Section 2.04B Publications of deci Melbourne Airport Reference number Applicant / Company If MEL is the applicant, date application submitted to ABC If MEL is not the applicant date which MEL received the application Description of proposed building activity Location of proposed building activity Status: Consent ( C ) Refusal ( R ) Withdrawn ( W ) Consent Date Issued ABC Date / MEL 13050 APAM 17/04/2013 Consolidation & Decommission of Fire Dampers T2 & T3 Terminals 2 & 3 MELBOURNE AIRPORT VIC 3045 C 8/05/2013 1 1 MEL 13051 Beca Consultants Pty Ltd 18/06/2013 Southern apron expansion works to support new pier & new aircraft stands, freight apron & increase GSE capacity & infill of existing grassed islands for new aircraft parking stands Airfield southern apron MELBOURNE AIRPORT VIC 3045 C 20/05/2013 1 MEL 13107 Sign manager Pty Ltd 6/08/2013 Alterations to Hertz car park area Multi-Level STCP MELBOURNE AIRPORT VIC 3045 C 19/08/2013 3 1 MEL 13110 Donald Cant Watts Corke Pty Ltd 6/08/2013 Construction of a new overflow facility for car rental tenants, an extension to the existing Thrifty car rentals site & MLS access ramp Francis Briggs Road MELBOURNE AIRPORT C 27/08/2013 3 1 MEL 13126 Gallagher Jeffs Consulting Pty Ltd 21/06/2013 Construction of Tri Generation Facility Bonney Court MELBOURNE AIRPORT VIC 3045 C 8/10/2013 1 13/ MEL 14029 Arup 10/06/2014 Installation of an approximately 200 m² modular building & connection to existing services for the relocation of the Victorian Taxi Directorate 51-53 Francis Briggs Road MELBOURNE AIRPORT VIC 3045 C 13/05/2014 3 1 MEL 14031 APAM 18/03/2014 Installation of new signage in the terminal forecourt Terminal forecourt MELBOURNE AIRPORT VIC 3045 C 31/03/2014 1 1 MEL 14088 George E Apted & Associates 14/07/2014 Upgrade of the Freight Terminal Building (BLDG 51) electrical switchboard and associated works Building 51 Service Road MELBOURNE AIRPORT VIC 3045 C 28/07/2014 1 MEL 14102 George E Apted & Associates 21/08/2014 Re facing of existing signs to Bravo, Charlie,& Echo Fingers, New signs to Bravo Gate 29 and Foxtrot Gates F11, F13-F20 Domestic Terminal MELBOURNE AIRPORT VIC 3045 C 19/08/2014 1 1 MEL 14104 MST Building & Maintenance Pty 7/08/2014 Toll DNATA fit out Corporate Area Level 2 - Terminal 2 Terminal 2 MELBOURNE AIRPORT VIC 3045 C 19/08/2014 2 1 MEL 14105 Total Trade Property Services Pty Ltd 7/08/2014 Supply and installation of 6x7m cantilevered awning above the existing roller door of the wash bay at Mercedes Benz 21-23 Gowrie Park Drive MELBOURNE AIRPORT VIC 3045 C 20/08/2014 1 MEL 14110 Aurecon Australasia Pty Ltd 20/08/2014 Antenna upgrades on Terminal building roof near lift motor room 3 associated works for Telstra Terminal Building MELBOURNE AIRPORT VIC 3045 C 1/09/2014 1 MEL 14112 True Value Solar Pty Ltd 28/09/2014 Installation of Solar Panel on the roof of the Essendon football Club True Value Solar Centre building. 275 Melrose Drive. MELBOURNE AIRPORT VIC 3045 C 19/09/2014 1 1 MEL 14119-V North Projects Pty Ltd 29/04/2015 Stage 1 - Construct approx. 60m Mace Way Rd extension Link Road / Airport Drive MELBOURNE AIRPORT VIC 3045 C 11/05/2015 2

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

MEL 13050 APAM 17/04/2013 Consolidation & Decommission of Fire Dampers T2 & T3

Terminals 2 & 3MELBOURNE AIRPORT VIC 3045

C 8/05/201313/3038 MEL

MEL 13051 Beca Consultants Pty Ltd 18/06/2013 Southern apron expansion works to support new pier & new aircraft stands, freight apron & increase GSE capacity & infill of existing grassed islands for new aircraft parking stands

Airfield southern apron MELBOURNE AIRPORT VIC 3045

C 20/05/201313/4703 MEL

MEL 13107 Sign manager Pty Ltd 6/08/2013 Alterations to Hertz car park area Multi-Level STCPMELBOURNE AIRPORT VIC 3045

C 19/08/201313/6050 MEL

MEL 13110 Donald Cant Watts Corke Pty Ltd 6/08/2013 Construction of a new overflow facility for car rental tenants, an extension to the existing Thrifty car rentals site & MLS access ramp

Francis Briggs Road MELBOURNE AIRPORT

C 27/08/201313/5892 MEL

MEL 13126 Gallagher Jeffs Consulting Pty Ltd 21/06/2013 Construction of Tri Generation Facility Bonney CourtMELBOURNE AIRPORT VIC 3045

C 8/10/201313/4610-2V MEL

MEL 14029 Arup 10/06/2014 Installation of an approximately 200 m² modular building & connection to existing services for the relocation of the Victorian Taxi Directorate

51-53 Francis Briggs Road MELBOURNE AIRPORT VIC 3045

C 13/05/201414/4620 MEL

MEL 14031 APAM 18/03/2014 Installation of new signage in the terminal forecourt

Terminal forecourt MELBOURNE AIRPORT VIC 3045

C 31/03/201414/2473 MEL

MEL 14088 George E Apted & Associates 14/07/2014 Upgrade of the Freight Terminal Building (BLDG 51) electrical switchboard and associated works

Building 51 Service Road MELBOURNE AIRPORT VIC 3045

C 28/07/201414/6043 MEL

MEL 14102 George E Apted & Associates 21/08/2014 Re facing of existing signs to Bravo, Charlie,& Echo Fingers, New signs to Bravo Gate 29 and Foxtrot Gates F11, F13-F20

Domestic Terminal MELBOURNE AIRPORT VIC 3045

C 19/08/201414/6557 MEL

MEL 14104 MST Building & Maintenance Pty 7/08/2014 Toll DNATA fit out Corporate Area Level 2 - Terminal 2

Terminal 2MELBOURNE AIRPORT VIC 3045

C 19/08/201414/6171 MEL

MEL 14105 Total Trade Property Services Pty Ltd 7/08/2014 Supply and installation of 6x7m cantilevered awning above the existing roller door of the wash bay at Mercedes Benz

21-23 Gowrie Park Drive MELBOURNE AIRPORT VIC 3045

C 20/08/201414/6294 MEL

MEL 14110 Aurecon Australasia Pty Ltd 20/08/2014 Antenna upgrades on Terminal building roof near lift motor room 3 associated works for Telstra

Terminal BuildingMELBOURNE AIRPORT VIC 3045

C 1/09/201414/5472 MEL

MEL 14112 True Value Solar Pty Ltd 28/09/2014 Installation of Solar Panel on the roof of the Essendon football Club True Value Solar Centre building.

275 Melrose Drive. MELBOURNE AIRPORT VIC 3045

C 19/09/2014

MEL 14119-V North Projects Pty Ltd 29/04/2015 Stage 1 - Construct approx. 60m Mace Way Rd extensionStage 2 - Construction of permanent future Mace Way & services

Link Road / Airport Drive MELBOURNE AIRPORT VIC 3045

C 11/05/2015

MEL 15008 Melbourne Aviation Precinct Pty Ltd 6/02/2015 Re-alignment of the airside / landside perimeter fencing at Melbourne Aviation Precinct Gate 24.

Melbourne Jet Base MELBOURNE AIRPORT VIC 3045

C 24/02/201515/1398 MEL

MEL 15009 George E Apted & Associates Pty Ltd 6/02/2015 Interior works to Avionics bldg. 165 and canopies to Oxygen Room bldg. 107 and Hydrostatic Room bldg. 101

Melbourne Jet Base MELBOURNE AIRPORT VIC 3045

C 19/02/201515/1315 MEL

MEL 15018 George E Apted & Associates Pty Ltd 4/03/2015 Jetstar stores and office relocation project at the Melbourne Jet Base building 101 & 177.

Melbourne Jet Bae MELBOURNE AIRPORT VIC 3045

W 16/03/2015 15/2021 MEL

MEL 15018-V George E Apted & Associates Pty Ltd 13/05/2015 Alterations to second floor on the west end of the Support Building lunch room and kitchen alterations to Central Store racking

Melbourne Jet Base MELBOURNE AIRPORT VIC 3045

W 26/05/2015

MEL 15019 Total Essential Services Group 4/03/2015 Removal of six thermal detectors from Service Road C 16/03/2016

Page 2: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

under external veranda area at the Melbourne Freight Support Centre (Bldg. 237) for Qantas Airways

MELBOURNE AIRPORT VIC 3045 14/7107 MEL

MEL 15043 HS Rekaris & Associates Pty Ltd 24/04/2015 Installation of a silo at site near gate 4 off Sunbury Road

Airside adjacent Gate 4 MELBOURNE AIRPORT VIC 3045

C 8/05/201515/2587 MEL

MEL 15048 Turner & Townsend 14/05/2015 Construction of a third 66/22 kV transformer at MAT, new 66kV control room & 66kV electrical connections.

corner South Centre Road / Link Road MELBOURNE AIRPORT VIC 3045

C 22/05/201515/3029-1 MEL

MEL 15054 Border Express 5/06/2015 Install 220 kVa standard VPO Border Express-MABP MELBOURNE AIRPORT VIC 3045

C 18/06/201515/3958 MEL

MEL 15058-V Root Project Australia Pty Ltd 22/06/2015 D4 transformer installation Delta 2 ConcourseMELBOURNE AIRPORT VIC 3045

C 2/07/201515/4034 MEL

MEL 15059 Signed On 24/06/2015 Installation of wayfinding totem light boxes (including power) Reid Way

Reid WayMELBOURNE AIRPORT VIC 3045

C 10/08/201515/4814 MEL

MEL 15069 Donald Cant Watts & Corke Pty Ltd 22/07/2015 Emirates First Class Lounge - floor penetrations for hydraulics, drainage & floor screed

Terminal 2MELBOURNE AIRPORT VIC 3045

C 4/08/201515/4925-1 MEL

MEL 15074 TNT Australia Pty Ltd 6/08/2015 Supply and install the external signage for the new TNT Super hub

South Centre Road MELBOURNE AIRPORT VIC 3045

C 19/09/201515/5593 MEL

MEL 15078 Point Project Management 17/08/2015 Installation of new external steps linked from aerobridges at Charlie gates 1,2,4,6,8 & 10 and linking from the terminal Bravo Gates 22 & 24 and associated works (including line markings & smaller structures installation

Terminal 1, Bravo & Charlie Piers MELBOURNE AIRPORT VIC 3045

C 23/09/2015 15/5908 MEL

MEL 15078-V RPS Project Management 19/05/2016 Variation to MEL 15078:Installation of external signage on the recently installed external steps linked from aerobridges at Charlie Gates 1,2,4,6,8 & 11 and Bravo Gates 22 and 24;The installation of internal glass balustrading at Gate 11 and 22; andThe additional atlas barriers to Charlie Gate 1

Terminal 1, Bravo & Charlie Piers MELBOURNE AIRPORT VIC 3045

C 31/05/2016 15/5908V MEL

MEL 15078-V3 RPS Project Management 11/10/2016 Qantas dual boarding project variation 1. Installation of additional jersey barriers and a gate to the base of the newly constructed stairs at Charlie Gate 1 Installation of additional concrete jersey barriers and Atlas barriers at Bravo Gate 24. Installation of internal glass balustrading to Bravo gate B22

Terminal 1, Bravo & Charlie Piers MELBOURNE AIRPORT VIC 3045

C 27/10/2016 15/5908-V2 MEL

MEL 15080 CMW Design & Construct (Vic) Pty Ltd 1/09/2015 Construction of a 23,616m2 warehouse to be split into three or four Separate tenancies

Sky RoadMELBOURNE AIRPORT VIC 3045

C 3/09/2015 15/8654-1 MEL

MEL 15080-V2 CMW Design & Construct (Vic) Pty Ltd 12/09/2016Variation to existing MEL 15080 -Additional Scope of Works being Porsche fit out works in Warehouse C2 including but not limited to dividing wall between Warehouse C1 & C2 , additional loading dock to warehouse C2, Dispatch office, installation of internal partitions to office C2, modifications to the office C2 facade. Location : Sky Road, MABP Structural fit-out works to Warehouse C2

Sky RoadMELBOURNE AIRPORT VIC 3045

15/8654-3V2 MEL

MEL 15086-V TM Commercial 10/09/2015 Variation to fire services design for tenancies STD02

Terminal 2MELBOURNE AIRPORT VIC 3045

C 21/09/2015

Page 3: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

(6), 1181 (28), 1110 (40), 1056 (41), 2101 (46) and the demolition of 2 no internal wall in tenancy 1056(41)

MEL 15087 APAM 11/09/2015 Installation of the new digital advertising signage throughout NT4

Terminal 4MELBOURNE AIRPORT VIC 3045

C 23/09/2015 15/6377 MEL

MEL 15089 Donald Cant Watts Corke Pty Ltd 16/09/2015 Design, Supply and installation of Melrose Drive LTCP Entry / Exit pylon sign with associated service connections. LTCP

Melrose DriveMELBOURNE AIRPORT VIC 3045

C 24/09/201515/6549 MEL

MEL 15097 George E Apted & Associates Pty Ltd 1/10/2015 Alterations to upgrade access and utilization of south end Freight Terminal Qantas T1

Terminal 1MELBOURNE AIRPORT VIC 3045

C 14/10/201515/7385 MEL

MEL 15098 Essendon Football Club 6/10/2015 Installation of automatic sliding gate Melrose DriveMELBOURNE AIRPORT VIC 3045

C 19/10/2015

MEL 15099 Star Track C/o Australia Post Corporation

5/10/2015 Installation of a conveyor system within existing warehouse

38 Annandale Road MELBOURNE AIRPORT VIC 3045

W 20/10/2015

MEL 15103 CARA Interior Project Management Pty Ltd

27/10/2015 Fitout of WH Smith Tenancy S20 - Terminal 4

Terminal 4MELBOURNE AIRPORT VIC 3045

C 9/11/2015 15/7274 MEL

MEL 15103-V WH Smith Australia Pty Ltd 11/08/2016 Fit Out of Retail Tenancy S-22 WH Smith Works include installation of high performance vinyl flooring, wiring of all equipment, data points, lighting to display fridges, internally illuminated sign over fridges,X2 LCD screen to column. Joinery works including counter, fridge enclosure, column cladding. X2 self-contained drink fridges & mobile freestanding shutter enclosures.

WH Smith Tenancy S22 - Terminal 4 MELBOURNE AIRPORT VIC 3045

C 8/09/2016

MEL 15107 AECOM 27/11/2015 Demolition of existing above ground HIALS structure Construction of new pit and conduit system for ALER 2 to the HIALS locations

Runway 16/34 threshold MELBOURNE AIRPORT VIC 3045

C 4/12/201515/7984 MEL

MEL 15108 George E Apted & Associates Pty Ltd 23/11/2015 Installation of new double doors in existing east wall and modify lock to doorway on west wall in the tool box storage room

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 4/12/201515/7834 MEL

MEL 15112 CARA Interior Project Management Pty Ltd

2/12/2015 Retail Fitout for WH Smith store located in MLS

MLSMELBOURNE AIRPORT VIC 3045

C 15/12/201515/7986 MEL

MEL 15113 PHD Retail P/L 2/12/2015 Retail shop Fitout Rolling Luggage Terminal 2 Departures MELBOURNE AIRPORT VIC 3045

C 15/12/2015 15/8075 MEL

MEL 15115 Root Projects Australia 8/12/2015 Construction of a new Customs Control Room

Terminal 2 Level 2MELBOURNE AIRPORT VIC 3045

C 21/12/201515/8299 MEL

MEL 15116 North Projects Pty Ltd Construction of approximately 800m of recycled water main pipe to connect to existing Francis Briggs Road near APAC Drive and Service Road

APAC DriveMELBOURNE AIRPORT VIC 3045

C 11/01/2016

MEL 15116-V North Projects Pty Ltd 1/09/2016 Variation Works to MEL 15116Installation of 355 mm dia HDPE portable water main.

Along Francis Briggs Rd from Service Rd to Centre Rd, MELBOURNE AIRPORT VIC 3045

C 2/09/201616/359-V MEL

MEL 16001 oOh Media Pty Ltd 4/01/2016 Upgrade existing advertising signs to new signs located at various locations within Terminal 2 and Terminal 3.

Terminal 2 & 3MELBOURNE AIRPORT VIC 3045

C 22/01/2016

MEL16003 CMW Design & Construct (Vic) Pty Ltd 21/12/2016 Construction of a 10,000m2 warehouse to be split in three separate tenancies.

Mace WayMELBOURNE AIRPORT VIC 3045

C 28/01/201615/8654 MEL

MEL 16004 Icon Co (Vic) Pty Ltd 21/01/2016 AirServices Australia One Sky equipment room

Plant RoadMELBOURNE AIRPORT VIC 3045

C 3/02/201616/423-1 MEL

Page 4: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

MEL 16005 Purple Hills Contracting 27/01/2016 Installation of new and replacement signage for Australia Post-Star Track

APAC DriveMELBOURNE AIRPORT VIC 3045

C 9/02/201615/8297 MEL

MEL 16006 oOH Media Pty Ltd 1/02/2016 2 new Advertising signs on the MLS Car Park structure

MLSMELBOURNE AIRPORT VIC 3045

C 9/02/2016

MEL 16012 Case Meallin & Associates 12/02/2016 Expansion of existing departures duty Free store works include demolition of a variety of existing tenancies

Terminal 2 Departures MELBOURNE AIRPORT VIC 3045

C 26/02/201616/1005 MEL

MEL 16013 Signed On 8/03/2016 Installation of 2x wayfinding light boxes to the front façade of the new T4 Terminal

Terminal 4MELBOURNE AIRPORT VIC 3045

C 8/03/201616/2025 MEL

MEL 16014 George E Apted & Associates Pty Ltd 23/02/2016 New fast lift doors and widening of existing door opening to composite area at Melbourne Base

Qantas Maintenance BaseMELBOURNE AIRPORT VIC 3045

C 7/03/201616/2030 MEL

MEL 16014 –V1 George E Apted & Associates Pty Ltd 15/9/2017 Variation to MEL16014 for new fast lift doors and widening of existing door opening at composite area at Melbourne Base Qantas

Melbourne Base QantasMELBOURNE AIRPORT VIC 3045

C 2/10/201716/2030 MEL

MEL 16016-V Lend Lease Building Contractors Pty Ltd 16/11/2016 Installation of temporary electrical supply for the Air NZ Lounge from Sub 102 to provide required capacity for the Air NZ Lounge until Sub 42 is Upgraded

Terminal 2MELBOURNE AIRPORT VIC 3045 C 28/11/2016 16/1576-V2 MEL

MEL 16017 CMW Design & Construct (Vic) Pty Ltd 1/03/2016 Installation of one new Substation and connection to existing Melbourne Airport infrastructure for the MABP project

Steele WayMELBOURNE AIRPORT VIC 3045

C 15/03/201616/1432 MEL

MEL 16018 CMW Design & Construct (Vic) Pty Ltd 10/03/2016 Installation of a new substation and connection to the existing Airport Infrastructure for the warehouse D/E/F development project

Mace WayMELBOURNE AIRPORT VIC 3045

C 29/03/201616/1641 MEL

MEL 16019 George E Apted & Associates Pty Ltd 9/03/2016 Replacement of 3 high voltage transformers

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 29/03/201616/5268 MEL

MEL 16020 Donald Cant Watts Corke Pty Ltd 10/03/2016 Upgrade of the existing Tiger Terminal 4 Façade

Terminal 4MELBOURNE AIRPORT VIC 3045

C 29/03/201616/1652 MEL

MEL 16021 Spotless Facility Services Pty ltd9/03/2016

Construction of four hour fire rated partition wall in Substations 2 & 3

AirsideMELBOURNE AIRPORT VIC 3045

C 30/03/2016 16/1604 MEL

MEL 16022 George E Apted & Associates Pty Ltd 11/03/2016 Replacement of support steel works to Bay Markers at Charlie Gates

AirsideMELBOURNE AIRPORT VIC 3045

C 30/03/2016 16/1680 MEL

MEL 16023 Melbourne Aviation Precinct Pty Ltd 11/03/2016 Erection of a new sign at the MAP Facility Operations RoadMELBOURNE AIRPORT VIC 3045

C 30/03/201616/1474 MEL

MEL 16025 Total Construction Pty Ltd 31/03/2016 Fitout an existing warehouse building into a commercial kitchen, food preparation area storage and distribution center Alpha Flight Services

South Centre Road MELBOURNE AIRPORT VIC 3045

C 13/04/2016 16/3521-1 MEL16/3521-2 MEL

MEL 16026 Lend Lease Building Contractors Pty Ltd 8/03/2016 Demolition of existing partition wall between vacant United Airline Lounge tenancy

Terminal 2 Level 2MELBOURNE AIRPORT VIC 3045

C 18/04/2016 16/1576 MEL

MEL 16027 Donald Cant Watts Corke Pty Ltd 2/03/2016 Upgrade Pier F in Terminal 4 which includes partial demolition of existing terminal building to facilitate construction and Fitout of terminal space

Terminal 4MELBOURNE AIRPORT VIC 3045

C 14/04/201616/1384 MEL

MEL 16028 ASA Building Consultants Pty Ltd 5/04/2016 Construction of fit out to the Mezzanine level to comprise of kennels and exercise yards (Han rob Melbourne Airport)

Melrose DriveMELBOURNE AIRPORT VIC 3045

C 18/04/201616/2444 MEL

MEL 16031 Builtwise Constructions Pty Ltd 7/04/2016 Relocation of DG cage internal warehouse install 2 No corporate signs

38-52 Sky RoadMELBOURNE AIRPORT VIC 3045

C 20/04/2016 16/3160 MEL

MEL 16032 Australia Post 7/04/2016 Upgrade of Fire Services APAC DriveMELBOURNE AIRPORT VIC 3045

C 20/04/201616/2806 MEL

MEL 16033 LendLease Engineering Pty Limited 13/04/2016 Widening of the existing Tullamarine Freeway and Sunbury Road including

Tullamarine Freeway MELBOURNE AIRPORT VIC 3045

C 22/04/2016 16/2959 MEL

Page 5: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Terminal DriveMEL 16034 TM Commercial & Leisure 22/04/2016 D18-20 Cabin services T2 Apron fit out of

internal space and storage Block 5 T2 Apron Demolition of existing internal walls and services

Terminal 2 ApronMELBOURNE AIRPORT VIC 3045

C 2/05/201616/2900 MEL

MEL 16035 George E Apted & Associates Pty Ltd 2/05/2016 Construction of new lunchroom on the existing mezzanine at Hangar 141.

