meeting summary october 26 , 2016 attendees...group (pag) to discuss the abe master plan. marc...

22
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #1 October 26, 2016 Prepared by: Marc Champigny, C&S Companies File: N93.012.001 Attendees: See Sign-In List A meeting was held at the Lehigh Valley Planning Commission (LVPC) offices with the Project Advisory Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference. Following is a summary of items discussed during meeting. Welcome & Introductions Individual introductions were done and LNAA leadership thanked the PAG members for participating and being a part of the master plan process. Project Overview The project process was presented, reviewed and discussed. See attached presentation for details. The following bullets were items mentioned during the presentation or subsequent discussion. Outreach to the regional business community is important. The consultant team and LNAA should get the word out to the regional or even national community about airport development to attract new business opportunities. The consultant team will be working with LNAA to get information on the master plan out at key milestones of the project, and the cross-represented PAG is intended to voice their input throughout the process. LVPC and others have conducted a lot of local/regional infrastructure planning. Freight infrastructure plan/movement is rapidly changing and will impact the region. Specifically, it was mentioned that the need to integrate freight infrastructure with airport growth should be considered. Can this or how will this be integrated into the master planning process? In addition, a “Port of Entry” assessment is either on-going or should be started. LVPC is very interested with LNAA being designated as a “Port of Entry”. A question to the consulting team is how or does this get integrated into the Master Plan. The consultant team will work to review and include relevant information as appropriate. The regional context effort of the master plan will need to be closely coordinated with the efforts of LVPC and it was requested that the regional context workshop be coordinated with the LVPC schedule so they could attend. LVPC noted meetings in early December that they wish to avoid.

Upload: others

Post on 20-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #1 October 26, 2016 Prepared by: Marc Champigny, C&S Companies

File: N93.012.001

Attendees: See Sign-In List

A meeting was held at the Lehigh Valley Planning Commission (LVPC) offices with the Project Advisory Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference. Following is a summary of items discussed during meeting.

Welcome & Introductions

Individual introductions were done and LNAA leadership thanked the PAG members for participating and being a part of the master plan process.

Project Overview

The project process was presented, reviewed and discussed. See attached presentation for details. The following bullets were items mentioned during the presentation or subsequent discussion.

Outreach to the regional business community is important. The consultant team and LNAA should get the word out to the regional or even national community about airport development to attract new business opportunities. The consultant team will be working with LNAA to get information on the master plan out at key milestones of the project, and the cross-represented PAG is intended to voice their input throughout the process.

LVPC and others have conducted a lot of local/regional infrastructure planning. Freight infrastructure plan/movement is rapidly changing and will impact the region. Specifically, it was mentioned that the need to integrate freight infrastructure with airport growth should be considered. Can this or how will this be integrated into the master planning process? In addition, a “Port of Entry” assessment is either on-going or should be started. LVPC is very interested with LNAA being designated as a “Port of Entry”. A question to the consulting team is how or does this get integrated into the Master Plan. The consultant team will work to review and include relevant information as appropriate.

The regional context effort of the master plan will need to be closely coordinated with the efforts of LVPC and it was requested that the regional context workshop be coordinated with the LVPC schedule so they could attend. LVPC noted meetings in early December that they wish to avoid.

Page 2: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

ABE Master Plan PAG Meeting #1 Notes Page 2 What will be done with the available airport land to the north with the increase in FedEx traffic.

This, along with all cargo requirements, will be assessed during the Master Plan.

A concern about runway length for larger aircraft like B767s among areas of density/forestation near the runway ends that could potentially impact the ability of emergency workers to get to aircraft emergency situations was brought forward. As part of the master plan process, the consultant team will utilize FAA standards to determine the requirements for the airport and propose alternatives to address those requirements.

The FAA requested that they are involved throughout the process and not just at the end. They wanted to make sure there was enough buffer in the schedule to review forecasts, ALP, etc. The consulting team has planned appropriately for these buffers and will keep the FAA involved throughout the master plan process.

There are significant opportunities to develop (redevelop) industrial parks adjacent to the airport as a part of larger regional growth. The airport is seen as a partner in this, and is very much willing to work closely with local and regional authorities for success.

Meeting was adjourned. PAG meeting #2 will be scheduled for the first quarter of 2017.

End Meeting

Page 3: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference
Page 4: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference
Page 5: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

PROJECT ADVISORY GROUP (PAG) MEETING #1AIRPORT MASTER PLAN UPDATE

LEHIGH VALLEY INTERNATIONAL AIRPORTOctober 26, 2016

Page 6: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

2

• Project Advisory Group

• Project Overview and Goals

• Near-Term Actions

• Questions and Answers

Agenda

Page 7: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

3

Project Advisory GroupIntroductions, Role

Page 8: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

4

• Role: A Project Advisory Group (PAG) will be established to provide guidance and input into the planning process throughout the Master Plan Update.

