meeting with cica/eic/unece and the african development bank · meeting with cica/eic/unece and the...

35
Development Bank African The MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business with the African Development Bank Dr. Jacques Moulot NEPAD, Regional Integration and Trade Department

Upload: phungtu

Post on 24-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

MEETING WITH CICA/EIC/UNECE

AND THE AFRICAN DEVELOPMENT BANK

Doing Business with the

African Development Bank

Dr. Jacques Moulot

NEPAD, Regional Integration and Trade Department

Page 2: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

OUR STRATEGY….

Page 3: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Ten Year Strategy

Overall goals: Green Growth and Inclusive Growth

PILLARS:

• Infrastructure (Transport, Energy, Water, ICT)

• Private Sector

• Regional Integration

• Governance and Accountability

• Skills and Technology

• Cross-Cutting Themes

• Agriculture, Environment and Climate Change, Gender, Knowledge activities

3

Page 4: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

High-Five Priority

A visionary impact-based reading of the TYS

5 impacts driven objectives

• Light and Power Africa: 100% access by 2025

• Integrate Africa

• Industrialize Africa

• Feed Africa

• Improve the well-being of African

4

Page 5: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

WHAT DOES THE BANK DO?

Page 6: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

• Support Social Economic Development of African RMC

• Demand-driven balance set of instruments

• Country Strategy Papers (CSP) or Regional Integration Strategy Paper(RISP)

Page 7: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

7

• Non-Lending Instruments • Technical Assistance

• Knowledge brokering

• Institutional capacity building (formulation of

macro- and micro-economic policies, project

preparation, appraisal)

• Lending Instruments • Project loans, including line of credit, Guarantee

• Policy-Based Loans

• Grants

Page 8: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

8

• Two Lending Windows

– Sovereign Guaranteed Operations (public

sector projects through governments at

concessionary terms)

– Non sovereign Guaranteed Operations -

OPSM (private sector projects at commercial

terms)

Page 9: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

9

• Private Sector Instruments • Senior Debt – Up to 20 years (5 years grace

period), foreign or local currencies

• Guarantees – partial risk, partial credit (long

tenors)

• Subordinated Debt – local currency

• Equity – direct, equity funds, up to 25%

• Technical Assistance – grants for studies, capacity

building

Page 10: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Sectors of interventions

• Infrastructure (Transport, Energy, Water, ICT)

• Governance

• Regional Integration

• Cross-Cutting Themes

• Synergies between the Fund and the Private Sector

• Agriculture, Natural Resource

• Management, Social and Human Development

• Gender, Environment and Climate Change

• Knowledge activities

10

Page 11: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Typical Interventions

• Energy (e.g. Power, thermal, hydro, wind, solar, Geothermal, EE)

• Transport (e.g. ports, roads, airports, rails)

• ICT (e.g. submarine cable, satellite, telephony)

• Oil & Gas (e.g. exploration, extraction, refining, pipelines)

• Mining (e.g. extraction, refining, smelting)

• Manufacturing (e.g. cement, fertilizers)

• Agribusiness (e.g. sugar, oils, timber, bio-fuels, fishing)

• Hospitality (e.g. hotels, resorts)

• Health & Education (e.g. hospitals, schools)

• Financial sector (e.g. banks, insurance, leasing, microfinance)

• Water and Sanitation (infrastructure, management, etc.)

11

Page 12: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

ENERGY SECTOR PROJECTS

Typical Projects Description

12

Page 13: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Towards a New Energy Policy

Ten (10) key principles:

• (i) ensuring energy security and increasing access for all

• (ii) moving steadily to a cleaner energy path

• (iii) pro-poor focus

• (iv) enhanced governance at the national level

• (v) innovation to increase financial flows in the energy sector

• (vi) integrating aid effectiveness principles

• (vii) social and environmental responsibility

• (viii) integrating response to climate change

• (ix) fostering knowledge transfer, and

• (x) mainstreaming gender dimension.

Page 14: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Cap-Vert Power Interconnection and Distribution

• Total: UAC 56,649,000

• IA: Ministry of Industry

• Location: six Island-Cap Vert

• Start Date : 02/11/2012

OMVG Hydroelectric

generation and transmission

system

• Total: UAC UAC 491,000,000

• IA: SPV-OMVG

• Location: Gambia, Guinea,

Guinea-Bissau, Senegal

• Start Date : 02/11/2012 Power distribution MV/LV; rural

electrification; Control Equipment

(SCADA)

Two HP Dam: Kaleta, 240 MW (Guinea),

Sambangalou (Guinea), 123 MW plus

interconnections

14

1 UAC=1.11374 Euro = 1.60936 USD

(Bank’s monthly rate – Sep 2011)

Page 15: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Inga HP and related Interconnections Studies

• Total: UAC 10,567,000

• IA: Govt DRC

• Location: DRC and Regional

• Start Date : End study: o6/12

Eskom Renewable Energy

Projects

• Total: UAC 881,154,380

• IA: ESKOM HOLDINGS LTD

• Location: South Africa

• Start Date : 29/05/2012

Market study, prefeasibility, feasibility,

EIA, Communication, Management of the

grand Inga site- estimated phase one HP:

4 to 6 GW and estimated USD8 billions

Investments in renewable energy:

Component-1, 100 MW Sere Wind Power;

component-2, 100 MW Upington

Concentrating Solar Power

15

Page 16: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Link to Projects Description: http://www.afdb.org/en/projects-and-operations/project-portfolio/

Page 17: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

WATER SECTOR PROJECTS

Typical Projects Description

17

Page 18: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Gambia - Rural Water Supply Sanitation Project

• Total: UAC 4,950,000

• IA: Department of Water

• Location: Gambia

• Start Date:12/02/2013

Lake Victoria Water and

Sanitation Program

• Total: UAC 81,940,000

• IA: Lake Victoria Bassin Commission

• Location: Lake Victoria Basin

• Start Date:23/11/2011

The programme consists of the following

components: Provision of Infrastructure;

Community Development; Capacity

Building and Training ; Management and

Technical Assistance

Water: infrastructure to provide water

Sanitation: Provision of drainage facilities

and communal toilet; Solid Waste

Management: Provision of equipment for

solid waste management system and

Storm Water Drainage; Inst. capacity-

building 18

Page 19: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

National Rural Water Supply Program-Mozambique

• Total: UAC 11,700,000

• IA: Water Department

• Location: NAMPULA , ZAMBEZIA

PROVINCE MOZAMBIQUE

• Start Date:09/11/2011

Urban Sanitation in Abidjan

• Total: UAC 23,300,000

• IA: Ministry of Construction

• Location: Abidjan

• Start Date: 24/11/2011

Rural water supply and sanitation

coverage in Nampula and Zambezia

Provinces (Planning, Infrastructure,

technical assistance, testing)

Development of infrastructure of

sanitation and drainage of storm water in

the basin of Gourou: comprehensive

study of the integrated management of

the basin side of the Gourou

19

Page 20: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

HOW TO WORK WITH US

20

Page 21: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Current solicitation

http://www.afdb.org/en/about-us/corporate-procurement/procurement-notices/current-solicitations/

21

Page 22: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Eligibility for Non-Sovereign Operation (Private sector)

• All member countries of the Bank are eligible to participate in all the procurements.

• Non-Sovereign Financing

• An enterprise/project must be located and incorporated in the Regional Member Countries (RMCs) of the Bank, whether promoted by African or non-African investors

• An enterprise/project must be majority-owned (51% +) by private-sector investors, or publicly owned with strong financial standing and proven managerial autonomy.

• Projects for the establishment, expansion, diversification and modernization of productive enterprises. No direct financing of trade.

• Maximum investment of 1/3 of total project cost

22

Page 23: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

The activities of the Private Sector comprise

• Non-sovereign guaranteed (NSG) lending activities (assistance to private entities) in the area of Financial Intermediation, Industries & Services, PPPs & Infrastructure, and Microfinance

• Non-lending activities include studies, initiatives and new programs.

23

Page 24: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

2012-2014 Financing Targets (in UA million)

2011 2012 2013 2014 2012-2014

ADB 3,600 3,600 3,600 3,600 10,800

ADB Public 2,490 2,324 2,260 2,193 6,777

ADB Private 1,110 1,276 1,340 1,407 4,023

ADF 1,900 2,100 2,000 1,900 6,000

NTF 20 25 25 25 75

Bank Group 5,520 5,725 5,625 5,525 16,875

http://www.afdb.org/en/about-us/structure/programming-budget-department/ 1 UA = 1,40935 USD

Page 25: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

LOOKING FORWARD

25

Page 26: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Interconnecting, integrating and transforming a continent

Programme for Infrastructure Development in Africa

DIAGNOSIS OF EXISTING SITUATION

OUTLOOK 2040

STRATEGIC FRAMEWORK

PIDA 2040

Vision: AUC 2004 Strategic Plan

Build an integrated, prosperous and peaceful Africa, driven by its citizens and representing a dynamic force in the International Arena

Consensus resulting from extensive sectoral and regional

consultative process 26

Page 27: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Interconnecting, integrating and transforming a continent

Programme for Infrastructure Development in Africa

PIDA’s Priority Action Program: establishing priorities

SELECTION CRITERIA

Agreed between PIDA Stakeholders

PIDA PAP

(1) eligibility and regional integration; (2) feasibility and readiness; (3) development impacts

27

Page 28: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Interconnecting, integrating and transforming a continent

Programme for Infrastructure Development in Africa

Ambitious, but affordable

• Total PIDA cost is US$ 360 billion by 2040.

• PIDA PAP (2012-2020)- first set of immediate priorities - contains 51 projects and programmes

• Overall capital cost of delivering the PAP from 2012 through 2020 - nearly $68 billion, or about $7.5 billion annually (below 1% of African GDP)

24 transport

15 energy

9 TWR

3 ICT

28

Page 29: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Interconnecting, integrating and transforming a continent

Programme for Infrastructure Development in Africa

Energy Generation Countries Utilities/Org Status

Great Millennium Renaissance ETH EEPCO S4B: Construction

Mphanda Nkuwa MOZ HMN S2: Pre-feasibility

Lesotho HWP phase II LSO LHDA/TCTA S1: Concept/Ident.

