method statement static pile load test

19
1 Method Statement FOR Static Pile Load Test (Compression Test,Tension Test and Lateral Test) PREPARED BY

Upload: rakesh-rana

Post on 12-Apr-2015

1.065 views

Category:

Documents


94 download

TRANSCRIPT

1

Method Statement

FOR

Static Pile Load Test

(Compression Test,Tension Test and Lateral Test)

PREPARED BY

2

METHOD STATEMENT FOR

COMPRESSION, TENSILEAND LATERAL PILE LOAD TEST

PROJECT INFORMATIONOwner : ……………………………..

Client : ……………………………..

Main Contractor : …………………………….

Contractor : …………………………….

Location : …………………………….

TEST PILE INFORMATIONPile No. 385 Pile No. 368 Pile No. 416

Pile Type 40 x 40 Driven 40 x 40 Driven 40 x 40 Driven

Pile Tip 4.2 m. 4.2 m. 4.2 m.

Pile Top 0.0 m. 0.0 m. 0.0 m.

Design Load 65 tons 15 tons 7 tons Maximum Test Load (200 % of design Load)

130 tons 30 tons 14 tons

Test Type Axial Compression Test Axial Tension Test Lateral Test

Anchor Piles 367, 368, 416, 417 367, 369 432, 417, 385

Testing Standard ASTM D1143-81

(Reapproved 1994)ASTM D3689-90

(Reapproved 1995)ASTM D3966-90

(Reapproved 1995)

3

1.0 TESTING APPARATUS

1.1 Reaction Beam The steel girders will be laid across the test pile with system set up similar to that shown

in Appendix A.

1.2 Hydraulic Jacks Axial Compressive Test : One hydraulic jack (1x400) ton capacity will be provided

on top of the pile head as loading apparatus. Axial Tension Test : One hydraulic jack (1x165) ton capacity will be provided

on top of the pile head as loading apparatus. Lateral Test : One hydraulic jack (1x59) ton capacity will be provided

on the side of the pile head as loading apparatus.

1.3 Ball Bearing To provide non-eccentric load to the pile head, a ball bearing shall be inserted in

between the reaction beam and the hydraulic jack.

1.4 Dial gauges Four dial gauges (Mitutoyo brand) will be provided to monitor the pile movements by

mounting between the pile head and reference beams. The micrometer has a range of 0-50 mm and an accuracy of 0.01 mm.

1.5 Reference Beam Two reference beams (channel 125x65x5 mm) will be cross-connected and laid on

support, firmly embedded in ground with one end fixed and the other end freed.

1.6 Leveling instrument Relative movements of the test pile head, reference beam and anchor pile will be

checked by a Shokisha precise leveling instrument with an accuracy of 0.01 mm. Readings will be made on ruler scale fixed on the reading points (1 point at pile head, 2 points at reference beams and 1 point at each anchor pile).

2.0 TEST PROCEDURE

2.1 Compression Pile Load Test

The test shall conform to the modified ASTM D 1143-81(Reapproved 1994) item 5.0 “Standard Loading Procedure” with load sequence in percentage of design load. Three cycles of test will be performed.

Cycle 1 (maximum to 100% of the design load)

A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, and 100% of the design load.

B. When each load increment will be achieved, the next load increment will be added only when the settlement rate will be less than 0.25 mm per hour or after 2 hours, whichever shall occur first.

C. At each load increment, load, settlement and time will be recorded at 1, 2, 4, 8, 15, 30, 60, 90, 120, 240 minutes and every 2 hours with an accuracy of at least 0.01 mm.

D. The maximum load will be kept constant for at least 24 hours and then reduced to 75%, 50%, 25% and 0% of the design load, respectively. Each load will be maintained until the rate of settlement would not be greater than 0.25 mm per hour or after two hours, whichever shall occur first.

E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a constant settlement will be reached.

Cycle 2 (QUICK TEST, maximum to 200% of the design load)

4

A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%, 125%, 150%, 175% and 200% of the design load.

B. When each load increment will be achieved, the next load increment will be added every after 5 minutes..

C. At each load increment, load, settlement and time will be recorded at 1 and 5 minutes with an accuracy of at least 0.01 mm.

D. The load will then be reduced to 175%, 150%, 125%, 100%, 75%, 50%, 25% and 0% of the design load, respectively

E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a no further settlement will be experienced.

F. The test pile will be considered failure when a rapid progressive movement of the pile in the direction of loading under a constant load or physical failure of the test pile is observed or a settlement of more than 15% of the diagonal dimension of the pile, which is equivalent to 90 mm.

2.2 Tension Pile Load Test

The test shall conform to the ASTM D 3689-90 (Reapproved 1995) “Standard Test Method for Individual Piles Under Static Axial Tensile Load.” with load sequence as explain below. The test will be conducted until the pile exhibit signs of failure.

Cycle 1 (maximum to 100% of the design load)

A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, and 100% of the design load.

B. When each load increment will be achieved, the next load increment will be added only when the settlement rate will be less than 0.25 mm per hour or after 2 hours, whichever shall occur first.

C. At each load increment, load, settlement and time will be recorded at 1, 2, 4, 8, 15, 30, 60, 90, 120, 240 minutes and every 2 hours with an accuracy of at least 0.01 mm.

D. The maximum load will be kept constant for at least 24 hours and then reduced to 75%, 50%, 25% and 0% of the design load, respectively. Each load will be maintained until the rate of settlement would not be greater than 0.25 mm per hour or after two hours, whichever shall occur first.

E. At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a constant settlement will be reached.

Cycle 2 (QUICK TEST, maximum to 200% of the design load)

A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%, 125%, 150%, 175% and 200% of the design load.