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 11/05/201616/3629 MEL

MEL 16036 Airside Projects Pty Ltd 5/05/2016 Strip out and demolition of the existing Air New Zealand Lounge returning the space to shell & Core removal of all fixtures

Terminal 2MELBOURNE AIRPORT VIC 3045

C 18/05/2016 16/3161 MEL

MEL 16037 Melbourne Aviation Precinct Pty Ltd 5/05/2016 Construction of driving loop in front of Gate 24C -MAP

Gate 24C -MAPMELBOURNE AIRPORT VIC 3045

C 18/05/201616/2826 MEL

MEL 16038 Melbourne Aviation Precinct Pty Ltd 13/05/2016 Construction of a bunded area for shell tankers and pits at the end of hangar 145

hangar 145MELBOURNE AIRPORT VIC 3045

C 26/05/2016 16/3169 MEL

MEL 16038-V Melbourne Aviation Precinct Pty Ltd Construction of a bunded area for shell tankers and pits at the end of the hangar 145

North End of Hanger 145, near W2 MELBOURNE AIRPORT VIC 3045

C(Consent granted as

MEL 16051)

9/09/2016 16/3169 MEL

MEL 16039 Root Projects Australia 27/05/2016 Stage 1 works -Demolition of ceiling to existing T2DC and Radio room including hazmat removal Miscellaneous new building and building services

Terminal 2MELBOURNE AIRPORT VIC 3045

C 27/05/2016 16/3586 MEL

MEL 16040 Case Meallin & Associates 22/05/2016 2nd Phase of the T2 Luxury redevelopment works involving demolition of remaining retail stores

Terminal 2MELBOURNE AIRPORT VIC 3045

C 1/06/2016 164465-1V MEL

MEL 16041 George Apted & Associates Pty Ltd 25/05/2016 Installation of a high quality aerospace standard gas fired down draft spray booth

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 7/06/2016 16/3635 MEL

MEL 16042 TM Commercial & Leisure Demolition of existing internal walls & services and Fitout of space to create five new offices and storage areas including amenity areas

Terminal 2 ApronMELBOURNE AIRPORT VIC 3045

C 7/06/2016 16/3588 MEL

MEL 16043 Maz Maintenance 27/05/2016 Renovation of Ramp Leading Hands Room Terminal 3MELBOURNE AIRPORT VIC 3045

C 14/06/2016 16/3051 MEL

MEL 16044 IN2 Space Interior Design 1/06/2016 Installation of 1 x external Sign & 1 x internal sign in the T4 Terminal

Terminal 4MELBOURNE AIRPORT VIC 3045

C 20/06/2016 16/3628 MEL

MEL 16045 AECOM Demolition of existing above ground HIALS structure, new pit and conduit system from ALER 3 to HIALS Runway 09/27

East of Runway 27 Threshold MELBOURNE AIRPORT VIC 3045

C 4/07/2016 16/5119 MEL

MEL 16046 Merit Interiors Pty Ltd 22/06/2016 To undertake light Fitout works to existing warm shell of Menzies Cargo Building

1 APAC DriveMELBOURNE AIRPORT VIC 3045

C 4/07/2016 16/4109 MEL

MEL 16047 Case Mealin & Associates Realignment of pedestrian concourse corridor to enlarge Duty Free Space

Terminal 2 Arrivals MELBOURNE AIRPORT VIC 3045

C 5/07/201616/4106 MEL

MEL 16047-V Case Mealin & Associates Amendment to Qantas Change Room partitioning layout and relocation of Distribution Board.

Terminal 2 Arrivals MELBOURNE AIRPORT VIC 3045

C 5/07/201616/4106-V MEL

MEL 16048 Builtwise Constructions Pty Ltd 23/06/2016 Alterations and additions to existing racking

1 Mace WayMELBOURNE AIRPORT VIC 3045

C 6/07/201616/4698 MEL

MEL 16049 Walker Fire Protection Pty Ltd Building 64 Stage 1 Fire Upgrade upgrading the Fire Detection, OWS sprinkler system, relocate hose reel and reprogram the FIP

Service RoadMELBOURNE AIRPORT VIC 3045

C 19/07/2016 16/4514 MEL

MEL 16050 Padraig Sinnott / GHD WoodheadDemolition, extension and refurbishment of existing Duty Free Department Retail Store over a staged development / DUFRY

Terminal 2 DeparturesMELBOURNE AIRPORT VIC 3045

C 14/07/2016 16/4147 MEL

MEL 16050-V Padraig Sinnott / GHD WoodheadDemolition, extension and refurbishment of existing Duty Free Department Retail Store over a staged development / DUFRY

Terminal 2 DeparturesMELBOURNE AIRPORT VIC 3045

C 8/06/2017

MEL 16052 Case Meallin & Associates 30/06/2016 APAM Base building work prior to tenant Terminal 2 Departures MELBOURNE C 15/07/2016 16/4355 MEL

Page 6: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Fitout- to be new Café Vue seating area fit out to be by tenant

AIRPORT VIC 3045 W -

MEL 16053 Melbourne Aviation Precinct 6/07/2016 Upgrade to MAP Facade and Canopy Front of office near Security Melbourne Aviation PrecinctMELBOURNE AIRPORT VIC 3045

C 21/09/2016 16/4380 MEL

MEL 16054 ASCO Open Space P/L 20/07/2016 Additional Toilet Block Taxi Holding Area MLSMELBOURNE AIRPORT VIC 3045

C 15/08/2016 16/4997 MEL

MEL 16055 Beca Consultants 21/07/2016 Construction of a new water hydrant in accordance with AIR-CI-BEC-SK183

Southern Apron Expansion Project East of pier G. MELBOURNE AIRPORT VIC 3045

C 12/08/201616/6042 MEL

MEL 16056 Airside projects 25/07/2016 Interior fit out of newly created Business Class Lounge for Air New Zealand Includes full kitchen, kids play area, staff room, toilet & shower block, and buffet.

T2 Ramp Level Concourse D MELBOURNE AIRPORT VIC 3045

C 15/08/2016 16/4553 MEL

MEL 16057 Desa Australia 27/07/2016 Installation & Relocation of digital way finding signage Bollards installed on L3 outdoor carpark New Totem Signs

MLCP car park on levels 1 to Level 5. L1 and L2 Helix rampMELBOURNE AIRPORT VIC 3045

C 22/08/201616/4419 MEL

MEL 16058 JB Commercial 12/07/2016 Construction and completion of alterations and additions to existing area for linen store for Qantas Airlines.

Ground floor of Block 4 of International T2 MELBOURNE AIRPORT VIC 3045

C 7/09/201616/4486 MEL

MEL 16059 The Frame Group Pty Ltd 1/08/2016 Generator Installation outside of MACE CCR on existing slab.In room works include Gas Suppression, lighting, Air Con, CCTV, Data Cabling, UPS Power, and Access Control

MACE CCRMELBOURNE AIRPORT VIC 3045

C 16/08/201616/5099 MEL

MEL 16060 Airservices 2/08/2016 Civil works to install GBAS equipment, equipment shelter & comms cable approx. 200m south of Main ARFF station

West of Runway 16/34 MELBOURNE AIRPORT VIC 3045

C 16/09/2016 16/7053 MEL

MEL 16061 Australia Pacific Airports (Melbourne) Pty Ltd

4/08/2016 Install permanent 9m x 3.6m billboard sign for commercial advertising Airport drive adjacent MACE Tenant Building 351

Airport Drv, Adjacent to 8 Mace Way MELBOURNE AIRPORT VIC 3045

WRefer MEL 16084

-

MEL 16062 Eleo Carpus Olive Estate Pty Ltd 10/08/2016 Demolition of Building 151 Melbourne Airport Club

309 Melrose DriveMELBOURNE AIRPORT VIC 3045

C 13/09/2016 16/4929 MEL

MEL 16063 Eleo Carpus Olive Estate Pty Ltd 10/08/2016 Demolition of House 145 Mansfield RoadMELBOURNE AIRPORT VIC 3045

C 10/08/2016 16/4361 MEL

MEL 16064 James Richardson Pty Ltd 11/08/2016 Shop Floor installation of modular carpet tiles over existing tiles

Shop E23 Terminal 2MELBOURNE AIRPORT VIC 3045

C 8/09/2016 16/4999 MEL

MEL 16065 Spotless Facility Services Pty Ltd 12/08/2016 Fit Out works for Red Spot Car Rentals at old AFT Tenancy in Short Term Car Park. Removals of existing partitions and facilitate an open plan layout.

Ground Floor, Short Term Car Park MELBOURNE AIRPORT VIC 3045

C 6/09/2016 16/5047 MEL

MEL 16066 Root Projects Australia 15/08/2016 T3 Dry Fire Services Replacement Melbourne Airport

T3 / T4 Terminal BuildingsMELBOURNE AIRPORT VIC 3045

C 3/10/2016 16/5049 MEL

MEL 16067 Toll Holdings Limited 23/08/2016 Supply and install Diesel & Adblue storage, dispensing and managementFacility, workshop equipment hoist, external signage, pallet racking.

Sky Road Melbourne Airport Business Park MELBOURNE AIRPORT VIC 3045

W -

MEL 16068 TM Commercial and Leisure 23/08/2016 Refurb of landlord shell Tenancy #19 into an office fit out for Virgin Australia.New partition walls relocated &new services, Comms room, work stations and ICT works

Tenancy 19, T2, Level 2MELBOURNE AIRPORT VIC 3045

C 14/09/201616/5200 MEL

Page 7: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

MEL 16069 TM Commercial and Leisure 23/08/2016 Refurb of existing legal/payroll/IT areas of Terminal 2 to accommodate additional office workstations and meeting rooms with an additional office area being created within the old drum area of Terminal 2

Terminal 2, Level 2,MELBOURNE AIRPORT VIC 3045

C 7/09/2016 16/5197 MEL

MEL 16070 Qanstruct Pty Ltd 23/08/216 Reprogramming of Fire Indicator Panel Gatehouse 1 - 25 Sky RoadMELBOURNE AIRPORT VIC 3045

C 21/10/201616/5173 MEL

MEL 16072 CMW Design & Construct (Vic) Pty Ltd 25/08/2016 Installation of 7 number totem signs in the road reserve at MABP site

Sky Road and Steele WayMELBOURNE AIRPORT VIC 3045

C 8/09/2016 16/5223 MEL

MEL 16073 Root Projects Australia 25/08/2016 All aspects of the 8th reclaim hall project including site facilities

T2 TerminalMELBOURNE AIRPORT VIC 3045

C 8/09/2016 20/10/2016- 14/2/201716/5824 MEL - 16/5824-2

MEL 16/5824A MEL

MEL 16073-V Root Projects Australia 10/11/2016 All aspects of the 8th reclaim hall project including site facilitiesVariation to Border Force tenancy area. Additional toilets added to serve APAM

T2 TerminalMELBOURNE AIRPORT VIC 3046

C 28/11/2016 16/5824-V MEL

MEL 16073-V2 Root Project Australia 9/02/2017 Construction of 8th reclaim project, relocation of north plant room and associated works including site facilities. Phase 3 - T2 8th Reclaim Main Works

T2 TerminalMELBOURNE AIRPORT VIC 3046

C 28/11/2016 16/5824-2-V2

MEL 16073-V3 Root Projects Australia 22/06/2017 All aspects of the Customer services desk including site facilities @ T2 Terminal

T2 TerminalMELBOURNE AIRPORT VIC 3046

C 07/07/2017 17/1769 MEL

MEL 16074 Turner & Townsend Thinc Pty Ltd 26/08/2016 Replacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into : "At Terminal" MLCP.

Centre Rd, Services Rd, Airside RdMELBOURNE AIRPORT VIC 3045

C 4/10/201616/5254 MEL

MEL 16075 The Frame Group Pty Ltd 31/08/2016 ICS outdoor shelter, new DB to existing pillar. Copper cabling, electronic key access, new concrete slab & electrical communications conduits to support new shelter.

Taxi Holding Area , Melrose Drive MELBOURNE AIRPORT VIC 3045

C 13/10/201616/6605 MEL

MEL 16076 CMW Design & Construct (Vic) Pty Ltd 8/09/2016 Installation of X2 building mounted signs for Bollore on Warehouse A at the MABP

Corner of Sky Road and Steele Way, MELBOURNE AIRPORT VIC 3045

C 5/10/201616/6295 MEL

MEL 16077 JB Commercial Building Contractors P/L 12/09/2016 Relocation of AKE roller racking to Gate B21

T1 - Gate B21MELBOURNE AIRPORT VIC 3045

C 5/10/201616/5784 MEL

MEL 16078 APAM 27/09/2016 Installation works required to provide LV power to the existing gantry at Melbourne Drive for the proposed Ooh Medial digital signs project Reference MEL 16010

Melbourne Drive GantryMELBOURNE AIRPORT VIC 3045

C 24/10/2016 16/6131 MEL

MEL 16079 Melbourne Aviation Precinct 29/09/2016 All aspects for the Construction of the New Melbourne Jet Base. Including; 1. Temporary Site Establishment of site offices and worker amenities including all required services;2. Proposed relocation of the exiting underground HV along the Eastern Boundary - works by APAM; 3: Relocation and under grounding of the overhead power lines along South Centre Rd - works by APAM; 4. Installation and removal of a new temporary security fence to the Northern end of the site during construction; 5. Installation of temporary site fencing and gates along South Centre Rd and Operations Rd.

MAP Gate 24 Operations Rd MELBOURNE AIRPORT VIC 3045

C 10/11/2016 16/5890-1 MEL

16/5890-2 MEL

16/5890-3 MEL

16/5890-4 MEL

16/5890-5 MEL

16/5890-6 MEL

Page 8: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

MEL 16080 JLL 5/10/2016 Demolition and Make good of ANZ Tenancy T2 Arrivals Landside

Terminal 2, ArrivalsMELBOURNE AIRPORT VIC 3045

C 27/10/2016 16/4995 MEL

MEL 16081 JLL 5/10/2016 Demolition and Make good of ANZ Tenancy T2 Departures ATM'S and office

Terminal 2, DeparturesMELBOURNE AIRPORT VIC 3045

C 27/10/2016 16/4996 MEL

MEL 16082 Root Projects Australia 19/09/2016 T3 Dry Fire Services Replacement Melbourne Airport - T3 / T4 Terminal Buildings Asbestos Remediation works

Terminal 3MELBOURNE AIRPORT VIC 3045

C 5/10/2016 16/5876 MEL

MEL 16083 Melbourne Aviation Precinct 10/10/2016 Construction of New Airside / Landside Security Fence. This is of a Temporary nature and will be removed once the new Jetbase has been built.

MAP Gate 24 Operations Rd MELBOURNE AIRPORT VIC 3045

C 8/11/2016 16/6235 MEL

MEL 16084 Elaeocarpus 18/10/2016 Advertising sign to be erected and installed .It will be a steel framed billboard 3.6m X 9 m (1.5 m off the ground ) concreted into the ground

11-21 Mace wayMELBOURNE AIRPORT VIC 3045

C 10/11/2010616/0379 MEL

MEL 16085 Builtwise constructions Pty Ltd 18/10/2016 Install or reinstatement of nonstructural partitioning to main office of Agility Logistics

25 Jets CourtMELBOURNE AIRPORT VIC 3045

C 10/11/201616/6920 MEL

MEL 16086 GHD Woodhead 21/10/2016 T2 -Fitout of existing office tenancy for Dufry offices at Duty Free Arrivals .These works will be carried out by the Shape Group.

Terminal 2, ArrivalsMELBOURNE AIRPORT VIC 3045

C 9/11/201616/6135 MEL

MEL 16087 Success City Pty Ltd T/A 3/11/2016 To install walkway on the roof of the hotel on the airport facing side with maintenance activities.

PARKROYAL Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 17/11/201616/7008 MEL

MEL 16088 TM Commercial and Leisure 3/11/2016 Minor refurbishment of the level, T2 main corridors and foyer areas. Works include fresh paint to walls, ceilings and doors, new skirting and carpet, lighting review and replacement where required, and new

Terminal 2, Level 2 Melbourne Airport MELBOURNE AIRPORT VIC 3045

W -

MEL 16089 TM Commercial and Leisure 3/11/2016 Relocation and installation of three existing site sheds and one amenity shed, with Building 59, to be used as temporary office accommodation for the Airfield Ops Team

Building 59MELBOURNE AIRPORT VIC 3045

C 21/11/201616/6507 MEL

16/6507-V MEL

MEL 16091 WSP Services 23/11/2016 Install concrete footing to fit new 9mt mid sign illuminated. To be replaced next to existing sign

BP Service Centre - Melbourne Drive MELBOURNE AIRPORT VIC 3045

C 6/12/201616/6938 MEL

MEL 16097 Airservices Australia 6/12/2016 Interim Power Supply installation - AirServices Australia ATSC Compound

ATSC CompoundMELBOURNE AIRPORT VIC 3045

C 9/01/2017 16/6849 MEL

MEL 16098 Currie & Brown 9/12/2016 Rex Bussing site at T4 to provide separating wall for the un scanned regional Rex passengers. T4 Rex AirArrivals

T4 Rex Air ArrivalsMELBOURNE AIRPORT VIC 3045

C 9/01/2017 16/7341 MEL

MEL 16100 George E Apted & Assoc P/L 19/12/2016 Construction of 10m x 5m refrigerated cool room with existing Freight Terminal FT1 building - Qantas Airways Ltd

Freight Terminal FT1 building - Qantas Airways LtdMELBOURNE AIRPORT VIC 3045

C 1/03/2017

MEL 16101 Airservices Australia 19/12/2016 Foam Tank & Pump System replacement at the main fire station

Perimeter RdMELBOURNE AIRPORT VIC 3045

C 22/02/2017 16/7428 MEL

MEL 16102 GHD Woodhead 19/12/2016 Construction to two new Duty Free Satellite shops for Dufry

T2 DeparturesMELBOURNE AIRPORT VIC 3045

C 22/02/2017 16/7426 MEL

MEL 16103 GHD Woodhead 19/12/2016 (A) Conversion old Jemena 66KV control room to amenities and mess room (B) Connection of the newtoilets to APAM sewer system Mat Substation

Cnr South Centre Road & Link Road MELBOURNE AIRPORT VIC 3045

C 9/01/2017

MEL 16104 Australia Post 19/12/2016 1) Separating existing hydrant and 13/23 APAC Drive C 12/01/2017 16/2806-V MEL

Page 9: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

sprinkler booster systems. 2) Install new hydrant booster connection on APAC Drive.3) Install additional sprinkler booster connection 4) New 150mm domestic water supply tapping5) Increase pipe to infill static water tanks

MELBOURNE AIRPORT VIC 3045 21/06/2016 19/01/2017

MEL 16105 HS Rekaris & Associates Pty Ltd 20/12/2016 Fit Out works - Hot Kitchen, Cool rooms and ramp

4-12 Reid Way - Gate Gourmet MELBOURNE AIRPORT VIC 3045

C 9/01/2017

MEL 16105 V1 HS Rekaris & Associates Pty Ltd 20/12/2016 Fit Out works - Hot Kitchen, Cool rooms and ramp

4-12 Reid Way - Gate GourmetMELBOURNE AIRPORT VIC 3045

C 3/10/2017

MEL 16106 Mobil Oil Australia Pty Ltd 21/12/2016 MLB JUHI TTUL Upgrade - Bay 1,2,& 3 Works 1) Add structural stiffening columns & beams to 2 existingtruck canopies at Bay 1/2& Bay 3/4 2) Construct new product receipt equipment pad by Bay 3 Receipt c/w concrete spill containment & equipment foundations 3) New Bay 3 Fuel Receipt system c/w 150NB piping, valves, pump, filtrations & meter from Receipt Bay 3 to Receipt Bay 1 4) Modify Receipt piping manifold at Bay 1 & 2 5) Electrics and controls (new and modification) for project works6) Widen existing internal concrete roadways and modify drainage system.

JUHI Aviation Fuel Facility, Marker RoadMELBOURNE AIRPORT VIC 3045

C 9/01/2017

MEL 17000 HS Rekaris & Associates Pty Ltd 20/02/2016 Installation of 2 building signs for Porsche on office C2 at the MABP Site

MABP SiteMELBOURNE AIRPORT VIC 3045

C 31/01/2017

MEL 17001 Red Rock Airport Services Pty Ltd 20/02/2017 T2 Luxury Project - Fitout of T2-S203 Retail tenancy Gastro Pub. General Fitout of food and BeverageTenancy, including services. Departures Level Terminal 2 – Airside Satellite Precinct

Departures Level Terminal 2 – Airside Satellite PrecinctMELBOURNE AIRPORT VIC 3045

C 7/03/2017

MEL 17002 Brunetti Airports Pty Ltd 20/02/2017 T2 Luxury Project - Fitout of T2-S208 Retail tenancy Cafe. General Fitout of food and BeverageTenancy, including services. Departures Level Terminal 2 – Airside Satellite Precinct

Departures Level Terminal 2 – Airside Satellite PrecinctMELBOURNE AIRPORT VIC 3045

C 7/03/2017

MEL 17003 Seaway Logistics Pty Ltd 20/02/2017 Four Post Cargo Hoist installation - 11-13 Mace Way

11-13 Mace WayMELBOURNE AIRPORT VIC 3045

C 7/03/2017 17/94-33 MEL

MEL 17004 Airport Retail Enterprises Pty Ltd 21/02/2017 T2 Luxury Project - Fit Out of Food & Beverage Tenancy - Terminal 2 Tenancy W05 Café Vue

Terminal 2 Tenancy W05 Café Vue MELBOURNE AIRPORT VIC 3045

C 9/03/2017

MEL 17005 Airport Retail Enterprises Pty Ltd 21/02/2017 T2 Luxury Project - Fit Out of Food & Beverage Tenancy - Terminal 2 Tenancy SO2 Urban Provodore

Terminal 2 Tenancy SO2 Urban Provodore MELBOURNE AIRPORT VIC 3045

C` 8/03/2017 17/525-1 MEL

17/525-2 MEL

MEL 17006 Airport Retail Enterprises Pty Ltd 21/02/2017 T2 Luxury Project - Fit Out of Food & Beverage Tenancy - Tenancy SO7 Bar Pulpo

Tenancy SO7 Bar Pulpo MELBOURNE AIRPORT VIC 3045

C 8/03/2017

MEL 17007 AMC Architecture 23/02/2017 Proposed Ceiling Upgrade works at Attorney Generals Department Tenancy T2 Level 2

T2 Level 2MELBOURNE AIRPORT VIC 3045

C 6/04/2017

MEL 17008 GHD Pty Ltd - Arnaud Marois 24/02/2017 Jet Base (MAP) HV feeder relocation - South Centre Road & Operations Road

South Centre Road & Operations Road MELBOURNE AIRPORT VIC 3045

C 14/03/2017 17/1286-1 MELMEL 05/10/2017

MEL 17009 Signed On (Aust) Pty Ltd - Ben Hurford 27/02/2017 Installation of framework and footings to ATCP 1,2,3 exit lanes C 15/03/2017

Page 10: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

create a new retail asset. Location: ATCP 1,2,3 exit lanes

MELBOURNE AIRPORT VIC 3045

MEL 17010 Cara Interior Project Management 28/02/2017 T2 Luxury Project - Fit out of WH Smith Tenancy S10 - T2

Terminal 2MELBOURNE AIRPORT VIC 3045

C 15/03/2017

MEL 17011 Harkess Ord Pty Ltd 1/03/2017 Rebrand of existing Mercedes-Benz Melbourne Airport Express dealership Incl installation of 9 exterior signs to reflect corporate branding and repainting of entrance portal and exterior columns. Location: Mercedes- Benz Melbourne Airport Express dealership

Mercedes-Benz Melbourne Airport Express dealershipMELBOURNE AIRPORT VIC 3045

C 17/03/2017 16/7337-A MEL

AMENDED 01/05/2017

MEL 17012 Turner & Townsend Pty Ltd 6/03/2017 The scope of work is to replace the HV and LV equipment of the substation SUB 42. This will see the car parking spaces adjacent the current Sub 42 KV room repurposed to contain the new Sub 42 LV equipment and MSSB's. Upgrade to the existing lighting and services will also be completed as part of this project.

Terminal 2, Apron adjacent Delta 4MELBOURNE AIRPORT VIC 3045

C 25/07/2017 17/1642 MEL

MEL 17013 CMW Design & Construct (Vic) Pty Ltd 7/03/2017 Construct a new tear drop traffic island at the end of Steele Way court bowl and modify adjacent existing line making and street signs on Steele Way.

Steele WayMELBOURNE AIRPORT VIC 3045

C 22/03/2017 17/1029 MEL

MEL 17014 CMW Design & Construct (Vic) Pty Ltd 9/03/2017 Supply and installation of in ground scales at Qantas Freight

Landside RoadMELBOURNE AIRPORT VIC 3045

C 27/03/2017

MEL 17015 George E Apted & Associates Pty Ltd 9/03/2017 Installation of new pallet racking. APAC Drive MELBOURNE AIRPORT VIC 3045

C 6/04/2017

MEL 17016 CMW Design & Construct (Vic) Pty Ltd 10/03/2017 Construction of Horse Transfer area within existing warehouse including associated trade waste and services. Construction of Cat & Dog enclosure. Construction of stable wash area. Office refurbishment andMake good works. New concrete ramp, fencing and landscaping.

