method statement for on site installation of diffusers, grilles and louvres to hvac ducting...
TRANSCRIPT
9/7/2014 Method Statement For On Site Installation Of Diffusers, Grilles And Louvres To HVAC Ducting Systems
http://www.methodstatementhq.com/method-statement-for-on-site-installation-of-diffusers-grilles-and-louvres-to-hvac-ducting-systems.html 1/4
H o m e Disclaimer Project HSE Plan Construction Method Statements
Method Statement Template Inspection Checklists Request A Method Statement
Project Execution Plan Customer Support Download Method Statements
Blocking air dampershoogenboomvalves.com
Solution designed for 100% shut off Contact us for more information!
Method Statement Free Download
RSS
You are here: Home » Method Statements » Const ruct ion Method Statements » HVAC Method Statements » Duct
Works » Method Statements » Const ruct ion Method Statements » HVAC Method Statements » Method Statement
For On Site Installat ion Of Diffusers, Grilles And Louvres To HVAC Duct ing Systems
Method Statement For On Site Installation Of Diffusers, Grilles And Louvres
To HVAC Ducting Systems
Tweet
Construction Supervisors to ensure that all ductwork
and insulation have been inspected and signed off
by the client prior to the installation of diffusers, grilles
and louvres to the HVAC ducting system. It is also
responsibility of site engineer and supervisor to ensure
plenum or terminal box openings are compatible for
diffusers, grilles and louvres (D.G.L.’s) to be installed.
Installation Method Statement for
Diffusers, Drills & Louvers
Volume control dampers will be installed for all inlets
and outlets including concealed adjustment devices, which should be accessible without
dismantling any plant, these will be shown on the contractors as built drawings and in general will be
incorporated within the component that will have all internal sections painted matt-black. Prior to
installation it will be ensured that Plenums are correctly acoustically lined.
During unpacking of DGL’s care will be taken to avoid damage to the finished face of DGL’s and
if any damage is noticed the supervisor will inform engineer to get the replacement.
March 5, 2013 | webmaster
SPECIAL RECENT POSTS
Installation of Marble and Granite
Tiles on floor, stairs, walls and
counters
April 4th, 2014
This m ethod statem ent covers the
detailed procedure to be followed for
Supply & Installation of [...]
Method Of Statement For Installation
of wires and cables - Wiring
March 29th, 2014
Below is the list of equipm ent / Tools
required for installation of wires and cables,
which cab be u[...]
Method Statement For Installation &
Testing of SMATV System
March 21st, 2014
Below are the steps or m ethod statem ent
for installation & testing of SMATV System in
a project.[...]
Sanitary Ware Installation Method
Statement
March 20th, 2014
Installation of sanitary ware can be done
step wise as per m entioned procedure or
m ethod statem ent b[...]
Plastering Works Method Statement
March 20th, 2014
Below are the equipm ent involved in
Plaster works that should be arranged
before starting the plaste[...]
Method Statement for Internal Painting
Works
March 20th, 2014
Below is the procedure for doing the
painting works for internal painting. This safe
work m ethod sta[...]
Chiller installation method statement
March 17th, 2014
Below is a standard operating procedure
which can be used a a m ethod statem ent
for installation of c[...]
How To Do Installation of Suspended
False Ceilings
March 14th, 2014
0 Email Share
9/7/2014 Method Statement For On Site Installation Of Diffusers, Grilles And Louvres To HVAC Ducting Systems
http://www.methodstatementhq.com/method-statement-for-on-site-installation-of-diffusers-grilles-and-louvres-to-hvac-ducting-systems.html 2/4
« Installation Of Noise and Vibration Control Equipm ents/Isolators
Cable Tray Inspection & Testing Form at / Sam ple Form »
All diffusers, grilles and louvres will be checked against the relevant schedules by the construction
supervisor prior to the commencement of installation, ensuring they are of the correct type and size
as reviewed by the client/consultant. All material must be pre approved by consultant.
Install subframe in the duct opening as manufacturers instructions and ensure that D.G.L.’s shall be
installed correctly as per the direction of air flow.
Prepare D.G.L.’s by installing sealing material to the internal side of the mating flange, carefully
locate D.G.L.’s into subframe and locate locking screws and tighten until correct level and the
alignment is attached.
After final alignment, carefully tighten the D.G.L.’s until an airtightness is achieved.
