meeting staged co2 capture requirements with the uop

16
Meeting Staged CO 2 Capture Requirements with the UOP SELEXOL™ Process Meeting Staged CO 2 Capture Requirements with the UOP SELEXOL™ Process © 2009 UOP LLC. All rights reserved. UOP 5254-01

Upload: others

Post on 29-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meeting Staged CO2 Capture Requirements with the UOP

Meeting Staged CO2 Capture Requirements with the UOP SELEXOL™ Process

Meeting Staged CO2 Capture Requirements with the UOP SELEXOL™ Process

© 2009 UOP LLC. All rights reserved. UOP 5254-01

Page 2: Meeting Staged CO2 Capture Requirements with the UOP

Gasification Project CO2 Considerations

CO2 capture or CO2 capture ready? CO2 capture level? CO2 quality requirements?Detailed evaluations with Selexol:

– IGCC Design Considerations for CO2 Capture—EPRI Interim Report March 2009

– Optional Carbon Capture, IChemE 2007(T. Alderson, S. Scott & J. Griffiths, Jacobs)

– Co-production of hydrogen and electricity with CO2 capture, IChemE 2007(S. Arienti & P. Cotone, FWI – J. Davison, IEA)

UOP 5254-04

Page 3: Meeting Staged CO2 Capture Requirements with the UOP

CO2 Capture and Sequestration (CCS) –Typical Gasification Complex

Coal or PetCoke,Biomass

O2

Treated Syngas

Sulfur

H2S

Raw Syngas

CO2

Gasifier SourShift

Air Separation

Tail Gas

Selexol Unit

Sulfur Recovery

No Shift, Full Shift or Partial Shift

Typical Raw Syngas H2 30 - 50% CO 30 - 50% Ar 0.5 - 1% N2 0.7 - 1.5% CO2 5 - 19% H2S 0.5 - 2% COS 200-1000 ppmv Ni & Fe Carbonyls HCN, NH3 ...

Applications: Power Chemicals Hydrogen Liquid Fuels etc

UOP 5254-06

Page 4: Meeting Staged CO2 Capture Requirements with the UOP

Designing for CO2 Capture Ready

CO2 capture should be based on proven technology Should not result in underutilization of major

