIONS AND PARAMETERS.
.2 TESTING, ADJUSTING AND BALANCING:.1 TEST, ADJUST AND BALANCE (TAB) ALL PLUMBING
AND HVAC EQUIPMENT AND SYSTEMS; INCLUDINGTHE FOLLOWING:.1 FURNACES;.2 CONDENSING UNITS;.3 HEAT RECOVERY VENTILATORS.
.2 TAB PROCEDURE SHALL BE COMPLETED INACCORDANCE WITH ASHRAE STANDARD 111,MEASUREMENT, TESTING, ADJUSTING ANDBALANCING OF BUILDING HVAC SYSTEMS.
.3 PROVIDE DETAILED REPORT AT END OF TAB, INACCORDANCE WITH THE REPORTING PROCEDURES OFASHRAE STANDARD 111.
.3 DEMONSTRATION AND TRAINING:.1 DEMONSTRATE OPERATION AND MAINTENANCE OF
EQUIPMENT AND SYSTEMS TO OWNER'S PERSONNELONE WEEK PRIOR TO DATE OF FINAL INSPECTION
.2 PRIOR TO DEMONSTRATION AND TRAINING, ENSURETHAT EQUIPMENT HAS BEEN INSPECTED AND PUTINTO OPERATION, INCLUDING COMPLETION OFCOMMISSIONING AND TESTING, ADJUSTING, ANDBALANCING.
.3 DEMONSTRATE START_UP, OPERATION, CONTROL,ADJUSTMENT, TROUBLE_SHOOTING, SERVICING, ANDMAINTENANCE OF EACH ITEM OF EQUIPMENT.
.4 INSTRUCT PERSONNEL IN PHASES OF OPERATION ANDMAINTENANCE USING OPERATION ANDMAINTENANCE MANUALS AS BASIS OF INSTRUCTION.REVIEW CONTENTS OF MANUAL IN DETAIL TOEXPLAIN ASPECTS OF OPERATION ANDMAINTENANCE.
ELECTRICAL NOTES
ELECTRICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHERDRAWINGS FOR THIS PROJECT.
1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF
LABOUR, AND THE OCCUPATIONAL HEALTH AND SAFETY ACT ANDREGULATIONS FOR CONSTRUCTION PROJECTS.
.2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING:.1ONTARIO ELECTRICAL SAFETY CODE;.2ELECTRICAL SAFETY AUTHORITY.
.3 SUBMIT TO ELECTRICAL SAFETY AUTHORITY NECESSARY NUMBER OFDRAWINGS AND SPECIFICATIONS FOR APPROVAL PRIOR TOCOMMENCEMENT OF WORK.
.4 PAY ALL ELECTRICAL PERMIT AND INSPECTION FEES.
.5 GROUND COMPLETE SYSTEM IN ACCORDANCE WITH THE ONTARIOELECTRICAL SAFETY CODE AND ELECTRICAL SAFETY AUTHORITY.
.6 IDENTIFICATION AND LABELLING:.1 IDENTIFY ELECTRICAL EQUIPMENT WITH LAMICOID NAMEPLATES,
INCLUDING AMPERAGE, VOLTAGE, PHASE AND POWER SOURCE..2 PROVIDE TYPEWRITTEN PANEL DIRECTORIES.
.7 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCEINSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT.
.8 CLEAN ALL ELECTRICAL SYSTEMS AT PROJECT COMPLETION.
.9 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORKPROGRESSES.
2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADES
QUALIFICATION AND APPRENTICESHIP ACT” AND REGULATIONS, BYPERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION(AS APPLICABLE):.1 ELECTRICIAN: CONSTRUCTION & MAINTENANCE;.2 ELECTRICIAN: DOMESTIC & RURAL.
3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING
FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THISWORK.
.3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THEOWNER.
.4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TONORMAL USE OF THE EXISTING BUILDING.
.5 DESIGNATED SUBSTANCES:.1 DESIGNATED SUBSTANCES SHALL BE TREATED IN ACCORDANCE WITH
THE REQUIREMENTS OF THE OCCUPATIONAL HEALTH AND SAFETY ACTAND REGULATIONS.
