  • 7/29/2019 Mega Dams Project

    1/15

    MEGA DAMSPROJECT

    SARAWAK WILL

    BUILD 12 DAMS

  • 7/29/2019 Mega Dams Project

    2/15

    Mega Dams Project In Malaysia

  • 7/29/2019 Mega Dams Project

    3/15

    What are the purpose for this mega

    dam project?

    To meet our future industrialization needs due to mega economic

    plan by government call as SCORE (Sarawak Corridor of Renewable

    Energy). The dams were necessary to meet energy demands because

    many industries will be consume very high energy especially

    electricity.

    Below are the company that will be settle their factory in SCORE area.

    I. Press Metal Bhd.

    II. Chinas Luneng Group.

    III. Smelter Asia Sdn Bhd.

    IV. Alcon Inc.

    V. Mitsubishi Corp.

    VI. BHP Billiton Ltd.

    VII.Australias Rio Tinto.

  • 7/29/2019 Mega Dams Project

    4/15

  • 7/29/2019 Mega Dams Project

    5/15

    THE

    DISADVANTAGESOF BUILDING MEGA

    DAMS

  • 7/29/2019 Mega Dams Project

    6/15

    Lost of river food source

    The forest area that flooded will lead to

    losing food source for the local natives.

    The river will polluted by the timber

    logging activity.

  • 7/29/2019 Mega Dams Project

    7/15

    Destroying animals

    natural habitats

    The dams project definitely will destroyingthe animal natural habitats because the

    forest which is their habitats will be flooded

    by water.

    The animal also may lost their food source

    and most probably meet their extinction.

  • 7/29/2019 Mega Dams Project

    8/15

    Local natives lost

    their homes

    People living in villages and towns

    that are in the valley to be flooded,

    must move out.

    This means that they lose their farms

    and businesses.

  • 7/29/2019 Mega Dams Project

    9/15

    Natural environment

    are destroyed

    The flooding of large areas of land means

    that the natural environment is

    destroyed.

    Also, they do logging timber which is

    harmful for the local.

  • 7/29/2019 Mega Dams Project

    10/15

  • 7/29/2019 Mega Dams Project

    11/15

    The Benefits

    OfMega Dams Project

  • 7/29/2019 Mega Dams Project

    12/15

    HIDRO POWERThe availability of energy is essential for the socio-economic development of a nation. It is

    advantages to use energy that is clean, efficient,

    dependable and renewable. Hydropower meets all

    of these requirements. In countries, where a vast

    amount of development still lies ahead, good

    conditions often exist for renewable energysources.

    The technically most advanced and economical

    source of renewable energy is hydropower.

  • 7/29/2019 Mega Dams Project

    13/15

    The attractiveness of reservoirs for tourism is

    often a significant benefit, in addition to the other

    purposes of a dam. This is very significant in areas

    where natural surface water is scarce or non-

    existent. Recreational benefits associated with

    lakes, such as boating, swimming, fishing, bird

    watching and nature walks, are taken into account

    early at the planning stage, along with otherobjectives achieve a balanced project. The

    operation of the dam and reservoir can enhance

    tourism.

    FOR RECREATION PURPOSE

  • 7/29/2019 Mega Dams Project

    14/15

    WATER SUPPLIES FOR DOMESTICAND INDUSTRIAL USE

    In Malaysia, dams also used for minor industrial

    such as fish breeding, prawn breeding and others.

    This can be good for the local income.

    Water stored in reservoirs is also used for

    industrial needs. This ranges from the direct use

    in chemical and refining processes to cooling forconventional and nuclear power production.