5 APAC DriveMELBOURNE AIRPORT VIC 3045

C 04/04/2017

MEL 17017 Sensor Dynamics Pty Ltd 10/03/2017 Installation and commissioning of an integrated Taxi Management System for Melbourne Airports Primary Taxi Holding Area (PHA), Secondary Holding Area (SHA), feeding exits to Terminal 1, Terminal 2 & Terminal 3 and Exit to Terminal 4 (MLS)

Terminal 1,2,3,4MELBOURNE AIRPORT VIC 3045

C 29/03/2017 17/1128 MEL

17/112/-V MEL 27/04/2018 171128-V2 MEL

MEL 17018 Care Interior Project Management 15/03/2017 Fit out of WH Smith Tenancy I13B T2 ArrivalsMELBOURNE AIRPORT VIC 3045

C 30/03/2017 17/825 MEL 18/05/2017

MEL 17019 George E Apted & Associates Pty Ltd 17/03/2017 Supply & installation of 4 new freight screening machines including wall penetrations, new airside screen wall and removal of existing fence and airside boundary relocated at Qantas Freight Terminal Building

Qantas Freight Terminal Building MELBOURNE AIRPORT VIC 3045

C 31/03/2017 17/1193 MEL

MEL 17023 Builtwise Constructions Pty Ltd 31/03/2017 Removal of storage racking from existing facility allowing space for the installation of new secured storage unit. Installation of new storage racking and service alterations to suit.

18 Reid WayMELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/1284 MEL

MEL 17024 OLPS Pty Ltd (Trading as Sidegreaves & Co

31/03/2017 T2 Luxury Project: Retail interior Fit out for Hugo Boss Menswear New Shopfront, new internal works to walls, floors and ceiling including Fire & Mechanical

Shop T2-L05 Airside International TerminalMELBOURNE AIRPORT VIC 3045

C 18/04/2017

Page 11: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Services and new Joinery.MEL 17025 Hotchin Design 3/4/2017 Retail Fit out - World of Chocolate. Shop T2-L05 Airside International

TerminalMELBOURNE AIRPORT VIC 3045

C 18/04/2017

MEL 17026 CMW Design & Construct (Vic) Pty 3/4/2017 Construction of temporary airside fence - Location 5 APAC Drive

5 APAC DriveMELBOURNE AIRPORT VIC 3045

C 16/08/2017 17/929 MEL 9/05/2017

MEL 17026-V1 CMW Design & Construct (Vic) Pty 2/04/2017 Construction of temporary airside fence - 5 APAC Drive

5 APAC DriveMELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/929-V MEL 18/05/2017 7/07/2017

MEL 17027 Newslink Pty Ltd 7/04/2017 T2 Luxury Project: Tenancy Fit out for Out of Australia

Tenancy S01MELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/1032 MEL

MEL 17028 Newslink Pty Ltd 7/04/2017T2 Luxury Project: Tenancy Fit Out of Tech2go

Tenancy S06MELBOURNE AIRPORT VIC 3045

27/04/2017 17/1034 MEL

MEL 17029 Giorgio Armani Australia Pty Ltd 10/04/2017T2 Luxury Project: Fit out of Tenancy T2-L04

Tenancy T2-L04MELBOURNE AIRPORT VIC 3045

C28/04/2017

17/1031 MEL

Mel 17029-V1 Giorgio Armani Australia Pty Ltd 10/04/2017 T2 Luxury Project: Fit out of Tenancy T2-L04. Variation 1 Structural works of interior retail store

Tenancy T2-L04MELBOURNE AIRPORT VIC 3045

C 16/8/2017 17/1031 MEL

MEL 17030 Case Meallin & Associates 10/04/2017 Demolition of the existing TRS counter in T2 Departures. A new TRS zone will be constructed consisting of the reconfiguration of the vacant Dufry landside site. The new TRS zone will take all passengers queuing away from Durfy Lobby.

Departure Level - Terminal 2MELBOURNE AIRPORT VIC 3045

C 28/04/2017

MEL 17031 Donald Cant Watts Corke 11/04/2017

Improving/upgrading of Virgin and Melair Valet offices on

Level 2 Carpark @ Terminal 1,2,3MELBOURNE AIRPORT VIC 3045

C 1/05/2017 17/1300 MEL

17/1300-V MEL

MEL 17032 Airside Projects Pty Ltd 19/04/2017 Strip out and demolition of the existing Air New Zealand Lounge. Returning the space to shell & Core. Removal of all fixtures, fittings and furniture, equipment and capping of all services at lease boundary in readiness for new fit out.

T2 Ramp Level Concourse DMELBOURNE AIRPORT VIC 3045

C 8/05/2017 17/1088 MEL

MEL 17033 Department of Immigration and Border Protection

27/04/2017 Installation of 3 SmartGates passengers processing units and relocation of 1 SmartGate kiosks. Details are provided in the scope of works document -

T2 arrivals Immigration Hall, Melbourne International Airport MELBOURNE AIRPORT VIC 3045

W -

MEL 17034 Ramvek Pty Ltd 1/05/2017 T2 Luxury Project: Fit out of Tenancy T2-L02 - including modifications to base buildings services to suit new design.

Tenancy T2-L02MELBOURNE AIRPORT VIC 3045

C 15/05/2017 17/1127 MEL

MEL 17035 GHD Woodhead 1/05/2017 T2 Luxury Project: Fit out of Salvatore Ferragmoa Brand Store.

Tenancy T2-L03MELBOURNE AIRPORT VIC 3045

C 17/05/2017 17/1033 MEL 26/07/2017

MEL 17036 Construction Specialists Pty Ltd 2/05/2017Installation of new racking

Warehouse C2 - 2 Steele WayMELBOURNE AIRPORT VIC 3045

C 17/05/207 17/1304 MEL

MEL 17037 GHD Woodhead 2/05/2017 T2 Luxury Project: Demolition, extension and refurbishment of existing Duty Free Department Retail store. T2 Departures

T2 DeparturesMELBOURNE AIRPORT VIC 3045

W -

MEL 17039 Gordon McKay Pty Ltd 5/5/2017 Existing DJR safety camera site upgrade Cnr Terminal Drive & Centre Road C 22/05/2017 17/1380 MEL

Page 12: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

inc. the following: Relocation & replace camera & flash poles, new footings, pits & underground conduits to be installed. Replace 1 & install 1 new electrical control cabinet. Replace existing electrical cabling on site.

MELBOURNE AIRPORT VIC 3045

MEL 17040 Spotless Facilities Services Pty Ltd 10/05/2017 APAM Lift 5 & 6 Digital Operation & Display Upgrade & APAM Lift 1, 2, 4, 5, 6 & 30 Wittur Door Operation Upgrade

APAM T2 & T3 - Lift 1, 2, 4, 5, 6 & 30MELBOURNE AIRPORT VIC 3045

C 1/06/2017 17/1149 MEL

MEL 17041 Root Projects Australia 10/05/2017Gate 22 Electrical and Comms back bone upgrade between Sub Station 99 MAT to Gate 22

Operations Road, South Centre Road, Link Road in proximity to MATMELBOURNE AIRPORT VIC 3045

C 29/05/2017 17/1222 MEL

MEL 17042 APAM 12/05/2017 Supply, install and commissioning of 8 x Thermal CCTV Cameras. The installation of stairs and a platform at Terminal 2 D20, to allow the installation and easy access of the new thermal camera. The supply and installation of a new camera pole at D20 Rooftop for the new camera to be mounted to. Installation of new CAT6 cabling using existing conduit.

Terminal 2 Level 2 Management Office.MELBOURNE AIRPORT VIC 3045

W -

MEL 17043 Airside Projects P/L 22/05/2017 The old Emirates lounge is to undergo a minor face lift. All existing building works will with no demolition works other than cosmetic. Scope of works is essentially carpets, wallpaper, painting, new furniture TV & FID's, minor buffet works, no work to kitchen other than painting and silicone Works, and minor electrical and plumbing works, some mechanical works and rebranding. Lounge will be converted to SRA by hoarding at front entry access proposed via stair 49

T2 Level 3 Concourse DMELBOURNE AIRPORT VIC 3045

C 29/5/2017 17/1088 MEL

MEL 17044 Airservices Australia n 26/05/2017 Installation of DE Antenna with Pole Mast and associated trenching.

Rwy 27 ILS Glide PathMELBOURNE AIRPORT VIC 3045

C 14/06/2017

MEL 17047 Root Projects 26/05/2017

Gas Suppression & VESDA installation in

MLS A & B Comms ROOMMELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1332 MEL

MEL 17048 Root Projects Australia 26/05/2017Gas Suppression & VESDA (Interface) installation for Pier F 11 Comms/UPS Room

Melb Airport Pier FMELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1331 MEL 30/06/2017

MEL 17049 Higgovale Pty Ltd Max Mara 26/05/2017

T2 Luxury Project - Fit out - Max Mara

T2-L10MELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1328 MEL

17/1328-A MEL

MEL 17050 Case Meallin & Associates 29/05/2017 The works consist of the reconfiguration of the existing loading dock, bin room and security screening area. Existing bin area will be demolished to increase the size of the area. The security screening will be increased and realigned to allow a body scanner to be installed. New ramp and extension to loading dock @

Satellite Loading Dock Apron Level, Terminal 2MELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1349 MEL

Mel 17050-V1 Case Meallin & Associate 29/05/2017 The works consist of the reconfiguration Satellite Loading Dock Apron Level, C 21/09/2017 17/1349 MEL

Page 13: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

of the existing loading dock, bin room and security screening area. Existing bin area will be demolished to increase the size of the area. The security screening will be increased and realigned to allow a body scanner to be installed. New ramp and extension to loading dock @ Satellite Loading Dock Apron Level, Terminal 2. Variation to MEL 17050 to exclude the following works. Deletion of works from the submitted RFT include the following: Concrete New Ramp / Infills / Bulk Fill/ Formwork. Existing Ramp Concrete Infill/Formwork/ Steel Edging. Apron Paving/ Edged Beams/ Bollards. New Formed Stairs and Bulk Concrete Fill. New Handrails, Brickwork Infill to Plant Room, New Access Door to Plan Room, Labour/Materials. Reinforcing, Concrete Pump.

Terminal 2.MELBOURNE AIRPORT VIC 3045

MEL 17052 McCredie Group Pty Ltd 31/05/2017 T2 Luxury Project – Fit out of Retail eyewear Store @

Terminal 2 - W09MELBOURNE AIRPORT VIC 3045

C 19/06/2017 17/1359 MEL

MEL 17053 PTID 01/06/2017 T2 Luxury Project - Retail fit out for jew2ellery store - Tiffany & Co. New partition walls, flooring finishes, ceiling, services, millwork and shop front.

Tenancy T2-L01 - Tiffany & CoMELBOURNE AIRPORT VIC 3045

C 19/06/2017 17/1360 MEL

MEL 17055 Transform Retail Project 6/6/2017T2 Luxury Project – Fit out of new Travelex Currency Exchange store

T2 W10 LanewayMELBOURNE AIRPORT VIC 3045

C 21/06/2017 17/1382 MEL

MEL 17056 Australian Produce Store 9/06/2017 T2 Luxury Project - Fitout of new Australian Produce Store T2 W03

95-99 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 27/06/2017 17/1408 MEL

MEL 17057 A1 Office 9/06/2017 Refurbishment of internal Fitout - 95-99 South Centre Road

T2 North Bag Room/Spotless OfficeMELBOURNE AIRPORT VIC 3045

C 27/06/2017 17/1664 MEL

MEL 17058 Donald Cant Watts Corke (Management) P/L

13/06/2017 MU-1: Demolition of existing spotless offices; services and other building works associated with fit out of the new open space; expansion of existing MU-1 carousel. North Bag Room (MU-14); Services and other building works associated with fit out of the existing vacant space in the North Bag Room; Installation of new MU-14 carousel. T2 North Bag Room/Spotless Office

T2 North Bag Room/Spotless OfficeMELBOURNE AIRPORT VIC 3045

C 28/06/2017 17/1499 MEL

MEL 17059 Donald Cant Watts Corke (Management) P/L

14/06/2017 Parking and Forecourt Optimization. Forecourt - Alterations to lanes 2, 3, & 4 to create better flow. Relocate pedestrian crossing. MLCP Ground Floor - installation of 8 boom gates and 8 vehicle inspection systems for rentals. Install new entrance off Centre Rd. New fencing internally and on Centre Road. Asphalting and line marking.

Sky Road Melbourne Airport Business ParkMELBOURNE AIRPORT VIC 3045

W -

MEL 17060 Toll Holdings Limited 14/06/2017 Demolish internal partitions and install workstations to the main office @Sky Road Melbourne Airport Business Park

107-113 Link Road (West)MELBOURNE AIRPORT VIC 3045

W -

MEL 17061 CMW Design & Construct (Vic) Pty Ltd 15/06/2017 Construction of a new 14,000m2 Warehouse with a 1,000m2 single story

107-113 Link Road (West)MELBOURNE AIRPORT VIC 3045

C 15/06/2017 17/1736-1 MEL

Page 14: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

office, associated car parking, hardstand and amenities. Connection to existing infrastructure services including extension of the high voltage network and installation of a new substation

17/1736-V MEL

17/2459 MEL

MEL 17062 Walker Fire Protection Pty Ltd 15/06/2017 Installation of Fire Detection and Gas Suppression System for Parkroyal Hotel

ParkroyalMELBOURNE AIRPORT VIC 3045

C 30/6/2017

MEL 17063 Spotless 19/06/2017 Construct a steel framed shelter to join existing building. The purpose of the shelter is to provide protection over the enquiries window and pedestrian walkway

Gate 27 MelbourneMELBOURNE AIRPORT VIC 3045

C 5/07/2017 17/1523 MEL

MEL 17064 Morphos 21/06/2017Office Fit Out Works for Japan Airlines -

Tenancy 4 Level 2 Japan AirlinesMELBOURNE AIRPORT VIC 3045

C 5/7/2017

MEL 17065 Cushman & Wakefield (on behalf of Growthpoint Properties)

21/06/2017 Refresh & make good works including: Demolition of office partition and floor finishes, installation of workstations to office space, replacement of ceiling tiles, reconfiguration of warehouse racking, painting of external building, it is proposed that the services design remains the same -

120 Link RoadMELBOURNE AIRPORT VIC 3045

C 5/07/2017

MEL 17066 Samsonite C/O PHD Retail 22/06/2017 T2 Luxury Project - Retail interior fit out - Rolling Luggage

Tenancy T2 - W02MELBOURNE AIRPORT VIC 3045

C 7/07/2017 17/1566 MEL

MEL 17067 GSM Operational Pty Ltd 22/06/2017 T2 Luxury Project - Fit out of retail - Billabong

Tenancy W08, T2MELBOURNE AIRPORT VIC 3045

C 7/07/2017 17/1567 MEL

MEL 17068 George E Apted & Associates Pty Ltd 23/06/2017 Removal of the existing mezzanine and associated services and tail dock equipment from Bay 1 and to relocate the existing tail docking equipment from Bay 2 to Bay 1 - No cutting and removal of concrete or excavation required for these works. - Qantas Maintenance Base C

Tenancy L07, T2MELBOURNE AIRPORT VIC 3045

C 10/07/2017 17/1595 MEL

MEL 17069 Tu Projects Pty Ltd 23/06/2017T2 Luxury Project - Fit out of retail - Furla

Tenancy L07, T2MELBOURNE AIRPORT VIC 3045

C 10/07/2017 17/1565 MEL

MEL 17070 Cara Interior Project Management 26/06/2017 T2 Luxury Project - Fit out of WH Smith Tenancy

Tenancy T2 - W07MELBOURNE AIRPORT VIC 3045

C 12/07/2017 17/1583 MEL

MEL 17071 GHD Woodhead 27/06/2017 T2 Luxury Project - Fit out of Bally Store

Tenancy T2 - L08MELBOURNE AIRPORT VIC 3045

C 12/07/2017 17/1592 MEL

MEL 17072 Root Projects Australia 27/06/2017Trolley lift Project - Site facilities and Baggage Line relocation - Terminal 2 Reclaim Hall

Terminal 2 Reclaim HallMELBOURNE AIRPORT VIC 3045

C 12/07/201731/01/2018

17/1935-1 MEL 31/01/201817/1935-2 MEL

17/1935-V MEL

MEL 17073 Root Partnerships Australia 29/06/2017 Demolition of the existing check-in counters in Zone N & M. The base building works include new hard flooring, new wall and column cladding, new way finding signage and display screens, clean and paint existing ceiling. Service desks, exception desks, weigh scales and specialist joinery in Zones N, M & O.

Terminal 2 Level 1MELBOURNE AIRPORT VIC 3045

C 17/07/2017 17/1701 MEL

17/17701-V2 MEL

MEL 17074 Case Meallin & Associates 29/06/2017 Construction of a key room for the New T2 Departures Level Two Johns Tenancy. Key room has a 20m2 area including fridge panels, compressor unit and allocated power board

T2 Store Room ArrivalsMELBOURNE AIRPORT VIC 3045

C 17/04/2017

17/530-V MEL 22/09/2017

Page 15: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

MEL 17075 Mecca Brands Pty Ltd 4/07/2017Installation of Pallet Racking and long span shelving

Unit C1 - 7-11 Sky RoadMELBOURNE AIRPORT VIC 3045

C 19/07/2017 17/1695 MEL 23/08/201717/1695-A MEL

MEL 17076 Luxtralia Pty Ltd 5/07/2017 T2 Luxury Project: Fit out of Michael Kors Shop

Tenancy T2 L11MELBOURNE AIRPORT VIC 3045

C 20/07/2017 17/1638 MEL 23/08/2017

MEL 17077 Airside Projects Pty Ltd 5/07/2017 The old united airlines / air New Zealand lounges have been demolished in readiness for two new lounges. The AMEX lounge will have its entrance next to the existing Singapore lounge and the Plaza Premium lounge will have its entrance next to the Malaysian lounge. Both AMEX & Plaza are operated by the plaza group. The lounges will be separate but will share a common kitchen and toilet facilities. The approx. area is 700m2 which is located on lower departures abutting the arrivals corridors

T2 Ramp Level Concourse DMELBOURNE AIRPORT VIC 3045

C 11/08/2017 17/1639 MEL

MEL 17078 Beca Consultants Pty Ltd - Melanie Orr 7/07/2017 As part of Taxiway Victor project Building 70 was demolished and the Negri site compound was utilized as temporary staff accommodation for building 70 staff until a permanent arrangement was made. The site compound fence was amended to allow for airside access from the site compound. This BAC is to reinstate the fence to its original arrangement. NOTE: Installation of 2 x double gates (6m wide) to be reinstalled on eastern side of the compound) Gate 22 access road side). No new fence posts required as the fence posts are still there from before

Gate 22 Operations Road.MELBOURNE AIRPORT VIC 3045

C 24/07/2014 17/1669 MEL

MEL 17080 Donald Cant Watts Corke (Management) P/L

17/07/2017 Construction of a new ICT Store Room in the Multi Story Carpark Level 3, which includes stud walling, shelving, floor screed, power, lighting, fire protection, CCTV, IT Services and Hydraulics. The store will be used for storing ICT equipment relocated from the current ICT Store in T2 Apron Level @

Level 3 Short Term CarparkMELBOURNE AIRPORT VIC 3045

C 24/07/2017 17/1643 MEL

MEL 17081 TVD 17/07/2017 T2 Luxury Project: Retail fit out of new tenancy for Watches of Switzerland MELBOURNE AIRPORT VIC 3045

C 1/08/2017 17/1713 MEL

MEL 17082 George E Apted & Associates Pty Ltd 17/07/2017 Construction of new office partition and door and associated electrical works and room air conditioners. - Qantas Freight Terminal

Qantas Freight TerminalMELBOURNE AIRPORT VIC 3045

W -

MEL 17083 The Blueprint Pty Ltd 18/07/2017 Removal and replacement of the Qantas Branded external signage on T1 domestic terminal - External Façade of Qantas T1 domestic

T1 domestic terminal - External Façade of Qantas T1 domesticMELBOURNE AIRPORT VIC 3045

C 22/11/2017 17/1715 MEL

MEL 17084 Donald Cant Watts Corke (Management) Pty Ltd

18/07/2017 Installation of illuminated Terminal Identification Signage on the landside structure of Terminals 1 to 4 at Melbourne Airport

Terminals 1 to 4MELBOURNE AIRPORT VIC 3045

W -

MEL 17085 Root Partnerships 31/07/2017 Remove and depose of the existing aerobridges D5, D6, D7, D10 in Terminal 2 and bays E4, E7, F12, F13 in T3. Functional items such as the control

T2 & T2 @ Gates D5, D6, D7, D10,E4, E7, F12 & F13MELBOURNE AIRPORT VIC 3045

C 15/08/2017 17/1817 MEL

17/1817-V MEL

Page 16: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

system and hydraulic system will be recovered and kept for utilization as spare parts on other aerobridges at Melbourne Airport

MEL 17086 Root Partnership 1/08/2017 Minor external works in the Tri-Generation building area such as: Soft Landscaping, Boom Gate relocation, minor asphalt works and kerbs realignment works, new chain mesh gate installation, stockpile removal and other tidy up works.

Terminal 2 Level 1MELBOURNE AIRPORT VIC 3045

C 16/08/2017 17/1980 MEL

MEL 17087 Turner & Townsend Pty Ltd 1/08/2017 Fit out of existing area (previously Landside duty Free) to be used as new Staff and Goods Corridor with all new screening equipment. Installation of new light and power and cable reticulation. Installation of new fan coil units and modification to duct works. Installation of new access security control and CCTV. All new finishes, tiles and structural floor to the existing structure, reated at 5.0kPA - T2 Departures.

T2 Departures.MELBOURNE AIRPORT VIC 3045

C 13/09/2017

MEL 17088 Australia Postal Corporation 2/08/2017 Development of land for a warehouse extension to the existing Australia Post Facility, approx. 5000sqm in size, and including any associated external and building services works. This is to accommodate new sortation equipment and will be constructed in keeping with the existing building. Including air conditioning, new roller shutter/ rapid lift openings and all associated building services requirements. 13-25 APAC Drive

13-25 APAC DriveMELBOURNE AIRPORT VIC 3045

C 17/08/2017 17/1827-1 MEL

17/1827-2 MEL 17/11/201717/1827-3 MEL

17/1827-V MEL 2/05/2018

MEL 17089 The Blueprint Pty Ltd 3/08/2017 Removal & Replacement of internal illuminated wall mounted letters. Removal and & refurbishment of existing under awning boxes. Removes & replacement of Qantas window decals -

T1 QantasMELBOURNE AIRPORT VIC 3045

C 31/10/2017 17/1714 MEL

MEL 17090 Rodine Australia 7/08/2017 Enclose existing Comms room 9, Install fire rated doors, A/C Unit, Access control and modify fire services.

T2 North Baggage RoomMELBOURNE AIRPORT VIC 3045

C 7/9/2017 17/1879 MEL

MEL 17091 TM Commercial & Leisure 7/08/2017 Building 64 refurbishment works and office including external make good works and improvement works to Building 59 carpark

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 22/08/2017

MEL 17091 Stage 1 TM Commercial & Leisure 7/08/2017 Stage 1: Building 64 refurbishment works and office including external make good works and improvement works to Building 59 carpark

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 26/09/2017 17/1852-1 MEL

MEL 17091 Stage 1- V1 TM Commercial & Leisure 16/11/2017 Stage 1 Variation: Building 64 refurbishment works and office including external make good works and improvement works to Building 59 carpark Variation to Stage 1 - converting the space into a single occupied tenancy

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 5/12/2017

MEL 17091 Stage 2 TM Commercial & Leisure 16/11/2017 Stage 2: Building 64 refurbishment works and office including external make good works to Level 1 - Building 64

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 16/11/2017 16/3586-V MEL

Page 17: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Melbourne AirportMEL 17092 TM Commercial & Leisure 15/08/2017 Demolition works of numerous buildings

and footings to ground level, fencing, asphalt and hardstand areas, tree removals, disconnection/capping of services and relocation of demountable building

10 Marker RoadMELBOURNE AIRPORT VIC 3045

C 29/08/2017 17/1924 MEL

MEL 17093 Red Rock Airport Services Pty Ltd 21/08/2017T2 Luxury Project - Fit out of T2-S09 Retail tenancy Asian Restaurant. General fit out of food & beverage tenancy, including services @ Departures level Terminal 2 - Airside Satellite Precinct

Tenancy T2 S09MELBOURNE AIRPORT VIC 3045

C 5/9/2017 17/1949 MEL

17/1949-1A MEL

17/4949-2 MEL

MEL 17094 Newslink Pty Ltd 21/08/2017T2 Luxury Project – Fit out of new retail tenancy - The Melbourne Store @

Tenancy T2- W01MELBOURNE AIRPORT VIC 3045

C 5/9/2017 17/1962 MEL 06/10/2017

MEL 17095 Newslink Pty Ltd 21/08/2017 T2 Luxury Project - Fit out of new retail tenancy - Purely Merino

Tenancy T2-W06MELBOURNE AIRPORT VIC 3045

C 5/9/2017 17/1963 MEL

MEL 17096 RPSPM 28/08/2017Melbourne Domestic Club Business Lounge Refurbishment

Qantas Domestic Lounge, Melb Domestic Terminal (T1)MELBOURNE AIRPORT VIC 3045

C 21/12/2017 17/1989 MEL 21/12/2017

MEL17097 AECOM 28/08/2017 Construction of new access road from Sunbury Road / Oakland Drive to Taxiway Quebec/Romeo. Construction of new section of Perimeter Road from Building 52 to the existing northern perimeter fence. Construction of new Gate House Building including screening rooms and covered canopy, amenities and car park. Construction of controlled entry gate. Construction of storm water drainage to suit the road alignment and new paved areas. Upgrade of Substation 32 from 200kVA to 1000kVA. Provision of utilities - Water supply, Sewerage, HV electrical, LV electrical, ICT infrastructure, Street Lighting.

North Eastern Airfield areaMELBOURNE AIRPORT VIC 3045

W -

MEL17098 Luxtralia Pty Ltd 1/09/2017 T2 Luxury Project: Retail interior fit out for TUMI shop. New shop front, new internal works to walls, floors and ceiling including Fire & Mechanical Services and new joinery. - Shop T2-L06

Shop T2-L06MELBOURNE AIRPORT VIC 3045

C 15/09/2017 17/2038 MEL

MEL17099 Newslink Pty Ltd 5/09/2017 Fit out of new retail tenancy @ T4 MAC T4 MACMELBOURNE AIRPORT VIC 3045

C 20/09/2017 17/2039 MEL

MEL17100 Turner & Townsend Pty Ltd 7/09/2017 The scope of works is define as the reconfiguration, upgrade and fit-out of the existing T2 Security Hall Farewell Wall and Security Hall Entry. New ceiling to the entrance and queuing rea and upgrade to existing fins. Modifications and upgrades to existing building services systems due to increase in demand loads; including electrical, Comms, fire, access security control and CTV, mechanical and hydraulics with replacement light and power cable reticulation required. All new

Terminal 2 DeparturesMELBOURNE AIRPORT VIC 3045

C 25/09/2017 17/2072 MEL

Page 18: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

finishes, tiles and structural floor to the existing structure, rated at 5.0kPA @ Terminal 2 Departures

MEL 17101 Builtwise Construction Pty Ltd 11/9/2017 Installation of new storage racking. Additional of extra hose reel and emergency exit signs to suit proposed racking installation

Agility Logistics Sky Road EastMELBOURNE AIRPORT VIC 3045

C 26/9/2017 17/1642 MEL

MEL 17102 CBRE (GCS) P/L - Thomas Alsop 15/09/2017 Removal of manual entry gates to be replaced with automated entry gates as well as reconfiguration of ground floor amenities

45-55 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 2/10/2017 17/2122 MEL

MEL 17103 Sencillo Design Pty Ltd - 15/09/2017 Fitout of new existing tenancy within the international luggage check in area

T2 Pressed Juices - Site I.D. 1L8MELBOURNE AIRPORT VIC 3045

C 2/10/2017 17/2116 MEL

MEL 17104 Cara Interior Project Management 20/09/2017 Fitout of WH Smith T2 K05MELBOURNE AIRPORT VIC 3045

C 5/10/2017 17/2129 MEL

MEL 17105 Donald Cant Watts Corke (Mang) Pty Ltd 25/09/2017 Demolition of existing concrete pathways, installation of concrete islands and ramp, installation of boom gate assembly and associated services, installation of line marking and bollards (summary of scape provided in cover letter)

Level 2, TerminalMELBOURNE AIRPORT VIC 3045

C 11/10/2017 17/2162 MEL

MEL 17106 Apam - Colin Fowler 26/9/2017 Taxiway Zulu Program - CP 14038 Airfield Northern PrecinctMELBOURNE AIRPORT VIC 3045

W -

MEL 17107 Signed On (Aust) Pty Ltd Installation of steel gantry with light box over carpark exit lane @ Business Parking - Centre Road - Stage 3

Business Parking - Centre Road - Stage 3MELBOURNE AIRPORT VIC 3045

C 17/10/2017

MEL 17108 Air Menzies International (AMI) Pty Ltd 9/10/2017 Office and Warehouse fit out to new premises. Light works only required. Office: Gyrock walls & partitioning, electrical and data work, furniture, IT room, staff lunch room, access control and CCTV, signage. Warehouse: Racking, access control, CCTV, Hoist installation (for handling airline ULD equipment), cabinet x-ray machine installation, warehouse office (demountable), inspection areas, electrical and data signage @ Unit 1F, 19-21 Mace Way, Melbourne Airport

Unit 1F, 19-21 Mace Way, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 26/10/2017 17/2301-1 MEL

MEL 17109 Turner & Townsend Pty Ltd - Marc Whiffin

13/10/2017 To demolish the existing Healthy Habbits tenancy back to base build in preparation for the new Noodles tenancy. The fit out of Noodles is not part of this application. Works will include demolition of the existing tenancy bake to existing slab floor, removal of existing fittings, fixtures and services. Replacement of existing DB with new to meet with current Australia Standards -

Terminal 2 Departures.MELBOURNE AIRPORT VIC 3045

C 31/10/2017 17/2228 MEL

MEL 17110 TM Commercial & Leisure 1/10/2017 Building 59 permanent office refurbishment to accommodate Airside Operations to ground level with upgrade to existing services to meet compliance to level 1. Removal and relocation of temporary Airside offices and facilities currently installed in

Bld 59 - Bld 59 Service RoadMELBOURNE AIRPORT VIC 3045

C 30/10/2017 17/2229 MEL

17/2229-V MEL

MEL 17111 Entire Building Services Pty Ltd 19/10/2017 Build two separate offices inside an existing warehouse (Timber Frame

45-55 South Centre RoadMELBOURNE AIRPORT VIC 3045

W -

Page 19: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Plaster) Build 5 offices inside an existing open plan office (Metal stud, plaster, glass)

MEL 17112 Advisian Pty Ltd 20/10/2017 JUHI Tanks - Underground Services Investigation -

Marker RoadMELBOURNE AIRPORT VIC 3045

W -

MEL 17113 Direct Couriers (Melb) Pty Ltd 24/10/2017 Relocation and installation of pallet racking -

45-55 South Centre RoadMELBOURNE AIRPORT VIC 3045

W -

MEL 17114 Menzies Aviation (Cargo) 27/10/2017 Remove existing signage board from building. Replace with new light box with new MA Logo and lettering affixed to its own backboard panel.

1 APAC Drive - Menzies Cargo Facility.MELBOURNE AIRPORT VIC 3045

W -

MEL 17115 Donald Cant Watts Corke (Management) P/L

1/11/2017 Construction relation to payments, drainage, hydraulics, communications, electrical and ICT Systems. Additionally, it involves an element of co-ordination and interface with JUHI for works running parallel to the construction for the installation of new fuel line and associated infrastructure. These works are to cater for APAM's need for additional and domestic stand-off aircraft stands for bussing operations. The Foxtrot Apron works project therefore seeks to construct and activate the aircraft stands F21 to F25, inclusive, and associated apron works to the meet this requirement.

End of current existing Pier F, Foxtrot infill area and around- about area to the north of the Foxtrot infill.MELBOURNE AIRPORT VIC 3045

C 17/11/2017 17/2262 MEL

MEL 17116 Turner & Townsend Pty Ltd 3/11/2017 Refurbishment of 5 Offices & storage tenancies in T2 & T3. Sita Office Site ID STD42, Red Rock Site ID 11128, Thai Airways Office and Kitchenette Site ID 11096, Gate Gourmet Office Site ID STA30, Menzies Engineering Office Site ID 11170 -

Terminal 2 & 3 Landside & Airside MELBOURNE AIRPORT VIC 3045

C 20/11/2017 17/2357 MEL

MEL 17117 Root Partnerships 8/11/2017New Departures Drive Ramp Lighting project to replace existing lighting and switchboards

T2 Terminal Departures Drive.MELBOURNE AIRPORT VIC 3045

C 27/11/2017 18/7001-1 MEL

18/1071-2 MEL

MEL 17118 HS Rekaris 17/11/2017 Proposed warehouse racking and associated works -

4-12 Reid WayMELBOURNE AIRPORT VIC 3045

C 5/12/2017 16/7474-3A & 3B MEL5/12/2017 & 13/12/2017

MEL 17119 Donald Cant Watts Corke (Management) P/L

21/11/2017 Construction of infrastructure relating to the separation of new spaces, new entry and exit points, new line marking arrangements, new ICT systems and a new modular toilet facility to service the Uber holding area.

Existing Value Long Stay carparkMELBOURNE AIRPORT VIC 3045

C 7/12/2017 17/2351 MEL 19/01/201817/2351-V MEL

MEL 17120 Vic-Roads 29/11/2017Installation of Safety Barrier, widening works, drainage works, and other associated civil works.

Sunbury Road, Melbourne Airport Between Tullamarine Freeway and Oaklands RoadMELBOURNE AIRPORT VIC 3045

C 14/12/2017 17/2529 MEL

MEL 17121 APAM 6/12/2017 - Building works for the Business Park Service Station, works to include: The Service Station Control Building and retail areas, Petrol Station canopy, signs, fuel bowsers, fuel tank farm and all associated works. Carpark, hardstands and landscaping. Builders temporary site sheds, fencing and all temporary services, inclusive of all contractors, all services required for the works, LV, Gas, Power,

Corner of Link Road , Airport Drive and Watson Drive - Business ParkMELBOURNE AIRPORT VIC 3045

W -

Page 20: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Lighting, Water, Drainage, Grease Traps, etc. Line marking signage, landscaping.

MEL 17122 APAM 6/12/2017 - Civil and infrastructure works required for the Business Park Service Station, the works to include: Road, Footpaths, kerbs and channels, Drainage, Water, High Voltage substation and cable reticulation, Low Voltage services, ICT etc. Street Lighting, Line marking, signage, landscaping.

Corner of Link Road, Airport Drive and Watson Drive - Business ParkMELBOURNE AIRPORT VIC 3045

W -

MEL 17123 Essendon Football Club 13/12/2017 4 light Towers to be installed on our Etihad size ground

Melrose Drive TullamarineMELBOURNE AIRPORT VIC 3045

C 10/01/2018 17/2146 MEL

MEL 17124 Construction Specialists Pty Ltd 19/12/2017 Relocation and installation of pallet racking - 101-111 South Centre Road

101-111 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 11/01/2018 17/2264 MEL

MEL 17125 Wood Group PSN Australia Pty Ltd 19/12/2017 JUHI PROJECT: Installation of 2 x additional 10ML Jet A1 tanks and associated infrastructure- 10-22 Marker Road

10-22 Marker RoadMELBOURNE AIRPORT VIC 3045

C 11/01/2018 17/2562 MEL

MEL 17125 Mobil Oil Australia Pty Ltd - Garth Norman

23/01/2018 JUHI PROJECT: Phase 2 - Jet Fuel Tanks and Foundations (Installation of two additional Jet Fuel Tanks and associated infrastructure.

10-22 Marker RoadMELBOURNE AIRPORT VIC 3045

C 08/02/2018

MEL 17125 Mobil Oil Australia Pty Ltd - Garth Norman

19/03/2018 JUHI PROJECT: Phase 3 - Jet Fuel Tanks and Foundations (Installation of two additional Jet Fuel Tanks and associated infrastructure. Final works and supporting infrastructure.

10-22 Marker RoadMELBOURNE AIRPORT VIC 3045

C 03/04/2018

MEL 18001 Ontoit Global Pty Ltd 3/01/2018 "The project involves upgrades to Sky Bus’s leased areas including:- Reconfiguration of corralling and ticketing areas (T1, T3 & T4)- Installation of 3 new ticket booths on these sites- Installation of 4 e-kiosk stands in each external area T1, T3 & T4- Installation of 5 e-kiosks across two locations in T4 internal area- Civil works to T4 forecourt.The works are planned in two stages: 1. T4 internal works, 2. T1, T3 and T4 external works(Note, the T2 works shown on the attached drawings are currently on hold, pending the proposed T2 redevelopment)."

T4 Forecourt,- T4 Internal,- T3 Forecourt,- T1 ForecourtMELBOURNE AIRPORT VIC 3045

C 22/01/2018 18/18 2-1 MEL 13/04/2018 1

MEL 18001 Stage 2 Ontoit Global Pty Ltd / Ash Ellawala Stage 2: The project involves upgrades to SkyBus's T2, T3 and T4 external Leased areas including: T1 & T3 T4 - ALL REMAINING WORKS

T1, T2 & T4 forecourt - SkyBus Facilities UpgradeMELBOURNE AIRPORT VIC 3045

C 19/06/2018 8/182-2 MEL

MEL 18002 Donald Cant Watts Corke 10/01/2018 Balustrade Repair Project: This project involves the repairs to 327 STCP Parapets / Concrete Balustrade Panels highlighted as loose in Multi-Level Car Park Expansion Stage 2. This includes

All levels Short Term Carpark,MELBOURNE AIRPORT VIC 3045

C 01/02/2018

Page 21: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

installing steel brackets to each identified balustrade panel as per design drawings provided by AECOM which are to withstand impact loads of 30kN and 240kN dependent on the area in the carpark.

MEL 18003 CMW Design & Construct ( Vic) Pty Ltd 15/01/2018 Installation of Pallet Racking, Long Span Shelving and Picking Bins. Installation of Zone Routing Conveyor System

107-113 Link RoadMELBOURNE AIRPORT VIC 3045

C 31/01/2018

MEL 18004 Root Partnerships Australia Pty Ltd 15/01/2018 T2 Replacement of Aerobridge Elevating Links (Like for like) @ Delta Concourse: Replace Aerobridges Elevating Links at D4, D5, and D6 & D7. These works will be carried out concurrently with Aerobridge replacement works (Ref MEL 17085).

Terminal 2 @ Gates: D4, D5, D6 & D7MELBOURNE AIRPORT VIC 3045

C 31/01/2018

MEL 18005 Blue Fire Systems – Brett Sheppard 22/01/2018 Supply and installation of a Novec 1230 Fire Suppression System. Associated installation works are as follows: - Installation of VESDA conduit and head unit - Minor modification of the existing fire detection system - Installation of a Novec 1230 gas bottle - Installation of gas pipe and nozzles

Building 277 (ALER 1) Met RoadMELBOURNE AIRPORT VIC 3045

C 07/02/2018

MEL 18006 CMW Design & Construct 22/01/2018 Construction of a new 7,000m2 warehouse with a 1,000m2 single storey office, associated car parking, hardstand and amenities. Connection to existing infrastructure services.

48-54 Operations RoadMELBOURNE AIRPORT VIC 3045

C 9/02/2018 18/431-1 MEL 19/03/201818/431-2 MEL 31/05/2018

MEL 18007 Donald Cant Watts Corke 23/01/2018 Fit out of food a beverage tenancyTerminal 2 Landside NoodlesMELBOURNE AIRPORT VIC 3045

C 08/02/2018

MEL 18008 Trio Plumbing 24/01/2018 Rectification and replacement of 75 apron slabs installed as part of the Southern Apron Expansion Project to correct levels and grading for compliance. Stage 1: will be undertaken first, rectifying 46 slabs with the temp closure of stand Hotel 2. Stage

Airfield, aircraft stand Hotel 2 and Hotel 3MELBOURNE AIRPORT VIC 3045

C 30/01/2018

MEL 18009 CMW Design & Construct 25/01/2018 Extension of the 225mm water main Cargo Road to the existing 300mm water main airside

Cargo Road, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 12/02/2018

MEL 18010 The Just Group 5/02/2018 Fit out of new Peter Alexander tenancy within T4

T4 DeparturesMELBOURNE AIRPORT VIC 3045

C 20/02/2018

MEL 18011 Airport Retail Enterprises 8/02/2018 Install a cool/freezer room within a store room partitioned by wire mesh

T2 Apron LevelMELBOURNE AIRPORT VIC 3045

C 28/02/2018

MEL 18012 Entire Building Services Pty Ltd 14/02/2018 Build two separate offices inside an existing warehouse (Timber Frame Plaster) & Build 5 offices inside an existing open plan office. (Metal stud, plaster glass)

101-111 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 1/03/2018 17/2242 MEL

MEL 18013 Umbarra Services Group P/L 15/02/2018 Remove and replace (foam) fire suppression system in commercial kitchens x 3.

Qantas catering facility Tullamarine Airport East StMELBOURNE AIRPORT VIC 3045

C 18/04/2018

MEL 18014 Country Road Group 20/02/2018 Demolition of fit out in Tenancy S5 - Ternary

T4 DeparturesMELBOURNE AIRPORT VIC 3045

C 7/03/2018

MEL 18015 DNATA Airport Services P/L - JH Choi 23/03/2018 Install 14 sets of new ULD build up & breakdown workstations with caster

DNATA 27-35 APAC DriveMELBOURNE AIRPORT VIC 3045

C 10/04/2018

Page 22: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

decks to minimize forklifts movement in the warehouse. Install 2 set of Universal decks including weighing scales for ULD turning to align ULD to the dolly under airside canopy area. Install caster deck platform with powered lead-on roller or ULD's transfer from/to dolly under air-side canopy area.

MEL 18016 Airside Projects P/L - Nikki Zhang 17/04/2018 The Plaza Premium & American Express Lounges consist of a shared amenity zone where the PWD toilet requires constructing additional shower facility. The proposed works in the PWD toilet include plumbing services for shower and to make existing walls and floors to comply with water resistant requirements.

T2 Lower Departures Concourse DMELBOURNE AIRPORT VIC 3045

C 03/05/2018

MEL 18017 Turner Townsend Thinc P/L - Daniel Scriva

17/04/2018 Wave Park - Works Package 1: Earthworks and includes clearing and grubbing, bulk excavation and stockpiling of fill, screening and sorting of unsuitable material (e.g. basalt floaters) and construction of storm water drainage.

6 Watson DriveMELBOURNE AIRPORT VIC 3045

C 05/05/2018 17/711-1 MEL

MEL 18018 Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion of Foxtrot Apron.

Foxtrot PierMELBOURNE AIRPORT VIC 3045

C 7/05/2018

MEL 18019 George E Apted & Associates P/L - George Apted

30/04/2018 Proposed new steel framed awning to south end of Qantas freight terminal

Qantas Freight TerminalMELBOURNE AIRPORT VIC 3045

C 30/05/2018 BAN-18-MEL-0059

MEL 18020 MST Building & Main - Michael Taylor 25/05/2018 Minor office alterations to main office building - Level 1 - Toll IPEC

11 Steel WayMELBOURNE AIRPORT VIC 3045

C 14/06/2018 18/1058 MEL

MEL 18021 CMW Design & Construct (Vic) P/L - Tom Carlisle

8/06/2018 Installation of office partitions and workstations ( no electrics involved in these works)

Porsche Cars Bld C2 8-10 Steele WayMELBOURNE AIRPORT VIC 3045

C 25/06/2018 BAN-18-MEL-0048

MEL 18022 GHD Woodhead - Padraig Sinnott 5/07/2018 Refit and Expansion of Arrivals Duty Free Store for Dufry

Terminal 2 Arrivals (International) MELBOURNE AIRPORT VIC 3045

C 23/07/2018 BAN-18-MEL-0057

3 Turner & Townsend Pty Ltd 15/02/2018 Installation of one additional UPS unit, which will provide Distributed UPS power to the Check-In West Comms Room and 4 additional banks of Check-In counters. Existing IDF frame containing the UPS units and communications equipment is at capacity and will be expanded. Room entry reconfiguration to wider kit-kat door style opening. The existing CRAC units are prone to failure and have been deemed unfit for purpose and are therefore also to be replaced.

T2 CIC Communications Room West (T2 Departures Hall)MELBOURNE AIRPORT VIC 3045

C 20/02/2018

10 Australia Pacific Airports Corporation Limited

23/02/2018 Install two FID screens and one advertising screen including frame and required electrical/data in T4 food court

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 09/03/2018

11 Root Partnerships 26/02/2018 Replacement of traditional CIC to ABD units and site facilities

Landside : T2 Departures hall Terminals : T2MELBOURNE AIRPORT VIC 3045

C 14/03/2018 BAN-18-MEL-0037

15 Airside Projects P/L 07/05/2018 The works is for the raising of the external pavement outside of the building to enable

DNATAMELBOURNE AIRPORT VIC 3045

C 24/05/2018 18/148-70 MEL

Page 23: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

level access to the loading dolly and rollers. This will involve laying a new section of concrete over the existing pavement. The size will be approx. 44 metres x 4 metres and less than 200mm in depth.

21 Donald Cant Watts Corke (Management) Pty Ltd

05/03/2018 In summary, the scope of works includes:• Construction of an extension to the fixed link at D10 including new bussing platform at Apron Level to facilitate bussing arrivals and departures• Installation of additional glass partitions and reconfiguration of existing services at D15 to enable both bussing departures & arrivals.• Reconfiguration of the existing terminal building at D20 including new bussing platform at Apron Level to facilitate bussing arrivals and departures

T2 Bussing Enhancement Project located airside at gates D10, D15 & D20.MELBOURNE AIRPORT VIC 3045

C 30/04/2018 BAN-18-MEL-0070

26 Airport Data & Electrical 08/03/2018 The North and South Data Centre’s do not have sufficient redundant cooling capacity to support failover in the event of the failure of the Kyoto Wheel. The scope of this project is to procure and commission additional Air Conditioning units in the North and South Data Centre to build redundant cooling capacity.

Landside : Data Centre North (DCN) and Data Centre South (DCS)MELBOURNE AIRPORT VIC 3045

R -

32 Turner & Townsend Pty Ltd 15/03/2018 Vacuum hazardous material containing dust from lift shaft and removal of hazardous materials components within lift 5 & 6.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 3/04/2018

35 Trio Plumbing Australia Pty Ltd 13/03/2018 T2 RE-ROOF & T2 PARAPET CAPPING & MAINTENANCE WORKS

Landside : Departure DriveTerminals : T2MELBOURNE AIRPORT VIC 3045

C 09/04/2018

36 Australia Pacific Airports Corporation Limited

13/03/2018 Smoke zone adjustments required to enable the WH Smith kiosk to be installed, MEL 17104, down in Pier D (DG 12-20).Works include adjusting the smoke baffles (re-use existing if possible and match existing), re-programming smokes to the adjusted zone and install a smoke damped within an existing AHU.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 29/03/2018

39 TM Commercial Pty Ltd 15/03/2018 Stage 1 – New Male Amenities to T4 Level 1 as enabling works for Stage 2, including partitions, buildingservices and fit outStage 2 – Demo of existing Male amenities, new access to Level 2, and fit out of services and finishesto Level 2 tenancy for office accommodation, including roof penetrations for skylights.Stage 2 consent to be issued separately.

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 09/04/2018BAN-18-MEL-0099

40 AECOM Australia Pty Ltd 15/03/2018 Construction of protection barriers along Sunbury Road to protect HIALS 27 structure.

Landside : Sunbury Road near HIALS 27 StructureMELBOURNE AIRPORT VIC 3045

CW

28/03/201820/06/2019

Page 24: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

43 Root Partnerships 20/03/2018 Installation of lifting equipment to move bags of outbound carousel to trolleys in the T4 bag room as part of works to have Work safe PIN removed

Airside : T4MELBOURNE AIRPORT VIC 3045

C 29/03/2018 18/148-88 Mel

47 UBERCON PTY LIMITED 22/03/2018 NT Safe Access Walkway 1. Supply & install new walkway on top of the existing bulkhead for access to clean the existing windows2. Modify the existing handrail on the stairs, supply & install new door for access to new walkway3. Make good existing bulkhead4. Paint to match existing

Landside : T4 & Terminals : T4MELBOURNE AIRPORT VIC 3045

C 05/04/2018

49 Root Partnerships 26/03/2018 Works involve the installation of new facilities for new sprinkler Pumps and Tanks in key locations, These installation shall provide reliable and independent water supply to the fire Sprinkler systems protecting the terminal. An existing contractor who is on site will be engaged and the current site facilities used.

Airside : T2 Gates, T3 F concourse and T1 Landside : TSBMELBOURNE AIRPORT VIC 3045

C 06/04/2018

50 SPOTLESS FACILITY SERVICES PTY LTD 26/03/2018 Comprehensive Removal of and Replacement of Concrete Slabs to Loaders Yard and Driveway

Landside : Menzies Cargo Terminal APAC DriveMELBOURNE AIRPORT VIC 3045

R -

51 SPOTLESS FACILITY SERVICES PTY LTD 26/03/2018 INSTALLATION OF WASTE WATER REMOVAL SYSTEM TO ALL LEVELS OF T 4 CAR PARK

Car Parks : @T4Landside : T4 CAR PARKMELBOURNE AIRPORT VIC 3045

C 10/04/2018

52 AECOM Australia Pty Ltd 28/03/2018 Non Destructive Investigations for Northern Access Route project to determine location of services

Airside : Northern Access Route areaMELBOURNE AIRPORT VIC 3045

R -

57 Beca Consultants Pty Ltd 06/04/2018 1 - Rigid Pavement Replacement. Replacement of rigid pavement on Taxiway Bravo.2 - Shoulder PavementReplacement of shoulder (asphalt) pavement and installation of blast pavement.3 - Subsoil DrainageSubsoil drainage to be installed on the southern side of Taxiway Bravo.4 - Airfield Ground Lighting (AGL)Removal and replacement of AGL cans, secondary cables and SITs affected by the works, including; upgrade of Taxiway Charlie to enable use during runway visual range (RVR) conditions <350m.

Airside : Taxiway Bravo &amp; Taxiway CharlieMELBOURNE AIRPORT VIC 3045

C 23/04/2018

58 Root Partnerships 09/04/2018 The Project involves the supply, installation and commissioning of a new Sewer Monitoring Station system connected to the existing main sewer outfall pipe adjacent to

Landside: Located just inside the Melbourne Airport southern boundary adjacent to Annandale Road Tullamarine.MELBOURNE AIRPORT VIC 3045

CW

27/04/201820/06/2019

Page 25: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Annandale Road.

70 CMW Design & Construct (Vic) Pty Ltd 18/05/2018 Construction of a 1500 diameter storm water drain linking the Geodis site to the Link Road storm water system.

Business Park TenancyMELBOURNE AIRPORT VIC 3045

C 30/05/2018

79 Donald Cant Watts Corke (Management) Pty Ltd

31/05/2018 These works are to be completed as part of the broader CP17028 Foxtrot Apron Works Project. To facilitate the construction of the overall project, the current parking positions of REX's aircrafts, at the western end of Pier F, need to be relocated. A suitable space has been determined for REX's aircrafts on the Sierra Infill apron and these works are required to modify this space to make it REX compliant.

Airside : Sierra Infill Apron - West of Pier G MELBOURNE AIRPORT VIC 3045

R -

80 A.G COOMBS PTY LTD 01/06/2018 Installation of 12-off additional surface mounted thermal energy meters to the chilled water system. All thermal energy meters to be connected to BMS system.

Airside : Service TunnelsLandside : Service TunnelsMELBOURNE AIRPORT VIC 3045

C 15/06/2018 18/148-117 MEL

86 Trio Plumbing Australia Pty Ltd 07/06/2018 Replace T2 roof & canopy on Departure Drive

Landside : Departure DriveTerminals : T2MELBOURNE AIRPORT VIC 3045

R -

87 Rodine Australia Pty Ltd 16/06/2018 Building 59 - Permanent Staff Accommodation Fit Out Works. Works required are demolition of existing conditions, new layout and refurbishment works. A small extension involved to the Kitchen/lunch room area. This extension is built using an Engineered Structural System by Hopley's

Airside : Building 59, Service Road, Melbourne AirportLandside : Building 59, Service Road, Melbourne AirportMELBOURNE AIRPORT VIC 3045

R -

90 TM Commercial Pty Ltd 12/06/2018 T4 Mezzanine fit out works to accommodate approximately 190 workstations, including meeting rooms, EOT facilities, break out spaces and Executive areas. The works will take place on T4 Mezzanine (Level 2)

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 16/07/2018BAN-18-MEL-0099

91 Donald Cant Watts Corke (Management) Pty Ltd

14/06/2018 The works comprise the provision of 2 new substations and a recycled water connection in the Business Park to service the Wave Park site which is bounded by Airport Drive, Melrose Drive and Watson Drive.SUBSTATION 124 - 1No. 1MVA substation will be located off Melrose Drive. SUBSTATION 125 - 1 No. 2.5MVA Substation will be located off Airport Drive at the South West Boundary of the Wave Park site.RECYCLED WATER CONNECTION will be located on Watson Drive to the South East corner of the site.

Business Park Tenancy: The works are located along Melrose Drive, Watson Drive and Airport Drive.MELBOURNE AIRPORT VIC 3045

C 25/06/2018BAN-18-MEL-0053

92 Turner & Townsend Pty Ltd 15/06/2018 • install 32 new self-service kiosks and 8 exceptions to replace the existing kiosks;• install 18 new automated bag drop units to replace traditional check-in counters; • realignment and reconfiguration of the take away belt; and• installation of new conveyor low height security screen

Terminals : T3MELBOURNE AIRPORT VIC 3045

C 10/07/2018BAN-18-MEL-0061

Page 26: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

94 Civilex Victoria Pty Ltd 16/06/2018 Dynamic Lane Allocation Early works package. Scope includes construction of guardrails along terminal drive and relocation of 1 Light-pole at G2 location. Construction of guardrails will involves excavation, removal of PFAS, concreting works, minor traffic management and installation works.

Landside : Terminal Drive, Various locationsMELBOURNE AIRPORT VIC 3045

C 03/07/2018BAN-18-MEL-0073

95 Root Partnerships 18/06/2018 Monitoring station for sewer discharge. Works are going to go out to tender on a D&C contract.

Landside : Annandale RdMELBOURNE AIRPORT VIC 3045

CW

26/06/201826/06/2019

98 Root Partnerships 21/06/2018 Installation of stainless steel water main under T2 satellite to allow abandonment of old in ground pipework. ( Please note works require no digging, all works above ground )

Airside : T2 SatelliteMELBOURNE AIRPORT VIC 3045

C 05/07/2018BAN-18-MEL-0054

100 Rodine Australia Pty Ltd 25/06/2018 Construct new bussing platforms at D10 and D20. Segregate D15 A&B at Departures level

Airside: D10 &amp; D20 Apron level. D15 departures levelMELBOURNE AIRPORT VIC 3045

R -

101 John Holland Group Pty Ltd 26/06/2018 Design and Construct for the provision of ceiling mounted air conditioning units and air curtains to the T4 Staff and Goods Screening area and installation of new or modification of existing automated doors to enclose the new air-conditioned space created.

Terminals : T4MELBOURNE AIRPORT VIC 3045

R -

102 Root Partnerships 28/06/2018 T3 Entry Alterations and T1 Taxi Lane Extension

Landside : T3 Entry and T1 Taxi LaneTerminals : T1,T3MELBOURNE AIRPORT VIC 3045

C 17/07/2018BAN-18-MEL-0194

103 John Holland Group Pty Ltd 28/06/2018 Design and Construct Contract for the provision of ceiling mounted air conditioning units and air curtains to the T4 Staff and Goods screening area and installation of new, or modification of existing automated doors to enclose the new air-conditioned space created.

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 18/07/2018BAN-18-MEL-0051

105 Civilex Victoria Pty Ltd 04/07/2018 Bored pile foundation works, construction of pile caps and plinths, fabrication and install of new overhead VMS gantries including columns along Terminal Drive. Removal of existing gantries G2 & G3 once new structures are commissioned.

Landside: Centre Rd &amp; Terminal Drive Intersection.MELBOURNE AIRPORT VIC 3045

C 17/07/2018BAN-18-MEL-0076

109 Donald Cant Watts Corke (Management) Pty Ltd

04/07/2018 Carrying out of structural rectification works to the Terminal T123 Car Park at Melbourne Airport across all levels. The works involve the following:- Concrete repair of spalled and delaminated concrete including areas of exposed reinforcement with low concrete cover- Sealing of cracks on the wearing surface and soffit of concrete decks. - Replacement of defective sealant joints and expansion joint covers- Re-fixing of sagging permanent formwork- Miscellaneous repairs

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 18/07/2018BAN-18-MEL-0071

110 TM Commercial Pty Ltd 04/07/2018 Prototype Rooms for the Square Hotel. Landside : Within Building 64 (north) R -

Page 27: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

These are a temporary installation to verify finishes and brand standards, expected to be in place for approximately 12 -18 months. They will be unoccupied other than occasional inspections by contractors & stakeholders.

MELBOURNE AIRPORT VIC 3045

112 Civilex Victoria Pty Ltd 06/07/2018 Civil works to complete trenching, footing excavation and conduit installation along Terminal Drive to support new gantry structures.

Landside : Terminal Drive, Gantry 2 &amp; 3MELBOURNE AIRPORT VIC 3045

C 17/07/2018BAN-18-MEL-0084

114 Turner & Townsend Pty Ltd 10/07/2018 With expected passenger growth, and current ageing infrastructure and mechanical equipment, 2 of. Lifts (part of the Lift Upgrade Project) in Terminal 2 are being upgraded to minimize disruption to passenger and staff movements. Lift 14, 15 works include upgrading door system, upgrading Hydraulic ram, and modernizing the interiors.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 26/07/2018BAN-18-MEL-0103

115 CMW Design & Construct (Vic) Pty Ltd 11/07/2018 Geodis Fit Out Works Business Park Tenancy : 48-54 Operations RoadMELBOURNE AIRPORT VIC 3045

C 06/08/2018BAN-18-MEL-1095

117 Turner & Townsend Pty Ltd 12/07/2018 Refurbishment of car park lift no's 22, 23, 24, 25, 26 and 27 Including installing 3D door protection units and upgrading/replacing door system, hoisting machines, landing fixtures, car operating panels and modernizing the interiors.Two lifts (1 on each side) will be taken out for installing/ upgrading at a time. Lift doors will be hoarded at the landings top and ground floor landings.

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 25/07/2018BAN-18-MEL-0110

121 Civilex Victoria Pty Ltd 17/07/2018 Package includes all electrical and ICT works necessary to provide electrical and data services to overhead gantries and supplementary control equipment. Specifically running cables through conduit, installation of cable trays, installation of all electrical/ICT equipment, fit off and termination of equipment, isolation and switchboard works.

Landside : Terminal Drive,MELBOURNE AIRPORT VIC 3045

C 27/07/2018BAN-18-MEL-0130

125 Root Partnerships

20/07/2018

Replacement of existing Air Handling Unit within Plant room 3, T2. The AHU services T2 Arrivals Duty Free.

Airside : Plant room 3, T2 Terminals : T2MELBOURNE AIRPORT VIC 3045

C 31/07/2018BAN-18-MEL-0194

126 Turner & Townsend Pty Ltd

06/08/2018Lift 30 works include upgrading door system and replacing landing/ lift car door panels

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 01/08/2018BAN-18-MEL-0151

132 A.G COOMBS PTY LTD 31/07/2018 Lift 30 works include upgrading door system and replacing landing/ lift car door panels

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 20/08/2018BAN-18-MEL-0154

133 Turner & Townsend Pty Ltd 01/08/2018 Installation of 250mm diameter (flow and return) chilled water pipe to connect to Concourse C to TSB2 in order to increase the cooling capacity in this area. All works are located in the service tunnel area as shown on design report and shop

Airside : In between T1 Concourse C and T1 Concourse B - Service TunnelLandside : In between T1 Concourse C and T1 Concourse B - Service TunnelMELBOURNE AIRPORT VIC 3045

C 27/08/2018BAN-18-MEL-0169

Page 28: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

drawings.The existing connection points are located at Concourse C and TSB2 respectively and currently have blanked valves for connecting to.

134 Turner & Townsend Pty Ltd 01/08/2018 Installation and commissioning of two (2No.) new LED technology based advertising super screens (24 meter wide x 13.2 meter high) on the eastern façade (car ramp structures) of the Terminal 4 (T4) Multi Level Structure (MLS) car park. Scope of works includes structural steel works and electrical power / data works. New super screen structures will use the existing advertising banner steel frames but these will be modified / strengthened to support the new LED screens.

Car Parks : @T4MELBOURNE AIRPORT VIC 3045

CW

15/08/201820/06/2019

135 Australia Pacific Airports Corporation Limited

02/08/2018 VIP Lane UpgradeCeiling Upgrade to remove the old fin type structure. All associated Lighting and power to accommodate.The perforated ceiling panels span across two different ceiling heights across the security hall.New Fire Protection and Detection and Mechanical upgrades to suit.An increased Tile scope including Hearing Loops between ABF and Dufry.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 21/08/2018BAN-18-MEL-0178

142 AIRSERVICES AUSTRALIA 03/09/2018 Construction of ATSC Building and Building Services Centre.

Landside : Melbourne ATSC siteMELBOURNE AIRPORT VIC 3045

C 02/10/2018BAN-18-MEL-0173

144 Programmed Maintenance Services Limited

15/08/2018 Install Programmed signage (predominately sticker signage) to Building 64 and T2 Block 5 office.

Airside : T2 Block 5 Access Doors to workshop/officeLandside : Building 64MELBOURNE AIRPORT VIC 3045

C 29/08/2018BAN-19-MEL-0073

146 Turner & Townsend Pty Ltd 13/08/2018 To create a new dedicated communication room with in the T2 Inbound bag room, located under the stairwell.The room to be sealed and incorporated all, mechanical, electrical, data, hydraulics and fire protection and fire detection services.

Airside : Terminal 2 Arrivals, Inbound Bag Room adjacent Delta 2MELBOURNE AIRPORT VIC 3045

C 30/08/2018BAN-18-MEL-0095

147 Turner & Townsend Pty Ltd 13/08/2018 The project involves the reconfiguration of the existing T2 Joint APAM / BHS Comms Room (located near LoadingDock 2 Security Point), with the primary intention of separating the existing space into separate APAM and BHSComms Rooms.

Airside : T2 Terminal 2, ApronMELBOURNE AIRPORT VIC 3045

R -

149 Turner & Townsend Pty Ltd 15/08/2018 The project involves the reconfiguration of the existing T2 Joint APAM / BHS Comms Room (located near Loading Dock 2 Security Point), with the primary intention of separating the existing space into separate APAM and BHS Comms Rooms.

Airside : T2 Loading Dock 1MELBOURNE AIRPORT VIC 3045

C 30/08/2018BAN-18-MEL-0077

150 Turner & Townsend Pty Ltd 15/08/2018 Refurbishment of Terminal lift no's 1, 2, 10, 21, 31, 35 and 38

Terminals : T2,T3MELBOURNE AIRPORT VIC 3045

C 30/08/2018BAN-18-MEL-0200

Page 29: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Including upgrading/replacing door system, machines, controllers, modernizing the interiors, Hazard and risk assessments to meet current code requirements

151 Programmed Maintenance Services Limited

15/08/2018 Fenced area to be installed in the T2 Penthouse, for United Lift Service to utilize as a material storage area and tool storage.

Landside : T2 Penthouse Plant RoomMELBOURNE AIRPORT VIC 3045

C 30/08/2018BAN-19-MEL-0074

159 CLA TRADING PTY LTD 24/09/2018 Refurbishment and new fit out of current Europcar retail location located in the main car park area directly opposite terminal 3 building. All new internal design with some external signage to replaced also.

Car Parks : @T3MELBOURNE AIRPORT VIC 3045

C22/10/2018

BAN-18-MEL-0185

166 Signed On (Aust) Pty Ltd 09/08/2018 LIGHTBOX INSTALLATION TO ATCP123 ENTRANCE CANOPY ON LEVEL 3.

Car Parks : @T3MELBOURNE AIRPORT VIC 3045 C 10/09/2018 BAN-18-MEL-0192

167 Signed On (Aust) Pty Ltd 28/08/2018 INSTALLATION OF 1 NO. FLEXFACE LIGHTBOX SIGN TO AT4 CARPARK - LEVEL 6 EXTERIOR.

Car Parks : @T4MELBOURNE AIRPORT VIC 3045

R _168 Retail PMS (Vic) Pty Ltd 03/09/2018 Retail fit out of Kathmandu store located

within the T2 International terminal at Melbourne Airport Departures, works to include:- Construct walls- timber ceiling feature- LED lighting throughout- vinyl floor files- proprietary wall post system, counter & credenza and misc. loose joinery- 2 stacking door closures- louvered BOH door to maintain the airflow- Kathmandu signage and light box to shopfront

Airside : Tenancy W13 T2 International terminalTerminals : T2MELBOURNE AIRPORT VIC 3045

C 24/09/2018BAN-18-MEL-0207

170 ISG MANAGEMENT PTY LTD 29/08/2018 Provide commercial lead in to 42 Francis Briggs Road.

14m P50 road crossing o/s 42 Francis Briggs Road. Install 2xP5 pits each side of road crossing. Bore of 70m on nature strip to extend network down to lead in. Hauling and jointing of 10pr cable to MDF inside no. 42 Francis Briggs Road.

Business Park Tenancy : 42 Francis Briggs RoadCar Parks : ContractorMELBOURNE AIRPORT VIC 3045

C 03/10/2018BAN-18-MEL-0340

172 PROMPCORP PTY LTD 03/09/2018 Reinforce wall and install TV screen to Melbourne Meeting Room, Level 2, Terminal 2 and associated works.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 21/09/2018BAN-18-MEL-0174

173 TM Commercial Pty Ltd 06/09/2018 Stage 3 T4 Mezzanine fit out works to accommodate approximately 190 workstations, including meeting rooms, EOT facilities, break out spaces and Executive areas.The works will take place on T4 Mezzanine (Level 2)

*Note these works have already received consent under Approval Number 90. A

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 13/09/2018BAN-18-MEL-0099

Page 30: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

PERCOW was already raised (Stage 2 works) under this application and a separate PERCOW was not able to be raised. Can you please issue approval for lodgment of PERCOW

174 Root Partnerships 07/09/2018 Satellite Water Ring Main installation. Airside : perimeter of Delta concourse "satellite"MELBOURNE AIRPORT VIC 3045

W -

178 Programmed Maintenance Services Limited

10/09/2018 Install additional bollards at the top and bottom of the escalators at the T4 Carpark on Ground Level & Level 2.

Car Parks : @T4MELBOURNE AIRPORT VIC 3045

C 25/09/2018 No ABC Permit will be issued

179 Programmed Maintenance Services Limited

16/10/2018 Addition of partition walls to the T2 Parents Room behind McDonalds and a additional GPO for power in this cubicle room.

Addition of doors to two of the three cubicles in the T4 Parents Room also behind McDonalds.

Terminals : T2,T4MELBOURNE AIRPORT VIC 3045

C 27/09/2018BAN-18-MEL-0249

180 Donald Cant Watts Corke (Management) Pty Ltd

11/09/2018 Installation of a Royal Wolf Container that has been re-purposed for general site office use by Rex. LV power to be provided to the container office.

Airside : Adjacent to Taxiway Sierra InfillMELBOURNE AIRPORT VIC 3045

C 14/10/2018BAN-18-MEL-0232

184 FITTED FRIDAY PTY LTD 13/09/2018 Stage and truss designs which will be all be supplied engineer certificate and added in the portal. VALUED LONG STAY CAR PARK.

Airside : Adjacent to Taxiway Sierra InfillMELBOURNE AIRPORT VIC 3045

C 12/12/2018BAN-18-MEL-0216

185 ISG MANAGEMENT PTY LTD 13/09/2018 Install 1 x new 6 pit outside 37 South Centre Road (located on Operations Road) Bore approx. 35m to install P100 (road crossing) conduit from new pit to existing manhole opposite new pit Trench approx. 2m to install P100 lead-in conduit from new pit to property boundary point Haul new 10pr cable through new and existing conduit as per plan Reinstate area and joint all cabling as required

Car Parks : Long TermLandside : VALUED LONG STAY CAR PARKMELBOURNE AIRPORT VIC 3045

C 01/10/2018BAN-00-MEL-0185

190 VIRGIN AUSTRALIA AIRLINES PTY LTD 10/10/2018 1) Refurbishment of level 2 (Virgin Tenant area T3) office space including partition wall changes, furniture, floor coverings, services alterations

2) Refurbishment of apron level (Virgin tenant spaces Echo Pier) training space including partition wall changes, furniture, floor coverings, services alterations.

Airside : T3 Echo Pier - Virgin Tenant spaceLandside : T3 - Level 2 Virgin Tenant spaceMELBOURNE AIRPORT VIC 3045

C 06/12/2018BAN-18-MEL-0225

193 HS REKARIS & ASSOCIATES P/L 24/10/2018 Proposed power upgradeAdditional amenitiesRoof accessSprinkler modificationProposed cool room & officeMoving Hose reel & sink

Business Park Tenancy : 4-12 Reid Way Melbourne AirportMELBOURNE AIRPORT VIC 3045

Page 31: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Associated works

198 AirServices Australia 24/09/2018 The Melbourne Fire Station Workshop has an outdoor canopy and carport which faces East and is open to the North, East and South. It is proposed to install a metal clad wall on the North side of the large canopy between the high canopy section and the carport to provide protection from the elements to ARFFS new Internal Access Vehicle (IAV). It is also proposed to install a small wall on the North end of the small carport to provide protection from the elements for the mechanical staff vehicles.

Landside : South Centre roadMELBOURNE AIRPORT VIC 3045

C 08/10/2018BAN-18-MEL-0234

199 MOBIL OIL AUSTRALIA PTY LTD 12/11/2018 Replace inoperable Jet A1 fuel hydrant pump with new hydrant pump set.Minor civil works to extend concrete pavement around end of new pump set for operator access - 3.9 m2 pavement area. Install new handrails around two sides of the new pavement area - 4.1 m length of handrail.Install new DN150 & DN200 stainless steel pipe spools and valves to connect new pump into existing fuel hydrant system.Electrical works to connect power and control cabling to the new pump motor.

Landside: JUHI Fuel Facility, Marker Road.MELBOURNE AIRPORT VIC 3045

C 18/10/2018BAN-18-MEL-0233

205 AUSTRALIA PACIFIC AIRPORTS (MELBOURNE) PTY LIMITED

25/09/2018 These works are associated with the installation of digital signs within the Multi-Level Car Park (MLCP).To allow better messaging to customers, new digital signage is to be installed at 3 main locations within the MLCP. This signage will be for car park specific marketing, branding and wayfinding. Each sign is to be supported by Comms and power cabling from local Distribution Boards and racks.

Airside : Building 379 - Emergency Vehicle Technician WorkshopMELBOURNE AIRPORT VIC 3045

R 21/11/2018

207 Programmed Maintenance Services Limited

14/01/2019 Fenced area to be built in the Building 64 workshop to securely store tools and materials.

Landside : Building 64 Workshop AreaMELBOURNE AIRPORT VIC 3045

C 07/01/2019BAN-18-MEL-0255

208 AUSTRALIA PACIFIC AIRPORTS (MELBOURNE) PTY LIMITED

26/09/2018 The works include the design, testing, supply and installation of a taxi alert system at Melbourne Airports T123 TMS. Currently taxis are bypassing the TMS system by following buses into T123. The proposed solution involves using two Lidar Sensors to detect and ignore buses whilst capturing all taxis using a dual channel LPR Camera. These reads will be then sent as alerts to the Head Of Rank.

