MEGAPROJECT RISK ANALYSIS AND
SIMULATION: A DYNAMIC SYSTEMS
APPROACH
MEGAPROJECT RISKANALYSIS AND SIMULATION:A DYNAMIC SYSTEMSAPPROACH
BY
PRINCE BOATENGKoforidua Technical University, Koforidua, Ghana
ZHEN CHENUniversity of Strathclyde, Glasgow, UK
STEPHEN O. OGUNLANAHeriot-Watt University, Edinburgh, UK
United Kingdom � North America � Japan � India � Malaysia � China
Emerald Publishing Limited
Howard House, Wagon Lane, Bingley BD16 1WA, UK
First edition 2017
Copyright r 2017 Emerald Publishing Limited
The right of Prince Boateng, Zhen Chen, and Stephen O. Ogunlana to be identified
as the Authors of this Work has been asserted in accordance with the Copyright,
Designs and Patents Act 1988.
Reprints and permissions service
Contact: [email protected]
No part of this book may be reproduced, stored in a retrieval system, transmitted in
any form or by any means electronic, mechanical, photocopying, recording or
otherwise without either the prior written permission of the publisher or a licence
permitting restricted copying issued in the UK by The Copyright Licensing Agency
and in the USA by The Copyright Clearance Center. Any opinions expressed in the
chapters are those of the authors. Whilst Emerald makes every effort to ensure the
quality and accuracy of its content, Emerald makes no representation implied or
otherwise, as to the chapters’ suitability and application and disclaims any warranties,
express or implied, to their use.
British Library Cataloguing in Publication Data
A catalogue record for this book is available from the British Library
Library of Congress Classification (LCC) – HE1-9990
BIC - KJMP
BISAC - BUS101000
Dewey Decimal Classification (DDC) – 388
ISBN: 978-1-78635-831-8 (Print)
ISBN: 978-1-78635-830-1 (Online)
ISBN: 978-1-78714-301-2 (Epub)
Certificate Number 1985ISO 14001
ISOQAR certified Management System,awarded to Emerald for adherence to Environmental standard ISO 14001:2004.
To our families
Contents
Abbreviations xi
List of Figures xv
List of Tables xix
List of Exhibits xxv
List of Equations xxvii
Acknowledgements xxix
About the Authors xxxi
Preface xxxiii
Foreword xxxv
Chapter 1 Introduction 11.1. Introduction 11.2. The Problem with Megaprojects 2
1.2.1. Megaproject Risks 21.2.2. Megaproject Risk Assessment 41.2.3. A New Risk Assessment Framework 5
1.3. Purpose and Scope 61.4. Structure of the Book 91.5. Originality and Value 101.6. Summary 12
Chapter 2 The Edinburgh Tram Network (ETN) Project 152.1. Introduction 152.2. Background to the Project 15
2.2.1. The 1871�1956 Era 152.2.2. The New Edinburgh Tram Network 16
2.2.3. Tram Network Construction and CivilEngineering Works 17
2.2.4. Contractual Disputes 282.3. STEEP Risks 28
2.3.1. Social Issues 282.3.2. Technical Issues 292.3.3. Environmental Issues 332.3.4. Political Issues 35
2.4. Summary 40
Chapter 3 Megaproject Risks Assessment Framework 433.1. Introduction 433.2. Risk Analysis Framework 46
3.2.1. The ANP Modelling Route 483.2.2. The SD Modelling Route 55
3.3. Risk Clusters 583.3.1. The Social Risks Cluster 593.3.2. Technical Risk Cluster 613.3.3. Economic Risks 643.3.4. Environmental Risk Cluster 683.3.5. Political Risk Cluster 70
3.4. Summary 74
Chapter 4 Megaproject Risk Quantification 774.1. Introduction 774.2. Analysis of Risk Interdependency 77
4.2.1. Qualitative Approaches 784.2.2. The Quantitative Approach 814.2.3. Descriptive Quantitative Results and Analysis 824.2.4. Standardized Quantitative Results and Analysis 844.2.5. Adjustments of Participants’ Opinions 85
4.3. ANP Model 854.4. Pairwise Comparison 924.5. Risk Interdependency Matrix 93
4.5.1. Project Objectives Cluster 934.5.2. Potential Risks Cluster 954.5.3. Potential Risks Sub-Clusters 95
4.6. Supermatrix Calculation 1104.7. Risk Rating 1194.8. Consistency Test 1194.9. Risk Priority Index (RPI) 1244.10. Summary 128
viii Contents
Chapter 5 Risk Simulation 1315.1. Introduction 1315.2. Project Risk Systems Model 131
5.2.1. Model Causality 1335.2.2. Initial Model Development 1355.2.3. System Boundaries 136
5.3. STEEP Risks System 1415.3.1. Social Risks System 1415.3.2. Technical Risks System 1455.3.3. Economic Risks System 1485.3.4. Environmental Risks System 1545.3.5. Political Risks System 157
5.4. System Verification 1625.5. System Modelling, Testing and Simulation 165
5.5.1. Integrated Stock and Flow STEEP Models 1655.5.2. Model Equation Formulation 1695.5.3. Model Evaluation Tests 1705.5.4. Dynamic Simulation Results and Discussion 184
5.6. System Validation 2165.6.1. Structure Verification 2185.6.2. Parameter Verification 2195.6.3. Boundary Adequacy 2195.6.4. Dimensional Consistency 219
5.7. Summary 221
Chapter 6 Conclusions 2236.1. Introduction 2236.2. Value for Practice 2236.3. Contribution and Impacts 2266.4. Practical Guide 2296.5. Limitations and Further Research 232
6.5.1. Limitations 2326.5.2. Further Research 234
References 235
Appendices 249Appendix A: Model Validation 250Appendix B: Structured Interview Questionnaire and Participants 289Appendix C: Respondent’s Mean Scores of Importance 291
Index 327
Contents ix
Abbreviations
ANP Analytical Network Process
AHP Analytic Hierarchical Process
BBS Bilfinger Berger Civil (UK) and Siemens plc
CEC City of Edinburgh Council
CDR Cost of Dispute Resolution
CDUD Cost of Delay in Utility Diversion
CI Consistency Index
CLA Cost of Legal Action
CLD Causal Loop Diagram
COD Cost of Delays
COR Cost of Rework
CR Consistency Ratio
DEG De-Escalation to Grievances
Disp. Disputes
DOAF Delay of All Forms
DOC Delay in Obtaining Consent
EC Economic Certainties
EcRM Economic Risks Model
ETN Edinburgh Tram Network (Project)
EG Escalation to Grievances
EnC Environmental Certainties
EnR Environmental Risks
EnRE Environmental Regulation Enforcement
EnRM Environmental Risks Model
EnU Environmental Uncertainties
EP Energy Price
EPC Engineering, Procurement and Construction
EPCO Escalation to Project Cost Overrun
EPTO Escalation to Project Time Overrun
ER Economic Risks
ERM Environmental Resource Management
ErG Error Generation
EU Economic Uncertainties
FE Foreign Exchange
GCP Ground Conditions Problem at a Given Site
GFP Government Funding Policy
IPV Ideal Priority Value
LA Legal Actions
LD Liquidated Damages
LIR Local Inflation Rate
LRC Legislative & Regulation Changes
IRPI Ideal Synthesized Risk Priority Indexes
IRPV Ideal Risk Priority Index
MCDM Multi-Criterion Decision Making
MLDMBI Multi-Level Decision-Making Bodies Involvement
MP Material Price
MPDS Modification to Project Design & Specification
MPH Material Price Hike
MUDFA Multi-Utilities Framework Agreement
NPV Normal Priority Value
O&M Operations and Maintenance
PA Social Acceptability
PC Political Certainties
PDP Political Debates on the Project
PH Political Harmony
PI Political Indecision
PIP Political Interferences in the Project
PMPS Pressure to Modify Project Scope
PoRM Political Risks Model
PQD Project Quality Deficiency
PR Political Risks
Proj.C Project Complexity
PS Political Support
xii Abbreviations
Proj.S Project Scope
PT Project Termination
PU Political Uncertainties
RMSI Respondent’s Mean Scores of Importance
RPCO Risks of Project Cost Overrun
RPI Risk Prioritization Index
RPIG Global Risks Priority Index
RPIL Local Risk Priority Index
RPTO Risks of Project Time Overrun
SC Social Certainties
SD System dynamics
SFM Stock and Flow Model
SG Social Grievances
SI Social Issues
SoRM Social Risks Model
SPV Special Purpose Vehicle
SR Social Risks
SU Social Uncertainties
TC Technical Certainties
TDUU Time to Divert Underground Utilities
TeRM Technical Risks Model
TIE Transport Initiatives Edinburgh Ltd.
TPAS Threat to Personal & Asset Security
TPV Total Priority Value
TR Technical Risks
TRO Traffic Regulation Order
TRPI Total Risk Priority Index
TU Technical Uncertainties
WCP Worksite Coordination Problems
WQS Weighted Quantitative Score
WI Wage Inflation
Abbreviations xiii
List of Figures
Chapter 2
Figure 2.1 Stakeholder relationship map for the ETN project. . . 25
Chapter 3
Figure 3.1 The SDANP framework for megaproject riskassessment.. . . . . . . . . . . . . . . . . . . . . . . 47
Figure 3.2 ANP network model for risk prioritization. . . . . . . 50
Figure 3.3 Calculation process for the CR method. . . . . . . . . 52
Figure 3.4 The three components of system dynamics models. . . 56
Figure 3.5 A simple stock and flow model. . . . . . . . . . . . . 57
Figure 3.6 Social risk entry points during mega constructionprojects. . . . . . . . . . . . . . . . . . . . . . . . . 61
Chapter 4
Figure 4.1 ANP model structure for STEEP risks prioritization. . 89
Figure 4.2 ANP sub-models for STEEP risks prioritization. . . . 90
Chapter 5
Figure 5.1 Causal loop diagram for STEEP risks on the ETNproject.. . . . . . . . . . . . . . . . . . . . . . . . . 132
Figure 5.2 Causes tree diagram for technical uncertainties entity. . 134
Figure 5.3 Uses tree diagram for technical uncertainties entity. . . 134
Figure 5.4 Causality of technical uncertainties. . . . . . . . . . . 134
Figure 5.5 Causal loop diagram for social risks system. . . . . . . 142
Figure 5.6 Causes tree diagrams for social risks model. . . . . . . 144
Figure 5.7 Uses tree diagrams for the social risks model. . . . . . 146
Figure 5.8 Causal loop diagram for technical risks system. . . . . 147
Figure 5.9 Causes tree diagrams for the technical risks model. . . 149
Figure 5.10 Uses tree diagrams for the technical risks model. . . . 150
Figure 5.11 Causal loop diagram for economic risks system. . . . . 152
Figure 5.12 Causes tree diagrams for the economic risks model. . . 153
Figure 5.13 Uses tree diagrams for the economic risks model. . . . 154
Figure 5.14 Causal loop diagram for environmentalrisks system. . . . . . . . . . . . . . . . . . . . . . . 155
Figure 5.15 Causes tree diagrams for the environmental risksmodel. . . . . . . . . . . . . . . . . . . . . . . . . . 158
Figure 5.16 Uses tree diagrams for the environmentalrisks model. . . . . . . . . . . . . . . . . . . . . . . 159
Figure 5.17 Causal loop diagram for political risks system.. . . . . 160
Figure 5.18 Causes tree diagrams for the political risks model. . . . 163
Figure 5.19 Uses tree diagrams for the political risks model. . . . . 164
Figure 5.20 A typical stock and flow model (SFM). . . . . . . . . 165
Figure 5.21 Integrated stock and flow diagram for the social riskssystem. . . . . . . . . . . . . . . . . . . . . . . . . . 167
Figure 5.22 Integrated stock and flow diagram for the technicalrisks system. . . . . . . . . . . . . . . . . . . . . . . 167
Figure 5.23 Integrated stock and flow diagram for the economicrisk system. . . . . . . . . . . . . . . . . . . . . . . 168
Figure 5.24 Integrated stock and flow diagram for theenvironmental risks system. . . . . . . . . . . . . . . 169
Figure 5.25 Integrated stock and flow diagram for the politicalrisks model. . . . . . . . . . . . . . . . . . . . . . . 170
Figure 5.26 A typical SD equation representation. . . . . . . . . . 184
Figure 5.27 Evaluation tests for the STEEP risks models. . . . . . 185
Figure 5.28 Dynamic risk-free simulation patterns for social riskssystem model. . . . . . . . . . . . . . . . . . . . . . 196
Figure 5.29 Dynamic scenario graphs for the social risks systemmodel. . . . . . . . . . . . . . . . . . . . . . . . . . 199
Figure 5.30 Simulation behaviour patterns for stocks in thetechnical risk system model . . . . . . . . . . . . . . 203
Figure 5.31 Baserun and actual scenario simulation patterns foreconomic risks.. . . . . . . . . . . . . . . . . . . . . 206
Figure 5.32 Dynamic patterns for stock entities in theenvironmental risks model.. . . . . . . . . . . . . . . 209
Figure 5.33 Dynamic simulation patterns for stock entities in thepolitical risks model. . . . . . . . . . . . . . . . . . . 212
Chapter 6
Figure 6.1 Proposed framework for dynamic risks assessment inmegaproject. . . . . . . . . . . . . . . . . . . . . . . 225
xvi List of Figures
Appendices
Figure A1 Model validation process. . . . . . . . . . . . . . . . 251
Figure A2 Behaviour reproduction test for the level of STEEPrisks impacts on the system (all variables at baselinelevels). . . . . . . . . . . . . . . . . . . . . . . . . . 259
Figure A3 Behaviour mode sensitivity graphs for social risks andsocial grievances. . . . . . . . . . . . . . . . . . . . . 274
Figure A4 Behaviour mode sensitivity graphs for technical risks. . 275
Figure A5 Behaviour mode sensitivity graphs for economic risks.. 275
Figure A6 Behaviour mode sensitivity graphs for environmentalrisks. . . . . . . . . . . . . . . . . . . . . . . . . . . 276
Figure A7 Behaviour mode sensitivity graphs for political risks. . 276
Figure A8 Dynamic confidence bounds sensitivity graph for socialgrievances. . . . . . . . . . . . . . . . . . . . . . . . 277
Figure A9 Dynamic confidence bounds sensitivity graph fortechnical risks. . . . . . . . . . . . . . . . . . . . . . 277
Figure A10 Dynamic confidence bounds sensitivity graph foreconomic risks.. . . . . . . . . . . . . . . . . . . . . 278
Figure A11 Dynamic confidence bounds sensitivity graph forenvironmental risks. . . . . . . . . . . . . . . . . . . . 278
Figure A12 Dynamic confidence bounds sensitivity graph forpolitical risks. . . . . . . . . . . . . . . . . . . . . . 279
Figure A13 Disaggregation of the dynamic simulation models fortransportation megaprojects. . . . . . . . . . . . . . . 283
List of Figures xvii
List of Tables
Chapter 2
Table 2.1 Basic information of the ETN project. . . . . . . . . . 18
Table 2.2 The internal stakeholders of the ETN project. . . . . . 19
Table 2.3 The external stakeholders of the ETN project. . . . . . 21
Table 2.4 Stakeholder’s attitude and influence on ETN Project. . 23
Table 2.5 Project organization of the ETN project. . . . . . . . 23
Table 2.6 Project environment of the ETN Project. . . . . . . . 24
Table 2.7 Original ETN project board governance structure.. . . 26
Table 2.8 Bridges built to accommodate Edinburgh Tram.. . . . 27
Table 2.9 Disputes and changes in the ETN project. . . . . . . . 29
Table 2.10 Project delivery against key milestones. . . . . . . . . 30
Table 2.11 Organizations and groups consulted during the EIAfor ETN Line One.. . . . . . . . . . . . . . . . . . . 34
Table 2.12 Specific risks impacting on the project environment. . . 38
Table 2.13 Specific technical risks impacting on the social andnatural environments. . . . . . . . . . . . . . . . . . 40
Chapter 3
Table 3.1 Relative importance and data transformation inpairwise comparison.. . . . . . . . . . . . . . . . . . 51
Table 3.2 The average random index. . . . . . . . . . . . . . . 54
Table 3.3 Typical stakeholders involved in transport projects. . . 60
Table 3.4 A summary of review on social risks cluster inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 62
Table 3.5 A summary of review on technical risks inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 65
Table 3.6 A summary of review on economic risks inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 69