.2 SHOULD ANY DESIGNATED SUBSTANCES BE ENCOUNTERED IN THEAREA OF CONSTRUCTION, ALL WORK SHALL STOP IMMEDIATELY, ANDTHE OWNER AND ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
.3 IF APPLICABLE, ASBESTOS REMOVAL SHALL BE COMPLETED INACCORDANCE WITH THE OCCUPATIONAL HEALTH AND SAFETY ACTAND ONTARIO REGULATION 278 “DESIGNATED SUBSTANCE -ASBESTOS ON CONSTRUCTION PROJECTS AND IN BUILDINGS ANDREPAIR OPERATIONS”.
.6 DISPOSAL OF MATERIALS: .1 REMOVE AND DISPOSE OF ALL WASTE MATERIALS. .2 RECYCLE MATERIALS WHERE POSSIBLE. .3 HANDLE WASTE MATERIALS NOT REUSED, SALVAGED, OR RECYCLED IN
ACCORDANCE WITHAPPROPRIATE REGULATIONS AND CODES.
.4 DO NOT BURY RUBBISH OR WASTE MATERIALS, OR DISPOSE OFMATERIALS INTO WATERWAYS, STORM, OR SANITARY SEWERS.
.5 KEEP RECORDS OF CONSTRUCTION WASTE INCLUDING NUMBER ANDSIZE OF BINS, WASTE TYPE OF EACH BIN, TOTAL TONNAGEGENERATED, TONNAGE REUSED OR RECYCLED, REUSED OR RECYCLEDWASTE DESTINATION.
.6 REMOVE MATERIALS FROM DECONSTRUCTION ASDECONSTRUCTION/DISASSEMBLY WORK PROGRESSES.
.7 PREPARE PROJECT SUMMARY TO VERIFY DESTINATION ANDQUANTITIES ON A MATERIAL_BY_MATERIAL BASIS.
4 FIXTURES AND EQUIPMENT:.1 INSTALL ALL ELECTRICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS..2 EQUIPMENT AND MATERIAL TO BE CSA CERTIFIED. WHERE THERE IS NO
ALTERNATIVE TO SUPPLYING EQUIPMENT WHICH IS NOT CSA CERTIFIED,OBTAIN SPECIAL APPROVAL FROM ELECTRICAL SAFETY AUTHORITY.
5 EQUIPMENT SUPPLIED BY OTHERS:.1 MAKE ALL ELECTRICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY
OTHERS..2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND
SUPPLIER, PRIOR TO INSTALLATION. THIS SHALL INCLUDE ALL CONNECTIONSIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNTEQUIPMENT CLEARANCES AND INSTALLATION REQUIREMENTS.
6 CONDUITS:.1 ELECTRICAL METALLIC TUBING (EMT), HOT DIPPED GALVANIZED STEEL,
WITH THREADED CONNECTORS AND COUPLINGS, WHERE NOT SUBJECT TOMECHANICAL INJURY, IN SERVICE AREAS ONLY.
7 WIRES AND CABLE:.1 VOLTAGE DROP:
.1 BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR A MAXIMUMVOLTAGE DROP OF 3% AT DESIGN LOAD.
.2 BUILDING WIRES IN CONDUIT SYSTEMS TO BE STRANDED COPPERCONDUCTORS FOR 10 AWG AND LARGER, MINIMUM SIZE 12 AWG, TYPERW90.
.3 BUILDING WIRES IN CONCEALED LOCATIONS TO BE COPPER, MINIMUM SIZE12 AWG, TYPE AC90.
.4 ALL WIRING SHALL BE CONCEALED IN WALLS AND CEILINGS, UNLESSOTHERWISE NOTED OR APPROVED. SURFACE-MOUNTED WIRING IS NOTPERMITTED.
8 FIRE PROTECTION:.1 ALL CABLING AND CONDUIT SHALL BE TIGHTLY FITTED AND SEALED WITH
FIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATEDMEMBRANES.
9 EARTHQUAKE LOAD:.1 ALL ELECTRICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE
EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDINGCODE.
.2 ELECTRICAL ELEMENTS AND COMPONENTS (FIXTURES, EQUIPMENT,CONDUIT, ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BECONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMICRESTRAINT MANUAL OR OTHER GUIDELINE REFERENCED IN THE ONTARIOBUILDING CODE.
10 EQUIPMENT SUPPORT:.1 ALL ELECTRICAL EQUIPMENT, CONDUIT, WIRING, LIGHTING, DEVICES, AND
RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED ANDFASTENED TO BUILDING STRUCTURE.
