NTS MECHANICAL LEGENDS AND SCHEDULES M0.1 19. CONNECTION INTO EXISTING 18. 17. 16. 15. 14. 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. REFER TO DRAWING/DETAIL NUMBER SHEET NUMBER RE: 2/M1.71 DRAWING NOTE REFERENCE (I.E., NOTES BY SYMBOL) 1 MISCELLANEOUS DRAWING/DETAIL REFERENCE ABBREVIATIONS GENERAL NOTES MECHANICAL SYMBOLS AND ABBREVIATIONS NOTE: ALL SYMBOLS AND ABBREVIATIONS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS DIFFUSER, GRILLE DESIGNATION AMOUNT OF AIR NECK SIZE OR WIDTH X HEIGHT (FOR LOUVERS) A 10X10 250 20X20 20X20 20X20 20X20 20X20 16X20 20X20 SYMBOLS SYMBOL DESCRIPTION (4-WAY UNLESS OTHERWISE INDICATED) SQUARE CEILING DIFFUSER (SUPPLY) (RETURN OR EXHAUST) MANUAL VOLUME DAMPER MOTORIZED DAMPER THERMOSTAT (OR) TEMP SENSOR FIRE DAMPER SQUARE CEILING GRILLE DUCT SPLITTER WITH DAMPER FD M T or VOLTS V UNIT HEATER UH TRANSFER AIR T/A THERMOSTAT, ROOM SENSOR T, TSTAT SPECIFICATIONS SPECS SQUARE FOOT, SUPPLY FAN SF SUPPLY AIR S/A RETURN AIR R/A PURGE EXHAUST FAN PEF ON CENTER O/C MBH 1000 BRITISH THERMAL UNITS / HOUR GALLONS PER MINUTE GPM FLOOR FLR FT. FOOT, FEET FD FIRE DAMPER EF EXHAUST FAN EDH ELECTRIC DUCT HEATER EQUIPMENT EQUIP DN DOWN COOLING COIL CC CLG CEILING BTU BRITISH THERMAL UNIT PER HOUR W/O WB UL TSTAT THRU RM RLA RE: PSI PROVIDE PH O/A N/O,N/C N/A MIN MCA LWT LRA LB L kW JUNCTION BOX INCH, INCHES HERTZ HORSEPOWER HEIGHT EXHAUST AIR CONDENSING UNIT AIR HANDLING UNIT ABOVE FINISHED FLOOR AFF AHU CU E/A H HP HZ IN. J-BOX ) DEGREES FAHRENHEIT KILOWATT LENGTH POUNDS LOCKED ROTOR AMPS LEAVING WATER TEMPERATURE MINIMUM CIRCUIT AMPACITY MINIMUM NOT APPLICABLE NORMALLY OPEN, NORMALLY CLOSED OUTSIDE AIR/FRESH AIR PHASE FURNISH AND INSTALL POUNDS PER SQUARE INCH REFERENCE, REFER RUNNING LOAD AMPS ROOM THROUGH THERMOSTAT OR ROOM SENSOR UNDERWRITERS LABORATORIES, INC. WET BULB WITHOUT DEGREES DEG FIRE SMOKE DAMPER FSD APPROXIMATE APPROX ARCHITECT/ENGINEER A/E EQUIPMENT DRAIN D EXISTING (E) FAN COIL UNIT FCU ACCESS DOOR AD A/C AIR CONDITIONING UNIT AIR FLOW SWITCH AFS BRAKE HORSE POWER BHP COMBUSTION AIR C/A CUBIC FEET PER HOUR CFH CUBIC FEET PER MINUTE CFM DB DRY BULB ENTERING AIR TEMPERATURE EAT ENTERING WATER TEMPERATURE EWT FLA FULL LOAD AMPS FPVAV FAN POWERED VAV FEET WATER GAUGE FT. WG GA U.S. GAUGE HEATING WATER RETURN HWR HWS HEATING WATER SUPPLY INCHES WATER GAUGE IN.WG LEAVING AIR TEMPERATURE LAT LPC LOW PRESSURE CONDENSATE LOW PRESSURE STEAM LPS HIGH PRESSURE CONDENSATE HPC HIGH PRESSURE STEAM HPS MAXIMUM MAX MFR MANUFACTURER SMOKE DETECTOR SD VELOCITY VEL WITH W/ VARIABLE FREQUENCY DRIVE VFD VAV VARIABLE AIR VOLUME TOTAL STATIC PRESSURE TSP TYPICAL TYP OPPOSED BLADE DAMPER OBD PRV PRESSURE REDUCING VALVE REFRIGERANT LIQUID RL RS REFRIGERANT SUCTION REVOLUTIONS PER MINUTE RPM D R=3D/2 W R=3W/2 20X20 ACOUSTICAL DUCT LINING (FIGURES SHOWN ARE INSIDE DUCT DIMENSIONS SUPPLY AIR DUCT UP (POSITIVE PRESSURE) RETURN, EXHAUST OR OUTSIDE AIR INTAKE DUCT UP (NEGATIVE PRESSURE) SUPPLY AIR DUCT DOWN (POSITIVE PRESSURE) RETURN, EXHAUST OR OUTSIDE AIR INTAKE DUCT DOWN (NEGATIVE PRESSURE) ROUND DUCT UP TRANSITION CONCENTRIC UNLESS TOP LEVEL(TOP LVL) OR BOTTOM LEVEL(BOT LVL) IS NOTED TRANSITION, RECTANGULAR TO ROUND CONCENTRIC UNLESS TOP LEVEL (TOP LVL) OR BOTTOM LEVEL (BOT LVL) IS NOTED ROUND DUCT RADIUS ELBOW RECTANGULAR DUCT RADIUS ELBOW RECTANGULAR DUCT SQUARE ELBOW WITH TURNING VANES ROUND DUCT DOWN 20. 21. 22. 23. ELEVATION NUMBER M301 1 SHEET NUMBER FSD FIRE SMOKE DAMPER PRIMARY MECHANICAL CODES : MECHANICAL: 2003 INTERNATIONAL MECHANICAL CODE (WITH CITY AMENDMENTS). ENERGY: 2003 INTERNATIONAL ENERGY CODE (WITH CITY AMENDMENTS). PROJECT DESIGN VALUES : OUTDOOR DESIGN TEMPERATURE (SUMMER): ) '5<%8/% ) :(7%8/% AMBIENT TEMPERATURE AT CONDENSING UNITS: ) '5<%8/% 6800(5 OUTDOOR DESIGN TEMPERATURE (WINTER): ) '5<%8/% INDOOR DESIGN TEMPERATURE (SUMMER): ) '5<%8/% 5(/$7,9( +80,',7< INDOOR DESIGN TEMPERATURE (WINTER): ) '5<%8/% OUTSIDE AIR REQUIREMENTS: PER IMC TABLE 403.3 BUILDING AUTOMATION SYSTEM BAS PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION. PROVIDE ALL PERMITS, INSPECTIONS, LICENSES AND FEES. FURNISH ALL LABOR, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS. THE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL DESIGN AND ARRANGEMENT OF PIPES, FIXTURES, EQUIPMENT, SYSTEMS, ETC. INFORMATION SHOWN IS DIAGRAMMATIC IN CHARACTER AND DOES NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DO NOT SCALE THE DRAWINGS FOR DIMENSIONS. TAKE ALL DIMENSIONS, MEASUREMENTS, EQUIPMENT LOCATIONS, LEVELS, ETC FROM THE ARCHITECTURAL DRAWINGS AND FROM THE EQUIPMENT TO BE FURNISHED. PIPING MAY BE RELOCATED OR OFFSET FOR PROPER CLEARANCES OR TO AVOID CONFLICTS WITH OTHER TRADES. THE DESIGN INTENT (I.E. PITCHES, VELOCITIES, PRESSURE DROPS, VOLTAGE DROPS, ETC) CANNOT BE GREATLY ALTERED WITHOUT THE APPROVAL OF THE ARCHITECT. THE COST OF THESE DEVIATIONS TO AVOID INTERFERENCE'S SHALL BE PART OF THE ORIGINAL CONTRACT BID. EACH SUBCONTRACTOR SHALL CONFER AND COOPERATE WITH ALL OTHER TRADES TO COORDINATE THEIR WORK. COORDINATION SHALL INCLUDE, BUT SHALL NOT BE LIMITED TO MATERIALS AND EQUIPMENT ROUTED IN CEILING AND WALL CAVITIES, EQUIPMENT ARRANGEMENT IN MECHANICAL SPACES, INCLUDING EQUIPMENT CLEARANCE REQUIREMENTS, ELEVATIONS AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS, ETC. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY CONFLICTS. BASE FINAL INSTALLATION OF MATERIALS AND EQUIPMENT ON ACTUAL DIMENSIONS AND CONDITIONS AT THE PROJECT SITE. FIELD MEASURE FOR MATERIALS AND EQUIPMENT REQUIRING EXACT FIT. NO EXTRAS WILL BE GIVEN FOR THE CONTRACTORS FAILURE TO FIELD COORDINATE. THE OWNER OR ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO PERFORM THE WORK. THE CONTRACTOR SHALL LOCATE ALL EQUIPMENT THAT MUST BE SERVICED, OPERATED, OR MAINTAINED IN FULLY ACCESSIBLE POSITIONS. EQUIPMENT SHALL INCLUDE (BUT NOT LIMITED TO) VALVES, MOTORS, CONTROLLERS, SWITCHGEAR, AND DRAIN POINTS IF REQUIRED FOR BETTER ACCESSIBILITY. FURNISH ACCESS DOORS FOR THIS PURPOSE. MINOR DEVIATIONS FROM THE DRAWINGS MAY BE ALLOWED TO PROVIDE FOR BETTER ACCESSIBILITY. ANY CHANGES SHALL BE APPROVED BY THE ARCHITECT AND CONSTRUCTION MANAGER/GENERAL CONTRACTOR PRIOR TO MAKING THE CHANGE. THE CONTRACTOR SHALL PROVIDE ACCESS DOORS, WALL OPENINGS, ROOF OPENINGS OR ANY OTHER CONSTRUCTION REQUIREMENT NEEDED TO ACCOMMODATE THE MECHANICAL EQUIPMENT. LOCATIONS OF THESE OPENINGS SHALL BE SUBMITTED IN SUFFICIENT TIME TO BE INSTALLED IN THE NORMAL COURSE OF WORK. THE CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS OF APPROVED EQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO THE PURCHASE AND INSTALLATION OF ANY ELECTRICAL GEAR OR CONDUIT. GENERAL CONTROL WIRING, THERMOSTATS, MOTORIZED DAMPERS AND CONDUIT ASSOCIATE WITH HVAC EQUIPMENT IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL THERMOSTATS, ROOM SENSORS, ETC WITH THE ARCHITECT AND ALL OTHER TRADES PRIOR TO INSTALLATION. IF A CONFLICT WITH MILLWORK, LIGHT SWITCHES, WINDOWS, ETC EXISTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF THE POTENTIAL INTERFERENCE PRIOR TO INSTALLATION. INSTALL THERMOSTATS WITH PROTECTIVE LOCKING COVER, CENTERED AT 4'-0" ABOVE FINISHED FLOOR, UNLESS OTHERWISE INDICATED. COMPLY WITH THE PROVISIONS OF THE AMERICANS WITH DISABILITIES ACT (ADA) AND THE TEXAS ACCESSIBILITY'S STANDARD (TAS). ALL DIMENSIONS SHOWN ON THE DRAWINGS FOR DUCTWORK ARE NET INSIDE CLEAR DIMENSIONS. FOR RECTANGULAR DUCT, THE FIRST FIGURE OF THE DUCT SIZE INDICATES THE DIMENSION OF THE FACE SHOWN. VERIFY THAT THE DUCTWORK SPECIFIED WILL FIT IN THE SPACE AVAILABLE USING THE ARCHITECTURAL, STRUCTURAL AND ELECTRICAL DRAWINGS AS REFERENCE PRIOR TO FABRICATION AND INSTALLATION. ROUND DUCT OF EQUAL NET INSIDE CLEAR AREA MAY BE USED IN LIEU OF RECTANGULAR DUCT. PROVIDE TURNING VANES ON ALL RECTANGULAR SUPPLY, EXHAUST AND RETURN DUCTWORK INCLUDING THE TOP AND BOTTOM OF VERTICAL DUCTS. PROVIDE A LOCKING QUADRANT VOLUME DAMPER AT THE TAP OF EACH RUN-OUT TO DIFFUSERS FOR BALANCING PURPOSES, UNLESS OTHERWISE INDICATED. THE RUN-OUT DUCT SIZE IS THE SAME SIZE AS THE DIFFUSER OR GRILLE NECK SIZE UNLESS OTHERWISE INDICATED. CEILING SPACE IS NEEDED AS A RETURN AIR PLENUM IN CERTAIN AREAS. FOLLOW ALL APPLICABLE CODES AS TO MATERIALS ALLOWED FOR USE IN AIR PLENUMS. COORDINATE WITH THE GENERAL CONTRACTOR TO PROVIDE FREE RETURN OF AIR FROM ALL LOCATIONS. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION OF ALL FIRE RATED WALLS AND CEILINGS. PROVIDE FIRE DAMPERS AND/OR COMBINATION FIRE/SMOKE DAMPERS IN DUCTWORK AT ALL LOCATIONS WHERE DUCTS PASS THROUGH FIRE RATED ASSEMBLY. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING FIRE AND SMOKE DAMPERS. COORDINATE CONSTRUCTION REQUIREMENTS WITH GENERAL CONTRACTOR. LOCATION OF ALL GRILLES, REGISTERS, DIFFUSERS AND CEILING DEVICES SHALL BE DETERMINED FROM THE ARCHITECTURAL REFLECTED CEILING PLANS AND WALL SECTIONS. COORDINATE ALL CEILING DIFFUSERS AND GRILLE LOCATIONS WITH LOCATION OF LIGHTS. ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH SMACNA STANDARDS. ALL DUCT WORK FROM AHU TO TERMINAL UNIT SHALL BE CONSTRUCTED TO 1" W.G. AND SEALED TO SMACNA CLASS A. DUCT WORK DOWN STREAM OF TERMINAL UNITS SHALL BE CONSTRUCTED TO 1/2" W.G. AND SEALED TO SMACNA CLASS C. SEAL ALL SEAMS WITH UL 181 MASTIC RATED FOR APPLICATION. INSTALL DX PIPING AS SPECIFIED, INCLUDING FILTER/DRYER, SIGHT GLASS, ISOLATION/CHARGING VALVES AND ALL APPURTENANCES PER MANUFACTURER'S RECOMMENDATIONS. INSTALLATION SHALL BE ACCOMPLISHED IN A NEAT AND ORDERLY FASHION, AS APPROVED BY THE ENGINEER. COORDINATE FOR ROUTING OF DX PIPING, UP INSIDE OF WALLS, ETC. AS REQUIRED, TERMINATING AT AHU's. PROVIDE BRACING/ISOLATION, AS REQUIRED TO PREVENT VIBRATION OF DX PIPING INSIDE WALLS, ETC. SIZE, ROUTE AND INSULATE DX PIPING PER MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATION REQUIREMENTS. PROVIDE VIBRATION ISOLATORS FOR MOTOR DRIVEN EQUIPMENT UNLESS NOTED OTHERWISE. PROVIDE ISOLATION AS INDICATED OR AS RECOMMENDED BY THE EQUIPMENT MANUFACTURER. SOME PIPES AND DUCTS SHOWN ON EACH FLOOR PLAN MAY BE SHOWN WITH AN OFFSET FOR CLARITY. SEAL ALL PIPE AND DUCT PENETRATIONS THROUGH FIRE RATED BUILDING ELEMENTS WITH AN APPROVED FIRE PROOFING MATERIAL. ALL EQUIPMENT SHALL HAVE IDENTIFICATION TAGS. TAGS SHALL BE PLASTIC LAMINATE, WHITE FACE WITH 1/2" TALL BLACK LETTERS. THE TAG SHALL MATCH THE UNIT DESIGNATIONS SHOWN ON THE SCHEDULES. THE CONTRACTOR SHALL EXPAND OR REDUCE DUCTS AT EQUIPMENT CONNECTIONS BASED ON THE EQUIPMENT PURCHASED, WITH TRANSITIONS NOT TO EXCEED 30 DEGREES. SIZES SHOWN ON SCHEDULES, ETC. ARE FOR GUIDANCE ONLY. ASPECT RATIO SHALL BE NO GREATER THAN 4:1, PER SMACNA'S GUIDELINES. ALL DUCTS WITH A DIMENSION GREATER THAN 12" PASSING THRU A NON-RATED WALL SHALL HAVE THE OPENING FRAMED IN WITH METAL STUDS. CONTRACTOR SHALL COORDINATE OPENING SIZE AND LOCATION WITH OTHER TRADES. PRIOR TO INSTALLATION COORDINATE ALL MECHANICAL WORK WITH PNEUMATIC TUBE SYSTEM BY OTHERS.. EQUIPMENT TO BE REMOVED (D) EQUIPMENT TO BE RELOCATED (R) (N) NEW EQUIPMENT 24. FORT WORTH, TEXAS 76116 2570 RIVER PARK PLAZA SUITE 100 EMAIL: [email protected] FAX: 817-377-3612 PHONE: 817-377-3600 A NEW LEASE FACILITY FOR CITY OF WESTWORTH VILLAGE, TEXAS C. CONNELLY SURVEY ABSTRACT No. 319 TARRANT CO., TX 2/6/2012 4458.2.6.2012.11107

Upload: lycong

Post on 06-Mar-2018

244 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal

NTSMECHANICAL LEGENDS AND SCHEDULES M0.1

19.

CONNECTION INTO EXISTING

18.

17.

16.

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.REFER TODRAWING/DETAIL NUMBER

SHEET NUMBER

RE: 2/M1.71

DRAWING NOTE REFERENCE (I.E., NOTES BY SYMBOL)1

MISCELLANEOUS

DRAWING/DETAIL REFERENCE

ABBREVIATIONS

GENERAL NOTES

MECHANICAL SYMBOLS AND ABBREVIATIONS NOTE: ALL SYMBOLS AND ABBREVIATIONS SHOWNARE NOT NECESSARILY USED ON THE DRAWINGS

DIFFUSER, GRILLE DESIGNATIONAMOUNT OF AIR

NECK SIZE OR WIDTH X HEIGHT (FOR LOUVERS)A 10X10

25020X20

20X20

20X20

20X20

18Ø

20X20

16X20

20X20 16Ø

SYMBOLSSYMBOL DESCRIPTION

18Ø

(4-WAY UNLESS OTHERWISE INDICATED)SQUARE CEILING DIFFUSER (SUPPLY)

(RETURN OR EXHAUST)

MANUAL VOLUME DAMPER

MOTORIZED DAMPER

THERMOSTAT (OR) TEMP SENSOR

FIRE DAMPER

SQUARE CEILING GRILLE

DUCT SPLITTER WITH DAMPER

FD

M

T

or

VOLTSVUNIT HEATERUH

TRANSFER AIRT/ATHERMOSTAT, ROOM SENSORT, TSTATSPECIFICATIONSSPECSSQUARE FOOT, SUPPLY FANSF

SUPPLY AIRS/A

RETURN AIRR/A

PURGE EXHAUST FANPEFON CENTERO/C

MBH 1000 BRITISH THERMAL UNITS / HOUR

GALLONS PER MINUTEGPM

FLOORFLR

FT. FOOT, FEET

FD FIRE DAMPER

EF EXHAUST FANEDH ELECTRIC DUCT HEATER

EQUIPMENTEQUIP

DN DOWN

COOLING COILCC

CLG CEILING

BTU BRITISH THERMAL UNIT PER HOUR

W/OWB

UL

TSTAT

THRU

RMRLA

RE:

PSI

PROVIDEPH

O/AN/O,N/CN/A

MIN

MCA

LWTLRALB

L

kWJUNCTION BOX

INCH, INCHESHERTZ

HORSEPOWERHEIGHT

EXHAUST AIR

CONDENSING UNIT

AIR HANDLING UNIT

ABOVE FINISHED FLOORAFF

AHU

CU

E/A

HHP

HZIN.