Table 3.7 A summary of review on environmental risks inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 71
Table 3.8 Sources of environmental risks in mega constructionprojects. . . . . . . . . . . . . . . . . . . . . . . . . 71
Table 3.9 A summary of review on political risks inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 75
Chapter 4
Table 4.1 Summary of interviewees’ profile and demography. . . 79
Table 4.2 Summary of survey conducted. . . . . . . . . . . . . 82
Table 4.3 Summary of descriptive results and analysis for thequestionnaire survey.. . . . . . . . . . . . . . . . . . 83
Table 4.4 Respondent’s mean scores of importance. . . . . . . . 86
Table 4.5 Matrix for project objectives with respect to decisiongoal. . . . . . . . . . . . . . . . . . . . . . . . . . . 94
Table 4.6 Comparison matrices for PR with respect to cost, timeand quality. . . . . . . . . . . . . . . . . . . . . . . 96
Table 4.7 Pairwise comparison matrix for socialrisk variables. . . . . . . . . . . . . . . . . . . . . . 98
Table 4.8 Pairwise comparison matrix for technical riskvariables.. . . . . . . . . . . . . . . . . . . . . . . . 100
Table 4.9 Pairwise comparison matrix for economic riskvariables.. . . . . . . . . . . . . . . . . . . . . . . . 103
Table 4.10 Pairwise comparison matrix for environmental riskvariables.. . . . . . . . . . . . . . . . . . . . . . . . 106
Table 4.11 Pairwise comparison matrix for politicalrisk variables. . . . . . . . . . . . . . . . . . . . . . 107
Table 4.12 Unweighted super matrix for potential risks.. . . . . . 111
Table 4.13 Weighted supermatrix for potential risks. . . . . . . . 112
Table 4.14 Final mode ANP decision-making priorities forpotential risks cluster. . . . . . . . . . . . . . . . . . 113
Table 4.15 Final mode ANP decision-making priorities for socialrisk sub-cluster. . . . . . . . . . . . . . . . . . . . . 114
Table 4.16 Final mode ANP decision-making priorities fortechnical risk sub-cluster. . . . . . . . . . . . . . . . 115
Table 4.17 Final mode ANP decision-making priorities foreconomic risks sub-cluster. . . . . . . . . . . . . . . . 116
Table 4.18 Final mode ANP decision-making priorities forEnvironmental Risk sub-cluster. . . . . . . . . . . . . 117
Table 4.19 Final mode ANP decision-making priorities forpolitical risk variables. . . . . . . . . . . . . . . . . . 118
Table 4.20 Deriving priorities for risks ratings. . . . . . . . . . . 120
xx List of Tables
Table 4.21 Verbal ratings for potential risks. . . . . . . . . . . . 120
Table 4.22 Verbal ratings for social risk variables.. . . . . . . . . 121
Table 4.23 Verbal ratings for technical risk variables. . . . . . . . 121
Table 4.24 Verbal ratings for economic risk variables.. . . . . . . 122
Table 4.25 Verbal ratings for environmental risk variables. . . . . 123
Table 4.26 Verbal ratings for political risk variables. . . . . . . . 123
Table 4.27 Values of CI, RI, CR and inconsistency for all thepairwise comparison matrices. . . . . . . . . . . . . . 124
Table 4.28 Summary of final ANP decision-making priorityresults for all risks. . . . . . . . . . . . . . . . . . . . 125
Chapter 5
Table 5.1 Technical uncertainties influence. . . . . . . . . . . . 135
Table 5.2 System boundary for social risks system.. . . . . . . . 136
Table 5.3 System boundary for technical risks system. . . . . . . 137
Table 5.4 System boundary for economic risks system.. . . . . . 138
Table 5.5 System boundary for environmental risks system. . . . 139
Table 5.6 System boundary for political risks system. . . . . . . 140
Table 5.7 Stock variables for STEEP models. . . . . . . . . . . 166
Table 5.8 Mathematical equation for the social risks systemvariables.. . . . . . . . . . . . . . . . . . . . . . . . 171
Table 5.9 Mathematical equation for the technical risks systemvariables.. . . . . . . . . . . . . . . . . . . . . . . . 173
Table 5.10 Mathematical equation for the economic risks systemvariables.. . . . . . . . . . . . . . . . . . . . . . . . 176
Table 5.11 Mathematical equation for the environmental riskssystem variables. . . . . . . . . . . . . . . . . . . . . 179
Table 5.12 Mathematical equation for the political risks systemvariables.. . . . . . . . . . . . . . . . . . . . . . . . 181
Table 5.13 ANP inputs to the STEEP risk systemmodelling. . . . . . . . . . . . . . . . . . . . . . . . 195
Table 5.14 Summary of the simulation results for the social riskssystem model. . . . . . . . . . . . . . . . . . . . . . 202
Table 5.15 Summary of dynamic simulation results for technicalrisks system model. . . . . . . . . . . . . . . . . . . 205
Table 5.16 Dynamic simulation results for the economic riskssystem model. . . . . . . . . . . . . . . . . . . . . . 208
List of Tables xxi
Table 5.17 Summary of the dynamic simulation results forenvironmental risks system. . . . . . . . . . . . . . . 211
Table 5.18 Dynamic simulation results for the political riskssystem model. . . . . . . . . . . . . . . . . . . . . . 215
Table 5.19 One-way analysis of variance: The extent to whichsteep risks impact on project objectives. . . . . . . . . 217
Table 5.20 Data validity on the ETN project. . . . . . . . . . . . 220
Chapter 6
Table 6.1 SDANP procedure for risks reduction inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 228
Table 6.2 Practical guide for using SDANP methodology inmegaprojects. . . . . . . . . . . . . . . . . . . . . . 230
Appendices
Table A1 Tests for building confidence in the integrated SDANPmodels.. . . . . . . . . . . . . . . . . . . . . . . . . 253
Table A2 Parameters in the STEEP models. . . . . . . . . . . . 256
Table A3 Parameter distributions of stock and exogenous systementities for STEEP risks models. . . . . . . . . . . . . 261
Table A4 Numerical sensitivity test for the social risksparameters. . . . . . . . . . . . . . . . . . . . . . . 263
Table A5 Numerical sensitivity test for the technical risksparameters. . . . . . . . . . . . . . . . . . . . . . . 265
Table A6 Numerical sensitivity test for the economic risksparameters. . . . . . . . . . . . . . . . . . . . . . . 267
Table A7 Numerical sensitivity test for the environmental risksparameters. . . . . . . . . . . . . . . . . . . . . . . 269
Table A8 Numerical sensitivity test for the political risksparameters. . . . . . . . . . . . . . . . . . . . . . . 271
Table A9 The significance of the dynamics simulation models fortransportation megaprojects in addressing policyproblems. . . . . . . . . . . . . . . . . . . . . . . . 285
Table C1 Respondent’s mean scores of importance for projectobjectives (Po). . . . . . . . . . . . . . . . . . . . . . 291
Table C2 Respondent’s mean scores of importance for potentialrisks (PR1): Social risks. . . . . . . . . . . . . . . . . 297
Table C3 Respondent’s mean scores of importance for potentialrisks (PR2): Technical risks. . . . . . . . . . . . . . . 303
xxii List of Tables
Table C4 Respondent’s mean scores of importance for potentialrisks (PR3): Economic risks. . . . . . . . . . . . . . . 309
Table C5 Respondent’s mean scores of importance for potentialrisks (PR4): Environmental risks. . . . . . . . . . . . 315
Table C6 Respondent’s mean scores of importance for potentialrisks (PR5): Political risks. . . . . . . . . . . . . . . . 321
List of Tables xxiii
List of Exhibits
Chapter 2
Exhibit 2.1 Utility diversions for Edinburgh Trams Networkconstruction . . . . . . . . . . . . . . . . . . . . . . 27
Exhibit 2.2 Road interruption due to tram construction in theEdinburgh city centre . . . . . . . . . . . . . . . . . 32
Exhibit 2.3 Rework and adverse environmental impacts such aswaste . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Exhibit 2.4 The impact of bad weather conditions on productivityand construction delay . . . . . . . . . . . . . . . . . 36
Exhibit 2.5 Delayed construction process caused by bad weatherconditions . . . . . . . . . . . . . . . . . . . . . . . 36
Exhibit 2.6 Poor well-being conditions on construction site:A worker was having his lunch in a cold rainy day. . . 37
List of Equations
Chapter 3
Equation 3.1 Weighted quantitative score method . . . . . . . . . 49
Equation 3.2 Pairwise comparison matrix computation . . . . . . 52
Equation 3.3 Vector normalization . . . . . . . . . . . . . . . . 53
Equation 3.4 Initial eigenvalue computation . . . . . . . . . . . . 53
Equation 3.5 Maximum eigenvalue computation. . . . . . . . . . 53
Equation 3.6 Computation of value of consistency index . . . . . 54
Equation 3.7 Consistency ratio computation. . . . . . . . . . . . 54
Equation 3.8 Final risk prioritization index . . . . . . . . . . . . 55
Equation 3.9 Mathematical definition of the integral for stockcomputation . . . . . . . . . . . . . . . . . . . . . 58
Equation 3.10 Basic stock computation . . . . . . . . . . . . . . . 58
Chapter 4
Equation 4.1 Respondent’s mean scores of importance . . . . . . 85
Equation 4.2 Priority matrix computation for the projectobjectives . . . . . . . . . . . . . . . . . . . . . . 93
Acknowledgements
This book summarizes a dedicated research funded and conducted under the
megaproject management research theme at Heriot-Watt University and in
the Scott Sutherland School of Architecture and Built Environment at
Robert Gordon University in the United Kingdom. The research was also
conducted through collaborative research amongst researchers from 24
European countries inside the COST Action TU1003 MEGAPROJECT
(2011�2015), which was funded by the European Cooperation in Science
and Technology (COST) and focuses on the effective design and delivery of
megaprojects in the European Union. The COST Action on
MEGAPROJECT was chaired by Professor Naomi Brookes at the
University of Leeds in the United Kingdom.The authors would like to thank all participants for making time and
efforts to support the research through interview and questionnaire survey
for data collection from the Edinburgh Tram Network (ETN) project. The
authors would also like to thank colleagues at the COST Action TU1003
for their advice and comments on the research into the ETN project.
