CLIENT : Mr.Abdulla Abdul Rahman Mohd Al Mohammad IR No: 58 Date: 22-06-15 Rev.00 PROJECT: (B+G+12+GM+ROO!" R#$%d#n& Bu%ld%n' A& Al Nahda CLIENT: Mr.Abdulla Abdul Rahman Mohd Al Mohammad CON )LTANT: A**#$$ En'%n##r%n' Con$ul&an* CONTRACTOR: M,$ Mod#rn E-#*u&% # Con&ra*&%n' $&#m L.L.C In$/#*&%on R#0u%r#d on Date:, Architectural Structural/Civil M! A/C lectrical !lu"#i$% Drawings/Specifications/Standard references Drawings In$/#*&%on R#0u#$& !or(IR": Lo*a&%on o I&#m: %'h L# #l 3a&#r u//lPPR 12&h !loor !or ME C: Mep MESC : 4a&# : R#*#% #d b Con$ul&an&: Re&ult& o' I$&(ectio$: A Work may proceed. ) Work may proceed subject to incorporate the below comments C Work may not proceed, corrections must be implemented, re-inspection required D Work may not proceed, work done not as per contract specific actions Co""e$t&: Consultant Engineer: Date: Resident Engineer : Date: R#*#% #d b *on&ra*&or: 4a&#:

Upload: abdul-hakeem-semar-kamaluddin

Post on 04-Nov-2015

9 views

Category:

Documents


0 download

DESCRIPTION

ada

TRANSCRIPT

CLIENT:Mr.Abdulla Abdul Rahman Mohd Al Mohammad

IR No: 58 Date: 22-06-15 Rev. 00 PROJECT: (B+G+12+GYM+ROOF) Resident Building At Al Nahda

CLIENT:Mr.Abdulla Abdul Rahman Mohd Al Mohammad

CONSULTANT:Access Engineering Consultancy

CONTRACTOR:M/s Modern Executive Contracting System L.L.C

Inspection Required on Date:, ArchitecturalStructural/CivilMEP

A/CElectrical Plumbing

Drawings/Specifications/Standard references

Drawings

Inspection Request For(IR):Location of Item:

High Level Water Supply PPR12th Floor

For MESC:

Mep MESC : Date: Received by Consultant: Results of Inspection:

A

Work may proceed.

BWork may proceed subject to incorporate the below comments

CWork may not proceed, corrections must be implemented, re-inspection required

DWork may not proceed, work done not as per contract specific actions

Comments:

Consultant Engineer:Date:Resident Engineer :Date:

Received by contractor: Date: