Presentation Briefing for
Trial Operation
(From 22nd June 2015 to 28th July 2015)
Methods of
Transporting
of
Soft Clay and Good Earth Materials
From APSG
and
Infilling Within
Tekong
CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
2/21
2CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
Trial Operation Period From 22nd June 2015 to 28th July 2015
(37 days)
Soft Clay
• Total Volume to be handled = 3,000 m3/day (or 111,000 m3
for the whole trial period).
• Estimated to handle 300 truck loads of soft clay per day.
Good Earth
• Total Volume to be handled = 750 m3/day (or 27,750 m3 for
the whole trial period).• Estimated to handle 75 truck loads of good earth per day.
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
3/21
3CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
PROPOSED ARRANGEMENTS FOR LOADING OF SOFT CLAY
AND GOOD EARTH MATERIALS AT SC JETTY (FOR TRIAL OPERATION)
Good Earth Soft Clay
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
4/21
4CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
PROPOSED LOCATIONS FOR DUMPING OF SOFT CLAY
AND GOOD EARTH MATERIALS (FOR TRIAL OPERATION)
1 2
3
2
3
Direct dumping of soft clay
in assigned existing pit
(existing levels -5m CDminimum)
Direct dumping of good
earth from existing to +1m
CD within Area D
(construction of edge
containment bunds)
Contingency plan fordumping of good earth via
Area D1 (for construction
of edge containment
bunds)
Legend
1
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
5/21
5CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
-1 to -2m CD
-2 to -3m CD
-4 to -6m CD
2
1
BATHYMETRY SURVEYS OF PROPOSED LOCATIONS FOR
DUMPING OF SOFT CLAY AND GOOD EARTH MATERIALS
()
Soft Clay
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
6/21
6CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
2
1Soft Clay
LAYOUT PLAN OF PROPOSED LOCATIONS FOR DUMPING
OF SOFT CLAY AND GOOD EARTH MATERIALS
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
7/21
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
8/21
8CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
DIRECT DUMPING OF SOFT CLAY AT ASSIGNED PIT AT
LOCATION 1 BY HOPPER BARGES
1 Direct dumping of soft clay in assigned existing pit
(existing levels -5m CD minimum)
Dump to -2m CD by direct dumping by hopper barges
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
9/21
9CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
DIRECT DUMPING AND DRY FILLING OF GOOD EARTH MATERIALS
AT LOCATION 2 (EDGE CONTAINMENT BUND WITHIN AREA D)
2Direct dumping of good earth from existing to +1m CD
within Area D (construction of edge containment bunds)
3Contingency plan for dumping of good earth via
Area D1 (for construction of edge containment
bunds)
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
10/21
10CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
Calculation
of
Volume
&
Average
Depths
in
Bathymetric
ChartVolume Calculation for Good Earth Bund
Block No.
Volume from
Present Level
up to
+1m CD(m³)
(A)
Volume from
+1m to +4m
CD(m³)
(B)
Total Volume
( A + B )
Cross Section at
Area (m2)
GEB‐
1 207.80 2,456.50 2,664.30 1,492.93GEB‐2 7,495.30 26,275.90 33,771.20 8,603.84
GEB‐3 8,345.20 24,765.60 33,110.80 8,972.00
GEB‐4 6,671.20 23,686.70 30,357.90 8,574.38
GEB‐5 5,884.70 22,710.60 28,595.30 8,351.30
Total 28,604.20 99,895.30 128,499.50
DUMPING BOXES FOR DIRECT DUMPING OF GOOD EARTH MATERIALS
AT LOCATION 2 (EDGE CONTAINMENT BUND WITHIN AREA D)
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
11/21
11CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
CROSS‐SECTIONAL AREA OF GOOD EARTH EDGE CONTAINMENT
BUND AND EXISTING SEABED LEVEL WITHIN AREA D AT LOCATION 2
SECTION AT CH 21.636
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
12/21
12CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
SECTION AT CH 87.994
CROSS‐SECTIONAL AREA OF GOOD EARTH EDGE CONTAINMENT
BUND AND EXISTING SEABED LEVEL WITHIN AREA D AT LOCATION 2
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
13/21
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
14/21
14CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
CROSS‐SECTIONAL AREA OF GOOD EARTH EDGE CONTAINMENT
BUND AND EXISTING SEABED LEVEL WITHIN AREA D AT LOCATION 2
SECTION AT CH 287.995
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
15/21
15CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
CROSS‐SECTIONAL AREA OF GOOD EARTH EDGE CONTAINMENT
BUND AND EXISTING SEABED LEVEL WITHIN AREA D AT LOCATION 2
SECTION AT CH 387.956
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
16/21
16
Equipment Name
and
Model
(Type)
SpecificationOf Equipment Ave.