• Provide input to the project team – 5 meetings

• Review and comment on working papers and documents

• Be a liaison with the community – 2 public meetings

• Advisory in nature

Role of the Project Advisory Group

Page 9: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

5

Project OverviewGoals, Team, Roles, Flowchart, Schedule

Page 10: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

6

• Create a flexible 25-year development plan and program that will maintain a safe, efficient, financially sound and sustainable airport facility

• Provide guidance to satisfy demand in a financially feasible and responsible manner, while at the same time addressing the aviation, environmental, and socioeconomic issues of the community and region

Master Plan Goals

Page 11: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

7

Project Team

LNAA Project Manager:Ryan MeyerLehigh Northampton Airport [email protected]

Russell BoroskiLehigh Northampton Airport [email protected]

Frank KulkaLehigh Northampton Airport [email protected]

Project Manager:Marc ChampignyC&S Engineers, Inc.518-915-7349 [email protected]

Deputy Project Manager:Aileen Maguire MeyerC&S Engineers, [email protected]

Client Manager:Jon DonahueC&S Engineers, Inc.315-703-4134 [email protected]

Arora Engineers, Inc.David Grigg704-900-1090 [email protected]

ADCICedrick [email protected]

Campbell HillEric Ford703-229-4257 [email protected]

Michael Gallis AssociatesMichael [email protected]

Unison ConsultingGregory Chappell312-988-3367 [email protected]

Page 12: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

8

Project Elements and Consultant Team RolesElement # Element Name Lead Support Element 1 Study Design and Working Groups C&S Team Element 2 Regional Context MGA C&S Element 3 Existing Conditions/Inventory C&S Team Element 4 Forecasts of Aviation Demand CH C&S Element 5 Demand/Capacity and Facility Requirements C&S Arora Element 6 Land Use Planning C&S Element 7 Alternatives Development and Evaluation C&S Arora/ADCI Element 8 Environmental Inventory and Review C&S Element 9 Implementation and Phasing C&S Unison Element 10 Financial Planning Unison C&S Element 11 Master Plan Reporting C&S Team Element 12 Airport Layout Plan (ALP) Set C&S Arora Element 13 Exhibit “A” Property Map Arora Element 14 Solid Waste/Recycling Plan C&S Element 15 Drainage Evaluation and Master Plan C&S Element 16 Pavement Management Plan (Airside) ADCI Arora Element 17 Public Involvement Program C&S Team Element 18 Project Administration C&S Team Element 19 AGIS/Airspace/Obstruction Analysis Services Arora C&S

Page 13: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

9

Master Plan Process Flowchart

Oct 16 ≈ Feb/Mar 17 ≈ Apr 17 ≈ Aug/Sep 17 ≈ Nov 17Sep 16 Mar 18

* Note: timeline not to scale with flow chart above.

Page 14: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

10

Near-Term ActionsElements, Briefings, Public Involvement

Page 15: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

11

• Element 2 – Regional Context

• Element 3 – Existing Conditions

• Element 4 – Forecasts of Aviation Demand

• Elements 12, 13 and 19 – AGIS, ALP, Exhibit “A”

• Element 17 – Public Involvement Program

Near-Term Project Elements

Page 16: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

12

• Led by Michael Gallis• Vision and Goal Setting

– As an air service facility– Relationship of the Airport to the

transportation and communications network

– Role in region’s social and economic development

• Regional Context and Land Use

Element 2 – Regional Context

Page 17: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

13

• Led by C&S Engineers• Various tasks• Use of previous studies• Sets the baseline for the master plan• Multiple site visits and interviews• Scheduling on-site visits

– Week of October 17 – 24-hour, 7-day traffic counts– Week of October 24 – meetings and data collection– November and December schedule in development

Element 3 – Existing Conditions

Page 18: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

14

• Led by Campbell Hill• Aviation demand forecast for 5-, 10-, 20-and 25-year horizon• Review Recent Passenger Leakage Study• FAA Terminal Area Forecast Updates• Passengers• Air Cargo• General Aviation and Military

Element 4 – Forecasts of Aviation Demand

Page 19: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

15

• AGIS– Flight to capture imagery occurred September 12 (leaf-on conditions)– Aerial imagery anticipated approximately 60 days after flight*;

planimetric data after 120 days**after completion of ground control

– Arora to coordinate AGIS project setup and features/attributes with LNAA staff

• ALP – FAA SOP 2.00• Exhibit “A” – FAA SOP 3.00

Elements 12, 13 and 19 – AGIS, ALP, Exhibit “A”

Page 20: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

16

Element 17 – Public Involvement Program

• Workshops (≈Feb & ≈Sept 2017)• Social Media• Website/Comment Management

Public Outreach

• LNAA Board Briefings (3)• Tenant & User Briefings (3)Briefings

• ATCT (2)• FAA ADO (3)• PennDOT (3)

Coordination

Page 21: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

17

Open DiscussionQuestions, Answers, Input

Page 22: Meeting Summary October 26 , 2016 Attendees...Group (PAG) to discuss the ABE Master Plan. Marc Champigny facilitated the meeting. A copy of the presentation is attached for reference

18

Master Plan Process Flowchart

Oct 16 ≈ Feb/Mar 17 ≈ Apr 17 ≈ Aug/Sep 17 ≈ Nov 17Sep 16 Mar 18

* Note: timeline not to scale with flow chart above.