MEND Treatment and Sludge Management Survey
Janice Zinck and Wesley GriffithJanice Zinck and Wesley GriffithNovember 28, 2007November 28, 2007
14th Annual BC/MEND - Metal Leaching/Acid Rock Drainage Workshop
![Page 2: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/2.jpg)
Introduction• Treatment and sludge management are two
important facets of mine site environmental control practices
• Most sites employ some form of chemical treatment to address acid drainage issues. • varies from site to site
• No single, comprehensive database containing treatment and sludge management information for mine sites
![Page 3: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/3.jpg)
Methodology
• A questionnaire was developed • Mining companies, federal, territorial and
provincial governments were contacted• Information compiled in an interactive database• Focussed mainly on Canadian sites.
• Data on sites in the US and globally will also be collected
• The surveys were completed thoroughly. Quality of the data is generally very good.
![Page 4: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/4.jpg)
The Survey
• The survey collected information on • Site background and history• Acidic drainage characteristics
![Page 5: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/5.jpg)
The Survey• Type of treatment used
(e.g. basic neutralization, mechanical solid/liquid separation, high density sludge, passive treatment, others • Reagents• Costs• Solid/liquid separation • Treatment issues
![Page 6: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/6.jpg)
The Survey• Sludge management practices (e.g. sludge
pond, with tailings or other wastes, in mine working, landfill, in pit, reprocessed, etc.• Sludge composition • Sludge management issues
![Page 7: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/7.jpg)
![Page 8: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/8.jpg)
Sites by Contacted by Region
0
24
68
10
1214
1618
20
BC MB NB NL NS NU
NWT
ONT
QCSAS
K YTUS/w
orld
Freq
uenc
y
![Page 9: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/9.jpg)
Completed Surveys by Region
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
BC MB NB NL NS NU
NWT
ONT QC
SASK YTUS/w
orld
Perc
enta
ge C
ompl
eted
![Page 10: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/10.jpg)
![Page 11: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/11.jpg)
![Page 12: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/12.jpg)
Type of Operation
0
5
10
15
20
25
30
35
Base Metal Coal PreciousMetal
Uranium Other
Freq
uenc
y
e.g. Sb
![Page 13: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/13.jpg)
Operation Status
0
5
10
15
20
25
30
35
Abandoned Closed Operating
Freq
uenc
y
![Page 14: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/14.jpg)
Average Influent pH
0123456789
10
0 10 20 30 40 50 60
Site #
pH
Neutral
Acidic
![Page 15: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/15.jpg)
Average Flow Rate
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0 10 20 30 40
Site #
Flow
Rat
e m
3/ho
ur .
![Page 16: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/16.jpg)
Peak Flows
• Maximum flows typically 2- 4 times greater than average flows.
Courtesy of B. Price
![Page 17: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/17.jpg)
Other Information Collected
• Mine drainage composition• Temperature, TDS, TSS, turbidity,
conductivity, Eh, acidity• Receiving environment• Expected length of treatment
• 9 months to in perpetuity
![Page 18: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/18.jpg)
Source of Acidic/Neutral Drainage
0
5
10
15
20
25
30
35
Tailings Waste Rock Mine Workings Other
Num
ber o
f Site
s
• ~30% sites treat other waste streams with their AD/ND
![Page 19: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/19.jpg)
Treatment Process Details
0
5
10
15
20
25
30
Basic
Neutra
lizatio
nReac
tors
Aeratio
nAcid
ificati
onPas
sive Trea
tmen
tMec
hanic
al L/S
Floccu
lation
Ferric
Sulp
hate
HDS
Membra
ne S
epara
tion
Sludge
Rec
ycle
Settlin
g Pon
ds
Other
Num
ber o
f Site
s .
![Page 20: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/20.jpg)
Flow Equalization
• Holding/collection ponds • pH controller on lime pH
feed line • Buffer pond and water
management• Feed pumps• Pump from surge pond• Pump and level control
![Page 21: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/21.jpg)
Capital Costs
0
5
10
15
20
25
0 5 10 15 20 25 30Site #
$ M
illio
ns
![Page 22: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/22.jpg)
Some Planned Upgrades• Rebuild/replace clarifier and steel tank• Addition new reactor tanks• Expand and winterize facilities pending
government approval • Sludge handling improvements• Reconfiguration• Slaker replacement • Replacement with newer unit with higher flow
capacity• Spiral rakes in the clarifier• Preventive maintenance
![Page 23: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/23.jpg)
Reagents
0
5
10
15
20
25
Nutrien
tsFe2
(SO4)3 CO2
BaCl2
NaOH
Limes
tone
Hydrat
ed
Quicklim
eSlak
ed lim
e Fr
eque
ncy
~15% Paste, 85% Slurry Slakers
![Page 24: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/24.jpg)
Other Reagents
• Sulphuric acid• Ferric chloride• Hydrogen peroxide• Aluminum chloride hydrate sulphate
(coagulant)• Sodium Hypochlorite• Sodium metabisulfide
![Page 25: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/25.jpg)
Flocculant
0123456
Ameriflo
c 300
Flomin
(Cie
SNS)
Golden
Wes
t 188
3A
Mag
naflo
c 101
1
Magna
floc 1
0Mag
naflo
c
Magna
floc 1
55
Magna
floc 1
56 (E
10)
Magna
floc 2
4
Magna
floc 3
38
Polyflo
c 110
3
Polyflo
c AE 11
25
Powerf
loc 30
56 SH
Super
Floc A
110
Freq
uenc
y
Dose ~ 1-6 mg/L
![Page 26: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/26.jpg)
Solid/Liquid Separation
![Page 27: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/27.jpg)
Solid/Liquid Separation
0
5
10
15
20
25
Thickener LamellaClarifier
VacuumFilter
GritRemoval
Sand Filter SettlingPond
Freq
uenc
y
![Page 28: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/28.jpg)
Treatment Issues• Gypsum scaling – most common problem• Suspended solids• Lime handling and mixing• Sludge density, settling, dredging disposal • Winter related
• Metal dissolution under ice cover (ponds)• Pipeline freeze ups • Polymer mixing during winter
• Other• Algal blooms in collection ponds• Seepage water corrosive to pumps
![Page 29: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/29.jpg)
Treatment Costs
0.00
0.50
1.00
1.50
2.00
2.50
0 5 10 15 20 25
Site #
$/m
3
Average
![Page 30: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/30.jpg)
Operating Cost Breakdown
05
101520253035
Reage
nts
Labo
urPow
er/Utilit
iesTra
nspo
rtatio
nSlud
ge M
anag
emen
tMain
tenan
ce
Other
Aver
age
Per
cent
age
•Sampling•Roads•Analyses•Etc.
![Page 31: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/31.jpg)
Annual Sludge Production
0
5000
10000
15000
20000
25000
0 5 10 15 20 25 30 35
Site #
Slud
ge p
rodu
ctio
n dr
y t/a
135,000 t/a
![Page 32: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/32.jpg)
Sludge Disposal
02468
10121416
Sludge
pond
Mixed w
ith ta
ilings
On exis
ting t
ailing
s
Dredge
d slud
ge on
tailin
gs
Mine w
orking
s
With w
aste
rock
Under
water c
over
PitBac
kfille
dLa
ndfill
Reproc
esse
dSmelt
ed
Other M
ethod
(Deta
ils)
e.g. Heap leach piles
![Page 33: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/33.jpg)
Annual Sludge Disposal Costs
0
20000
40000
60000
80000
100000
120000
0 2 4 6 8 10 12 14 16
Site #
Annu
al S
ludg
e Di
spos
al ($
/a)
![Page 34: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/34.jpg)
Sludge Management Issues• Sludge desiccation and dusting – difficult to
manage• Some sites have limited sludge disposal capacity
and are looking at off site disposal for the future• Difficulty in dredging sludge, high disposal costs,
pH spikes in ponds • Presence of cadmium over permissible leachate
limits • Dewatering NaOH sludge
more difficult than lime based sludge
![Page 35: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/35.jpg)
Next Steps
• Will continue to take surveys up until January 2008• All sites encouraged to participate• More international sites to be included
• Final report to be completed by March’08• Database to be updated on a regular
basis – working document
![Page 36: MEND Treatment and Sludge Management Surveybc-mlard.ca/files/presentations/2007-3-ZINCK-GRIFFITH... · 2017-03-28 · MEND Treatment and Sludge Management Survey Janice Zinck and](https://reader031.vdocument.in/reader031/viewer/2022011906/5f3b6e2c3b3e1853bc20baaa/html5/thumbnails/36.jpg)
Acknowledgements
Beaver Brook Antimony Mine Inc.