equipment Initial investment and operating costs should

be minimized Additional plant space will be needed

UOP 5254-07

SELEXOL can meet all these criteria

Page 5: Meeting Staged CO2 Capture Requirements with the UOP

CO2 Capture Ready Design

How UOP looks at the problem……1. Initial design without CO shift

- Minimizes pre-investment - Moderate chilling can be considered

2. With CO shift, pre-investment in sulfur section- Need to evaluate complexity and cost implications

3. Evaluate at placement of CO shift system- Before or after bulk sulfur removal

UOP 5254-08

Page 6: Meeting Staged CO2 Capture Requirements with the UOP

CO2Absorber

CO2

TreatedGas

ConcentratorColumn

Selexol Process Unit - Capture Ready Example #1: Add Sour CO Shift Upstream

SulfurAbsorber Reflux

Pump

StripperReboilerPackinox

Exchanger

H2SStripper

RefluxAccumulator

AcidGas

ExportWaterFeed

Gas

H2SFlash

MakeupWater

SourCO

Shift

TreatedGas

Low pre-investment Impact of shift on

Absorber can be minimized by adding refrigeration

Lean Solution

Filter

UOP 5254-09

Page 7: Meeting Staged CO2 Capture Requirements with the UOP

Sulfur AbsorberSulfur Absorber

RegeneratorRegenerator

UOP 5254-10

Page 8: Meeting Staged CO2 Capture Requirements with the UOP

Pre-investmentPre-investment

Sulfur AbsorberSulfur Absorber

RegeneratorRegenerator

UOP 5254-10

Page 9: Meeting Staged CO2 Capture Requirements with the UOP

Pre-investmentPre-investment

Sulfur AbsorberSulfur Absorber

RegeneratorRegenerator

UOP 5254-10

Expansion with CO2 Absorber

Expansion with CO2 Absorber

Page 10: Meeting Staged CO2 Capture Requirements with the UOP

Pre-investmentPre-investment

Sulfur AbsorberSulfur Absorber

RegeneratorRegenerator

UOP 5254-10

Expansion with CO2 Absorber

Expansion with CO2 Absorber

Expansion with Concentrator

Expansion with Concentrator

Page 11: Meeting Staged CO2 Capture Requirements with the UOP

ConcentratorColumn

Selexol Process Unit - Capture Ready Example #2: Sour Shift in Initial Design

SulfurAbsorber Reflux

Pump

StripperReboilerPackinox

Exchanger

H2SStripper

RefluxAccumulator

AcidGas

ExportWaterFeed

Gas

MakeupWater

SourCO

Shift

Minimizes operational change in downstream power block

CO2Absorber

CO2

TreatedGas

Lean Solution

Filter

TreatedGas

UOP 5254-11

Page 12: Meeting Staged CO2 Capture Requirements with the UOP

Trim SulfurAbsorber

TreatedGas

CO2Absorber

CO2

Selexol Process Unit - Capture Ready Example #3: Integrated Sour Shift Concept

SulfurAbsorber

RefluxPump

StripperReboiler

PackinoxExchanger

H2SStripper

RefluxAccumulator

AcidGas

ExportWaterFeed

Gas

H2SFlash

MakeupWater

Lean SolutionFilter

SourCO

Shift

MP Steam

TreatedGas

UOP 5254-12

Page 13: Meeting Staged CO2 Capture Requirements with the UOP

Trim SulfurAbsorber

CO2Absorber

CO2

TreatedGas

Selexol Process Unit - Capture Ready Example #3: Integrated Sour Shift Concept

SulfurAbsorber

RefluxPump

StripperReboiler

PackinoxExchanger

H2SStripper

RefluxAccumulator

AcidGas

ExportWaterFeed

Gas

H2SFlash

MakeupWater

Lean SolutionFilter

SourCO

Shift

MP Steam

Design allows for true “bolt-on” design– Few or no changes required in

sulfur sectionUses commercially proven technologyResults in reduced Capex and Opex in

the Selexol unitResults in very clean CO2 stream

UOP 5254-13

Page 14: Meeting Staged CO2 Capture Requirements with the UOP

UOP Syngas Purification Complex Optimization

Sulfur Product

Syngas

Up front optimization is an integral part of each Selexol project execution to assure Capex and Opex are minimized

while achieving the project goals

H2Product

SNG Product

CO2Product

Technology Partners

UOP/Ortloff UOP

PSA Tailgas

SRU Tailgas

Acid Gas

FT Liquids

Methanol

UOP 5254-17

Selexol Unit

PolybedTM

PSACO Shift/COS Hydrolysis

SulfurGuardbed

TGCU

SRU

Methanation

FT Reactor

Methanol Unit

Page 15: Meeting Staged CO2 Capture Requirements with the UOP

Selexol ProcessCommercial Experience

Over 60 operating units– Both Natural Gas and Gasification applications

4 Recent Gasification Applications in Operation– Sarlux – Italy – IGCC Power plus H2– API – Italy – IGCC Power– Coffeyville Resources – USA-NH3/UAN– OptiCanada – Oil Sands Canada – H2 plus fuel

Multiple large units in engineering phase– Residue gasification for H2 production, Oil Sands Canada– Other gasification projects

• SNG, Power, NH3, Coal to Liquids, Methanol

UOP 5254-18

Page 16: Meeting Staged CO2 Capture Requirements with the UOP

Conclusions

Selexol process – Excellent solution for CO2 capture ready plants Integrates into gasification flow schemes for

all applications - from power to chemicals Bolt-on CO2 provides optimum flexibility

UOP 5254-19