.2 HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED INACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS- MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, ANDINSTALLATION.
11 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING
SHALL BE TAKEN FROM SITE BY CONTRACTOR..2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE
SCOPE OF WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT.COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHERTRADES AND ALLOW FOR ANY ADDITIONAL CONDUIT, WIRING, FITTINGS,SUPPORTS, ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THEWORK.
.3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS,WITHOUT CHARGE, TO ACCOMMODATE SITE CONDITIONS ANDCOORDINATION.
.4 COORDINATE AND VERIFY ALL ELECTRICAL BRANCH CIRCUITREQUIREMENTS FOR EQUIPMENT SUPPLIED BY OTHERS, PRIOR TOMATERIAL PROCUREMENT OR INSTALLATION.
.5 PROVIDE ALL WIRING TO ALL MECHANICAL EQUIPMENT, INCLUDINGWIRING BELOW 50V. COORDINATE ALL MECHANICAL EQUIPMENT WIRINGWITH MECHANICAL TRADES.
12 START-UP, COMMISSIONING AND TRAINING:.1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:
.1 ELECTRICAL CONNECTIONS TO NEW EQUIPMENT..2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS
FOLLOWS:.1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT
DOCUMENTS, DESIGN CRITERIA AND INTENT,AND MANUFACTURER'S REQUIREMENTS;
.2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;
.3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF..3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF
ALL DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUM PERFORMANCE..4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING
EQUIPMENT OPERATIONAL CONDITIONS AND PARAMETERS.
All drawings, specifications and related documents are the copyright propertyof the Engineer and must be returned upon request. Reproduction of drawings,specifications, and related documents in part or whole is forbidden without the
Engineers' written permission.
The contractor must check and verify all dimensions on the job prior tostart of construction.
DRAWINGS ARE NOT TO BE SCALED
Scale:
REV DATE:
Drawing No.:
Contract No.:
Project No.:
Date:
Approved:Checked:
Checked:Drawn:
Design:
Drawing Title:
RevisionsDateByNo.
Facsimile: (613) 345-0008Telephone: (613) 345-0400
Web: www.EastEng.com100 Strowger Blvd. Suite 207Brockville, Ont. K6V 5J9
Eastern Engineering Group Inc.
6/20/2018
MECHANICAL & ELECTRICALNOTES & SCHEDULES
- - MM
MP 12-07-17
8051
ME1
0 MP 2018-02-02 FOR REVIEW
1 MP 2018-04-23 FINAL REVIEW
2 GB 2018-05-30 FOR TENDER & PERMIT
3 GB 2018-06-13 LAYOUT CLARIFICATION
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Scale:
Horizontal: AS SHOWN
Vertical: AS SHOWN
Project Title:
478 Main St. EastWinchester, Ontario
WINCHESTEROLD TOWN HALL THEATRE
HVAC MODIFICATIONS
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
SCALE: 14" = 1'-0"
PARTIAL FLOOR PLAN - DEMOLITION
RA 32x14 SA 1
2x1
4
SA 12Ø
SA 32x14
SA 2
4x1
4 S
A 2
4x1
2
SA 20x8
SA 12Ø
SA 12Ø
SA 12Ø
SA 12Ø
SA 12Ø
SA 12Ø
SA 12Ø
ELECTRIC BASEBOARD HEATERDISCONNECT & REMOVEINCLUDING CONDUIT & WIRINGBACK TO SOURCE
RETAIN EXISTING EXHAUST FANNO CHANGE
SHOW CURTAIN
EXISTING ROOFTOP UNITLENNOX - DISCONNECT, REMOVE & DISPOSE OF UNIT
INCLUDING ALL DUCTWORKS ASSOCIATED WITH THE UNIT.
- REUSE EXISTING NAT. GAS PIPING FOR NEW FURNACES
- INFILL & REPAIR ROOF OPENINGS TO MATCH EXISTING.REFER TO DETAIL.