Inga III LH DRC MHRE S3A: Feasibility, Detailed

Design and Structuring

Sambangalou hydro GIN OMVG S3A: Detailing and

Structuring

Kaleta hydro GIN MEE S4: Construction

Batoka hydro ZMB, ZAM ZESCO, ZESA S3A: Feasibility

Ruzizi III hydro RWA, DRC EGL S3B: Financing close

Rusumo Falls hydro RWA EWSA S3B: Financing Close

29

Page 30: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Interconnecting, integrating and transforming a continent

Programme for Infrastructure Development in Africa

Energy

Projects -

Interconnector Countries Utilities RECs / PP Status

North-South

Interconnector Corridor

EGY, SUD, ETH, TAN, KEN,

ZAM, ZIM, MOZ, SA

EEHC, MED, EEPCO;

EEPCO, TANESCO,

KPLC, OPPPI, ZESCO,

EDM, ZESA, ESKOM

COMESA,

SADC/SAPP S2, S3A

Central Africa (Inga-SA) DRC, ZAM, ZIM, SA

ENE, SNEL, SEGESA,

SEEG, SONEL, STEE,

NamPower, ESKOM

ECCAS,

SADC/CEAPP

S2:pre-

feasibility

WA Corridor (NGR-SEN) NGR, BEN, TGO, GHA, CI,

LIB, SIL, GUI, B-GUI,

GAM, SEN

EDG, LEC, NPA, CIE,

ECG, CEET, SBEE,

NIGELEC, PHCN

ECOWAS/WA

PP S2

NA Corridor EGY, LYB, TUN, ALG, MOR STEG, GECOL, EEHC UMA/COMEL

EC S3A

Nigeria-Algeria Gas

Pipeline NGR, ALG NNPC ECOWAS S2

Kenya (Eldoret)-Uganda

(Kampala): Oil pipeline KEN, UGA MOE, MEMD EAC S1 (?)

30

Page 31: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

PIDA PAP TWRM

31

1 Palambo Regulation dam to imporve

navigability of Obangui River with

added hydropower component

S2 155 Congo River

Basin

ECCAS CENTRAL

2 Fomi Hydropower station in Guinea with

irrigation water supply for Mali and

regulation of the Niger river (9

Countries)

S3 384 Niger River

Basin

ECOWAS WESTERN

3 Multi-sectoral

Investment

Opportunity

Studies

Identification and preparation of

investment programmes in the basin

S1 1 Okavango River

Basin

SADC SOUTHERN

4 Lesotho HWP

Phase II - water

transfer

component

Water transfer programme supplying

water to Gauteng Province in SA

S3 1 100 Orange-Senqu

River Basin

SADC SOUTHERN

5 Gourbassy Multi-purpose dam located in Guinea:

regulation of the Senegal river (4

Countries)

S2 NA Senegal River

Basin

ECOWAS WESTERN

6 Noumbiel Multi-purpose dam with hydropower

generation (for Burkina Faso and

Ghana) component

S1/S

2

NA Volta River

Basin

ECOWAS WESTERN

7 Nubian Sandstone

Aquifer System

IMPLEMENTATION OF REGIONAL

STRATEGY FOR THE UTILISATION

OF THE AQUIFER SYSTEM

S4 5 Nubian

Sandstone

Aquifer System

UMA NORTHERN

8 NORTH-WEST

SAHARA

AQUIFER

SYSTEM

PRE-FEASIBILITY STUDIES FOR

IMPROVED USE OF THE AQUIFER

SYSTEM

S2 2,5 North West

Sahara Aquifer

System

UMA NORTHERN

9 IULLEMEDEN

AQUIFER

SYSTEM

PRE-FEASIBILITY STUDIES FOR

IMPROVED USE OF THE AQUIFER

SYSTEM

S2 10 Iullemeden and

Taoudeni/

Tanezrouft

Aquifer System

UMA NORTHERN

Page 32: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Scaling up NEPAD Infrastructure Project Preparation Facility (IPPF)

Status:

• Resource mobilization strategy in progress

• Inviting to new Donors to make contributions

• Align with rationalization and strengthen existing

IPPFs

• Focus on regional projects of transformational nature

Page 33: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Partnership - How to get involved?

AUC • Political Leadership and

Consensus, advocacy

NPCA

•Programme Coordinator, Custodian of Database and Information system and project fiches

REC or

SRO

• Regional Coordinator

COUNTRY

• Project Implementation Agencies

AFDB Partner of

Choice

Page 34: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Merci! Thank You!

Page 35: MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK · MEETING WITH CICA/EIC/UNECE AND THE AFRICAN DEVELOPMENT BANK Doing Business ... (e.g. submarine cable, satellite

Development Bank African

The

Environmental and social safeguards policies