Handling
Capacity
Per Unit
Qty.
ToBe
Handled
(Soft
Clay)
No.
of
TripsPer Day No.
of
Equipment/
Machineries
to be
mobilised
Hopper Barge
(1,500 m3)
Draft @ full load = 5.0m
Draft @ half load = 3.0m
Draft @ empty load = 2.4m
1,500 m3 3000 m3/
day 2 1
Flat‐top Barge
With Ramp
(2,000 m3)
70m (L) x 19m
(W)
Draft @
full load
= 3.5m
Draft @ half load = 1.8m
Draft @ empty load = 1.0m
2,000m3
Transfer of
1500 m3 to
each
hopper
barge trip
Flat‐top barge to
be stationed at
all
times at APSG as
holding barge for
transfer of Soft
Clays to Hopper
Barge
1
Hydraulic
Excavator
(35T)
Bucket size = 1.8 m3 3,000 m3/day 3000 m3/
day
To be
stationed at
all times at in
holding barge for
transfer of Soft
Clays to Hopper
Barge
2
CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
CONSTRUCTION EQUIPMENT & MACHINERIES REQUIRED FOR TRANSPORTING AND
THE INFILLING OF SOFT CLAY MATERIALS (FOR TRIAL OPERATION)
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
17/21
17
Equipment Name
and
Model
(Type)
SpecificationOf Equipment Ave.
Handling
Capacity
Per Unit
Qty.
ToBe
Handled
(Good
Earth)
No.
of
TripsPer Day No.
of
Equipment/
Machineries
to be
mobilised
Tug Boat 1200 Hp NA NA NA 1
Flat‐top Barge
With Ramp
(2,000 m3)
70m (L) x 19m
(W)
Draft @
full load
= 3.5m
Draft @ half load = 1.8m
Draft @ empty load = 1.0m
2,000m3
750 m3 for
each trip
per day
1 1
Hydraulic
Excavator
(35T)
Bucket size = 1.8 m3 1,500 m3/day 750 m3/
day
To be
stationed at
all times at in
holding barge for
transfer of Soft
Clays to Hopper
Barge
2 (Inside Flat‐top
barge)
CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
CONSTRUCTION EQUIPMENT & MACHINERIES REQUIRED FOR TRANSPORTING AND
THE INFILLING OF GOOD EARTH MATERIALS (FOR TRIAL OPERATION)
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
18/21
18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 0000 0100 0200 0300 0400 0500 0600
Loading by
Excavator 6hr180m3/hr
Sailing Out @
3knots 1hr3.2 nautical m
Discharge0.5hr
‐
Sailing Back @
5knots 45 mins‐
Berthing15 mins
Loading7am to 11pm
Sailing Out @
3knots 1.5 hr
Discharge4.5 hr
Sailing Back @
3knots 45 mins
Berthing15 mins
200 Trucks
Pulau Tekong
Infill Area
Pulau Tekong
Infill Area
2000m3
1500 m3
Soft Clay Flat
Top Barge
Soft Clay
Hopper Barge
Good Earth
Flat Top
Barge
2000m3
Hours Worked
Destination Barge Activity RemarksDuration
7am to 11pm
180m3/hr
unloading by
2 excavators
Loading by Trucks
from Direct
Discharge Platform
Transfering of Soft
Clay by Excavator
from Flat
Top
Barge to Hopper
Barge
Capacity
CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
CYCLE TIME FOR HOPPER AND FLAT‐TOP BARGES FROM APSG TO
LOCATIONS 1 AND 2 INFILLING AREAS
See tidal data for June and July 2015
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
19/21
19CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
TIDAL DATA FOR MONTH OF JUNE 2015 (FOR OPERATION OF FLAT‐
TOP BARGE DURING UNLOADING AT LOCATION 2 FOR GOOD EARTH)
DAY/HR 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 231 2.3 1.8 1.2 0.8 0.6 0.7 0.9 1.3 1.7 2.1 2.4 2.6 2.6 2.3 1.9 1.4 1.1 1.2 1.4 1.7 2.0 2.4 2.7 2.8
2 2.5 2.1 1.5 0.9 0.5 0.4 0.6 1.0 1.4 1.8 2.3 2.6 2.7 2.6 2.2 1.7 1.3 1.1 1.2 1.5 1.9 2.3 2.6 2.8
3 2.8 2.4 1.8 1.2 0.6 0.3 0.3 0.6 1.1 1.5 2.0 2.5 2.7 2.7 2.5 2.1 1.6 1.2 1.1 1.3 1.7 2.1 2.5 2.8
4 2.9 2.7 2.2 1.6 0.9 0.4 0.2 0.3 0.7 1.2 1.7 2.2 2.6 2.8 2.7 2.5 2.0 1.5 1.1 1.2 1.5 1.9 2.3 2.6
5 2.9 2.9 2.5 2.0 1.3 0.7 0.2 0.1 0.4 0.8 1.3 1.9 2.4 2.7 2.8 2.7 2.3 1.8 1.3 1.1 1.2 1.6 2.0 2.4
6 2.8 2.9 2.8 2.4 1.8 1.1 0.5 0.2 0.2 0.5 0.9 1.5 2.0 2.5 2.7 2.8 2.6 2.2 1.7 1.3 1.1 1.3 1.7 2.1
7 2.5 2.8 2.9 2.7 2.2 1.6 0.9 0.4 0.2 0.3 0.6 1.1 1.3 2.1 2.5 2.7 2.7 2.5 2.0 1.5 1.2 1.2 1.4 1.8
8 2.2 2.6 2.8 2.8 2.6 2.1 1.4 0.8 0.4 0.3 0.4 0.7 1.2 1.7 2.2 2.6 2.7 2.6 2.4 1.9 1.5 1.2 1.2 1.4
9 1.8 2.2 2.5 2.7 2.7 2.4 2.0 1.4 0.9 0.5 0.4 0.6 0.9 1.3 1.8 2.3 2.6 2.7 2.6 2.3 1.8 1.4 1.2 1.2
10 1.4 1.7 2.1 2.4 2.6 2.6 2.4 2.0 1.5 1.0 0.7 0.6 0.7 1.0 1.4 1.8 2.2 2.5 2.6 2.5 2.2 1.8 1.4 1.1
11 1.1 1.3 1.6 1.9 2.2 2.4 2.5 2.4 2.0 1.6 1.2 0.9 0.8 0.9 1.1 1.5 1.9 2.2 2.5 2.6 2.5 2.2 1.7 1.3
12 1.1 1.0 1.1 1.3 1.7 2.0 2.3 2.4 2.4 2.2 1.9 1.5 1.1 1.0 1.0 1.2 1.5 1.9 2.3 2.5 2.6 2.5 2.2 1.7