MUSICBOOTH
SEATINGAREA
SHOWAREA
DRESSINGRM
W/RCORR
RETAIN EXISTING EXHAUST FANNO CHANGE
T
REPLACE EXISTINGTHERMOSTAT
RELOCATE EXISTINGREFRIGERATOR
T
REPLACE EXISTINGTHERMOSTAT
ELECTRIC BASEBOARD HEATERDISCONNECT & REMOVE
INCLUDING CONDUIT & WIRINGBACK TO SOURCE
F-1FURNACESA19x12 (NOM) OFF UNITELBOW & TRANS TO SA16x10RA22x14 (NOM) OFF UNITWITH FILTER RACK & FILTERELBOW TO 8' AFFACOUSTICALLY LINE COMPLETE LENGTH12" GAS CONNECTION WITH UNION,ISOLATING VALVE & DRIP LEGCOMB/VENT AIR TO EXTERIOR WALL CAP
SCALE: 14" = 1'-0"
PARTIAL FLOOR PLAN - NEW CONSTRUCTION
39'-2"±
D
12
'-6"±
CEILING HT: 8'
MUSICBOOTH
SEATINGAREA
SHOWAREA
DRESSINGRM
18
'-3"±
10
'-4"±
5'-834"±
13'-0"±
SA 8
"Ø
SA 16x10
75S312" Ø
EXISTING EXHAUST FANNO CHANGE
T
NEWTHERMOSTAT
BARRIER-FREEW/R
T
NEWTHERMOSTAT
200S124X6
R124x6
50
'-0"±
26'-7" ±
150S212X4
150S212x4
DENOTES BELOWFLOOR
SA 10"Ø
SA 10"Ø
D
D D
SA 2
0x2
0 S
A 2
0x1
6
APPROX LOCATION OF EXISTINGNAT. GAS SERVICE & METER
F-1
SA 8
"Ø
D
SA 8
"Ø
GA
S
FD FD
SA 6"ØCAP FOR FUTUREWASHROOM
200S318"Ø
200S218"Ø
200S318"Ø
R140X14
F-2FINAL LOCATIONBY OWNER
A
A
200S124X6
SA 6
"Ø
SA 6
"Ø
GAS GAS GAS
SA 10"Ø
200S124X6
200S124X6
200S124X6
D
D D
D D SA 10"Ø
D D
GA
SG
AS
GA
S
GAS GAS GAS GAS
REFRIGERANT LINES FROMCONDENSING UNIT CU-2
COMB/VENTTHROUGH WALL TO
EXTERIOR WALL CAP
200S124X6200S1
24X6
200S124X6
200S124X6
SA 12x10
34" NAT. GAS PIPINGFROM ROOF
SA 8x10
R224"x6"
R224"x6"
R224"x6"
R224"x6"
D
SA 10"Ø
SA 10"Ø
SA 10"Ø
F-2FURNACESA 19x19 (NOM) OFF UNITWITH COOLING COILRA 21.5x19.5 (NOM) OFF UNIT WITHFILTER RACK & FILTERELBOW TO BASEMENT RA PLENUMACOUSTICALLY LINE FULL LENGTH12" GAS CONNECTION WITH UNION,ISOLATING VALVE & DRIP LEGCOMB/VENT AIR TO EXTERIOR WALL CAPCONDENSATE DRAIN TO FLOOR DRAIN
D
SA 10"Ø
SA 10"Ø
200S124X6
DO NOT CUT OR MODIFYEXISTING STRUCTURE DURINGCONSTRUCTION
HRV-1HEAT RECOVERY VENTILATOR - HRV SA 14x8 TO RA PLENUM- HRV RA 14x8 - HRV OA 14x8 FROM ROOF - HRV EA 14x8 TO WALL CAP- CONDENSATE PIPE DRAIN TO FLOOR
DRAIN
SCALE: 316" = 1'-0"
SECTION A-A
HRV-1HEAT RECOVERYVENTILATOR
F-2FURNACE
SA 20x20 SA 20x16
SA 24x6DIFFUSER
All drawings, specifications and related documents are the copyright propertyof the Engineer and must be returned upon request. Reproduction of drawings,specifications, and related documents in part or whole is forbidden without the
Engineers' written permission.
The contractor must check and verify all dimensions on the job prior tostart of construction.
DRAWINGS ARE NOT TO BE SCALED
Scale:
REV DATE:
Drawing No.:
Contract No.:
Project No.:
Date:
Approved:Checked:
Checked:Drawn:
Design:
Drawing Title:
RevisionsDateByNo.
Facsimile: (613) 345-0008Telephone: (613) 345-0400
Web: www.EastEng.com100 Strowger Blvd. Suite 207Brockville, Ont. K6V 5J9
Eastern Engineering Group Inc.
6/20/2018
HVACFLOOR PLANS
- - MM
MP 12-07-17
8051
ME2
0 MP 2018-02-02 FOR REVIEW
1 MP 2018-04-13 FINAL REVIEW
2 GB 2018-05-30 FOR TENDER & PERMIT
3 GB 2018-06-13 LAYOUT CLARIFICATION
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Scale:
Horizontal: AS SHOWN
Vertical: AS SHOWN
Project Title:
478 Main St. EastWinchester, Ontario
WINCHESTEROLD TOWN HALL THEATRE
HVAC MODIFICATIONS
P
R
O
J
E
C
T
N
O
R
T
H
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.
SCALE: 14" = 1'-0"
PARTIAL ROOF PLAN - NEW CONSTRUCTION
APPROX LOCATION OF EXISTING11
4" NAT. GAS SERVICE & METER
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
SG
AS
GA
SG
AS
GA
S
GAS
GA
SG
AS
GA
SG
AS
GA
SG
AS
GA
SG
AS
GA
SG
AS
GA
SG
AS
REFRIGERANT LINESTO FURNACE F-1
REFRIGERANT LINESTO FURNACE F-2
NEW1" NAT GAS LINEON ROOF MOUNTING BLOCKSTO FURNACE F-2
NEW1" NAT GAS LINECONNECT TO EXISTINGON ROOF MOUNTING BLOCKSCONNECT TO EXISTING
EXISTING1" NAT GAS ON ROOFMOUNTING BLOCKS
NAT GAS LINE & REFRIGERANT LINESDOWN THE WALL, UNDER SOFFIT TOCEILING SPACE
NEW34" NAT GAS LINEON ROOF MOUNTING BLOCKSTO FURNACE F-1
OUTDOOR AIR INLET TOHEAT RECOVERYVENTILATOR HRV-1
CU-1CONDENSING UNITMOUNTED ON ROOFREFER TO DETAIL
CU-2CONDENSING UNITMOUNTED ON ROOFREFER TO DETAIL
EXISTING1" NAT GAS
UP WALL TO ROOF
EXISTING1" NAT GAS
DOWN WALL TO BASEMENT
EXISTING11
4" NAT GAS
STRUCTURAL NOTES1) ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE 2012 ONTARIO BUILDING CODE2) CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO FABRICATION.3) STEEL SHALL BE MIN. FY=300MPA TO CAN G40.21-13.4) HOLES SHALL BE DRILLED, DIAMETER +2MM (1/8”). NO BURNING OF HOLES IN STEEL IS NOT PERMITTED.5) STEEL SHALL BE SHOP PRIMED AND TOUCHED UP IN FIELD WITH PRIMER AS REQUIRED.6) CONCRETE SHALL BE MIN. 35 MPA AT 28 DAY STRENGTH. EXPOSURE CLASS C-1.7) REINFORCING STEEL SHALL BE MIN. GRADE 400.8) MAINTAIN A MINIMUM OF 50MM (2”) CLEAR COVER ON ALL SIDES.9) PRIOR TO SAW-CUTTING THE EXISTING SLAB SHALL BE SCANNED. DO NOT CUT REINFORCING STEEL.10) EPOXY SHALL BE HILTI HY200 ADHESIVE ANCHORING SYSTEM OR AN APPROVED EQUAL.11) INSTALL ALL PREMANUFACTURED BRACKETS, FASTENERS AND ADHESIVES IN ACCORDANCE WITH THE MANUFACTURER
SPECIFICATIONS AND INSTALLATION GUIDELINES.