J-BOX

F DEGREES FAHRENHEIT

KILOWATT

LENGTH

POUNDSLOCKED ROTOR AMPSLEAVING WATER TEMPERATURE

MINIMUM CIRCUIT AMPACITY

MINIMUM

NOT APPLICABLENORMALLY OPEN, NORMALLY CLOSEDOUTSIDE AIR/FRESH AIR

PHASEFURNISH AND INSTALL

POUNDS PER SQUARE INCH

REFERENCE, REFER

RUNNING LOAD AMPSROOM

THROUGH

THERMOSTAT OR ROOM SENSOR

UNDERWRITERS LABORATORIES, INC.

WET BULBWITHOUT

DEGREESDEG

FIRE SMOKE DAMPERFSD

APPROXIMATEAPPROX

ARCHITECT/ENGINEERA/E

EQUIPMENT DRAIND

EXISTING(E)

FAN COIL UNITFCU

ACCESS DOORADA/C AIR CONDITIONING UNIT

AIR FLOW SWITCHAFS

BRAKE HORSE POWERBHP

COMBUSTION AIRC/A

CUBIC FEET PER HOURCFHCUBIC FEET PER MINUTECFM

DB DRY BULB

ENTERING AIR TEMPERATUREEAT

ENTERING WATER TEMPERATUREEWT

FLA FULL LOAD AMPS

FPVAV FAN POWERED VAV

FEET WATER GAUGEFT. WGGA U.S. GAUGE

HEATING WATER RETURNHWRHWS HEATING WATER SUPPLY

INCHES WATER GAUGEIN.WG

LEAVING AIR TEMPERATURELATLPC LOW PRESSURE CONDENSATE

LOW PRESSURE STEAMLPS

HIGH PRESSURE CONDENSATEHPCHIGH PRESSURE STEAMHPS

MAXIMUMMAX

MFR MANUFACTURER

SMOKE DETECTORSD

VELOCITYVEL

WITHW/VARIABLE FREQUENCY DRIVEVFD

VAV VARIABLE AIR VOLUME

TOTAL STATIC PRESSURETSP

TYPICALTYP

OPPOSED BLADE DAMPEROBD

PRV PRESSURE REDUCING VALVE

REFRIGERANT LIQUIDRL

RS REFRIGERANT SUCTIONREVOLUTIONS PER MINUTERPM

D

R=3D/2

W

R=3W/2

20X20ACOUSTICAL DUCT LINING (FIGURESSHOWN ARE INSIDE DUCT DIMENSIONS

SUPPLY AIR DUCT UP (POSITIVE PRESSURE)

RETURN, EXHAUST OR OUTSIDE AIR INTAKEDUCT UP (NEGATIVE PRESSURE)

SUPPLY AIR DUCT DOWN (POSITIVE PRESSURE)

RETURN, EXHAUST OR OUTSIDE AIR INTAKEDUCT DOWN (NEGATIVE PRESSURE)

ROUND DUCT UP

TRANSITION CONCENTRIC UNLESS TOP LEVEL(TOP LVL)OR BOTTOM LEVEL(BOT LVL) IS NOTED

TRANSITION, RECTANGULAR TO ROUND CONCENTRICUNLESS TOP LEVEL (TOP LVL) OR BOTTOM LEVEL(BOT LVL) IS NOTED

ROUND DUCT RADIUS ELBOW

RECTANGULAR DUCT RADIUS ELBOW

RECTANGULAR DUCT SQUARE ELBOW WITHTURNING VANES

ROUND DUCT DOWN

20.

21.

22.

23.

ELEVATION NUMBERM301

1

SHEET NUMBER

FSD FIRE SMOKE DAMPER

PRIMARY MECHANICAL CODES:MECHANICAL: 2003 INTERNATIONAL MECHANICAL CODE (WITH CITY AMENDMENTS).ENERGY: 2003 INTERNATIONAL ENERGY CODE (WITH CITY AMENDMENTS).

PROJECT DESIGN VALUES:OUTDOOR DESIGN TEMPERATURE (SUMMER): 99 F (DRYBULB), 77 F (WETBULB)AMBIENT TEMPERATURE AT CONDENSING UNITS: 105 F (DRYBULB, SUMMER)OUTDOOR DESIGN TEMPERATURE (WINTER): 22 F (DRYBULB)INDOOR DESIGN TEMPERATURE (SUMMER): 75 F (DRYBULB), 50% (RELATIVE HUMIDITY)INDOOR DESIGN TEMPERATURE (WINTER): 72 F (DRYBULB)OUTSIDE AIR REQUIREMENTS: PER IMC TABLE 403.3

BUILDING AUTOMATION SYSTEMBAS

PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES AND AUTHORITIESHAVING JURISDICTION. PROVIDE ALL PERMITS, INSPECTIONS, LICENSES AND FEES. FURNISHALL LABOR, EQUIPMENT, SUPPLIES AND MATERIALS NECESSARY TO PROVIDE COMPLETE ANDOPERATIONAL SYSTEMS.

THE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL DESIGN AND ARRANGEMENTOF PIPES, FIXTURES, EQUIPMENT, SYSTEMS, ETC. INFORMATION SHOWN IS DIAGRAMMATIC INCHARACTER AND DOES NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC.DO NOT SCALE THE DRAWINGS FOR DIMENSIONS. TAKE ALL DIMENSIONS, MEASUREMENTS,EQUIPMENT LOCATIONS, LEVELS, ETC FROM THE ARCHITECTURAL DRAWINGS AND FROM THEEQUIPMENT TO BE FURNISHED. PIPING MAY BE RELOCATED OR OFFSET FOR PROPERCLEARANCES OR TO AVOID CONFLICTS WITH OTHER TRADES. THE DESIGN INTENT (I.E.PITCHES, VELOCITIES, PRESSURE DROPS, VOLTAGE DROPS, ETC) CANNOT BE GREATLYALTERED WITHOUT THE APPROVAL OF THE ARCHITECT. THE COST OF THESE DEVIATIONS TOAVOID INTERFERENCE'S SHALL BE PART OF THE ORIGINAL CONTRACT BID.

EACH SUBCONTRACTOR SHALL CONFER AND COOPERATE WITH ALL OTHER TRADES TOCOORDINATE THEIR WORK. COORDINATION SHALL INCLUDE, BUT SHALL NOT BE LIMITED TOMATERIALS AND EQUIPMENT ROUTED IN CEILING AND WALL CAVITIES, EQUIPMENTARRANGEMENT IN MECHANICAL SPACES, INCLUDING EQUIPMENT CLEARANCEREQUIREMENTS, ELEVATIONS AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS,ETC. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY CONFLICTS.