Car Parks : @T1,@T2MELBOURNE AIRPORT VIC 3045

C 09/10/2018BAN-18-MEL-0227

210 SUCCESS CITY PTY LIMITED 25/10/2018 • Installation of new camera- above the first parking bay allocated to PARKROYAL Valet area (adjacent to Enterprise rental office).

Car Parks : @T2Landside : Ground floor - PARKROYAL Valet area (adjacent to Enterprise rental office)

C 06/12/2018 BAN-19-MEL-0009

Page 32: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

The camera will be installed between the tray and the pipe looking down at the PARKROYAL parking bays.• Replacement of existing camera (from analogue to IP) – above the Citi link pass station in front of the PARKROYAL lifts on the ground floor.

MELBOURNE AIRPORT VIC 3045

214 Turner & Townsend Pty Ltd 2/10/2018 Item 1. Installation of a new alternative / egress gate to the existing black steel mesh landscape fence protecting the @T4 MLS Car Park Northern Services Yard.Item 2. Installation of a new galvanized and cantilevered steel awning structure above the @T4 MLS Car Park Southern Services Yard exit / egress door to Room IT-UPS room B.

Item 1. And Item 2. Are required in response ABCO bld permit approval to ensure protected egress is provided to all areas / rooms below the new T4 MLS super screens.

Car Parks : @T4Landside : @T4 Northern and Southern Service AreasMELBOURNE AIRPORT VIC 3045

C 19/10/2018BAN-18-MEL-0169

215 Australia Pacific Airports Corporation Limited

03/10/2018 Alterations to the 'Concierge Area' within T2 Luxury to install a large LED screen.

Airside : Departures - Luxury PrecinctTerminals : T2MELBOURNE AIRPORT VIC 3045

C 22/10/2018BAN-18-MEL-0257

227 THINXTRA LTD 12/10/2018 Conducting a walk around to test reception signals so once Telematics devices are all installed on the GSE Equipment we don't lose signals for the GPS around the Airport.The site survey is the first stage to determine if the reception signals are good and the second stage will be to install antennas to fix the problems in the low coverage areas if required.

Airside : Ramp and Bag roomTerminals : T1,T2,T3,T4MELBOURNE AIRPORT VIC 3045

W 01/11/2018

232 BLACK LINE AUSTRALIA PTY LIMITED 21/11/2018 Internal Fit out Retail; flooring works, new ceiling and internal walls, fire and mechanical, internal joinery.

Landside : Shop 5 T2 Arrivals Landside MELBOURNE AIRPORT VIC 3045

C 13/11/2018BAN-18-MEL-0243

234 Root Partnerships 16/10/2018 Construction of Zone X CIC counters and associated equipment , existing site sheds to remain from Zone L

Airside : T2 bag room Terminals : T2MELBOURNE AIRPORT VIC 3045

C 31/10/2018BAN-18-MEL-0276

235 Donald Cant Watts Corke (Management) Pty Ltd

26/10/2018 Construction and repairs to 726 Parapets/Concrete Balustrade Panels within the Short Term Car Park. This project is following on from the previous Stage 1 in-which 327 panels were repaired.

Landside : T123 Short Term Multi Level Car ParkMELBOURNE AIRPORT VIC 3045

C 15/11/2018BAN-18-MEL-0269

236 Turner & Townsend Pty Ltd 16/10/2018 Install new and alter existing conveyor equipment to provide Virgin Airlines with one new make Up carousel within the existing T3 bag room.

Terminals : T3MELBOURNE AIRPORT VIC 3045

C 01/11/2018 BAN-18-MEL-0264

Page 33: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

237 AirServices Australia 08/11/2018 Existing HV supply to existing ATSC building to be diverted to facilitate construction of plant room.Diverted ATSC HV supply from new joint pit to existing HV pit. New section of 22 KV 50 mm2 triplex cable (in new 150 mm dia. Orange conduit) + 1 spare conduit.

Landside : Melbourne ATSC Site MELBOURNE AIRPORT VIC 3045

C 23/11/2018BAN-18-MEL-0271

238 115 SOLUTIONS PTY LTD 17/10/2018 Installation of Digital Signage plus Audio installation

Airside : Melbourne International Arrivals Dufry Duty Free StoreMELBOURNE AIRPORT VIC 3045

R -

239 CNG Systems Pty Ltd 23/10/2018 Installation of additional GPO's and data outlets to facilitate the tenant’s office layout.

Landside : Building 64 - Level 1MELBOURNE AIRPORT VIC 3045

C 14/11/2018BAN-18-MEL-0347

243 115 Solutions P/L 19/10/2018 Installation of digital signage and Audio network

Airside : Ts Arrivals Melbourne International Air Port MELBOURNE AIRPORT VIC 3045

R -

244 Root Partnerships 19/10/2018 The project involves the enhancement of the existing fire protection and occupant warning services within the At Terminal 1, 2,3 Carpark at Melbourne Airport. This generally includes provision of new horn speakers throughout the carpark, improved signage to manual call, and extension of the existing fire sprinkler system within the ballroom storage area to adjacent storage areas.

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 13/11/2018 BAN-18-MEL-0345

246Donald Cant Watts Corke (Management)

Pty Ltd22/10/2018 Construction of the concrete pavement on

top of JUHI's fuel pipe on stands F19, F24 and F25 and construction of the concrete surrounds for JUHI's hydrants on stands F21, F22 and F23.

Airside : Stands F19, F21, F22, F23, F24 and F25MELBOURNE AIRPORT VIC 3045

C 13/11/2018

BAN-18-MEL-0253

247 Turner & Townsend Pty Ltd 22/10/2018 The refurbishments of these vertical transportation units include:Lift 3 :1. Replace controller2. Upgrade door system3. Replace Car and landing doors panels4. Modernize car and landing appointments

Lift 20:1. Upgrade door system2. Replace Car and Landing doors panels3. Modernize car interiors, car and landing appointments

Lift 34:1. Upgrade door system2. Replace Car and Landing doors panels

Airside : Stands F19, F21, F22, F23, F24 and F25MELBOURNE AIRPORT VIC 3045

C 14/11/2018BAN-18-MEL-0279

Page 34: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Escalator 8:1. Replace controllers

250 Root Partnerships 23/10/2018 Installing fire sprinkler protection to Short Term Car Park Car Hire Tenancies, Park Royal Lift Lobby and Short Term Car Park Loading Bay.

Car Parks : @T1,@T2,@T3,@T4MELBOURNE AIRPORT VIC 3045

C 15/11/2018BAN-18-MEL-0231

252 AirServices Australia 047/11/2018 Fit out the ground floor of the Qantas/Jetstar building to house 85 staff, a server room and training facilities

Landside : Qantas Building Operations Road TullamarineMELBOURNE AIRPORT VIC 3045

CW

26/11/201820/06/2019

253 W T H PTY LTD 30/10/2018 1. Line Markings at state office2. Line Markings at returns area3. Concrete ground works for drains & repairs4. Electrical supply to containers

Business Park Tenancy : Avis Budget state officeCar Parks : @T1MELBOURNE AIRPORT VIC 3045

W -

261 Service Stream Limited 27/11/2018 Installation of equipment for a telecommunications facility at 2 locations.

Landside : Rooftop of Holiday InnMELBOURNE AIRPORT VIC 3045

C 13/01/2020

265 PASCAL COMMERCIAL INTERIORS PTY. LTD.

19/12/2018 Minor internal office alterations, full height partitioning

Business Park Tenancy : 115-121 South Centre Road TullamarineMELBOURNE AIRPORT VIC 3045

C 06/12/2018BAN-18-MEL-0305

271 ROYAL EXPRESS PTY. LTD.14/11/2018

Dexion Racking will be installed at warehouse at 55-65 Sky Road Melbourne Airport

Business Park Tenancy : 55=--65 Sky Road Melbourne airportMELBOURNE AIRPORT VIC 3045

C 29/11/2018BAN-18-MEL-o311

274Root Partnerships

14/11/2018 Adding additional infill steel platforms to mezzanine levels servicing T2 inbound baggage conveyors to provide safe access. Conveyor locations are roughly above Airside Rd in T2.

Airside : T2 Outbound Conveyors Mezzanine LevelTerminals : T2MELBOURNE AIRPORT VIC 3045

C 04/12/2018BAN-18-MEL-0350

279 Donald Cant Watts Corke (Management) Pty Ltd

27/11/2018 The scope of works involves delivery of a new taxiway (Taxiway Zulu), modifications/ extensions to existing taxiways (Taxiways Alpha, Echo, Papa, Victor) and provision of new infrastructure services;

Demolition,Earthworks and Subgrade Preparation,Pavement Construction,Airfield Drainage,Airfield Electrical Services,Airfield Communications and ICT,Airfield Water Supply and Sewer,Grassing,Miscellaneous Airfield Works

Airside : New taxiway Zulu and existing taxiways (Alpha, Echo, Papa, Victor) MELBOURNE AIRPORT VIC 3045

C 08/02/2019BAN-18-MEL-0336

282 AUSTRALIA PACIFIC AIRPORTS (MELBOURNE) PTY LIMITED

21/11/2018 These works are associated with the installation of digital signs within the Multi-Level Car Park (MLCP).

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 12/12/2018BAN-18-MEL-0191

Page 35: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

To allow better messaging to customers, new digital signage is to be installed at 2 main locations within the MLCP. This signage will be for car park specific marketing, branding and wayfinding.

Each sign is to be supported by Comms and power cabling from local Distribution Boards and racks.

283 PROPERTY BEYOND PTY LIMITED 22/11/2018 Demolition of old demountable and fuel tanks

Business Park Tenancy : 27 Francis Briggs Road, Tullamarine VIC MELBOURNE AIRPORT VIC 3045

R -

285 Root Partnerships 22/11/2018 Establishment of a new sewer monitoring station located within existing wetland, adjacent the southern boundary at Annandale Road within the Business Precinct between 40 and 120 Annandale Rd (see attached locality Plan). Sewer monitoring station will consist of an in-ground concrete caisson extending down to existing sewer line and an maintenance entrance platform at surface (see attached design documentation)

Landside : adjacent the southern boundary at Annandale Road within the Business Precinct between 40 and 120 Annandale Rd (see attached locality Plan)MELBOURNE AIRPORT VIC 3045

W -

287 Transform Retail Projects Pty Ltd - (Travelex)

14/12/2018 Fit-out of New Travelex Currency Exchange Store

Landside : T2 Departures Landside Level 1 Terminals : T2MELBOURNE AIRPORT VIC 3045

C 08/01/2018BAN-18-MEL-0323

288 THE TRUSTEE FOR QANSTRUCT (AUST) UNIT TRUST

26/11/2018

Construction of a warehouse and office facility for GEA, including a retaining wall to the eastern boundary.

Landside : Mace Way, TullamarineMELBOURNE AIRPORT VIC 3045

C 13/12/2018BAN-18-MEL-0325

292 TM Commercial Pty Ltd 27/11/2018 New Hanna's Cafe redevelopment including: - Minor demolition works - New Gas Authority Line - GIT & In ground Waste services - Fit-out of Cafe space - ceiling, floor finishes, joinery - Mechanical, Hydraulic, Electrical, Fire Services- Kitchen Fit-out - External Planters and Landscaping- Signage

Landside : T4 MLS - Ground Floor TenancyMELBOURNE AIRPORT VIC 3045

C 20/12/20148BAN-18-MEL-0333

295 QANTAS AIRWAYS LIMITED 03/12/2018 As part of the Qantas Signage Rebranding project, several signs have been replaced within the Melbourne airport domestic terminal. These works were previously completed as part of Application ID 161 which was an exemption. Within this exemption application, 4 signs were deemed to require ALCC. This applications is for the 4 remaining signs which are situated at Locations 46, 143, 147 and 253. This

Landside : Four locations within the Domestic TerminalMELBOURNE AIRPORT VIC 3045

C 15/02/2019BAN-18-MEL-0091

Page 36: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

application is for the remaining 4 signs.

302 Root Partnerships 06/12/2018 Works required to comply with new Aviation Security Federal Legislation. Enhancement to Terminal 2 Loading Dock 1 screening point (from Landside to Airside).Remove existing wall, doors, plasterboard ceiling and install new wall, doors, plasterboard ceiling, lighting, power, communication cables, diffusers and card reader.Potential modification of existing sprinklers to suit architectural layout.

Airside : Terminal 2 Loading Dock 1 screening pointLandside : Terminal 2 Loading Dock 1 screening pointMELBOURNE AIRPORT VIC 3045

C 18/01/2019BAN-18-MEL-0307

303 Root Partnerships 06/12/2018 Works required to comply with new Aviation Security Federal Legislation. Enhancement works at Terminal 2 Loading Dock 2 screening point.Demolish existing floor finishes, doors, walls, plasterboard ceiling and cold room insulation panels. Remove existing steel stairs and removable bollards. Install new bulkhead, doors, walls, ramp, landings and stairs. Install new lighting, power, sprinklers and communication cables.

Airside : Terminal 2 Loading Dock 2Landside : Terminal 2 Loading Dock 2MELBOURNE AIRPORT VIC 3045

C 19/02/2019CBAN-18-MEL-0308

304 Root Partnerships 06/12/2018 Works required to facilitate compliance with new Aviation Security Federal Legislation. Existing Virgin Temporary Training Room has to be fitted out for VA to decant from existing T3 office so that works for integrated screening point (Terminal 2 Loading Dock 1 and T3 Virgin) can be carried out. Install new walls, doors, plasterboard ceiling, lighting, power, communication cables, plumbing and kitchenette sink. Remove existing partition walls, doors, plasterboard ceiling and flooring.

Airside : Terminal 2 Pier D3MELBOURNE AIRPORT VIC 3045

C 22/01/2019BAN-18-MEL-0335

308 Root Partnerships 08/12/2018 New Sewer Monitoring Station being constructed over existing sewer line to allow future recording of flows and quality.

Landside : Within wetland area off Annandale Rd, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 10/01/2019BAN-19-MEL-0008

317 Australia Pacific Airports Corporation Limited

14/12/2018 Base build works to create a 'feature corner tenancy' in the current Cafe Vue/Travelex space in T2 Departures. Works also involve freshen up surrounding areas.

Landside : Cafe Vue /Travelex CornerTerminals : T2MELBOURNE AIRPORT VIC 3045

C 10/01/2019BAN-18-MEL-0356

318 GEORGE E. APTED & ASSOCIATES PTY LTD 28/12/2018 Facilitate The Air Services Tenancy at Ground Floor and separation of the First Floor Tenancy entry at Qantas Support Building. Melbourne Airport

Works involved the demolition of existing partitions and reception desk installation of new glazed partitions and sliding doors,

Building 177MELBOURNE AIRPORT VIC 3045

C 09/01/2019BAN-18-MEL-0355

Page 37: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

alterations to lighting, smoke detectors and power to accommodate new partitions layout.

319 HENRY BUCK PROPRIETARY LIMITED 17/12/2018 Remove all flooring to clean base slab including removing any glue residueRemove the ceiling and bulkheads;Make safe all electrical items, power, air conditioning, water and waste and remove all electrical and data cabling back to the distribution board;Fill and fire stop all core holes;Remove all fixtures and fittings and the Shop Front;Patch and undercoat all walls;

Terminals : T1MELBOURNE AIRPORT VIC 3045

R -

320 CMW Design & Construct (Vic) Pty Ltd 17/12/2018 Construction of a 9,896sqm Warehouse with 2,000sqm 2 storey office, associated car parking, hardstand, recessed dock, dock office and amenities. Connection to existing infrastructure services.

Business Park Tenancy : 115-119 Link Rd,MELBOURNE AIRPORT VIC 3045

C 16/01/2019BAN-19-MEL-0052

324 AirServices Australia 14/01/2019 Refit Building 193, Operations Rd to become a canteen and recreation space

Landside : Building 193, Operations Rd, TullamarineMELBOURNE AIRPORT VIC 3045

C 06/02/2019 10/12/2019BAN-19-MEL-0017

329 Airport Retail Enterprises 08/01/2019 Fit out of new Food & Beverage Retail - St. ALi

Airside : Tenancy T2-W12Terminals : T2MELBOURNE AIRPORT VIC 3045

C 24/01/2019BAN-19-MEL-0016

330 Root Partnerships 08/01/2019 Works required to facilitate compliance with updating of checked bag screening systems mandated by Aviation Federal Legislation. The new screening machines and conveyors will be housed in the proposed T2 Left CBS area, which will occupy the existing footprint of Out-of-Gauge (OOG) Baggage Room and mezzanine level over Substation No. 2, Terminal 2 Loading Dock 1 and Airside Road. As such, the defunct T2/T3 elevated baggage link and services are required to be demolished and removed.

Airside : Terminal 2 Loading Dock 1MELBOURNE AIRPORT VIC 3045

C 13/02/2019BAN-19-MEL-0012

331 Elgin Associates Pty Ltd 07/01/2019 Collection of sediment samples by hand collection methods (trowel, shovel, grab sampler) at 0-100mm depth from storm water drains and creek beds of receiving waterways.This includes the drainage networks and creek beds in the Arundel Creek, Deep Creek tributary and Steele Creek North catchments. Sampling is largely on Landside areas, with some locations on Airside.A total of 111 samples are proposed to be collected - one sample each at 111 locations.

Airside: Arundel and Steel Creek storm water drainage networks from south of Southern Apron towards Aircraft maintenance facilities and Gate 22, and also south of east-west runway near Mansfield Road east to BoM station. Landside : Along Arundel Creek Landside area to Annandale Rd boundary, along Steele Creek North Landside area to Airport Drive/Link Rd area, along Deep Creek tributary from Sunbury Rd gate to Deep Creek quarry dam areaMELBOURNE AIRPORT VIC 3045

R _

Page 38: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

335 CMW Design & Construct (Vic) Pty Ltd 08/01/2019 Construction of new warehouse and office facility

Business Park Tenancy : 31 Jets Court, MABPLandside : 31 Jets Court, MABPMELBOURNE AIRPORT VIC 3045

C 12/03/2019BAN-19-MEL-0189

BAN-19-MEL-0189

337 Root Partnerships 11/01/2019 Works required to comply with new Aviation Security Federal Legislation.Demolish existing fencing (part), bitumen road (part), gravel road (part) and swing gates. Install new fencing to align with remaining fencing, bitumen road, gravel road, boom gates, storm water grate and drainage.Construct and install services for new guardhouse (adjacent to existing guardhouse), concrete path and canopy.

Airside : Gate 22Landside : Gate 22MELBOURNE AIRPORT VIC 3045

C 15/02/2019BAN-19-MEL-0014

338 Root Partnerships 11/01/2019 Works required to comply with new Aviation Security Federal Legislation.Demolish existing fencing (part), bitumen road (part) and gravel road (part). Install new fencing to align with remaining fencing, bitumen road, gravel road, boom gates, storm water grate and drainage.Construct and install services for new guardhouse (south of existing guardhouse), concrete path, gravel path, boom gates, lanes and canopy.

Airside : Gate 27Landside : Gate 27MELBOURNE AIRPORT VIC 3045

C 13/03/2019BAN-19-MEL-0015

343 Root Partnerships 16/01/2019 New North Bag Room Tug Exit Widening for MUP 14.

Airside : New North Bag Room MUP 14MELBOURNE AIRPORT VIC 3045

C 04/02/2019BAN-19-MEL-0046

344 IKON Property Services Australia Pty Ltd 17/01/2019 Construction of Bin Enclosure Fencing for Bins to be stored.

Car Parks : @T2MELBOURNE AIRPORT VIC 3045

C 04/02/2019BAN-19-MEL-0049

345 Turner & Townsend Pty Ltd 17/01/2019 Geotechnical & Environmental Investigation Services

Airside : T3 Bag Room &amp; OOG Room MELBOURNE AIRPORT VIC 3045

R -

348 Donald Cant Watts Corke (Management) Pty Ltd

22/01/2019 The AGL (Airfield Ground Lighting) System Upgrade Project scope is to deliver a fully-addressable Safe LED-IQ whole of airfield AGL Lighting System for the Melbourne Airport Airfield (including Runways, Taxiways and Aprons) designed in accordance with the CASA Manual of Standards (MOS) Part 139. The delivery of this system specifically excluded areas of the Airfield which were to be upgraded as part of the Taxiway Zulu Project and the Runway Development Project.

Airside : Runways, Taxiways and Aprons MELBOURNE AIRPORT VIC 3045

C 28/02/2019BAN-19-MEL-0025

350 Department of Home Affairs - Operational Capability Branch

22/01/2019 The Dept., via its contractor (Benelec), seeks to replace its existing UHF radio

Terminals : T1MELBOURNE AIRPORT VIC 3045

CW

30/01/201925/02/2019

Page 39: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

infrastructure. This involves replacement of the Penthouse rack, roof-mounted antenna and networking of the system into the Department's network.

363 Donald Cant Watts Corke (Management) Pty Ltd

29/01/2019 The project is reconfiguring the northern end of Building 64 to facilitate the construction of office Tenancies and stores within the building. This application is specifically for Stage 1 - Demolition Works.

Landside: Building 64 North, Service Road, Melbourne Airport, 3045.

C 08/02/2019BAN-18-MEL-0282

367 BADGE CONSTRUCTIONS (SA) PTY LTD 31/01/2019 Mobilization of site fencing, site shed installation and amenities to facilitate the construction of the new ATSC Modernization project for Air Services Australia.

Landside : Air Services Australia MELBOURNE AIRPORT VIC 3045

W 18/02/2019

370 Airmaster Australia Pty Ltd 01/02/2019 T4 MLS UPS room Installation of ACB219 Installation of Air Conditioning to Comms Room

Landside : T4 MLS UPS Rooms A &amp; B &amp; B219 Comms RoomMELBOURNE AIRPORT VIC 3045

C 18/02/2019BAN-19-MEL-0214

376 Root Partnerships 04/02/2019 Early Works - Demolition of the Existing T3 Car Hire Booths, and reinstatement of floor tiles.

Landside : T3 Baggage Reclaim Hall Ground FloorMELBOURNE AIRPORT VIC 3045

C 20/02/2019BAN-19-MEL-0040

377 Root Partnerships 04/02/2019 Extension of the T1 Taxi Bay for an additional 6 more bays.

Landside : T1 Arrivals Drive Northern End MELBOURNE AIRPORT VIC 3045

C 19/02/2019BAN-18-MEL-0172

379 The trustee for Decon Technologies Trust 03/04/2019 Installation of two existing Telstra site. Install 3 x TELSTRA RV4PX310R-V2 panel Antennas. Install 3 x RADIO4415-B1 Install 3 x 7/8' Hybrid cablesInstall 3 x AIR6488 panel AntennasRecover 3 X VVPX308.10B2 panel AntennasRecover 3 x NNPX310R panel Antennas Recover 3 x VVPX310R-V4 panel Antennas

Car Parks : Long TermMELBOURNE AIRPORT VIC 3045

C 03/04/2019BAN-19-MEL-0165

382 Root Partnerships 11/02/2019 T2 Arrivals Early Works - Refurbishment of the T2 Arrivals Hall Amenities block.

Landside : Terminal 2 Arrivals Hall, Ground Floor LandsideMELBOURNE AIRPORT VIC 3045

C 25/02/2019BAN-19-MEL-0067

383 WH SMITH AUSTRALIA PTY 11/02/2019 Fit out new retail tenancy Landside : T2 Landside Departures LevelMELBOURNE AIRPORT VIC 3045

C 25/02/2019BAN-19-MEL-0056

386 Root Partnerships 13/02/2019 Application Consent for Building Permit -1 Only: The project aims to upgrade three old cooling towers CT1, CT2 & CT3 (approaching or exceeding the manufacturer’s recommended serviceable life; circa 25-30 years) located in the cooling tower compound serving TSB-1. The project will also replace the old façade of the cooling compound to provide more air flow and better heat-exchange. Also, the façade on the overhead pipe bridge.