DESIGN LOADS:SS=2.3 KPASR=0.4 KPAIS =1.0SA(0.2) = 0.60IE= 1.0DL (ROOF): 2.4 KPA
: MECHANICAL SELF-WEIGHT (REFER TO MANUFACTURER)
*PRIOR TO APPLICABLE LOAD FACTORS
HRV-1HEAT RECOVERY VENTILATOR<12A, 120V/1PHBELOW FLOOR
F-1FURNACE<12A, 120V/1PH
CEILING HT: 8'
SCALE: 14" = 1'-0"
ELECTRICAL - NEW CONSTRUCTION
39'-2"±
12
'-6"±
MUSICBOOTH
SHOWAREA
DRESSINGRM
18
'-3"±
10
'-4"±
5'-834"±
13'-0"±
50
'-0"±
T
BARRIER-FREEW/R
T
F-2FURNACE<16A,120V/1PHBELOW FLOOR
CU-2CONDENSING UNIT30.1 MCA, 240V/1PH(LOCATED ON ROOF)
CU-1CONDENSING UNIT14.5MCA, 240V/1PH(LOCATED ON ROOF)
EXISTING ROOFTOP UNITLENNOX - #GCS16-120-270-2Y58 MCA, 240V/3PHDISCONNECT & REMOVEELECTRICAL WIRING BACK TOSOURCE
EXISTING ELECTRICAL SERVICESUPPLY & INSTALL THE FOLLOWING NEW
BRANCH CIRCUITS:· 15A/1P - FURNACE F-1· 20A/1P - FURNACE F-2
· 20A/2P - CONDENSING UNIT CU-1· 50A/2P - CONDENSING UNIT CU-2
· 15A/1P - HEAT RECOVERY VENTILATOR
SCALE:- NTS
CONDENSING UNIT & SERVICE CURB DETAIL (STRUCTURAL)
ROOF STRUCTURE
CONDENSING UNITMOUNTED ON CONCRETE SLAB10% SLOPE
1" RUBBER ROOFING PAD
1'-10"1'-4"
1'-2"
2'-6
"
8"
10"HRV OA 14"x8" (INSUL)
EXISTINGEXTERIORWALL
MECHANICAL PIPING
4"x4"x38" ELASTROMIC PAD
W/ 38"Ø HILTI KWIK BOLT TZMECHANICAL ANCHOR(MIN. 2' EMBEDMENT)
NOTE: SCAN SLAB PRIORTO INSTALLING ANCHORAGEDO NOT INTERFERE ORDAMAGE ANY REINFORCING
SCALE = NTS
ROOF INFILL DETAIL (STRUCTURAL)A1
1A1
EXISTING CONCRETE ROOF SLAB(MIN. THICKNESS 100mm)
10mm Ø HILTI ADHESIVE ANCHORS @ 12" o.c.W/ 50mm (MIN.) EMBEDMENT
SIZE OF EXISTING OPENING TOBE SITE VERIFIED5mm THINK STEEL PLATEFASTENED TO U/S OF SLAB
NEW 20MPa CONC. ROOF SLAB TOMATCH EXISTING DEPTH
NOTES:USE PRE-MIX CONCRETE ONLY.
10mm ANCHORS @ 12"AROUND PERIMETER
5mm THINK STEEL PLATE
EXISTING ROOF SLAB
ISOMETRICSECTION
NEW CONC. INFILL
DOWEL EPOXYMIN'M 200mm EMBEDMENT
10M REINFORCEMENT @200mm o.c. BOTH WAYS
DOWEL EPOXY INTO EXISTINGROOF SLABMIN'M 200mm EMBEDMENT
10M REINFORCEMENT @200mm o.c. BOTH WAYS
8"2" XX
MAKE GOOD ALL ROOFINGFINISHES TO MATCH EXISTING
All drawings, specifications and related documents are the copyright propertyof the Engineer and must be returned upon request. Reproduction of drawings,specifications, and related documents in part or whole is forbidden without the
Engineers' written permission.
The contractor must check and verify all dimensions on the job prior tostart of construction.
DRAWINGS ARE NOT TO BE SCALED
Scale:
REV DATE:
Drawing No.:
Contract No.:
Project No.:
Date:
Approved:Checked:
Checked:Drawn:
Design:
Drawing Title:
RevisionsDateByNo.
Facsimile: (613) 345-0008Telephone: (613) 345-0400
Web: www.EastEng.com100 Strowger Blvd. Suite 207Brockville, Ont. K6V 5J9
Eastern Engineering Group Inc.
6/20/2018
ROOF PLANELECTRICAL FLOOR PLAN
- - MM
MP 12-07-17
8051
ME3
0 MP 2018-02-02 FOR REVIEW
1 MP 2018-04-23 FINAL REVIEW
2 GB 2018-05-30 FOR TENDER & PERMIT
3 GB 2018-06-13 LAYOUT CLARIFICATION
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Scale:
Horizontal: AS SHOWN
Vertical: AS SHOWN
Project Title:
478 Main St. EastWinchester, Ontario
WINCHESTEROLD TOWN HALL THEATRE
HVAC MODIFICATIONS
P
R
O
J
E
C
T
N
O
R
T
H
Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.