Before leaving each installation of a D.G.L. ensure it is undamaged, clean and screws are tight.
Ensure that all D.G.L.’s are left in closed position and protection shall be provided until handover.
The supervisor in charge and the QC Engineer will continuously monitor the activities to ensure that
all D.G.L.’s and components indicated on the approved construction drawings have been installed
and that the completed installation is in accordance with the contract requirements and
manufacturers recommendations.
LIKE US ON FACEBOOK
Filed under Duct Works, HVAC Method Statements | Tags: &, diffusers, grilles and louvres, HVAC Method Statements,
louvers
Floor Heating Systemalibaba.com
Find Quality Products from Verified
Suppliers. Get a Live Quote Now!
Equipm ent Required For Installation of
Suspended Ceilings Leveling Instrum ents
Line dory C[...]
Transformer testing & commissioning
method statement
March 14th, 2014
Below is a standard m ethod statem ent
which can be used as learning purpose and
to prepare further pr[...]
METHOD STATEMENT FOR
INSTALLATION, TESTING AND
COMMISSIONING OF UPS
March 14th, 2014
1.0. PURPOSE: The purpose of this m ethod
statem ent defines the procedure to be
followed for Insta[...]
CATEGORIES
BMS
Cem ent & Clinker Testing
Civil Engineering
Civil Method Statem ents
Concrete Testing
Construction Method Statem ents
Drainage Pipes Installation
Duct Works
Electrical
Electrical Method Statem ents
Fire Suppression System
Health & Safety
HVAC Checklists
HVAC Maintenance
HVAC Method Statem ents
ISO 9001
Method Statem ent Tem plate
Method Statem ents
Piping Method Statem ents
Piping Works
Plum bing Method Statem ents
Pressure Testing
Project HSE Plan
Pum p Installation
Quality Assurance
Quality Managem ent
Risk
Risk Assessm ent
Risk Managem ent
Sam ple Form s & Form ats
Tem plates
Testing & Com m issioning
Water Supply Piping
Welding Risk
What Is Hazard?
What Is Risk?
Working At Height
9/7/2014 Method Statement For On Site Installation Of Diffusers, Grilles And Louvres To HVAC Ducting Systems
http://www.methodstatementhq.com/method-statement-for-on-site-installation-of-diffusers-grilles-and-louvres-to-hvac-ducting-systems.html 3/4
Comments are closed. TAGS
& Access Control System Accessories AC Duct ing
Method Statement ac duct installat ion ACMaintenance Acoust ic Lining blank performablank proforma bms system BMS TestingProcedure Building Management SystemBuilding Management System BMS control
measures Electrical Method Statement forhazard hvac HVAC Method Statements
installat ion Installation of GI Conduits &
Accessories method Method
Of Statement Method
Statement met hod
st at ement for Inst allat ion Met hodSt at ement Templat e MST MST For BMS
of pipe flushing pressure pumps risk RiskAssessment safe work method sample
check list sample checksheet Sample
Format Electrical statement swms
template test Testing & CommissioningTesting & Commissioning MethodStatement water
DOWNLOAD METHOD STATEMENTS
Download BMS Installation Method Statem ent
Download Chilled Water Pipes Installation &
Testing Method Statem ent
Download Method Statem ent For INSTALLATION
HYDRO TESTING & FLUSHING OF FIRE FIGHTING
PIPING SYSTEM INCLUDING SPRINKLERS
Download Method Statem ent For CENTRAL
BATTERY SYSTEM INSTALLATION
Download Method Statem ent For Fire Alarm
System
Download Method Statem ent For Flushing Of
Chilled Water Piping
Download Method Statem ent For Installation Of
Packaged Units
Download Method Statem ent For Installation Of
Split Units & Risk Assessm ent
Download Method Statem ent For Installation Of
Transform ers
Download Project HSE Plan With All Form s
Hom e
Privacy Policy
Disclaim er
Hom e
Privacy Policy
9/7/2014 Method Statement For On Site Installation Of Diffusers, Grilles And Louvres To HVAC Ducting Systems
http://www.methodstatementhq.com/method-statement-for-on-site-installation-of-diffusers-grilles-and-louvres-to-hvac-ducting-systems.html 4/4
Disclaim er
Copyright © 2014 Method Statement Free Download | zBorder Theme powered by WordPress