BASE FINAL INSTALLATION OF MATERIALS AND EQUIPMENT ON ACTUAL DIMENSIONS ANDCONDITIONS AT THE PROJECT SITE. FIELD MEASURE FOR MATERIALS AND EQUIPMENTREQUIRING EXACT FIT. NO EXTRAS WILL BE GIVEN FOR THE CONTRACTORS FAILURE TOFIELD COORDINATE.

THE OWNER OR ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETYPRECAUTIONS OR FOR MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, ORPROCEDURES REQUIRED TO PERFORM THE WORK.

THE CONTRACTOR SHALL LOCATE ALL EQUIPMENT THAT MUST BE SERVICED, OPERATED, ORMAINTAINED IN FULLY ACCESSIBLE POSITIONS. EQUIPMENT SHALL INCLUDE (BUT NOTLIMITED TO) VALVES, MOTORS, CONTROLLERS, SWITCHGEAR, AND DRAIN POINTS IFREQUIRED FOR BETTER ACCESSIBILITY. FURNISH ACCESS DOORS FOR THIS PURPOSE.MINOR DEVIATIONS FROM THE DRAWINGS MAY BE ALLOWED TO PROVIDE FOR BETTERACCESSIBILITY. ANY CHANGES SHALL BE APPROVED BY THE ARCHITECT AND CONSTRUCTIONMANAGER/GENERAL CONTRACTOR PRIOR TO MAKING THE CHANGE.

THE CONTRACTOR SHALL PROVIDE ACCESS DOORS, WALL OPENINGS, ROOF OPENINGS ORANY OTHER CONSTRUCTION REQUIREMENT NEEDED TO ACCOMMODATE THE MECHANICALEQUIPMENT. LOCATIONS OF THESE OPENINGS SHALL BE SUBMITTED IN SUFFICIENT TIME TOBE INSTALLED IN THE NORMAL COURSE OF WORK.

THE CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS OF APPROVEDEQUIPMENT WITH THE ELECTRICAL CONTRACTOR PRIOR TO THE PURCHASE ANDINSTALLATION OF ANY ELECTRICAL GEAR OR CONDUIT.

GENERAL CONTROL WIRING, THERMOSTATS, MOTORIZED DAMPERS AND CONDUIT ASSOCIATEWITH HVAC EQUIPMENT IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTORSHALL COORDINATE THE LOCATION OF ALL THERMOSTATS, ROOM SENSORS, ETC WITH THEARCHITECT AND ALL OTHER TRADES PRIOR TO INSTALLATION. IF A CONFLICT WITHMILLWORK, LIGHT SWITCHES, WINDOWS, ETC EXISTS, THE CONTRACTOR SHALL NOTIFY THEARCHITECT OF THE POTENTIAL INTERFERENCE PRIOR TO INSTALLATION. INSTALLTHERMOSTATS WITH PROTECTIVE LOCKING COVER, CENTERED AT 4'-0" ABOVE FINISHEDFLOOR, UNLESS OTHERWISE INDICATED. COMPLY WITH THE PROVISIONS OF THE AMERICANSWITH DISABILITIES ACT (ADA) AND THE TEXAS ACCESSIBILITY'S STANDARD (TAS).

ALL DIMENSIONS SHOWN ON THE DRAWINGS FOR DUCTWORK ARE NET INSIDE CLEARDIMENSIONS. FOR RECTANGULAR DUCT, THE FIRST FIGURE OF THE DUCT SIZE INDICATESTHE DIMENSION OF THE FACE SHOWN. VERIFY THAT THE DUCTWORK SPECIFIED WILL FIT INTHE SPACE AVAILABLE USING THE ARCHITECTURAL, STRUCTURAL AND ELECTRICALDRAWINGS AS REFERENCE PRIOR TO FABRICATION AND INSTALLATION. ROUND DUCT OFEQUAL NET INSIDE CLEAR AREA MAY BE USED IN LIEU OF RECTANGULAR DUCT.

PROVIDE TURNING VANES ON ALL RECTANGULAR SUPPLY, EXHAUST AND RETURNDUCTWORK INCLUDING THE TOP AND BOTTOM OF VERTICAL DUCTS.

PROVIDE A LOCKING QUADRANT VOLUME DAMPER AT THE TAP OF EACH RUN-OUT TODIFFUSERS FOR BALANCING PURPOSES, UNLESS OTHERWISE INDICATED. THE RUN-OUTDUCT SIZE IS THE SAME SIZE AS THE DIFFUSER OR GRILLE NECK SIZE UNLESS OTHERWISEINDICATED.

CEILING SPACE IS NEEDED AS A RETURN AIR PLENUM IN CERTAIN AREAS. FOLLOW ALLAPPLICABLE CODES AS TO MATERIALS ALLOWED FOR USE IN AIR PLENUMS. COORDINATEWITH THE GENERAL CONTRACTOR TO PROVIDE FREE RETURN OF AIR FROM ALL LOCATIONS.

REFER TO ARCHITECTURAL DRAWINGS FOR LOCATION OF ALL FIRE RATED WALLS ANDCEILINGS. PROVIDE FIRE DAMPERS AND/OR COMBINATION FIRE/SMOKE DAMPERS INDUCTWORK AT ALL LOCATIONS WHERE DUCTS PASS THROUGH FIRE RATED ASSEMBLY.MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING FIREAND SMOKE DAMPERS. COORDINATE CONSTRUCTION REQUIREMENTS WITH GENERALCONTRACTOR.

LOCATION OF ALL GRILLES, REGISTERS, DIFFUSERS AND CEILING DEVICES SHALL BEDETERMINED FROM THE ARCHITECTURAL REFLECTED CEILING PLANS AND WALL SECTIONS.COORDINATE ALL CEILING DIFFUSERS AND GRILLE LOCATIONS WITH LOCATION OF LIGHTS.

ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH SMACNASTANDARDS. ALL DUCT WORK FROM AHU TO TERMINAL UNIT SHALL BE CONSTRUCTED TO 1"W.G. AND SEALED TO SMACNA CLASS A. DUCT WORK DOWN STREAM OF TERMINAL UNITSSHALL BE CONSTRUCTED TO 1/2" W.G. AND SEALED TO SMACNA CLASS C. SEAL ALL SEAMSWITH UL 181 MASTIC RATED FOR APPLICATION.

INSTALL DX PIPING AS SPECIFIED, INCLUDING FILTER/DRYER, SIGHT GLASS,ISOLATION/CHARGING VALVES AND ALL APPURTENANCES PER MANUFACTURER'SRECOMMENDATIONS. INSTALLATION SHALL BE ACCOMPLISHED IN A NEAT AND ORDERLYFASHION, AS APPROVED BY THE ENGINEER. COORDINATE FOR ROUTING OF DX PIPING, UPINSIDE OF WALLS, ETC. AS REQUIRED, TERMINATING AT AHU's. PROVIDE BRACING/ISOLATION,AS REQUIRED TO PREVENT VIBRATION OF DX PIPING INSIDE WALLS, ETC. SIZE, ROUTE ANDINSULATE DX PIPING PER MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONREQUIREMENTS.

PROVIDE VIBRATION ISOLATORS FOR MOTOR DRIVEN EQUIPMENT UNLESS NOTEDOTHERWISE. PROVIDE ISOLATION AS INDICATED OR AS RECOMMENDED BY THE EQUIPMENTMANUFACTURER.

SOME PIPES AND DUCTS SHOWN ON EACH FLOOR PLAN MAY BE SHOWN WITH AN OFFSETFOR CLARITY.

SEAL ALL PIPE AND DUCT PENETRATIONS THROUGH FIRE RATED BUILDING ELEMENTS WITHAN APPROVED FIRE PROOFING MATERIAL.

ALL EQUIPMENT SHALL HAVE IDENTIFICATION TAGS. TAGS SHALL BE PLASTIC LAMINATE,WHITE FACE WITH 1/2" TALL BLACK LETTERS. THE TAG SHALL MATCH THE UNITDESIGNATIONS SHOWN ON THE SCHEDULES.

THE CONTRACTOR SHALL EXPAND OR REDUCE DUCTS AT EQUIPMENT CONNECTIONS BASEDON THE EQUIPMENT PURCHASED, WITH TRANSITIONS NOT TO EXCEED 30 DEGREES. SIZESSHOWN ON SCHEDULES, ETC. ARE FOR GUIDANCE ONLY. ASPECT RATIO SHALL BE NOGREATER THAN 4:1, PER SMACNA'S GUIDELINES.

ALL DUCTS WITH A DIMENSION GREATER THAN 12" PASSING THRU A NON-RATED WALL SHALLHAVE THE OPENING FRAMED IN WITH METAL STUDS. CONTRACTOR SHALL COORDINATEOPENING SIZE AND LOCATION WITH OTHER TRADES.

PRIOR TO INSTALLATION COORDINATE ALL MECHANICAL WORK WITH PNEUMATIC TUBESYSTEM BY OTHERS..

EQUIPMENT TO BE REMOVED(D)

EQUIPMENT TO BE RELOCATED(R)

(N) NEW EQUIPMENT

24.

FOR

T W

OR

TH, T

EX

AS

761

16

2570

RIV

ER

PA

RK

PLA

ZA S

UIT

E 1

00

EM

AIL

: m

ail@

schw

arz-

hans

on.c

om

FAX

: 81

7-37

7-36

12

PH

ON

E:

817-

377-

3600

A N

EW

LE

AS

E F

AC

ILIT

Y F

OR

CIT

Y O

F W

ES

TWO

RTH

VIL

LAG

E, T

EX

AS

C. C

ON

NE

LLY

SU

RV

EY

AB

STR

AC

T N

o. 3

19 T

AR

RA

NT

CO

., TX

2/6/2012

4458.2.6.2012.11107

Page 2: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal

18"x

14"

10"

AHU-1

EF-3

A640

B10260

A635

A640

A10210

A12430

A10365 A12

430

G22/22

G22/22

B10360

G22/22

B10250

E8250

M8M8

E8250

E8250

A12345

A695

VAV-2-3

VAV-2-2

VAV-2-1

EF-2

VAV-1-3

VAV-2-1

VAV-1-1

G22/22

E12255

B10270

EF-1

E12255

G22/22

G22/22

18"x

16"

AC-1

CU-1 HP-1

T

T

T

T

TT

14"

G22/22

A10240

6"

16"x12"

20"x12"

8"

2 23 3L6/6

6

L6/6

L6/6

1

5 5

1

8

8

55

5

5

8

5

G22/22

5

4

7

7

1

16"x12" 8

G22/22 5

16"x12"

T CCP

16"x12" 8

20"x12" 8

10"x8"8

16"x16"8

VAV-1B

HP-2

10

9

10

VAV-2B

6"

14"x

14"

18"x18"

AHU-2

6"

16"x

14"

2

3

40"x

18"

40"x18"

11

1

1

1

1

1

1

12

13

13

1415

15

15

100

101

102

103

104

104B

105

106

107

108

109

110

111

112

114

113

115

118

116

117

119

120

16

1/8" = 1'-0"MECHANICAL FLOOR PLAN

8'

1/8"=1'-0"

0 8' 16' M2.1

NOTES #

1 EQUIPMENT AND DUCTWORK ROUTED IN PLENUM SPACE BELOW ATTICINSULATION.

2 REFRIGERANT LINES SUPPORT ON AND CLAMP TO UNI-STRUT CHANNEL ANCHOREDTO PAD 48" O.C.. PAINT ELECTROMETRIC INSULATION WITH TWO COATS UV RATEDPAINT. INSULATED REFRIGERANT LINES - ROUTE UP THRU STUD WALL CAVITY TOABOVE CEILING. PROVIDE WALL SUPPORT. CAULK AROUND EXTERIOR WALLPENETRATIONS.

3 SPLIT SYSTEM OUTDOOR UNIT, PAD AND ANCHORS SHALL BE RATED FOR 150MPH WIND CRITERIA.

4 DUCTLESS SPLIT SYSTEM AIR HANDLER (AC-1) LOCATED IN CEILING GRID SUPPORT FROMSTRUCTURE PER MANUFACTURES RECOMMENDATIONS.

5

67

LINED 22X22 DUCT ELBOW FROM GRILLE (MARK G22/22). SEE 'RETURN GRILLEDETAIL' ON SHEET M6.1.

8

9

PROVIDE CONDENSATE OVERFLOW ALARM

10

1112

MOUNT CENTER LINE OF SLOT DIFFUSERS AT 10'-6" A.F.F.LINED TRANSFER DUCT. SEE 'ACOUSTICALLY LINED TRANSFER DUCT DETAIL' ONSHEET M6.1.PREBALANCE TO CFM INDICATED. TYPICAL FOR SLOT DIFFUSERS IN VESTIBULE.RETURN DUCT FULL SIZE OF CONNECTION. ROUTE UP THRU METAL DECK ANDTERMINATE.INSTALL SMOKE DETECTOR IN RETURN DUCT OF AHU-2.

