Page 1: MeerKAT  DBE Past Present Future

MeerKAT DBEPast Present Future

Alan Langman

28 September 2009

Page 2: MeerKAT  DBE Past Present Future

2

Overview

• Objectives of MeerKAT• MeerKAT Phase• XDM• KAT-7

– ROACH/katADC– Fringe Finder

• MeerKAT• Conclusions

Page 3: MeerKAT  DBE Past Present Future

3

Objectives of MeerKAT

• Build a world class radio telescope (up to 80 dishes)• Choose a frequency range that is likely to have high

science impact.• Commission a 7 dish system from end of 2010,

engineering risk mitigation and do some early science. • Train a new generation of scientists and engineers who

are capable to participate in large international projects, such as the SKA.

• Provide an excellent facility for local and international scientists.

• Implement mission-driven innovation to mobilise industry, academia and research fraternity.

• SKA pathfinder (precursor)

Page 4: MeerKAT  DBE Past Present Future

4

Definitions

Page 5: MeerKAT  DBE Past Present Future

5

KAT element MeerKAT

Page 6: MeerKAT  DBE Past Present Future

SKA-SA: MeerKAT Phases

• XDM (Done)• Single Antenna HARTRAO• (PED)

• KAT7 (7 antennas Karoo)• Fringe Finder• Phase 1• KAT7• Optimization/Learning??

• MeerKAT (80 Antennas Karoo)

Page 7: MeerKAT  DBE Past Present Future

7

eXperimental DeMonstrator

Page 8: MeerKAT  DBE Past Present Future

8

Requirements

• Initially FPA/Multiple Feed (7 feeds)• Spectrometer

– 256MHz bandwidth– 2K channels– Minimum 100us dump time

• Radiometer• Histogram

Page 9: MeerKAT  DBE Past Present Future

9

XDM: Plan A

ATX

12

Pow

er

Rel

ax

Com

pone

nt

Pla

cem

ent

Focus gateware and firmware on XDM Requirements

Page 10: MeerKAT  DBE Past Present Future

XDM: Plan B

Page 11: MeerKAT  DBE Past Present Future

11

First Casper Solution

Page 12: MeerKAT  DBE Past Present Future

XDM Results08/27/08

Page 13: MeerKAT  DBE Past Present Future

13

meerKAT-7

Page 14: MeerKAT  DBE Past Present Future

14

Key Requirements

• Input signal – 72->328MHz, -27dBm (max 0dBm), NF=40dB

• Correlator/Beamformer– a) 1 band with total bandwidth >= 256MHz covering the whole

input frequency range, with equi-spaced channels of at least 1 MHz bandwidth each

– (b) 1 (goal 2 or 4) bands with total bandwidth >= 3.5 MHz selected from anywhere in the input frequency range, with equi-spaced channels of <= 10.7 kHz bandwidth each

– (c) 1 (goal 2 or 4) bands with total bandwidth >= 580 kHz selected from anywhere in the input frequency range, with equi-spaced channels of <= 530 Hz bandwidth each

Page 15: MeerKAT  DBE Past Present Future

15

KAT-7 Block Diagram

Page 16: MeerKAT  DBE Past Present Future

16

Key Component ROACH

Page 17: MeerKAT  DBE Past Present Future

17

katADC (production)

Page 18: MeerKAT  DBE Past Present Future

18

katADC Prelim results

Page 19: MeerKAT  DBE Past Present Future

19

Mechanical Enclosure

Page 20: MeerKAT  DBE Past Present Future

20

Detailed Design

Page 21: MeerKAT  DBE Past Present Future

21

Key Component ROACH

Page 22: MeerKAT  DBE Past Present Future

22

Production (always fun)

Page 23: MeerKAT  DBE Past Present Future

23

Stress testing tool chainMillion channels, 512MHz BW, Single ROACH

Page 24: MeerKAT  DBE Past Present Future

24

Fringe Finder -Risk Mitigation

• Fringe Finder (same base specs as KAT-7) – End of 2009

• Single baseline dual polarized correlator• Quad baseline single polarization

correlator.• 100ms dump time.

Page 25: MeerKAT  DBE Past Present Future

25

Physical Solution

Page 26: MeerKAT  DBE Past Present Future

26

FF Signal Flow

Page 27: MeerKAT  DBE Past Present Future

27

Yet another PoCo

Page 28: MeerKAT  DBE Past Present Future

28

Towards KAT-7 (Casper Collab)

Page 29: MeerKAT  DBE Past Present Future

29

MeerKAT Key SpecsMetric KAT-7 MeerKAT

Pre-SACMeerKATPost-SAC

Flow 1.2 GHz 700 MHz 580 MHz

Fhigh 1.95 GHz 10 GHz 15 GHz

Ae/Tsys 16 m2/K 200 m2/K 200 m2/K

DRimag 30 dB 60 dB 60 dB

DRspec 30 dB 50 dB 50 dB

Xpol -20 dB -25 dB -25 dB

BW 256 MHz 1 024 MHz(2 048 MHz)

1 024 MHz(4 096 MHz)

Nchan 4 096 32 768 32 768?

Tint <1 s 0.1 ms 0.1 ms

Page 30: MeerKAT  DBE Past Present Future

MeerKAT Phasing

KAT-72010

Phase 12013

Phase 22014

Phase 32015

Phase 42016

Flow 1.2 GHz 0.9 GHz 0.9 GHz8 GHz

0.9 GHz8 GHz

0.58 GHz8 GHz

Fhigh 1.95 GHz 1.75 GHz 1.75 GHz14.5 GHz

1.75 GHz14.5 GHz

2.5 GHz14.5 GHz

BWRF 256 MHz 850 MHz 2 GHz 2 GHz 4 GHz

ADC 800 MSa/s 5 GSa/s 5 GSa/s 5 GSa/s 10 GSa/s

BWDIG 256 MHz 850 MHz 2 GHz 2 GHz 4 GHz

Bmin 20 m 20 m 20 m 20 m 20 m

Bmax 200 m 10 km 10 km 50 km 50 km

30

Page 31: MeerKAT  DBE Past Present Future

MeerKAT Phasing

KAT-72010

Phase 12013

Flow 1.2 GHz 0.9 GHz

Fhigh 1.95 GHz 1.75 GHz

BWRF 256 MHz 850 MHz

ADC 800 MSa/s 5 GSa/s

BWDIG 256 MHz 850 MHz

Bmin 20 m 20 m

Bmax 200 m 10 km

31

Page 32: MeerKAT  DBE Past Present Future

32

Block Diagram

Page 33: MeerKAT  DBE Past Present Future

33

Key Challenges

• Digitization – Feed, Back Dish , Pedestal or correlator room

• Distributed correlator architecture• Timing and synchronization• Array Process/Backend Processor

Page 34: MeerKAT  DBE Past Present Future

34

Conclusions

• Road to MeerKAT• XDM• KAT-7• ROACH development• Fringe Finder Risk Mitigation• MeerKAT challenge

Page 35: MeerKAT  DBE Past Present Future

Questions?