Landside : The cooling tower compound between TSB-1 &amp; TSB-3MELBOURNE AIRPORT VIC 3045

C 26/02/2019BAN-19-MEL-0079

Page 40: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

387 Root Partnerships 13/02/2019 Works required to facilitate compliance with updating of checked bag screening systems mandated by Aviation Federal Legislation. The new screening machines and conveyors will be housed in the proposed T2 Left CBS area. Prior to this, the final screening machines will be selected from the trial exercise where machines from three suppliers will be run and tested. Portion of existing T2 baggage system will be modified to accommodate these trial screening machines.

Airside : Terminal 2 CBS X-Ray Area (Adjacent to Airside Road, Near Pier D)MELBOURNE AIRPORT VIC 3045

C 26/02/2019BAN-19-MEL-0058

390 NEWSLINK PTY. LIMITED 14/02/2019 Change in Retail store fit out from an "Out of Australia" to "Icons Victoria"-installation of Cafe-Change signage-upgrade services

Airside : Out of Australia Tenancy T2-W06MELBOURNE AIRPORT VIC 3045

C 06/03/2019BAN-19-MEL-0031

392 Turner & Townsend Pty Ltd 15/02/2019 The upgrading works to the existing Vertical Transportation assets Lifts 4, 13, 17, 32, 37 & ES 7, 30, 44, MW 35, 43 include:Lifts: Upgrade hydraulic system, door system, Controller, Hazard and Risk, Car Interior/Fixtures, Landing Fixtures;Escalator: Replace controllers, Install ‘Eco-mode’Moving Walk: Replace controllers/Drives & 1 set of step chains, install ‘anti-climb device’

Terminals : T2,T3,T4MELBOURNE AIRPORT VIC 3045

C 01/03/2019Ban-19-MEL-0061

403 PROPERTY BEYOND PTY LIMITED 22/02/2019 Installation of CCTV cameras and boom gates.

Business Park Tenancy : Avis Budget - Corner Francis Brigg Road and Centre Road, TullamarineMELBOURNE AIRPORT VIC 3045

C 01/03/2019

408 THE TRUSTEE FOR QANSTRUCT (AUST) UNIT TRUST

26/02/2019 Construction of a Warehouse and Office Facility for Salco Group

Business Park Tenancy : Mace Way, Tullamarine Business ParkMELBOURNE AIRPORT VIC 3045

C 12/03/2019BAN-19-MEL-0229

416 A.S. JAMES PTY. LIMITED 04/03/2019 Geotechnical Investigation Business Park Tenancy : Mace WayLandside : Mace WayMELBOURNE AIRPORT VIC 3045

CW

20/03/201928/03/2019

420 BSA LIMITED 30/04/2019 Refer to AVFS002-F000 for a description Thereplacement of the NAFS III suppression system with acomplaint Novec 1230 Suppression system andseal the rooms to achieve a compliant room integrity forfollowing spaces; Store, Paint, Cleaning RoomRetain the gas control in the MFIP, detection andancillaries to the gas suppression systems.

Airside : Qantas Maintenance Building 96 Operations Road Melbourne Airport VIC 3045

C 29/07/2019

Page 41: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

The driveris to undertake work necessary to achieve compliant gassuppression and sealing to permit a satisfactory roomintegrity.

424 Atelier Projects 06/03/2019 Conversion of Building 64 North to new offices and stores.

Landside : Building 64 NorthMELBOURNE AIRPORT VIC 3045

C 22/03/20198BAN-18-MEL-0282

427 SYMMETRY COMMERCIAL PTY LTD 29/03/2019 Supply & install partitioning for 5 new offices and associated services

Business Park Tenancy : Level 2, 140-144 Link Road, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 12/04/2019BAN-19-MEL-0086

429 NEWSLINK PTY. LIMITED 13/03/2019 The site is to be returned to a base build shell. Everything installed as part of the original fit out to be removed including; -All fixtures, shopfront, flooring/screed, ceiling elements, finished plasterboard walls etc.-DB to remain in existing location-Fire Services at high level to remain to maintain a compliant shell (return fire protection to open plan layout)

Airside: Terminal 4. Retail location S07MELBOURNE AIRPORT VIC 3045

C 29/03/2019BAN-19-MEL-0038

430 Donald Cant Watts Corke (Management) Pty Ltd

13/03/2019 Contractor airfield access from the Sunbury Road roundabout including a news access road and haul road, relocated airside fence and services to facilitate access, new laydown areas and a new security gate house and access point. The new security gate house building will have an adjacent steel canopy over the vehicle gates on the entry lane side, to provide suitable protection from the elements during vehicle screening. A new substation 32 will be installed to support the gate house and associated works.

Airside : North East AirfieldMELBOURNE AIRPORT VIC 3045

C 15/04/2019BAN-18-MEL-0030

BAN-18-MEL-0030

433 TM Commercial Pty Ltd 18/03/2019 Installation of Level 1 Female & DDA Amenities Relocation Demolition of existing female and DDA toilets and conversion into storeroom.

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 04/04/2019

437 TM Commercial Pty Ltd 22/03/2019 Construction of a new 464 room dual branded hotel with associated Food & Beverage and conferencing facilities as well as a gym and commercial office/co-working tenancy.

Landside : Cnr Grants Rd &amp; Service Rd &amp; Former Europecar siteMELBOURNE AIRPORT VIC 3045

CW

09/05/201922/07/2019

440 Root Partnerships 22/03/2019 The replacement of existing perimeter (boundary) fence located in the north-western (NW) & the eastern (E) sectors along with a few other broken sections along the airport boundary. Please refer the map attached for the exact location details.

Airside : Airside boundary fencingMELBOURNE AIRPORT VIC 3045

C 15/04/2019BAN-19-MEL-0207

Page 42: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

444 Turner & Townsend Pty Ltd 25/03/2019 With expected passenger growth, and current ageing infrastructure and mechanical equipment, T2 T3 vertical Transportation units are being upgraded to minimize disruption to passenger and staff movements, also to meet the current safety code requirements.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 14/04/2019BAN-19-MEL-0136

445 Root Partnerships 26/03/2019 Staff involved in CBS X-Ray Trial will be located in ISS office room (former Qantas Workshop, office). Installation of new walls, doors, plasterboard ceiling, lighting, power, communication cables, plumbing, card readers and kitchenette sink. Removal of existing partition walls, doors, card reader, plasterboard ceiling and flooring.

Airside : T2 Delta 3MELBOURNE AIRPORT VIC 3045

C 17/04/2019BAN-19-MEL-0137

448 AECOM AUSTRALIA PTY LTD 27/03/2019 Construction of Phase 2 of the Northern GSE project. Works will include asphalt pavement, ULD storage racking, lighting, CCTV for Melbourne Airport and Australian Border Force, fire hydrants and safety showers, new jersey barriers and containment fencing.

Airside : Northern GSE to the west of Delta PierMELBOURNE AIRPORT VIC 3045

C 15/04/2019BAN-19-MEL-0196

450 FDC CONSTRUCTION & FITOUT (VIC) PTY LIMITED

29/03/2019 Installation of a new small parcel conveyor within the Australia Post parcel sorting facility (MGF) on 13-23 APAC Drive. The building alterations/additional works associated with this involves a small section of the existing ceiling to be raised 1.5metres along with running a new switchboard and Comms cabinet for the works.FDC Construction & Fit out will undertake the building works and Beumer will undertake the conveyor installation thereafter.

Landside : Australia Post MGF - 13-23 APAC Drive, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 12/04/2019BAN-19-MEL-0159

455 Turner & Townsend Pty Ltd 01/04/2019 Replacement of 23 No. existing airfield pavement slabs at the Twy Sierra / Twy Uniform intersection using Rapid Set concrete methodology plus replacement of 1No. Trial pavement slab at Twy Sierra South. Construction Period: 1 May 2019 to 14 June 2019 inclusive.

Airside : Twy Sierra / UniformMELBOURNE AIRPORT VIC 3045

C 12/04/2019BAN-19-MEL-0150

457 VIRGIN AUSTRALIA AIRLINES PTY LTD 02/04/2019 To replace the site main fire panel in the hangers at the Virgin Melbourne Jet base.To replace an old annunciator panel and install a new MECP which will be integral to the new fire panel.

Airside : Virgin Melbourne Jet base hangersMELBOURNE AIRPORT VIC 3045

C 18/04/2019BAN-19-MEL-0198

465 Root Partnerships 10/04/2019 Redevelopment of retail tenancies and adjacent common areas:T1/T2 Qantas link - Amcal, Rolling Luggage,

Terminals : T2,T3MELBOURNE AIRPORT VIC 3045

C 01/05/2019BAN-19-MEL-0171

Page 43: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Nandos, Hudsons, Siricco, Hungry Jacks, Subway & Passenger CorridorT2/T3 - Hudsons, McDonalds, PJ Obriens, High Tide & Passenger CorridorConcourse Echo - Boost Juice, Newslink

466 Root Partnerships 05/04/2019 Retail redevelopments at Qantas Link, T2/T3 Link and Concourse Echo.

Affected tenancies include: Subway, Hungry Jacks, Hudsons (Qantas Link), Siricco, Nandos, Hudsons (T2/T3 Link) McDonalds, PJ Obriens, High Tide, Boost Juice, Hudsons (Echo), Newslink (Echo) and Fly bar

Terminals : T2,T3,T4MELBOURNE AIRPORT VIC 3045

R _

468 Root Partnerships 09/04/2019 Extension of Mark-Up-Points 1 (MUPS1). Relocation of water tanks. Early works for RHS

Airside : T2, Delta concourse, baggage outbound hallMELBOURNE AIRPORT VIC 3045

C 17/04/2019 30/09/2019 BAN19MEL191

469 Turner & Townsend Pty Ltd 16/04/2019 Removal of the existing structure steel frame at the top level of T4 Carpark.

The scope of works includes:

- Temporary removal and isolation of CCTV cameras;- Decommissioning of the structural frame using a crane; and- Reinstating of any concrete breakout at slab level.

Car Parks : @T4MELBOURNE AIRPORT VIC 3045

C 01/05/2019BAN-19-MEL-0168

470 Root Partnerships 09/04/2019 This project intends to upgrade those various building services approaching the end of life or other growth/risk factors. Under the purview of this specific application consent, only electrical services upgrade works in the services tunnels are requested. The electrical services upgrade will include artificial, emergency and the exit lighting in the service tunnels. All other services packages will be submitted as separate applications.

Landside : Services TunnelsMELBOURNE AIRPORT VIC 3045

C 09/05/2019BAN-19-MEL-0262

471 Root Partnerships 09/04/2019 This project intends to upgrade those various building services approaching the end of life or other growth/risk factors. Under the purview of this specific application consent, only "Mechanical Services" upgrade works in the services tunnels are requested. The mechanical services upgrade will include upgrading all the fresh air supply and exhaust fans, interlocking with the fire panels and associated electrical upgrades for the services tunnels.

Landside : Services TunnelsMELBOURNE AIRPORT VIC 3045

C 09/05/2019BAN-19-MEL-0263

Page 44: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

472 OTIS ELEVATOR COMPANY PTY LTD 10/04/2019 Replacement of lift number QL2 from Terminal 2 Qantas department. Like for like replacement

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 15/04/2019BAN-19-MEL-0167

476 Australia Pacific Airports Corporation Limited

12/04/2019 New Intertenancy wall, relocation of services and provision of new services to suit two cold shell tenancies (following on from Amuse demolition works - reference Application ID: 429)

Airside : S07 Current Amuse TenancyTerminals : T4MELBOURNE AIRPORT VIC 3045

C 29/04/2019BAN-19-MEL-0174

477 Root Partnerships 15/04/2019 The project includes an expansion of the Arrivals Hall to the South including two new escalators and a lift, a new Terminal entrance on Departures Level, a centralized exit of arriving passengers from the Baggage Reclaim hall, and a central meet and greet area, reconfigured and improved retail facilities and amenities, and reconfigured external queuing including re-grading the existing pedestrian footpath area. This application also includes a site compound at the Trigen Smokers area.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 21/05/2019BAN-19-MEL-0177

479 Australia Pacific Airports Corporation Limited

15/04/2019 Replacement of gantry advertising screen.

The replacement is a like for like scenario.

Landside : Terminal DriveMELBOURNE AIRPORT VIC 3045

C 01/05/2019BAN-19-MEL-0176

483 Airside Projects P/L 18/04/2019 The proposed works are for Menzies Aviation. There are three areas of concrete slab. The existing loaders yard; the original entry driveway into the loaders yard and container holding (ULD) area. The civil documents provided within the application demonstrate repair and replacement of pavement works; reinstatement of existing kerbs; removal of selected ULD racking. There is no works for any underground services and the reinstatement of ULD racking will be by others.

Landside : 1 APAC drive, Melbourne airportMELBOURNE AIRPORT VIC 3045

C 13/05/2019

488 Root Partnerships 24/04/2019 Construction of two new domestic cold water (DCW) pipelines to extending from existing Melbourne Airport DCW network to new connection points within JUHI compound

Landside : JUHI CompoundMELBOURNE AIRPORT VIC 3045

C 16/05/2019

492 JB Commercial Building Contractors Pty Ltd

26/04/2019 REMOVE EXISTING INGROUND SCALES, EXCAVATE & FORM NEW CONCRETE SCALES PIT, INSTALL NEW INGROUND SCALES.

Airside : QANTAS FREIGHT TERMINAL FT1MELBOURNE AIRPORT VIC 3045

C 27/05/2019

503 ROOT PARTNERSHIPS PTY LTD 03/05/2019 The T2 Amenities Departures Refurbishment Project (the amenities located behind McDonalds and Nandos at T2 Departures) purpose is to refresh and refurbish the existing amenities in line with the new APAM Design Vision. The scope of works

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 29/05/2019BAN-19-MEL-0205

Page 45: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

largely pertains the upgrades of finishes and fixtures with some minor services works. The works also include establishing a contractor site shed landside, located near the Tri-Gen facility

506 CPN COMMERCIAL GROUP PTY LTD 08/05/2019 Proposing to increase hardstand area by approximately 500 sqm.

Business Park Tenancy : 15 Jets Court portMELBOURNE AIRPORT VIC 3045

C 19/07/2019BAN-19-MEL-0182

520 MECCA BRANDS PTY LTD 15/05/2019 Store Fit out Terminals : T4MELBOURNE AIRPORT VIC 3045

C 02/06/2019BAN-19-MEL-0221

523 Donald Cant Watts Corke (Management) Pty Ltd

20/05/2019 1.) Install (18) eighteen GPO’s within the existing wash and vacuum bays from existing power circuits on the Ground Level of the At Terminal 123 Car Park.2.) Install (9) new water points to each of the existing wash bays on the Ground Level of the At Terminal 123 Car Park.3.) Two (2) laborers to box up and grout existing side entry pit within the Melair Vacuum Bay.

Landside : Ground Level - At Terminal CarparkMELBOURNE AIRPORT VIC 3045

R -

526 Maz Building Maintenance 20/05/2019 Install steel work to infill the open areas in the floor in the T2 mezzanine. Works are to install 180UB 19 support beams with grind mesh top, hand railing to be altered to suit. Total 5 infills only.

Terminals : T2MELBOURNE AIRPORT VIC 3045

R -

535 Air Services Australia 24/06/2019 Refurbishment of the ground floor only, to update air traffic control technology training equipment to support the One SKY project. Please note Level One will not be refurbished until a later date.

Landside : BLDG 212, Operations Rd, TullamarineMELBOURNE AIRPORT VIC 3045

C 19/07/2019

537 Programmed Maintenance Services Limited

27/05/2019 Minor refurbishment of the Silver Kris Lounge. New fridge room, change of wall linings in one area and additional GPO's, removal of barrisol ceiling feature

Airside : T2 Satellite Silver Kris LoungeMELBOURNE AIRPORT VIC 3045

C 11/06/2019BAN-19-MEL-0271

549 Built Pty Ltd 29/05/2019 HAZMAT removal, isolation of services and demolition of building No's. 166, 186, 152, & 47. Building 360 is to be relocated from this site.

Landside : Corner of Grants Road, &amp; Service RoadMELBOURNE AIRPORT VIC 3045

C 17/06/2019BAN-19-MEL-0243

556 Maz Building Maintenance 31/05/2019 Install steel work to infill the open areas in the floor in T2 Mezzanine. Works are to install 180 UB 16 support beams with grid mesh top, hand railing to be altered to suit. Total 5 infills

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 25/06/2019

557 Australia Pacific Airports Corporation Limited

30/05/2019 Retail Tenancy Fit out Landside : Terminal 2 Qantas Link Terminals : T2MELBOURNE AIRPORT VIC 3045

C 19/06/2019BAN-19-MEL-0232

560 Signed On (Aust) Pty Ltd 22/07/2019 New Signage: Installation of Alu frames with Business Park Tenancy : 11-13 Mace Way C 30/07/2019

Page 46: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

ACM cladding to external cladding of building at 11-13 Mace Way.

MELBOURNE AIRPORT VIC 3045 BAN-18-MEL-0294

564 Australia Pacific Airports Corporation Limited

04/06/2019 - Partial Demolition (Maintaining Ceiling) & Fit out of Proud Mary Tenancy

Landside : T3 MezzanineTerminals : T3MELBOURNE AIRPORT VIC 3045

C 01/07/2019BAN-19-MEL-0258

573 Root Partnerships 13/06/2019 Pier E Infills. 4 concourse level extensions will be installed to provide additional Retail Tenancy and Virgin Service Desk area. The affected locations are Echo 1, Echo 3, Echo 4 and Echo 6.

Airside : Echo ConcourseTerminals : T3MELBOURNE AIRPORT VIC 3045

C 05/07/2019BAN-19-MEL-0277

575 Root Partnerships 13/06/2019 Terminal 4, Departure Lounge, Amenity Expansion and additional Store rooms

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 05/07/2019BAN-19-MEL-2048

576 Root Partnerships 13/06/2019 T4 Pier F Amenity Demolition and Rebuild Airside : T4 Pier F AirsideTerminals : T4MELBOURNE AIRPORT VIC 3045

C 05/07/2019BAN-19-MEL-0249

582 Australia Pacific Airports Corporation Limited

21/06/2019 T2 Departures Cross Concourse - New Bubble Tea Kiosk (currently no existing kiosk and housing vending machines)

Airside : T2 Departures Cross ConcourseTerminals : T2MELBOURNE AIRPORT VIC 3045

C 07/10/2019 07/11/2019BAN-19-MEL-0287

583 CMW Design & Construct (Vic) Pty Ltd 19/06/2019 Directed Electronics' Tech Area Fit-out & Racking

Business Park Tenancy : 115-119 Link Rd, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 03/07/2019BAN-19-MEL-0308

590 Australia Pacific Airports Corporation Limited

09/08/2019 T3 Pier E - Fitout of Retail Tenancy AS02 Boost Juice (Tenancy Remaining Boost Juice with new Fitout)

Airside : T3 Pier ETerminals : T3MELBOURNE AIRPORT VIC 3045

C 16/07/2019BAN-19-MEL-0298

594 RETAIL DIMENSION PTY LTD 09/07/2019 Relocation of the existing of the Hertz demountable office located in the T1 Carpark at Melbourne Airport, and installation of a new updated transportable booth.

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 30/07/2019 04/12/2019BAN-19-MEL-0366

601 Australia Pacific Airports Corporation Limited

26/06/2019 T3 Pier E - AS03 WH Smith Tenancy Fitout (Tenancy was previously Newslink)

Airside : Terminal 3 Pier ETerminals : T3MELBOURNE AIRPORT VIC 3045

C 11/07/2019BAN-19-MEL-0296

602 Australia Pacific Airports Corporation Limited

08/07/2019 T4 FB08 & FB09 (currently Chop'd Salad and Sixpence Pies) - Demolition works and tenancy split

- Demolition of existing tenancy fitouts.- Reinstate Base Building Fire Services to open plan.- Reinstate Inter tenancy wall.- Install new Kitchen Exhaust Fan to FB09.

Airside : T4 (Currently Chop'd &amp; Sixpence Pies)Terminals : T4MELBOURNE AIRPORT VIC 3045

C 24/07/2019BAN-19-MEL-0305

605 Australia Pacific Airports Corporation Limited

10/07/2019 Installation of 4x CAT6 in T1 Qantas Movements Control Office HUB14 Comms room. Cables from existing local room

Terminals : T1MELBOURNE AIRPORT VIC 3045

C 10/07/2019BAN-19-MEL-0300

Page 47: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

IDF/CP to an ICT rack for APAM Comms access. Cables to terminate on a patch panel within an existing Qantas ICT rack. Cables to traverse through existing floor penetrations and raised accessible floor space.

616 Australia Pacific Airports Corporation Limited

09/07/2019 T4 Level 2 Storeroom Split

- Replace existing cage with plasterboard stud wall - Install door with half leaf and reuse existing cage door- Relocate existing lighting and install additional new lighting- Provide water and waste point

Airside : T4 Level 2Terminals : T4MELBOURNE AIRPORT VIC 3045

C 22/07/2019BAN-19-MEL-0311

620 Australia Pacific Airports Corporation Limited

11/07/2019 T3 - LS02 Scott Pickets Deli Tenancy Fitout (Tenancy was previously PJ O'Briens)

Landside : Terminal 3 Level 1Terminals : T3MELBOURNE AIRPORT VIC 3045

C 13/08/2019BAN-19-MEL-0325

623 Root Partnerships 12/07/2019 Demolition and strip out of Flybar and adjacent back of house rooms back to base building condition.

Airside : Concourse EchoTerminals : T3MELBOURNE AIRPORT VIC 3045

C 25/07/2019BAN-19-MEL-0344

624 Beca Consultants Pty Ltd 15/07/2019 Works to consist of the following: - Installation of temporary hoardings for delineation of work site- Demolition of tile and screed- Temporary removal / reinstatement of facade at node to crane travellator components into the T4 concourse. - Supply, Installation and commissioning of 4 x travellators (incl. connection of electrical services)- Installation of travellator access ramps- Installation of travellator handrails

Terminals : T4MELBOURNE AIRPORT VIC 3045

R 17/07/2019

625 MOBIL OIL AUSTRALIA PTY LTD 17/07/2019 Upgrade of the Jet A1 Road receipt Bay equipment, comprising of:- Install new Meter skid (fabricated offsite)- Install transfer pumps and piping- Concrete pavement/foundations to cater for the new equipment- New power supply, Motor Control Centre and power reticulation to the new receipt pumps- Demolition and removal of existing Bay 1 and 2 receipt systems (pumps, meters, piping)- New steel platform around existing Bay 1 & 2 Filter Water Separator

Landside : JUHI Aviation Fuel Storage FacilityMELBOURNE AIRPORT VIC 3045

C 30/07/2019BAN-19-MEL-0284

626 THE TRUSTEE FOR QANSTRUCT (AUST) UNIT TRUST

12/07/2019 Construction of a warehouse and office facilities for Bapcor.

Landside : Link Rd, TullamarineMELBOURNE AIRPORT VIC 3045

C 07/08/2019 16/12/2019BAN-19-MEL-0496

631 Root Partnerships 16/07/2019 Construct a new PO Box Room between the Elevated Road Columns in the Northern

Landside : Northern Undercroft area between T1 and T2 (forecourt)

C 29/07/2019BAN-19-MEL-0340

Page 48: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Undercroft area between T1 and T2. The room includes, fire services, lighting and ventilation/heating.

MELBOURNE AIRPORT VIC 3045

634 Australia Pacific Airports Corporation Limited

29/07/2019 T2 Qantas Link - LS09 Grill'd Tenancy Fitout (Tenancy was previously Nandos)

Landside : T2 Qantas LinkTerminals : T2MELBOURNE AIRPORT VIC 3045

C 16/08/2019BAN-19-MEL-0312

635 Beca Consultants Pty Ltd C17/07/2019 Works to consist of the following: - Installation of temporary hoardings for delineation of work site- Demolition of tile and screed- Temporary removal / reinstatement of facade at node to crane travellator components into the T4 concourse. - Supply, Installation and commissioning of 4 x Travellators (incl. connection of electrical and data services)- Supply and Installation of travellator access ramps (incl. handrails)

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 26/07/2019BAN-19-MEL-0326

639 Australia Pacific Airports Corporation Limited

22/07/2019 T2 Qantas Link - LS05 Hawker Bar Tenancy Fit out (Tenancy was previously Hungry Jacks)

Landside : T2 Qantas LinkTerminals : T2MELBOURNE AIRPORT VIC 3045

C 02/08/2019BAN-19-MEL-0335

642 Root Partnerships 19/07/2019 Build new cleaners cupboard on Pier E, Terminal 3

Airside : Pier ETerminals : T3MELBOURNE AIRPORT VIC 3045

C 30/07/2019BAN-19-MEL-0277

643 Donald Cant Watts Corke (Management) Pty Ltd

22/07/2019 Install of a new door in the D10 fixed link Terminals : T2MELBOURNE AIRPORT VIC 3045

C 30/07/2019 BAN-19-MEL-0348

645 Donald Cant Watts Corke (Management) Pty Ltd

17/06/2019 Installation of a symphonic roof drainage system at Building 64, Melbourne Airport.