Without their supports, this research cannot be completed.The research theme on megaproject management at Heriot-Watt
University was set up in 2012 and has been strongly supported by the follow-
ing world renowned experts:
• Geoff Baskir, Chair, Aircraft/Airport Compatibility Committee,
Transportation Research Board, National Academy of Sciences, USA• Naomi Brookes, Professor of Complex Project Management, University
of Leeds, and CEO, Projektlernen, UK• Volker Buscher, Director, Global Digital Business, Arup, UK• John Connaughton, Professor of Sustainable Construction, Head of
Construction Management and Engineering, University of Reading, UK• Henry Ergas, Professor of Infrastructure Economics, University of
Wollongong, Australia• Stuart Ladds, Head of Property Strategy & Logistics, College of Policing
Limited, UK• Heng Li, Chair Professor in Construction Informatics, The Hong Kong
Polytechnic University, Hong Kong, China• Edward W. Merrow, Founder and President, Independent Project
Analysis, Inc., USA
• Stanley G. Mitchell, CEO, Key Facilities Management International,
Scotland. Chair, ISO TC 267 Facilities Management Committee• David Mosey, Professor of Law and Director, Centre of Construction
Law and Dispute Resolution, King’s College London, UK• John Pike, Chairman, Bellrock Property Services, UK• Rodney Turner, Professor of Project Management, SKEMA Business
School, France.
The authors would like to thank the entire publishing team at Emerald.
Special thanks to colleagues at Emerald Publishing Limited, including Amy
Barson, Senior Content Editor; Carole Caines, Books Production
Controller; Nicki Dennis, Publisher; Charlotte Hales, Editorial Assistant;
Liron Gilenberg, Cover Designer; Philippa Grand, Executive Publisher; Jen
McCall, Publisher; and Kousalya Krishnamoorthy, Project Manager at
MPS Limited.
xxx Acknowledgements
About the Authors
Prince Boateng, PhD, MASCE, AFHEA, is Lecturer in Building
Technology & Quantity Surveying in Koforidua Technical University,
Ghana. He is a former Lecturer in Construction and Project Management
at Robert Gordon University, Aberdeen, the United Kingdom. He is profi-
cient in working with and analysing complex risk data. He uses analyticaland system dynamics modelling tools to prioritize and simulate project
risks overtime during risks assessment in megaprojects at the construction
phase. He has used this expertise in developing innovative risk assessment
tool known as SDANP methodology to model and predict project cost and
time overruns in many megaprojects in Europe and Africa. Prince’s areas
of expertise include risks analysis and modelling with system dynamics andthe analytical network process for multi-criteria decision making for the
effective megaproject delivery within the European Union and beyond.
Zhen Chen is Lecturer in Construction Management in the Department ofArchitecture at the University of Strathclyde. He is a former Lecturer in
Facilities Management and the founder and leader of Megaproject
Management research theme at Heriot-Watt University. He serves at technical
committees (Facility Management; Project, Programme and Portfolio
Management; and Service Life Planning) at British Standards Institution
(BSI), and technical committees (Airport Planning and Operations; andInfrastructure Resilience) at the American Society of Civil Engineers (ASCE).
He is a member of the management committee of COST Action TU1003 (The
Effective Design and Delivery of Megaprojects in the European Union). He
also serves at editorial boards for several international journals at ICE
(Engineering Sustainability; Infrastructure Asset Management; Management,
Procurement and Law; and Waste and Resource Management) and Elsevier(International Journal of Project Management). He is the Specialty Chief Editor
on Construction Management for Frontiers in Built Environment published by
EPFL in Switzerland. He is the Associate Editor for Innovative Infrastructure
Solutions at Springer and Frontiers in Built Environment at EPFL. He has
engaged in more than 30 research projects, worth over £5 million and has
authored over 160 publications in construction engineering and management.
Stephen O. Ogunlana, BSc, PhD, is currently the Chair of Construction
Project Management at the School of the Built Environment, Heriot-Watt
University. Professor Ogunlana has an international reputation for researchin the application of system dynamics simulation to construction projects
and organizations. He is the author of over 250 scholarly publications in
top-tier journals and refereed conferences. He is also the editor of the book
Profitable Partnering for Construction Procurement published by Taylor
and Francis and Training for Construction Industry Development published
by the CIB/AIT and co-editor of Joint Ventures in Construction (Thomas
Telford) and Public-Private Partnership in Infrastructure Development —
Case Studies from Asia and Europe (Bauhaus Universitat Weimar). His
research work has been funded by the Canadian International
Development Agency, European Union, Thai National Housing Authority,
UNOCAL, Japanese Government, British Council etc. His works on lead-
ership were awarded Emerald Literati Award for two consecutive years
(2009 and 2010) for the most outstanding paper in the journal Engineering
Construction and Architectural Management. Professor Ogunlana is the
joint coordinator of CIB W107 Commission on Construction in
Developing Economies and a member of the Editorial Board for over 10
internationally refereed academic journals including Engineering
Construction and Architectural Management, the International Journal of
Financial Management of Property and Construction, International Journal
of Energy Sector Management, International Journal of Construction
Management, Journal of Engineering Development and Technology,
Surveying and the Built Environment, Civil Engineering Dimensions and
Akruti Journal of Infrastructure. He has acted as external examiner for sev-
eral top universities in the world.
xxxii About the Authors
Preface
This book provides technical details on a dynamic systems approach to
megaproject risk analysis and simulation, and it is based on the authors’
long-term research into megaproject management, multi-criteria decision
making, and system dynamics. For the first time, the authors have
attempted to find a technical solution to tackle overruns on cost and time
in megaprojects, and this is based on a comprehensive set of risks asso-
ciated with social, technical, economic, environmental and political
(STEEP) issues in megaproject environment and a dynamic systems
approach called SDANP. The approach is an integrated use of tools includ-
ing analytic network process (ANP) and system dynamics (SD) for risks
prioritization and simulation.The new SDANP model is described in this book with a case study on
the Edinburgh Tram Network (ETN) project, which was a live case project
during the time of the authors’ research into a dynamic systems approach
to megaproject risk analysis and simulation. Through this experimental
research, the SDANP model has provided interesting results on cost and
time overruns with accuracy rates above 80%, respectively, for the ETN
project over the time period between 2007 and 2013. The authors expect
that this dynamic systems approach to megaproject risk analysis and
simulation can be widely tested for the benefits of stakeholders in dealing
with cost and time overruns in megaproject development.
Prince BoatengZhen Chen
Stephen O. Ogunlana
Foreword
As our journey into the uncertainties of the twenty-first century continues,
of one thing we can be sure: megaprojects are viewed as increasingly
important in creating solutions to societal problems. Megaprojects will
provide the new power plants that will give us with green energy, they will
deliver transport systems that work for all without increasing carbon emis-
sions, they will provide us with the integrated hospitals and healthcare that
we need and they will even delight us with cultural and sporting events! We
remain optimistic that the huge complexities of megaprojects in people,
capital and technology can be tamed and we can look forward to feeling
the benefits of their successful implementations.However, at their heart, megaprojects pose a conundrum. Time after
time (and despite their apparent benefits) we do not seem to be able to
deliver them on time, to budget and actually producing the output
functionality that we need. We only have vague ideas why some succeed
and, where they fail, we discover worryingly psychological failings in
their planning and design. Given their importance in facing twenty-first
century challenges, we desperately need to undertake more research to
help us deliver megaprojects more effectively and to insure that the
results of that research are available to the widest possible population of
stakeholders.It is precisely this gap that Boateng, Chen and Ogunlana have aimed at
with the work that they report upon in this book. They take one of the
most clearly identified complexities in delivering megaproject, namely risk,
and explore new ways of conceptualizing it and dealing with it. They
employ a wide range of novel systems dynamics and frameworks to develop
an understanding of risk in megaprojects. They provide interesting applica-
tions of techniques used elsewhere in simulation to megaprojects. They
illustrate their work with an insightful case of the Edinburgh Tram Project,
a megaproject which embodies both the huge benefits that megaprojects
can bring and the significant issues that inhibit their delivery. Boateng,
Chen and Ogunlana are to be congratulated for the zeal with which they
have pursued their research objectives and their fervour to share the results
of their endeavours with others.This book provides a valuable addition to the work currently being
undertaken by academics and practitioners alike in understanding mega-
project design and delivery. It is through such committed work that we
really will be able to tame megaprojects and insure that they can reliably
deliver the outcomes that society so desperately needs.
Professor Naomi Brookes, PhD DICVisiting Professor in Complex Project Management,
University of LeedsChair – MEGAPROJECT COST Action
C.E.O. – Projektlernen
xxxvi Foreword
Chapter 1
Introduction
1.1. Introduction
Major stakeholders on megaprojects have been facing risks associated with
social, technical, economic, environmental and political (STEEP) issues
that may lead to significant cost and time overruns compared with initial
budget and schedule estimates. Although much attention has been devoted
to managing risks in megaproject delivery, results have not always been sat-
isfactory in most cases across the world in the past. There have been
increasing needs for advanced tools to support better risk assessment so as
to inform decision-making in megaproject management. Regarding the
complexity of megaprojects, and the great scope for risks and their inter-
action in mega construction and development projects, it has been widely
accepted that quantitative approaches are necessary supplements in risk
analysis process. However, there has been little attempt to apply sophisti-
cated methods recommended by industry standards for risk analysis in
megaproject practice. Through developing and using a dynamic systems
approach over a four-year period, the authors of the book have developed
a new tool that can significantly identify major project risk factors and pro-
vide predications on time and cost overruns with over 80% accuracy com-
pared to real figures in one megaproject, that is the Edinburgh Tram
Network (ETN) project. This book summarizes their research into mega-
project risk analysis and simulation to inform both academic researchers
and megaproject stakeholders who have interest in qualitative and quanti-
tative risk analysis and simulation for megaprojects across the world.This book covers all aspects of a real case study oriented research into
megaproject risk analysis and simulation through a dynamic systems
approach. A case study on the ETN project is used as an example of mega-
project to develop a general technical framework called SDANP for
STEEP risks analysis and simulation on megaprojects. An analytic network
process (ANP) is adopted for risk quantification modelling, while a system
dynamics (SD) (Brookes, 2015; Dimitriou, 2014; Flyvbjerg, 2014;
Flyvbjerg, Bruzelius, & Rothengatter, 2003; Mentis, 2015; Priemus, 2014;
Renuka, Umarani, & Kamal, 2014; Spirkova, 2014; Van de Graaf &
Sovacool, 2014) for risk simulation over time. Both the ANP and SD pro-
vide practical guides for the application of the dynamic systems approach
in megaproject research and practice.By providing crucial background information for those who want to
understand the dynamics of risks over time and their assessment during the
decision-making processes on large transport infrastructure projects
(Hickman et al., 2015), this book can prove an important source of infor-
mation for academics, researchers and students in the fields of transport,
infrastructure, project management, management science, economic ana-
lysis (cost�benefit analysis), public policy, environmental policy and ethics.
Practitioners, politicians and policy-makers involved in large transport
infrastructure projects can also find this book to be a useful reference on
risk analysis and simulation for megaproject management.
1.2. The Problem with Megaprojects
1.2.1. Megaproject Risks
Flyvbjerg, Skamris Holm, and Buhl (2003) found that 258 highway and rail
projects ($90 billion worth) in 20 countries did not perform well on budgets
as estimated, and about 90% of these projects suffered cost overruns, with
the average rail project costing 45% more than what were projected, while
it was over 20% in average for highway projects. Based on a continuous
research, Flyvbjerg et al. (2003) underscored that cost overrun has not
decreased over 70 years in the 20th century and seems to be a global phe-
nomenon, which can also be attested on many megaprojects. For example,
the Pusan and Muckho harbour project suffered significant cost overruns
in the mid-1970s and relied on an extra $75 million loan for it to complete
(2003), and the Big Dig project was estimated at a cost of $2.6 billion but
was completed at a cost of $14.6 billion, additionally completion was
delayed from 2002 to 2005 (2003). These projects have made the learned
society and the public acutely aware of the problems of project delay and
cost overruns in megaprojects. In addition, these technical problems also
indicate clearly that construction cost estimating on major infrastructure
projects has not improved in accuracy in the past more than half century,
and the magnitude of underestimated project costs has been almost in the
same order according to Flyvbjerg, Holm, and Buhl (2002) and Salling and
Leleur (2015). It has been identified by Flyvbjerg et al. (2002) that the main
possible reason for cost and time overruns in many megaprojects across the
2 Megaproject Risk Analysis and Simulation
world was to simplify the marginalization of risks during feasibility studiesby undependably assuming what the World Bank calls the ‘Everything GoesAccording to Plan’ (EGAP) principle. There have been increasing needs fornew ideas and techniques (Davies, MacAulay, DeBarro, & Thurston, 2014;Flyvbjerg et al., 2002; Kwak, Walewski, Sleeper, & Sadatsafavi, 2014) inorder to tackle all risks associated with those significant problems for mak-ing the right decisions (Mentis, 2015) on both business and project towardssuccessful megaprojects.
Evidence gleaned through research worldwide suggests that large andcomplex infrastructure projects such as airport, bridge and highway areusually money pits where funds are simply ‘swallowed up’ without deliver-ing sufficient returns. These problems are as a result of unbalanced subject-ive beliefs and information in assessing risks and uncertainties, and takingcorrective actions to effectively control and manage the identified risks atthe right time (Brookes, 2015; Dimitriou, 2014; Flyvbjerg, 2014; Flyvbjerget al., 2003; Mentis, 2015; Priemus, 2014; Renuka et al., 2014; Spirkova,2014; Van de Graaf & Sovacool, 2014). Flyvbjerg, (2014) further assertsthat the track record of megaprojects under his study was terrible duringdevelopmental phases and reflected many credibility problems especially ontransportation megaprojects. Proost et al. (2014) and Salling and Leleur(2015) emphasised that costs for transportation megaprojects were oftengrossly underestimated while traffic is often overestimated, and the per-ceived failure of the project was subject to a public enquiry, which con-cluded that the planned budget and schedule were hardly realistic althoughsome of the cost increases were justified spending indeed. In reality, signifi-cant wastes were caused by design delays, over-optimistic programmingand uncertain authority at the construction and development stages ofmegaprojects.
The construction industry, like many other industries is a free-enterprisesystem, and has sizeable risks built into its structure and project based pro-cesses (Ball, 2014; Fulford & Standing, 2014; Guo, Chang-Richards,Wilkinson, & Li, 2014). From the initiation to the closing stages, construc-tion process especially that for megaprojects is complex and characterizedby a number of uncertainties and interactions (Brookes, 2015) that cannegatively influence the project delivery in many ways (Brookes, 2015;Dimitriou, 2014; Flyvbjerg, 2014; Flyvbjerg et al., 2003; Mentis, 2015;Priemus, 2014; Renuka et al., 2014; Spirkova, 2014; Van de Graaf &Sovacool, 2014). For example, uncertainties about changes in weather con-ditions (Mentis, 2015), sub-contractor delays (Diab & Nassar, 2012;Eizakshiri, Chan, & Emsley, 2015), community resistance (Jordhus-Lier,2015), political interferences (Kennedy, 2015) and unpredictable site condi-tions (Adam, Josephson, & Lindahl, 2014; Boateng, Chen, & Ogunlana,2012) can compromise the completion of megaproject development on time
Introduction 3