Page 1: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

1 | 16

MEGAFLOHORIZONTAL SHRU IZI

INSTALLATION MANUAL

MEGAFLO Product Guide

MEGAFLO EcoUnvented Direct & Indirect

Hot Water Cylinders

MEGAFLO Eco Product Guide

Page 2: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

2 | 16

1. Introduction 3

2. Product Technical Data 4

2.1. Dimensions 4

2.2.TechnicalSpecifications 4

3. Pre-installation Requirements 5

3.1. Principle of Operation 5

3.2InstallationConfiguration 5

3.3.RequirementsforRecognitionwithinSAPCalculations 6

3.3.1.DwellingEvaluation 6

3.3.2.DrainageConnections 6

3.3.3.PlumbingConnections 7

3.3.4.InstallionLocation 7

4. Installation 8

4.1.PackageContents 8

4.2. Installation Procedure 9

4.2.1 Installation - Method 1 10

4.2.2 Installation - Method 2 12

5. Maintenance 14

6.Warranty 14

7.Safety 15

7.1.TestedforDrinkingWaterConsumption 15

7.2.LegionellaPrevention 15

Page 3: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

3 | 16

Page 4: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

4 | 16

130

96

540

53 487

456 84 M 1/2"

M 1/2"

90

0-2

0 40

83 428 29

25 46

( mm )

Page 5: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

5 | 16

Page 6: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

6 | 16

Page 7: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

7 | 16

Page 8: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

8 | 16

53

2

41

5

Page 9: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

9 | 16

4.2TWOMETHODSOFINSTALLATION

4.2.1Installationabovetheslab/coupledtotheshowertray. PAGE10-11

4.2.2Installationundertheslab/undertheshowertrayorbathtub

withdesiredseparation. PAGE12-14

Page 10: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

10 | 16

EE

SECTION E-E

α

4.2.1INSTALLATION-METHOD1

1

2

3

Usingaspiritleveland4adjustablefeet(5),adjusttheunit’sheightandpositionithorizontallyinitsfinallocation.TheinternalboreoftheMegafloHorizontalSHRUiZialreadyhasaslopeof2%toensurethecorrectflowofwastewaterfromtheshower.

PuttheshowertrayovertheMegafloHorizontalSHRUiZiandalignit. Removethetrayforimplementingthenextsteps.

555555

12

4

3

!!

AlwaysensurethatthepipeconnectingthedrainandMegafloHorizontalSHRUiZihasaninclination(α)between1%and2%.

Page 11: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

11 | 16

555555

12

4

3

4

5

6

Connectthemainscoldwatertotheunit’sinlet(3),andpreheatedwa-teroutlet(4)fromtheunittothecoldsideoftheshowermixertapand/ordomesticwaterheater(dependingoninstallationconfiguration).UsebothoftheprovidedMale1/2’’fittingsandproceedtosealinaccordan-cewithbestplumbingpractices.ConnecttheMegafloHorizontalSHRUiZidrainwateroutlet(2)tothedrainpipe.

Werecommendthattheinstallerperformsaleaktestonthemainswatercircuitandonthedrainwatercircuittoensuretheintegrityoftheinlet and outlet connections.

Assemblethevalveandshowertray.

Page 12: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

12 | 16

Ensurethatthereisenoughspaceforaneasyinstallation ofMegafloHorizontalSHRUiZi.

Ø40mm

Installa90°elbowØ40mm.Ensurethatelbowgoesbeyond the seal in the unit.

Ifnecessary,useasectionofappropriatelyratedPVC ofthedesirelength.

4.2.2INSTALLATION-METHOD2

1

2

3

Page 13: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

13 | 16

Usingscrews,fixtheMegafloHorizontalSHRUiZitotheslab.

Makesurethattheunitisinstalledhorizontally.TheinternalboreoftheMegafloHorizontalSHRUiZialreadyhasaslopeof2%toensurethecorrectflowofwastewaterfromtheshower.

Connectthemainscoldwatertotheunit’sinlet(3),andpreheatedwateroutlet(4)fromtheunittothecoldsideoftheshowermixertapand/ordomesticwaterheater(dependingoninstallation configuration).UsebothoftheprovidedMale1/2’’fittingsand proceedtosealinaccordancewithbestplumbingpractice.

ConnecttheMegafloHorizontalSHRUiZidrainwateroutlet(2)to the drain pipe.

555555

12

4

3

!!

4

5

6

Page 14: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

14 | 16

Werecommendthattheinstallerperformsaleaktestonthemainswatercircuitandonthedrainwatercircuittoensuretheintegrityofthe inlet and outlet connections.

Installtheshowertrayandtheshowervalve.

Draw_16WEIGHT:

A3

SHEET 1 OF 1SCALE:1:10

DWG NO.

TITLE:

REVISIONDO NOT SCALE DRAWING

MATERIAL:

DATESIGNATURENAME

DEBUR AND BREAK SHARP EDGES

FINISH:UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

Q.A

MFG

APPV'D

CHK'D

DRAWN

5.MAINTENANCE

6.WARRANTY-2YEARS

TheMegafloHorizontalSHRUiZihasbeendesignedtorequireminimalmaintenanceotherthanregularcleaningoftrapsandfiltersremovingallhairanddirt,thuspreven-tingblockages.

Toavoidlosingefficiencyinthelongterm,werecommendyouperiodicallydissolvesoapresidueontheinsidecopperpipewithyourusualdraincleanerand/ortocleantheunitwithapipecleaningbrushandhotwater.

Duringthewarrantyperiod,themanufactureroranauthorizedservicecompanywillreplaceorrepairanyProductthathasadefectindesign,materialorworkmanship.

Thewarrantywillbeinvalidatedifproductfailuresarecausedbythefollowing:

•Installedwithcoldinletpressureabove6bar.

•Useofthesystemwithoutadrainvalvetrap.

•Inadequatecleaningofthedrainvalvetrap.

•InstallationoftheMegafloSHRUnotinaccordancetotheseinstructions..

•Unauthorizedrepairsandmodifications.

7

8

Page 15: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

15 | 16

Page 16: MEGAFLO Eco Unvented Direct & Indirect MEGAFLO Hot Water Cylinders HORIZONTAL SHRU IZI · 2017. 6. 26. · position it horizontally in its final location. The internal bore of the

16 | 16

Customer Service

Important notice to installations outside of the UK.

Telephone:0344 8711535

Facsimile:0344 8711528

E-mail:[email protected]

MegafloHurricane WayNorwichNorfolkNR6 6EA

References to legislation, legal requirements, regulations, building regulations benchmark, spares stockists, guarantees and warranty areONLY APPLICABLE WITHIN THE UK.

For local legislation, legal requirements, regulations, building regulations outside of the UK, contact your local Authority.

For spares stockists, guarantees and warranty outside the UK, contact your local supplier or,