metal and nonmetal fatal accident review cy - 2010
DESCRIPTION
Metal and Nonmetal Fatal Accident Review CY - 2010. MNM Fatalities. MNM Fatalities by Commodity. Salt, Clay, Uranium, Silver, Granite, Sandstone. MNM Fatalities by Classification. * Electrical, Exploding Vessels, Explosives, Fall of Person, Drowning. MNM Fatalities by Mine Size. - PowerPoint PPT PresentationTRANSCRIPT
Metal and NonmetalMetal and NonmetalFatal Accident ReviewFatal Accident Review
CY - 2010CY - 2010
Contractor Employees, 10
Mine Employees, 13
MNM FatalitiesMNM Fatalities
Copper8%
Gold13%
Crushed Stone26%
Other*27%
Sand & Gravel, 10%Cement
8%
Dimension Stone8%
MNM Fatalities by CommodityMNM Fatalities by Commodity
•Salt, Clay, Uranium, Silver, Granite, Sandstone
Machinery, 14%
Other*, 20%Falling
Material, 26%
Powered Haulage, 31%
Fall of Roof/Rib, 9%
MNM Fatalities by ClassificationMNM Fatalities by Classification
*Electrical, Exploding Vessels, Explosives, Fall of Person, Drowning
1-5 Employees,
17%
6-10 Employees,
9%
11-20 Employees,
9%
21-50 Employees,
17%
51-100 Employees,
17%
100+ Employees,
31%
MNM Fatalities by Mine SizeMNM Fatalities by Mine Size
MNM Fatalities by OccupationMNM Fatalities by Occupation
Laborer22%
Supervisor14%
Mobile Equipment Operator
30%
Repairman/Technician
30%
Machinery/Plant Operator
4%
Maintenance57%
Other13%
Production30%
MNM Fatalities by ActivityMNM Fatalities by Activity
MNM Fatalities by Total ExperienceMNM Fatalities by Total Experience
30+ Years, 9%
0-1 Year, 17%
11-20 Years, 17% 2-5 Years,
35%6-10 Years, 9%
21-30 Years, 13%
MNM Fatalities by Job ExperienceMNM Fatalities by Job Experience
2-5 Years, 26%
0-1 Years, 40%
21-30 Years, 4%
6-10 Years, 4%
11-20 Years, 17%
30+ Years, 9%
51-60, 13%
20-40, 43%
41-50, 22%
60+, 22%
MNM Fatalities by AgeMNM Fatalities by Age
MNM Fatalities by Day of WeekMNM Fatalities by Day of Week
Sunday9%
Monday4%
Tuesday9%
Saturday22%
Friday17%
Thursday17%
Wednesday22%
9- 12 midnite, 4%
12-3 a.m., 9%
6-9 a.m., 22%
9-12 noon, 26%
12-3 p.m., 22%
3-6 p.m., 4%
6-9 p.m., 13%
MNM Fatalities by Hour of DayMNM Fatalities by Hour of Day
Root CausesRoot Causes
No Risk Assessment ConductedNo Risk Assessment Conducted
Training InadequateTraining Inadequate
Failure to Conduct ExaminationsFailure to Conduct Examinations
Inadequate Policies, Procedures, ControlsInadequate Policies, Procedures, Controls
Procedures not Followed or MonitoredProcedures not Followed or Monitored
Personal Protective Equipment not usedPersonal Protective Equipment not used
Did not conduct Pre-operation ChecksDid not conduct Pre-operation Checks
Equipment not MaintainedEquipment not Maintained
55
47
30
42
26 27
35
26
33
23
1623
0
10
20
30
40
50
60
70
MNM Fatalities – 1999-2010MNM Fatalities – 1999-2010
Powered HaulagePowered Haulage
YearYear ’05 ‘06 ’05 ‘06 ‘07 ‘07 ’08 ’08 ’09 ’09 ‘10‘10
FatalitiesFatalities 16 7 8 16 7 8 5 5 5 5 7 7
--Includes Mobile Equipment and Belt Conveyors--Includes Mobile Equipment and Belt Conveyors
Powered Haulage-- Powered Haulage-- Mobile EquipmentMobile Equipment
Maintain mobile equipmentMaintain mobile equipment
Always wear a seat beltAlways wear a seat belt
Be aware of the location and traffic patterns of mobile Be aware of the location and traffic patterns of mobile equipment in your work areaequipment in your work area
Sound the horn to warn persons of intended movementSound the horn to warn persons of intended movement
Powered Haulage --Powered Haulage --Belt ConveyorsBelt Conveyors
Deenergize and block belt conveyors against motion Deenergize and block belt conveyors against motion before starting the task before starting the task
Lock-out/tag-out all energy sources to belt conveyors Lock-out/tag-out all energy sources to belt conveyors before working on them.before working on them.
Maintain communications with all persons performing the Maintain communications with all persons performing the task task
ElectricalElectrical
YearYear ‘05 ‘05 ‘06 ‘06 ‘07 ‘07 ’08 ’08 ’09 ’09 ‘10‘10
FatalitiesFatalities 2 2 5 5 1 1 2 2 1 1 1 1
MCC fires / explosions MCC fires / explosions
DeenergizeDeenergize
Lockout/TagoutLockout/Tagout
Power line clearancePower line clearance
Monitor ContractorsMonitor Contractors
Fall of MaterialFall of Material
YearYear ‘05 ‘05 ‘06 ‘06 ‘07 ‘07 ‘08 ‘08 ’09 ’09 ‘10 ‘10 FatalitiesFatalities 3 3 6 6 2 2 3 3 3 3 6 6
Block equipment against motionBlock equipment against motionCover or secure openingsCover or secure openingsBarricade area below work Barricade area below work Avoid suspended loads Avoid suspended loads
Fall of Roof,Back,RibsFall of Roof,Back,Ribs
YearYear ‘05 ‘06 ‘05 ‘06 ‘07 ‘07 ‘08 ‘08 ’09 ’09 ‘10‘10
FatalitiesFatalities 0 0 0 0 3 3 3 3 1 1 2 2Examine and test for loose groundExamine and test for loose ground
Design, install, and maintain a support system to control Design, install, and maintain a support system to control the ground in places where persons work or travel in the ground in places where persons work or travel in performing their assigned tasks performing their assigned tasks
Slip / Fall of PersonSlip / Fall of Person
YearYear ‘05 ‘05 ‘06 ‘06 ‘07 ‘07 ‘08 ‘08 ’09 ’09 ‘10‘10
FatalitiesFatalities 3 3 3 3 6 6 4 4 2 2 1
Many serious fall injuriesMany serious fall injuries
Eliminate Hazards and use PPEEliminate Hazards and use PPE– Inadequate walkwaysInadequate walkways
and scaffoldsand scaffolds– Fall protection not usedFall protection not used
– Persons not anchoredPersons not anchored – Holes not covered or protectedHoles not covered or protected