ROOM SCHEDULENUMBER NAME

100 VESTIBULE101 GREETER102 LOBBY103 WAITING AREA104 TRAINING ROOM

104B COAT CLOSET105 MSR 1106 MSR 2107 ASSISTANT MANAGER108 MANAGER109 MSR110 WOMEN'S TOILET ROOM111 CORRIDOR112 MEN'S TOILET ROOM113 TELE/COMM/ELEC ROOM114 BREAK ROOM115 JANITOR'S STORAGE CLOSET116 VAULT ROOM117 WORK ROOM118 TELLER AREA119 IRT / ATM PROCESSING AREA120 EXPRESS AREA

INSTALL HVAC CENTRAL CONTROL UNITS THIS LOCATION.

SEQUENCE OF OPERATIONAHU-1 AND AHU-2:

THE CENTRAL CONTROL PANEL SHALL INDEX THE AHU FOR "OCCUPIED" PERIODS BASED ONUSER DEFINED, PROGRAMMABLE. DURING "OCCUPIED" MODE, THE CONTROL SYSTEM SHALLBE PLACED IN OPERATION, THE OUTSIDE AIR DAMPER SHALL OPEN AND THE SUPPLY FANSHALL RUN CONTINUOUSLY. THE CENTRAL CONTROL PANEL SHALL CONTROL, IN SEQUENCE,THE HEATING MODE AND COOLING MODE ACCORDING TO THE ZONE TEMPERATURE SENSORSSETPOINTS.

OCCUPIED OPERATION:

UNOCCUPIED OPERATION:THE CENTRAL CONTROL PANEL SHALL INDEX THE AHU FOR "UNOCCUPIED" PERIODSBASED ON USER DEFINED OCCUPANCY SCHEDULE. DURING "UNOCCUPIED" MODE THE UNITFAN, HEATING, AND COOLING SHALL CYCLE TO MAINTAIN THE HEATING AND COOLING SETPOINTS (64 F HEATING ADJ, 81 F COOLING ADJ) AND THE OUTSIDE AIR DAMPER SHALLREMAIN CLOSED.COOLING MODE:UPON A MAJORITY CALL FOR COOLING BY THE ZONE TEMPERATURE SENSORS, THECOMPRESSOR(S) SHALL BE ENERGIZED. WHEN ALL ZONE TEMPERATURE SENSORSHAVE BEEN SATISFIED, THE REVERSE SHALL OCCUR.

HEATING MODE:

BYPASS VAV SYSTEM OPERATION:ZONE CONTROL DAMPERS, BYPASS DAMPER, ZONE TEMPERATURE SENSORS, BYPASSCONTROLLER, CENTRAL CONTROL PANEL WITH PROGRAMMABLE TIME CLOCK AND ALLACCESSORIES NECESSARY FOR AN OPERABLE PRESSURE INDEPENDENT BYPASS VAVSYSTEM, SHALL BE PROVIDED BY A SINGLE VENDOR IN COORDINATION WITH THEPACKAGED HEATING AND AIR CONDITIONING UNITS MANUFACTURERS.

ZONE CONTROL DAMPERS SHALL BE UNDER CONTROL OF THEIR RESPECTIVE ZONETEMPERATURE SENSORS.DURING COOLING, THE ZONE DAMPERS SHALL MODULATE CLOSED ON A FALL IN ZONETEMPERATURE BELOW THE SET POINT (76 ADJ), ON A RISE IN ZONE TEMPERATUREABOVE THE SET POINT (76 ADJ), THE REVERSE SHALL OCCUR.DURING HEATING, THE ZONE DAMPER OPERATION SHALL REVERSE CONTROL ACTIONSUCH THAT ON A FALL IN ZONE TEMPERATURE BELOW THE SET POINT (68 ADJ), THEZONE DAMPER SHALL MODULATE OPEN, ON A RISE IN ZONE TEMPERATURE ABOVE THESET POINT (68 ADJ), THE REVERSE SHALL OCCUR.

COOLING AND HEATING OPERATION SHALL BE ESTABLISHED BY SYSTEM VENDORSSTANDARD METHODS. DUCT DISCHARGE STATIC PRESSURE SHALL BE CONTROLLEDSUCH THAT IN A RISE IN DUCT STATIC PRESSURE ABOVE SETPOINT, THE BYPASS DAMPERSHALL MODULATE OPEN. ON A FALL IN DUCT STATIC PRESSURE THE REVERSE SHALLOCCUR. SET POINT SHALL BE COORDINATED WITH EQUIPMENT VENDOR.

START-UP AND FIELD TEST FOR PROPER OPERATION OF ALL AHUs SHALL BEACCOMPLISHED BY, OR BE UNDER DIRECT SUPERVISION OF, A TECHNICIAN CERTIFIED BYTHE MANUFACTURER. (2) COPIES OF THE START-UP REPORT SHALL BE SENT TO THEENGINEER PRIOR TO FINAL ACCEPTANCE.

EF-2 AND EF-3EXHAUST FANS SHALL BE CONTROLLED BY THEIR RESPECTIVE LIGHT SWITCH.

EF-1:EXHAUST FAN SHALL BE INTERLOCKED WITH AHU-1 AND SHALL OPERATE AS FOLLOWS:EXHAUST FAN SHALL BE ENERGIZED WHEN AHU IS INDEXED FOR "OCCUPIED" MODE.WHEN AHU IS INDEXED FOR "UNOCCUPIED" MODE, THE EXHAUST FAN SHALL BE DE-ENERGIZED.

DUCTLESS SPLIT SYSTEM:

ON A RISE IN SPACE TEMPERATURE ABOVE THE THERMOSTAT SET POINT (76 F ADJ.),THE COMPRESSOR(S) SHALL BE ENERGIZED. ON A DROP IN TEMPERATURE THEREVERSE SHALL OCCUR.

CU-1 AND AC-1:COOLING MODE:

UPON DETECTION OF WATER IN THE CLOGGED PRIMARY LINE, THE ALARM WILLACTIVATE AN LED AND BUZZER, AND IT WILL DE-ENERGIZE THE CONDENSINGUNIT. WHEN THE ALARM CONDITION IS RESOLVED AND PROBES ARE DRIED, THESYSTEM WILL BE AUTOMATICALLY RESET TO NORMAL OPERATION.

CONDENSATE OVERFLOW DETECTION ALARM:

ON A DROP IN SPACE TEMPERATURE BELOW THE HEATING SET POINT (68 F ADJ) THEHEAT PUMP SHALL BE ENERGIZED. ON A CONTINUED DROP IN SPACE TEMPERATURE,THE ELECTRIC HEATING ELEMENT SHALL BE ENERGIZED. ON A RISE IN SPACETEMPERATURE ABOVE THE HEATING SET POINT (68 ADJ) THE REVERSE SHALL OCCUR.ON A DROP IN OUTDOOR TEMPERATURE BELOW 35 F (ADJ), THE HEAT PUMP SHALL BEDE-ENERGIZED AND THE ELECTRIC HEATING ELEMENT SHALL BE ENERGIZED TOMAINTAIN THE HEATING SETPOINT.

A DUCT MOUNTED SMOKE DETECTOR SHALL BE MOUNTED IN THE RETURN AIRDUCT OF AHU-1. UPON DETECTION OF PRODUCTS OF COMBUSTION AS SENSEDBY THE DETECTOR, THE DETECTOR SHALL SHUT DOWN THE FAN MOTOR ANDCONTROL SYSTEMS FOR THE RTU AND ACTIVATE A VISIBLE AND AUDIBLESUPERVISORY SIGNAL ON SYSTEM SENSOR SSK451 MULTI-SIGNALINGACCESSORY. RESET SHALL BE MANUAL.

SMOKE DETECTOR:

13 MOTORIZED DAMPER TO BE INTERLOCKED WITH AHU. DAMPER IS TOCLOSE WHEN AHU FAN IS OFF AND OPEN WHEN AHU FAN IS ON.

14 PROVIDE INSULATED SHEET METAL PLENUM FULL SIZE OF LOUVER AND18" DEEP. SEE ARCHITECTURAL DRAWINGS FOR LOUVER LOCATION ANDSIZE.

15 MOUNT GRILLE IN SOFFIT, TRANS AT GRILLE AS REQUIRED.

COORDINATE DUCT ROUTE WITH STRUCTURAL.

FOR

T W

OR

TH, T

EX

AS

761

16

2570

RIV

ER

PA

RK

PLA

ZA S

UIT

E 1

00

EM

AIL

: m

ail@

schw

arz-

hans

on.c

om

FAX

: 81

7-37

7-36

12

PH

ON

E:

817-

377-

3600

A N

EW

LE

AS

E F

AC

ILIT

Y F

OR

CIT

Y O

F W

ES

TWO

RTH

VIL

LAG

E, T

EX

AS

C. C

ON

NE

LLY

SU

RV

EY

AB

STR

AC

T N

o. 3

19 T

AR

RA

NT

CO

., TX16

2/6/2012

4458.2.6.2012.11107

Page 3: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal

NTSMECHANICAL DETAILS M6.1

1" ACOUSTICALDUCT LINER

DUCT SUPPORTEDFROM STRUCTUREABOVE

CEILING GRID

30" MINIMUM

RETURN GRILLE DETAILNO SCALE

RETURN GRILLE (G22/22)

FLEXIBLE DUCT CONNECTION DETAILNO SCALE

FACTORY INSULATED FLEXIBLE DUCTFULL NECK SIZE OF DIFFUSER6'-0" MAXIMUM LENGTH

VOLUME DAMPER

SEALANT AND CLAMPS

SEALANT AND CLAMPS

CEILINGINSULATION

RIGID DUCT MINIMUMLENGTH OF 2 TIMES THEDUCT DIAMETER

DIFFUSER

PARTITION

6' MIN.,TYP.

PLAN VIEW

PARTITION

1" ACOUSTICALDUCT LINER

CEILING GRID

HEIGHT

SECTION VIEW

MINIMUM LENGTHEQUAL TO THEHEIGHT

ACOUSTICALLY LINEDTRANSFER DUCT DETAILNO SCALE

NOTE: SEE PLAN FOR INSIDE CLEAR DIMENSION.

2. STAINLESS STEEL CLAMPS SHALL BE USED TO SECURE FLEX DUCT.

FLEX. CONNECTION

SUPPLY DUCT

CONTROL PANEL

NOTE 1

BOX INLETPRIMARY AIR

TRANSITION TO DUCT SIZE, AS REQ'D.

HIGH PRESSURE FLEXIBLE DUCTMAX. 2 FT LENGTH

DUCT SHALL BE 2" LARGER THANBOX VALVE SIZE.

NOTES:

DUCT CONNECTION TO BE SAME SIZE AS INLET. WITH A MINIMUM STRAIGHTSECTION OF 4Ø OR AS RECOMMENDED BY MANUFACTURER.

1.

W/ AVERGING AIR FLOW SENSOR

3. SUPPORT BOX FROM STRUCTURE WITH ALL THREAD RODS.PROVIDE VIBRATION ISOLATION AS REQUIRED.

AIR

FLO

W

SUPPLY AIR DEVICE, AND OTHERWISE AS INDICATED.REQ'D AT EACH RUN-OUT TAP TO EVERY TERMINAL

FLOWAIR

DAMPER W/ SHAFT EXTENSIONLOCKING QUADRANT

CONICAL SPIN TAP

AND 2" BUILD OUT

STRUCTURE ABOVE

OR WALL CAPTO LOUVER

EXHAUST GRILLE

EXHAUST FANWITH INTEGRALBACKDRAFT DAMPER

CEILING OR STRUCTURE

M

RETURN AIR DUCT

SEE DETAIL NOTE 3

SUPPLY AIR DUCT

FLEX CONNECTION (TYPICAL)

STRUCTURE

VIBRATION ISOLATORS

6.

1.

2.

3.

5

4.

NOTES FOR DETAIL:

MECHANICAL CONTRACTOR TO SUSPENDFROM STRUCTURE. USE 3"x3"x1/4" PAINTEDOR GALVANIZED ANGLE SUSPENDED USING3/8" ALL THREAD RODS.

EXTERIOR WALL

CLEARANCE ZONE FOR

DISCONNECT (TYPICAL)

CLEARANCE ZONE FOR

DISCONNECT (TYPICAL)

NOTE 3 EXTERIOR WALLOF BUILDING

NOTE 4NOTE 4

36"

15" 15"

30"

36"

15" 15"

30"

TYPICAL AHU DETAILNO SCALE

TYPICAL OUTDOOR UNIT DETAILNO SCALE

TYPICAL TERMINAL UNIT DETAILNO SCALE

TYPICAL EXHAUST FAN DETAILNO SCALE

TYPICAL TAP DETAILNO SCALE

FOR

T W

OR

TH, T

EX

AS

761

16

2570

RIV

ER

PA

RK

PLA

ZA S

UIT

E 1

00

EM

AIL

: m

ail@

schw

arz-

hans

on.c

om

FAX

: 81

7-37

7-36

12

PH

ON

E:

817-

377-

3600

A N

EW

LE

AS

E F

AC

ILIT

Y F

OR

CIT

Y O

F W

ES

TWO

RTH

VIL

LAG

E, T

EX

AS

C. C

ON

NE

LLY

SU

RV

EY

AB

STR

AC

T N

o. 3

19 T

AR

RA

NT

CO

., TX

2/6/2012

4458.2.6.2012.11107

Page 4: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal
Page 5: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal
Page 6: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal
Page 7: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal
Page 8: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal
Page 9: MECHANICAL SYMBOLS AND ABBREVIATIONSshaynephillips.com/images/M_and_E_Sheets_NFCU-BID_SET-2-6-201… · mechanical symbols and abbreviations ... all ductwork shall be sheet metal