  • Report on Traffic impact analysis due to proposed project in 5 km radius

    The project complex shall have traffic entry/exit from 24 meter service road of Noida-

    Greater Noida Expressway going through north-west of the project. All the internal

    roads Proposed are 9 wide for smooth internal circulation. The entry/exit points have

    been marked on the layout plan. The project site is well connected to network of

    roads leading from various parts of the city.

    Figure: - Five Km radius map around Project site

    Project site is well connected through two national highways. One is Noida – Greater

    Noida Expressway which is adjacent to project site and another is NH – 24

    approximately 8.24 km distant towards NNW direction. Also kalindi kunj Bridge is

    about 01 kilometer from the project site.

    Proposed scenario for Traffic management:-

    Keeping in view of the extraordinary traffic on kalindi kunj Bridge the traffic exits from

    the project site shall only be allowed to exit towards Noida greater Noida express

    way via the 24 meter service road of the expressway.

  • Existing Traffic Scenario on Noida greater Noida express way & LOS

    S. No Vehicles

    Distribution

    Number of Vehicles

    Distribution/Day

    Passenger

    Car Unit

    (PCU)

    Total Number of

    Vehicle (PCU)

    Noida-Greater Noida

    Expressway

    Noida-Greater

    Noida Link Road

    1. Cars 7000 1.0 7000

    2. Two wheelers 3500 0.5 1750

    3. Three wheelers 400 1.5 600

    Total 9350/24= 390

    PCU/hr

    Road V (Volume

    in PCU/hr)

    C (Capacity in

    PCU/hr)

    Existing

    V/C Ratio

    LOS

    Noida-Greater Noida

    Link Road

    390 3500 0.11 A

    Reference Table for level of Services estimation

    V/C LOS Performance

    0.0-0.2 A Excellent

    0.2-0.4 B Very Good

    0.4-0.7 C Good/ Average/ Fair

    0.7-0.8 D Poor

    0.8-1.0 E Very Poor

    >1.0 F Worst

    It means the performance of existing level of services (LOS) on Noida greater Noida

    express way falls under excellent category.

    POST PROJECT OPERATION TRAFFIC SCENARIO & LOS

  • S. NO VEHICLES

    DISTRIBUTION

    NUMBER OF VEHICLES

    DISTRIBUTION/DAY

    PASSENGER

    CAR UNIT

    (PCU)

    TOTAL

    NUMBER OF

    VEHICLE

    (PCU)

    Noida-Greater Noida

    Expressway

    Noida-

    Greater

    Noida Link

    Road

    1. Cars 7000 +3136=10136 1.0 10136

    2. Two wheelers 3500 +200=3700 0.5 1850

    3. Three wheelers 400 +40=440 1.5 660

    Total 12646/24=

    527

    PCU/hr

    Road V (Volume

    in PCU/hr)

    C (Capacity in

    PCU/hr)

    Existing V/C

    Ratio

    LOS

    Noida-Greater Noida Expressway

    527 3500 0.15 A

    Conclusion

    Thus, after considering the existing traffic load on Noida-greater Noida expressway

    and proposed traffic management in view of increased traffic densities due to project

    operation it can be safely concluded that performance scenario in terms of level of

    services (LOS) on Noida greater Noida express way shall also remained under

    excellent category and no road traffic services shall not comprised.

  • Figure: - Traffic Circulation Plan