MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012. What We’re Going to Cover. Electricity Plumbing Water Gas Drains/waste Steam Refrigeration Exhaust. Electricity. Electrical Terms Voltage is a measure of potential energy Current is the flow of electricity - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012
Page 2: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

MEP 123

Steve Carlson, FCSI, LEEDRobert Rippe & Associates

April 20, 2012

Page 3: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

What We’re Going to Cover

• Electricity• Plumbing

– Water– Gas– Drains/waste– Steam– Refrigeration– Exhaust

Page 4: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Electricity

• Electrical Terms– Voltage is a measure of potential energy– Current is the flow of electricity– Amperage is how current is measured– DC - direct current-batteries

• Used for some elevators in Chicago Loop area– AC is alternating current– Hertz is the frequency of alternating current

• 60 in US, 50 in Europe & Asia– Hot (X), Neutral (N) and Ground

Page 5: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Voltages

• 120/1 = 120 volts, single phase• 208/1• 120/208• 120/240 - residential • 208/3 = 120/208/3• 277/1 – used for building lighting• 480/3 = 208/480/3

Page 6: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

120V/1

Page 7: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

120/240V (What’s in your Home)

Page 8: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

120/208/3 – “Y” Configuration

Page 9: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

120/208/3 - “Delta” Configuration

Page 10: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Hertz

Page 11: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Ohms Law

Volts * Amps = Watts

Page 12: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Use Ohm’s Law to Calculate Amperage from Wattage

• P= V x I or watts = volts x amps• Example - how many amps is 3600 watts?

Voltage Divide by Watts Amps

120 120 3600 30.00

208 208 3600 17.31

120/208 208 3600 17.31

208/3 360 3600 10.00

480/1 480 3600 7.50

480/3 831 3600 4.33

Page 13: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

When to Use Different Voltages

• 3 phase better for large motors• 480/3 better for large loads like heaters• 480/3 doesn’t need to go thru a secondary transformer• Consider availability of replacement motors or heaters before

specifying 480/3

Page 14: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Water

• Temperature - hot or cold• Pressure• Size - inches NPT• Quality - hardness, chlorine, etc• Protection from contamination• Flow control/shut-offs

Page 15: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Water Temperature

• Hot Water– Minimum incoming temperatures for warewashing equipment– Booster heaters required to raise temperature to 180 degrees,

sometimes for lower temperatures– Some elementary schools only provide 90 -110 degree hot water,

always ask!– Temperature for food prep & pot washing 110 degree minimum– Chemical sanitizing needs 75-120 degree water

Page 16: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Cold Water

• Sometimes cold is not so cold, find out summer water temperatures when sizing ice makers

• Shouldn’t have problems with water being too cold

Page 17: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Water Pressure

• Always check manufactures cutsheet– Warewashing equipment 20-25 psi– Cooking equipment 30-60– Beverage equipment up to 80-90 psi– Ideal water pressure should be 40 -55 psi– Tell engineers what pressure the equipment

needs, they should specify pressure reducing valves at equipment

Page 18: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Flow Control/Faucets

• Shut-off should be provided at all water connections• Engineer to specify, mechanical contractor to install• Types-gate valves, ¼ turn ball valves, angle stops • Faucets typically furnished loose for installation by

mechanical trades

Page 19: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Water Line Sizes

• Usually 1/2” NPT, etc.• Difference between connection size and rough-in size, discuss

with engineer

Page 20: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Water Quality

• Biggest concern is hardness - check specs

• Important for any equipment that heats water

• Water filters can help, they take out particulate, not minerals/hardness

• Reverse osmosis systems take out minerals/hardness

• Water softening exchanges calcium with sodium which can still precipitate

Page 21: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Water Quality

• Chlorine is a problem for ice makers • Prevents water from freezing• Affects flavor• Charcoal filter will remove chlorine

Page 22: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Protection from Contamination

• Backflow prevents/anti-siphon devices

• Required for “submerged inlets” like disposer water inlets, spray rinses, etc.

• Prevent waste water from siphoning back into water supply if water pressure drops

• Water wash hoods require “reduce pressure principal backflow device” or RPZ

Page 23: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Gas

• Natural and propane• Measured in BTU’s• Sizes in inches NPT• 1 cubic foot of natural gas = 1000 BTU’s• 1 cubic foot of propane gas = 2500 BTU’s

Page 24: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Gas Pressure

• Gas pressure for cooking equipment listed as inches/water column, w.c.

• Typical pressures 3.5-7 w.c.• Gas piping in commercial building is

2 psi or higher• 1 psi = 27” w.c.• Engineer needs to specify a “Pounds to

Inches” pressure reducing valve• Cooking equipment should have a “Inches

to Inches” pressure reducing valve

Page 25: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Gas Quick Disconnects

• Many details available• Should clearly state who furnishes

and installs components

Page 26: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Drains/Waste Systems

• Direct-hard piped • Indirect-piped to floor sink or floor drain with air-gap• Local codes determine which type of connection• Most states require food prep sinks to have an indirect waste

connection

Page 27: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Direct Waste Connections

• Typically for handsinks or other non-food sink

• When food prep sinks are direct connected a “tell-tale” floor drain is required

• Require a tail-piece and a “P-trap”, typically furnished by mechanical trades

• Drain usually furnished loose by FSEC

• Drain can be strainer, removable basket, lever or pop-up waste

Page 28: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Grease Traps

• Put them far away from the kitchen

• Required for “greasy waste”• What fixtures needs to be

connected varies by code and inspector

• If you can’t get them out of the kitchen try to make them flush with floor

Page 29: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Steam

• Steam is water vapor• Transfers heat by condensing from vapor to water • There is five times as much heat in steam as boiling water• Steam is the most efficient way to transfer heat/cook• Steam can be hotter than 212 degrees• You can brown meat in a steam kettle with 50 psi steam

Page 30: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Steam

• Steam requirements are listed as inches NPT, psi and pounds/hour or boiler horsepower

• 1 boiler horsepower = 34.5 pounds/hour

• Typical steam pressures are 15-45 psi

• Some cook/chill projects use 100 psi steam

• The higher pressure the faster the cooking

Page 31: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Steam Piping

• Steam kettle detail

Page 32: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Steam Piping

• Steam requires 2 connections• Supply• Condensate return• Condensate lines need to

return via gravity or a condensate pump

• Challenges with condensate return when on grade

Page 33: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Refrigeration

• Refrigeration removes heat by “changing state” from liquid to a vapor or gas

• Refrigerant boils at low temperatures, 25 degrees or -20 degrees

• Liquid refrigerant can still give off heat on a 120 degree roof

• Refrigeration systems work on changes in pressure– High pressure = hot– Low pressure = cold

Page 34: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Refrigeration

Page 35: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

The “Low Pressure” side

• The expansion valve releases high pressure liquid refrigerant into the evaporator coil

• There is so little pressure in the coil so the refrigerant boiling point is so low that it absorbs heat from the air and turns into a “super-heated” gas

• The refrigerant gas is “sucked” on to the compressor so this is also known as the “suction or gas” side

Page 36: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

The "High” Side

• The compressor “compresses” the gas which increases it temperate to 90-130 degrees

• The gas proceeds to the condenser, like a radiator, and it gives off it’s heat to the atmosphere

• Then on to the receiver which has a reserve of liquid refrigerant ready to meet demand

• Then back to expansion valve• Condensing unit refers to the

compressor, the condenser and controls

Page 37: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Pressure Controls

• Refrigeration systems are activated by changes in pressure• There is no wiring required between the coil and the

condensing unit

Page 38: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Defrost

• Electric heaters controlled by a timer for freezer

• Do need to wire from time clock to coil

• Air defrost for refrigerators

Page 39: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Other Components

• Suction line accumulator/filter-prevents liquid from getting into compressor

• Liquid line filter/drier-collects moisture and debris before expansion valve

• Liquid line site glass-for inspection• Low ambient controls

– Headmaster controls-regulates how much heat needs to be given off when cold outside

– Crankcase heater

Page 40: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Exhaust Hoods

• Type I-grease exhaust• Type II-steam and vapor-

limited uses• Hood types

– Wall canopy– Island, single and double– Backshelf or low proximity

Page 41: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Exhaust Volumes

• How low is low volume?• Caveat Emptor-see Fishnick.com

http://www.fishnick.com/publications/appliancereports/hoods/disclaimer.php

• The more ends of the hood that are enclosed the lower the volume can be

• Island hoods require the most exhaust• Backshelf hoods use the lowest amounts

- look at McDonald’s fryer line

Page 42: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Make-up Air

• What goes out must come in• Make-up air has to come from

the room, not the hood• Make-up air replaces the air the

rises from the cooking equipment

• How the make-up air is supplied affects exhaust performance more than hood design

Page 43: MEP 123 Steve Carlson, FCSI, LEED Robert Rippe & Associates April 20, 2012

Make-up Air Guidelines

• The farther away the better• The lowest velocity possible• Some make-up air systems at the

hood do work, but be cautious• Look at the Schlieren tests

http://www.fishnick.com/ventilation/ventilationlab/