Landside: Building 64, Service Road, Melbourne Airport, 3045.

C 05/08/2019 BAN-19-MEL-0282

646 QANTAS AIRWAYS LIMITED 23/07/2019 Rebranding of the Qantas Valet signage Car Parks : @T1Landside : Qantas Valet entranceMELBOURNE AIRPORT VIC 3045

C 02/09/2019

652 AECOM Australia Pty Ltd 25/07/2019 Design and Construction services for the PFAS Water Treatment Plant (WTP) as part of the planned Temporary PFAS Soil Storage Facility (The Facility).

Scope includes the following:- PFAS WTP;- Civil works and services for PFAS WTP;- Holding Basin Transfer Pump;- Drying Pan;- Perimeter and Internal Roads;- Fencing and access gate (3 No.);- Operation and Maintenance Procedures/manuals;- Testing and commissioning.

Landside: Northern Portion of Lot 1 (TP171590) adjacent to the boundary with Lot 1 (TP171589) Mansfield Road.Melbourne Airport, 3045

C 28/11/2019

Page 49: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

655 Built Pty Ltd 29/07/2019 Hotel Development Stage 1: Bulk Excavation, In-ground Services, Foundations & Piling, Retention Precast, Slab on GroundStage 2: Precast Lift & Stair Cores, Precast WallsStage 3: Ground Level Slab & Office StairStage 4: Levels 1-2 SlabsStage 5: Aero foil & Podium SteelworkStage 6: Levels 3 - Roof SlabsStage 7: Roof Plant SteelworkStage 8: ServicesStage 9: Curtain Wall FacadeStage 10: Aero foil FacadeStage 11: Podium FacadesStage 12: ArchitecturalStage 13: Landscaping & Civil Works

Landside : 1-5 Grants Road, Melbourne Airport, 3045

C 13/08/2019BAN-19-MEL-0310

661 TM Commercial Pty Ltd 01/08/2019 Build a new tenancy wall and separate services

Terminals : T2Melbourne Airport, 3045

C 26/08/2019BAN-19-MEL-0357

662 Root Partnerships 31/07/2019 Installation of Ball Decking in T2 Outbound Bag room as a ULD handling aid.

Airside : T2 Outbound Bag roomMelbourne Airport, 3045

C 21/08/2019BAN-19-MEL-0372

665 Turner & Townsend Pty Ltd 02/08/2019 To install new machine, governor, buffer and roller guides for lifts 1 and 2

Terminals : T3Melbourne Airport, 3045

C 15/08/2019BAN-19-MEL-0394

670 AirServices Australia 08/08/2019 Remove existing cladding on ATSC (BLD 212) eastern façade and replace with non-combustible type cladding

Landside : Building 212 ATSCMelbourne Airport, 3045

C 20/08/2019

672 ROOT PARTNERSHIPS PTY LTD 06/08/2019 The scope of works includes provisions to upgrade HV supply for AirServices Australia. It includes the installation of new RMU and transformers along with HV cabling and necessary civil infrastructure.

Landside : Near AirServices Australia Site, between the existing RMUs: RMU-14 &amp; RMU-15Melbourne Airport, 3045

C 16/09/2019 27/11/2019BAN-19-MEL-0399

673 Australia Pacific Airports Corporation Limited

15/08/2019 T4 - FB09 Roll'd Tenancy Fitout (Tenancy was previously Sixpence Pies)

Airside : T4 Food CourtTerminals : T4MELBOURNE AIRPORT VIC 3045

C 30/08/2019BAN-19-MEL-0373

674 McDonalds Australia Limited 18/11/2019 Safety bollards are required along the front of our tenancy on the external TIU site - they unfortunately have already been installed, however we are seek approval for the bollards. These works are a part of a nationwide safety audit that was completed by McDonalds Australia Limited.

Landside : External McDonalds adjoining BP

675 Airport Data & Electrical 13/08/2019 Installation of communications conduit from existing Optus pit near Gate 22 to the

Landside : Optus pit near Gate 22Melbourne Airport, 3045

CW

21/08/201920/09/2019

Page 50: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

existing Telstra pit near Qantas building Gate 24.Installation of single mode Fibre optic cable from Comms cabinet in ASA Building 212 and Comms cabinet in Jetstar Support Building.

682 Donald Cant Watts Corke (Management) Pty Ltd

12/08/2019 Install of new line marking, pavement and tire spikes in the long term carpark.

Car Parks : Long TermMelbourne Airport, 3045

C 06/12/2019

683 VIRGIN AUSTRALIA AIRLINES PTY LTD 13/08/2019 Fitout of office space located at Level 2, terminal 2 Melbourne Airport. Refresh of existing offices (previously APAM) to enable consolidation of Virgin Australia offices.

Landside : Level 2, terminal 2 Melbourne Airport 3045

C 13/09/2019BAN-19-MEL-0385

690 Root Partnerships 14/08/2019 Temporary Smokers Area - Departure Drive Landside : Departure DriveMelbourne Airport, 3045

C 10/09/2019BAN-19-MEL-0391

692 Australia Pacific Airports Corporation Limited

14/08/2019 T2 LS10 Rolling Luggage Tenancy Fit out (Tenancy was previously Rolling Luggage and is being refit out)

Landside : T2 Terminals : T2Melbourne Airport, 3045

C 28/08/2019BAN-19-MEL-0365

695 GHD 16/08/2019 Construct a wall down the Centre of the existing retail space to create two stores. Both stores will be operated by Dufry.

Airside : T2 Departures Duty FreeMelbourne Airport, 3045

C 09/09/2019BAN-19-MEL-0339

697 HARRIS HMC INTERIORS PTY LTD 11/09/2019 Upgrade of the training facilities for the Essendon Football Club at the existing facility near Melbourne Airport. Extension to the South side of the building and internal Fitout. The works will encompass a 4 storey extension and comprise additional and updated facilities such as new Hall of Fame, café and kitchen facilities, locker and change rooms, dormitory style accommodation, car parking and landscaping and community facilities (offices, meeting rooms, etc.)

Landside : 275 Melrose DriveMelbourne Airport, 3045

C 26/09/2019BAN-19-MEL-0371

701 Australia Pacific Airports Corporation Limited

22/08/2019 T4 - FB08 Subway Tenancy Fitout (Tenancy was previously Chop'd Salad)

Airside : T4Terminals : T4Melbourne Airport, 3045

C 09/09/2019BAN-19-MEL-0362

703 Maz Building Maintenance 22/08/2019 This project is to facilitate the provision of additional work stations to the east end of the First Floor, the upgrade of the Male, Female and Accessible toilet facilities, the provision of more Break Out Areas; the provision of more natural light to Training Rooms and an upgrade of the Stairwell.

Landside : Building No. 177Melbourne Airport, 3045

C 05/09/2019BAN-19-MEL-0411

704 Australia Pacific Airports Corporation Limited

22/08/2019 T2 - LS02 Axil Coffee Tenancy/Kiosk Fitout (Tenancy was previously Hudsons)

Landside : T2Terminals : T2Melbourne Airport, 3045

C 20/09/2019BAN-19-MEL-0396

705 Turner & Townsend Pty Ltd 22/08/2019 Full depth pavement reconstruction of Airport Drive (southbound carriageway only) between APAC Drive and Mercer Drive -

Landside : Airport Drive (southbound carriageway only) between APAC Drive and Mercer Drive

CW

13/09/201918/11/2019

Page 51: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Package AFull depth pavement reconstruction of Airport Drive / Mercer Drive roundabout - Package B does not form part of the current scope or work.

Melbourne Airport, 3045

708 Turner & Townsend Pty Ltd 22/08/2019 Incinerator Road / Operations Road existing PFAS stockpile re-protection works to APAM PFAS Management Framework requirements.

Landside: Existing MA PFAS Stockpiles Incinerator Road, 150m West of the intersection with Operations Road.Melbourne Airport, 3045

CW

10/09/201925/09/2019

716 Civilex Victoria Pty Ltd 02/09/2019 Construction of a new Gantry 1 along Terminal Drive, decommissioning of the redundant gantry. Cable route trenching required to feed new gantry, roadside barriers to be upgraded.

Landside : Terminal Drive, between Tullamarine Freeway and Substation 90Melbourne Airport, 3045

C 18/09/2019BAN-19-MEL-0419

718 AirServices Australia 05/09/2019 AirServices will be undertaking refurbishment of Bldg. 212. As a result we will need to relocate the security office into a temporary building during the works

Landside : Operations Rd, TullamarineMelbourne Airport, 3045

C 19/09/2019 BAN-19-MEL-0455

719 MIC PROJECTS PTY LTD 10/09/2019 Internal Fit-out Works - restaurant and fast food tenancy.- flooring- walls- bar- painting- tiling- joinery- stainless benches- electrical & plumbing works-etc

Business Park Tenancy : 6 Watson Drive TullamarineMelbourne Airport, 3045

C 26/09/2019 10/01/2020BAN- 19-MEL-0423

723 THE TRUSTEE FOR QANSTRUCT (AUST) UNIT TRUST

06/09/2019 Warehouse Development including two story offices

Landside : 15 Woodruff WayMelbourne Airport, 3045

C 14/10/2019

730 Startrack 11/09/2019 Works associated with installing additional conveyor system within the facility. These works include:New openings to external wall in building.Weather wall to be installed under awningInternal installation of doorPower and data to suit layout.

Business Park Tenancy : 140 Sharps Road, TullamarineMELBOURNE AIRPORT VIC 3045

C 30/09/2019 04/12/2019BAN-19-MEL-458

732 Australia Pacific Airports Corporation Limited

10/09/2019 T3 Pier E - Fitout of Retail Tenancy AS04 Stomping Ground (Previously Flybar)

Airside : T3 Pier ETerminals : T3Melbourne Airport, 3045

C 24/09/2019 08/11/2019BAN-19-MEL-0418

733 Turner & Townsend Pty Ltd 11/09/2019 Terminal 2Relocation of 9 Elec/data floor boxes to avoid clashing with the support feet of the new CTiX machine. Terminal 4;Demo of 1x pass back on the North end, 1x South end, Relocation of 2x FHR & Hydrants, install larger sqm grid queuing system,

Terminals : T2,T4Melbourne Airport, 3045

C 10/10/2019

Page 52: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Install 2x reduced shutters, Install rapid close doors to existing 2x pass back’s, Install CT Machines to new Lanes 1 & 6 inclusive, along with new 2x new iLanes (staged) (2 off.) and 3 body scanners, Install future hydraulic waste points & Install joinery.

734 Australia Pacific Airports Corporation Limited

12/09/2019 T3 - LS01 AFL Bar Tenancy Fitout (Tenancy was previously High tide)

Terminals : T3Melbourne Airport, 3045

C 02/10/2019BAN-19-MEL-0412

735 BUILTPLUS PTY. LTD. 16/09/2019 Minor Fitout Works Business Park Tenancy : 115-119 Link Road, TullamarineMelbourne Airport, 3045

C 08/10/2019BAN-19-MEL-0450

737 Australia Pacific Airports Corporation Limited

13/09/2019 Installation of new Cool room next to Loading Dock 1 for T3 LS02 Scott Pickett Deli (area was previously a larger cool room )

Airside : T3 Loading Dock 1Terminals : T3Melbourne Airport, 3045

C 09/10/2019 07/11/2019BAN-19-MEL-0325

738 TNT Australia 17/09/2019 Relocate 53 m of chainmesh fence, and re-install to new allocated area using new cables and barbed wire. Extend fence to boundary fencing. Relocate gate and install new track. Cut and shave existing Dyna bolts. Back fill track screw holes. Supply labor and materials to fabricate and install (7x) 90x12 flat bar rings around base of columns then infill with construction grout to protect base place bolts. Prime and paint 7 x steel columns including materials.

Landside : Sky Road TullamarineMelbourne Airport, 3045

C 02/10/2019BAN-19-MEL-0466

742 Australia Pacific Airports Corporation Limited

18/09/2019 T2 Qantas Link - LS08 Middle Ground Tenancy Fitout (Tenancy was previously Sirocco)

Terminals : T2Melbourne Airport, 3045

C 04/10/2019BAN-19-MEL-0440

744 Donald Cant Watts Corke (Management) Pty Ltd

19/09/2019 The provision of a new 2,500kVA Substation adjacent to Marker Rd extension to service the new pumps associated with the recently installed JUHI tanks.

The works comprise HV Pits, Kiosk, Kiosk enclosure and slab, drainage and access way.

Landside : Adjacent to JUHIMelbourne Airport, 3045

C 11/10/2019

757 Huawei Technologies (Australia) Pty Ltd 13/09/2019 Optus has proposed a mobiles equipment upgrade to improve the existing Optus 4G services at Melbourne Airport Terminals 1-4. Works include:

* Staggered swap-out of existing remote units throughout Terminals 1-4 (17 x Locations);* Replacement of existing Optus racks within Optus BTS room;* Upgrade and consolidation of technologies

Terminals : T1,T2,T3,T4 C 14/11/2019 19/11/2019BAN-19-MEL-0535

Page 53: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

within existing and new Optus equipment racks within the Optus BTS room;* Installation of new Fibre terminal box within Optus BTS room;

768 Air Services Australia 07/10/2019 Establishment of a next Load Bay / Access road to the new Canteen

Landside : Airservices Campus - Building 193 C 31/10/2019 10/12/2019BAN-19-MEL-0455

769 CMW Design & Construct (Vic) Pty Ltd 08/10/2019 Installation of Pallet Racking, Dead House storage compartment and Office Workstations

Business Park Tenancy : 31 Jets Court - New Building fitoutLandside : Jets Court - New Building fitout

C 25/10/2019 22/11/2019BAN-19-MEL-0465

781 Australia Pacific Airports Corporation Limited

23/10/2019 T4 - Fitout of Retail Tenancy S7B Amcal (Previously part of Amuse before tenancy was split into two with the other half now Mecca )

Terminals : T4 C 01/11/2019 17/01/2020BAN-19-MEL-0478

783 Root Partnerships 29/10/2019 Modification of steel platform including the installation of new steel work and repositioning of existing step ladder.

Airside : Airside Road, Terminal 2 C 12/11/2019

785Australia Pacific Airports Corporation Limited

16/10/2019 Fitout works to re-brand the existing Oxford tenancy in T1 to JB Hi-Fi. Note the intent is to retain the existing ceiling.

Airside : Oxford TenancyTerminals : T1

C 08/11/2019 20/11/2019BAN-19-MEL-0485

789 Donald Cant Watts Corke (Management) Pty Ltd

21/10/2019 Construction of a new BP Petrol Station and McDonalds Restaurant

Business Park Tenancy : South East Corner of Airport Drive and Link Road

C 12/11/2019

792Programmed Maintenance Services Limited

23/10/2019 Additional pallet racking installed in the Programmed B64 Workshop and construction paint wash area. Shower install in the locker room in the office.

Landside : B64

793 Australia Pacific Airports Corporation Limited

01/11/2019 New Freezer Room Installation

Note: Freezer Room was previously documented and approved (APAM Reference No: 634) across the hallway but is now required to be relocated due to spatial conditions on site being different than originally documented.

Airside : Loading Dock 2Terminals : T2

C 29/10/2019BAN-19-MEL-0312

798Australia Pacific Airports Corporation Limited

28/10/2019 T2 Qantas Link - Fitout of Retail Tenancy LS06 Roll'd (Previously Subway)

Terminals : T2 C 12/11/2019 22/11/2019BAN-19-MEL-0413

801 Turner & Townsend Pty Ltd 01/11/2019 With expected passenger growth, and current ageing infrastructure and mechanical equipment, Lift 33 (part of the Lift Upgrade Project) is being upgraded to minimize disruption to passenger and staff movements. Scope of work includes

Terminals : T2 C 22/11/2019

Page 54: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

upgrading door system and conducting Hazard and risk assessment.

802 Donald Cant Watts Corke (Management) Pty Ltd

06/11/2019 Solar Farm HV Pit & Duct works, including HV, LV & Communications pit and conduit network from Substation 32 to north of Sunbury Road. Civil works only.

Airside : Airside portion: from substation 32 heading north to northern airfield boundaryLandside : Landside portion: from airfield boundary near 16-36 HIALS to north side of Sunbury Road

C 22/11/2019 19/12/2019BAN-19-MEL-0521

808 CUSHMAN & WAKEFIELD PTY LTD 20/11/2019 The addition of 5 emergency exit lights

Business Park Tenancy : 120 Link Road

c 12/12/2019 16/01/2020BAN-19-MEL-0476

819 AECOM Australia Pty Ltd 19/11/2019 HIALS 27 Concrete Barrier Protection works

Landside : Sunbury Road beneath HIAL27 Gantry

c 04/12/201

822 Programmed Maintenance Services Limited

29/11/2019 Demolition of B223. Above ground works only. On Francis Briggs road, next to Skybus Depot. Only the above ground garage/shed building will be removed. No ground works will take place.

Business Park Tenancy : B223 C 12/12/2019

835 Department of Infrastructure, Regional Development & Cities

26/11/2019 A Fit out for the Department of Infrastructure.

The works included the construction of internal walls to create;

- Meeting room- Conference room- Breakout area- comms room- 12 workstations

Landside : Building 64 (near T4) R _

837 Department of Infrastructure, Regional Development & Cities

27/11/2019 The works involves constructing internal walls for the creation of;

- small meeting room- conference room- comms room -breakout area- Area for 12 Workstations

181m2 in total

Landside : Building 64 Suites 4 &amp; 5 (near T4)

C 09/01/2020

839 Fulton Hogan 28/11/2019 Mobilization of Concrete Batch Plant Airside : Currently located Airside prior to completion of Northern Access Road

C 07/01/2020

Page 55: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

Landside : Will be located Landside once Northern Access Road is complete

841 PROPERTY BEYOND PTY LIMITED 28/11/2019 New Boom gate, vehicle spikes and bollards within the Avis Budget Area, ground floor of the carpark.

Car Parks : @T1,@T2,@T3

849 Australia Pacific Airports Corporation Limited

03/12/2019 T1 Qantas Departures - Fitout of Retail Tenancy Harvest Juice (Previously OZ Gifts)

Terminals : T1 C 17/01/2020 23/01/2020BAN-19-MEL-0512

851 TM Insight P/L 03/12/2019 T3 Office Fitout Terminals : T3 R -

857 AUSTRALIA PACIFIC AIRPORTS (MELBOURNE) PTY LIMITED

09/12/2019 End of life gate equipment throughout the STCP is to be replaced at all main entries and exits. Ski data columns are to be removed and replaced by an upgraded version. To enable works, an electrical and data contractor (AD and E) will be required to disconnect the existing power and data connections in the columns, allowing the column's baseplate to be removed and replaced. To install the new baseplate, new drilled fixings shall be provided.

Car Parks : @T1,@T2,@T3 c 17/12/2019 16/12/2019BAN-19-MEL-0566

861 ROOT PARTNERSHIPS PTY LTD 11/12/2019 CP18102-04 - Terminal 4 Checked bag Screening Regulatory Upgrade. This work is part of the CBS Regulation program which covers T2 and T3 as well. This application is for T4 only. The scope is to remove existing CBS X Ray equipment and replace with new. New equipment will be installed on a new purpose built mezzanine above the existing carousels and within a new environment controlled and secure equipment room. The Out of Gauge X-Ray equipment will also be replaced and the room expanded.

Terminals : T4

865 Donald Cant Watts Corke (Management) Pty Ltd

11/12/2019 Construction of the new ALER 3 Building and demolition of the

Airside : East of Twy Alpha and north of Runway 09/27

Page 56: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

existing ALER 3 Building.

867 Turner & Townsend Pty Ltd 12/12/2019 Replacement of the Standard two CBS machines with Standard three CBS machines (direct replacement); 3 new CBS machines in total; 2 in-gauge machines; 1 over sized machineModifications to the current belt-based baggage handling system as required to accommodate the reconfigured operational requirementsProvision of a suitable and safe injection point for Airside deliveries of oversized bagsBuilding infrastructure and services

Airside : Terminal 3 Baggage Screening HallTerminals : T3

C 08/01/2020

868 Premier Electrical and Solar Services Pty Ltd

12/12/2019 Installation and commissioning of Solar Panels

Business Park Tenancy : 115 South Centre Rd. Tullamarine

872 BLUEKEN PROJECT MANAGEMENT PTY LTD

17/12/2019 Replacement of the existing Fire Detection and Alarm systems and network throughout Terminal 2. The project scope aligns with the Fire Services Strategy and Masterplan and involves replacement of existing Fire Detection Control & Indication (FDCIE) panels, new fibre optic network and graphics, new detectors and loops transferred onto the new network. The project shall be designed and delivered in two Phases. This permit application relates to Phase 1 only,

Airside : New FDCIEs and cabling networks to existing FIP locations - out to Pier D gatesCar Parks : @T2Landside : New FDCIEs and cabling networks to existing FIP locations - out to TSBsTerminals : T2

C 09/01/C2020

874 THE TRUSTEE FOR QANSTRUCT (AUST) UNIT TRUST

17/12/2019 Replacement of the existing Fire Detection and Alarm systems and network throughout Terminal 2. The project scope aligns with the Fire Services Strategy and Masterplan and involves replacement of existing Fire Detection Control & Indication (FDCIE) panels, new fibre optic network and graphics, new

Landside : Mace Way, Tullamarine 3043

C 09/01/2020

Page 57: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

detectors and loops transferred onto the new network. The project shall be designed and delivered in two Phases. This permit application relates to Phase 1 only,

882 Decon Technologies Pty Ltd 20/12/2019 Hauling and Jointing of NBN Distribution Fiber Network (DFN) from Tullamarine exchange down Melrose drive to Tunnel Entrance and up South Centre rd to Control Tower

Landside : Tullamarine exchange down Melrose drive to Tunnel Entrance and up South Centre rd to Control Tower

884 Root Partnerships 07/01/2020 T2 Relocation Inbound OOG / Baggage handling system works

Airside : T2 Airside Road, south of T2 transfer line

894 BLUEKEN PROJECT MANAGEMENT PTY LTD

14/01/2020 As part of the HV Asset Replacement program of works, APAM has identified a number of HV Assets (i.e. Kiosk Substations) within the Melbourne Airport Business Park that require Vehicle Protection Barriers installed to mitigate vehicle impact damage to high risk HV Assets within the business park. Assets to have protection barriers installed were identified via risk assessment in 2014 by VicRoads Traffic consultants GTA Consultants, which was further developed to Construction Docs by GHD.

Landside : Melbourne Airport Business Park - various HV Kiosk Substation assets

C 29/01/2020

904 CMW Design & Construct (Vic) Pty Ltd

21/01/2020 Flag Poles Business Park Tenancy : 31 Jets Court, Melbourne Airport

910 TM Insight P/L 28/01/2020 Demolition & Hazmat removal of ex VA tenancy T3

Landside : T3

911 Turner & Townsend Pty Ltd 28/01/2020 The SDA Upgrade project will see the replacement of 7x SDA metered switchboards along the Level 2 corridor at both Terminal 2 & 3, with new SDA boards.The SDA boards will be fed from a SDA-MDB (2 off) located in the Penthouse and North Plant room Level 2.

Terminals : T2,T3

Page 58: Melbourne Airport · Web view2020/01/17  · Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application

submitted to ABC

If MEL is not the applicantdate which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABCDate

New cable tray will be installed within the ceiling space, from each tenancy to the SDA locations.