13 1.2 0.9 0.8 0.9 1.1 1.5 1.8 2.2 2.4 2.5 2.4 2.1 1.7 1.3 1.1 1.1 1.3 1.6 2.0 2.3 2.6 2.7 2.5 2.1
14 1.6 1.1 0.7 0.5 0.6 0.9 1.3 1.8 2.2 2.5 2.6 2.5 2.2 1.8 1.4 1.1 1.1 1.3 1.7 2.1 2.4 2.7 2.7 2.5
15 2.0 1.5 0.9 0.5 0.3 0.5 0.9 1.3 1.8 2.2 2.6 2.7 2.6 2.3 1.8 1.4 1.1 1.2 1.5 1.8 2.2 2.6 2.8 2.7
16 2.4 1.9 1.3 0.7 0.3 0.2 0.4 0.9 1.3 1.8 2.3 2.7 2.8 2.6 2.3 1.8 1.3 1.1 1.3 1.6 2.0 2.4 2.7 2.8
17 2.7 2.3 1.7 1.1 0.5 0.1 0.2 0.5 0.9 1.4 1.9 2.4 2.7 2.8 2.6 2.2 1.7 1.3 1.2 1.4 1.7 2.1 2.5 2.8
18 2.9 2.6 2.1 1.5 0.9 0.3 0.1 0.2 0.6 1.1 1.6 2.1 2.5 2.8 2.8 2.5 2.0 1.5 1.2 1.2 1.5 1.9 2.2 2.6
19 2.8 2.8 2.5 2.0 1.3 0.7 0.3 0.1 0.3 0.8 1.2 1.7 2.2 2.6 2.8 2.7 2.3 1.8 1.4 1.2 1.3 1.6 2.0 2.4
20 2.7 2.8 2.7 2.3 1.7 1.1 0.6 0.3 0.3 0.5 1.0 1.4 1.9 2.4 2.7 2.7 2.5 2.1 1.6 1.3 1.2 1.4 1.7 2.1
21 2.4 2.7 2.8 2.5 2.1 1.5 0.9 0.5 0.3 0.4 0.8 1.2 1.7 2.1 2.5 2.6 2.6 2.3 1.9 1.4 1.2 1.3 1.5 1.9
22 2.2 2.5 2.7 2.6 2.3 1.9 1.3 0.8 0.5 0.5 0.7 1.0 1.4 1.9 2.3 2.5 2.6 2.4 2.1 1.7 1.3 1.2 1.3 1.6
23 1.9 2.2 2.5 2.6 2.5 2.1 1.7 1.2 0.8 0.6 0.7 0.9 1.2 1.6 2.0 2.3 2.5 2.5 2.2 1.9 1.5 1.3 1.3 1.424 1.6 1.9 2.2 2.4 2.4 2.3 2.0 1.6 1.2 0.9 0.8 0.9 1.1 1.4 1.8 2.1 2.3 2.4 2.3 2.1 1.7 1.5 1.3 1.3
25 1.4 1.6 1.8 2.1 2.2 2.2 2.1 1.8 1.5 1.2 1.1 1.1 1.1 1.3 1.6 1.9 2.1 2.3 2.4 2.2 2.3 1.7 1.4 1.3
26 1.3 1.3 1.5 1.7 1.9 2.1 2.1 2.0 1.8 1.6 1.4 1.3 1.2 1.3 1.4 1.6 1.9 2.2 2.3 2.3 2.2 2.0 1.7 1.4
27 1.2 1.1 1.2 1.3 1.6 1.8 2.0 2.1 2.0 1.9 1.8 1.6 1.4 1.3 1.4 1.5 1.7 2.0 2.2 2.4 2.4 2.2 2.0 1.6
28 1.3 1.1 1.0 1.0 1.2 1.5 1.7 1.9 2.1 2.1 2.1 1.9 1.7 1.5 1.3 1.4 1.5 1.8 2.0 2.3 2.4 2.4 2.3 2.0
29 1.6 1.1 0.8 0.7 0.8 1.1 1.4 1.7 2.0 2.3 2.3 2.3 2.1 1.7 1.5 1.3 1.4 1.6 1.9 2.1 2.4 2.6 2.5 2.3
30 1.9 1.4 0.9 0.6 0.6 0.7 1.0 1.4 1.8 2.1 2.4 2.5 2.4 2.1 1.7 1.4 1.3 1.4 1.7 2.0 2.3 2.6 2.7 2.6
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
20/21
-
8/15/2019 METHOD OF TRANSPORTING AND INFILLING OF SC&GE FOR TRIAL OPERATION- REV.0 (15-06-15).pdf
21/21
21CONSTRUCTION AND MANAGEMENT OF STAGING GROUND AND INFILLING WORKS
THANK YOU