CLIENT:Mr.Abdulla Abdul Rahman Mohd Al Mohammad
IR No: 59 Date: 22-06-2015 Rev. 00 PROJECT: (B+G+12+GYM+ROOF) Resident Building At Al Nahda
CLIENT:Mr.Abdulla Abdul Rahman Mohd Al Mohammad
CONSULTANT:Access Engineering Consultancy
CONTRACTOR:M/s Modern Executive Contracting System L.L.C
Inspection Required on Date:, ArchitecturalStructural/CivilMEP
A/CElectrical Plumbing
Drawings/Specifications/Standard references
Drawings
Inspection Request For(IR):Location of Item:
Drainage High Level9th Floor
For MESC: Project Manager: Mep MESC : Date: Received by Consultant: Results of Inspection:
A
Work may proceed.
BWork may proceed subject to incorporate the below comments
CWork may not proceed, corrections must be implemented, re-inspection required
DWork may not proceed, work done not as per contract specific actions
Comments:
Consultant Engineer:Date:Resident Engineer :Date:
Received by contractor: Date: