media 2009-2010. planning, budgeting, and accountability presentation to i.t. media 2009-2010
TRANSCRIPT
MEDIA 2009-2010
Planning, Budgeting, and Accountability
Presentation to I.T.
MEDIA 2009-2010
EMPLOYEES
3FTE (-2) = 16PTE 2 SH (soft funded) Staging
1. MEDIA TECHNOLOGY SUPPORT & SERVICES
2. MEDIA TECHNOLOGY MAINTINANCE3. MEDIA INTRASTRUCTURE &
ENGINEERING4. MEDIA CONSULTATION
2008-2009 PBA REPORT
IT: WE DID NOT ASK FOR ANYTHING BUT MENTIONED THE SAME ITEMS WE REQEUSTED THROUGH ACADEMICS
2008-2009 PBA REPORT
ACADEMICS AND OTHER PBA’S: 1. 6-7 YEAR EQUIPMENT REPLACMENT
CYCLE2. 1 FTE TECHNITION
Other:STUDENT RESPONSE SYSTEMSDIGITAL SIGNAGEVIDEO SURVLANCE
PBA REPORT
2008-2009PBA REPORT
ACCADEMICS: ONGOING
• 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (FIVETH REQEUST)
PARTIAL FUNDED• DIGITAL SIGNAGE VP FUNDING PTE POSSITON(DAVE &
40 LOCATIONS)• VIDEO SURVLANCE MEDIA DID CONSULTING AND SEMI
FUNDED THROUGH BUILDING BUDGET & FACILITIES (230 CAMERAS)
REQUEST NOT MET• 6-7 YEAR EQUIPMENT REPLACMENT CYCLE• MEDIA ENHANCED CLASSROOM UPGRADES
2008-2009 PBA
2008-2009 ONGONG MONEY RECEIVED THOUGH PBA:• 1 FTE TECHNITION (NOT HIRED) (2 SOFT FUNDED STUDENT HOURLY)
DEPARTMENT RESTRUCTURE JOB DISCRIPTION CARREER LADDER RESLOTTING OTHER HR ITEMS
PBA REPORT
2005-2006 ONGONG MONEY RECEIVED THOUGH PBA: ACCADEMIC MEDIA FUNDING 70K
7 MEDIA ENHANCED CLASSROOMS AND MAINTIANING OF EXISTING SYTEMS
CAMPUS BULBS AND MAINTINANCE
PAST ONGOING PBA FUNDS
REPORT
2007-2008 ONGONG MONEY RECEIVED THOUGH VP’S:DSS MEDIA FUNDING 30K
1 PTECURRENT 49 DISPLAYS AT 45 LOCATION
OTHER FUNDS AND SCPECIAL PROJECTS
ACHEIVMENTS
LC
DSS
VSS
1.) 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (Fifth Request)
2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US)
100% MEDIA ENHANCED CLASSROOM
Other PBA Request that have to do with Media:
3.) Interactive Digital Signage 8K per location (Main Entrances)
4.) Commercial Free Content for Campus Entertainment Displays and Cable System (This will solve copy-write issues and un-commercialize signage)
PBA REQUESTS
1.) 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (4)
2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US)
100% MEDIA ENHANCED CLASSROOMS
PBA REQUESTS
2.) MEANS TO SUPPORT OTHER PBA REQUESTS
(THAT HAVE TO DO WITH US.)
100% MEDIA ENHANCED CLASSROOMS
DEPARTMENT RESTURCTURE FTE RESLOTTING (Use Academic Media Funds) PTE TO FTE AS PART OF RESTURCTURE 7 Year replacement cycle Additional support and maintenance funds.
(See PowerPoint Presentation: 100% MEC 09-10 FINAL)
PBA REQUESTS