B. When each load increment will be achieved, the next load increment will be added every after 5 minutes..

G. At each load increment, load, settlement and time will be recorded at 1 and 5 minutes with an accuracy of at least 0.01 mm.

H. The load will then be reduced to 175%, 150%, 125%, 100%, 75%, 50%, 25% and 0% of the design load, respectively

I.At "0" load, rebound movement will be recorded at 1, 2, 4, 8, 15, 30, 40, 60 minutes and every hour thereafter until a no further settlement will be experienced.

J. The test pile will be considered failure when a rapid progressive movement of the pile in the direction of loading under a constant load or physical failure of the test pile is observed or a settlement of more than

5

15% of the diagonal dimension of the pile, which is equivalent to 90 mm.

2.3 Lateral Pile Load Test

The test shall conform to the ASTM D 3966-90 “Standard Test Method for Individual Piles Under Lateral Load.” with load sequence as explain below. The test will be conducted until the pile exhibit signs of failure.

A. The load will be added gradually by increasing from initial 0 to 25%, 50%, 75%, 100%, 125%, 150%, 170%, 180%, 190% and 200% of the design load.

B. When each load increment will be achieved, the next load increment will be added after each load duration shown in Table 3.

C. At each load increment, load and time will be recorded at 1, 5, 10 minutes with an accuracy of at least 0.01 mm.

D. The test pile will be considered failure when a rapid progressive movement of the pile in the direction of loading under a constant load or physical failure of the test pile is observed.

During the load test, records including plots of load vs. time and load vs. settlement will be maintained progressively.

3.0 RESULTS OF TEST

The test results will then be reported in the form of:

� Time, load, pile head movements, settlements and reference beam movements. � Load-settlement curve. � Time-settlement curve. � Time-load curve. � Report and recommendations on the ultimate pile capacity.

ESTI

MA

TIO

N O

F U

LTIM

ATE

LO

AD

FR

OM

PIL

E LO

AD

TES

T B

Y D

AV

ISSO

N M

ETH

OD

Fc'=

400

ksc.

Pile

Dia

.=0.

46m

.

Q=

270

Tons

L=12

.8m

.

A=

0.16

sq.m

.

Ec=

29,4

27M

pa

Ec=

3.00

E+06

Tons

/sq.

m.

Settl

e-1=

7.02

mm

.

Settl

e-1=

2.81

inch

Settl

e-2=

0.50

inch

Settl

e-2=

1.27

mm

.

Se

ttle-

3=0.

14in

ch

Settl

e-3=

0.35

mm

.

Tota

l Set

tle=

3.44

inch

Dav

idso

n O

ffse

t Lin

e Li

mit=

3.44

inch

Dav

idso

n O

ffse

t Lin

e Li

mit=

8.75

mm

.

APPENDIX A TABLES, FIGURES &

DESIGN CALCULATIONS

K a e n g K h o i 2 P o w e r P l a n t (C o m p r e s s i o n T e s t i n g )

Design Load = 65 Tons FS = 2 Test Load = 130 TonsHydraulic Jack No./s 905

CYCLE 1: Maximum to 100% of the design load.

Date Start Interval Load Pressure RemarksTime (hours) (Tons) (Bars) (%)

3-Jul 09:00 1 16.3 18.0 25%10:00 1 32.5 34.0 50%11:00 1 48.8 50.1 75%12:00 1 65.0 66.1 100%13:00 24 48.8 56.0 75%

4-Jul 13:00 1 32.5 39.9 50%14:00 1 16.3 23.8 25%15:00 2 0.0 0.0 0%

CYCLE 2: QUICK TEST; Maximum to 200% of the design load.

Date Start Interval Load Pressure RemarksTime (min) (Tons) (Bars) (%)

4-Jul 17:00 5 16.3 18.0 25%17:05 5 32.5 34.0 50%17:10 5 48.8 50.1 75%17:15 5 65.0 66.1 100%17:20 5 81.3 82.1 125%17:25 5 97.5 98.1 150%17:30 5 113.8 114.1 175%17:35 5 130.0 130.2 200%17:40 5 113.8 120.4 175%17:45 5 97.5 104.3 150%17:50 5 81.3 88.2 125%17:55 5 65.0 72.1 100%18:00 5 48.8 56.0 75%18:05 5 32.5 39.9 50%18:10 5 16.3 23.8 25%18:15 120 0.0 0.0 0%

P i l e N o . 385

Table 1Schedule of Loading

K a e n g K h o i 2 P o w e r P l a n t (T e n s i o n T e s t i n g )

Design Load = 15 Tons FS = 2 Test Load = 30 TonsHydraulic Jack No./s 912

CYCLE 1: Maximum to 100% of the design load.

Date Start Interval Load Pressure RemarksTime (hours) (Tons) (Bars) (%)

6-Jul 09:00 1 3.8 18.3 25%10:00 1 7.5 31.8 50%11:00 1 11.3 45.3 75%12:00 24 15.0 58.8 100%12:00 1 11.3 71.9 75%

7-Jul 12:00 1 7.5 58.3 50%13:00 1 3.8 44.7 25%13:00 2 0.0 0.0 0%

CYCLE 2: QUICK TEST; Maximum to 200% of the design load.

Date Start Interval Load Pressure RemarksTime (min) (Tons) (Bars) (%)

7-Jul 15:00 5 3.8 18.3 25%15:05 5 7.5 31.8 50%15:10 5 11.3 45.3 75%15:15 5 15.0 58.8 100%15:20 5 18.8 72.3 125%15:25 5 22.5 85.9 150%15:30 5 26.3 99.4 175%15:35 5 30.0 112.9 200%15:40 5 26.3 126.4 175%15:45 5 22.5 112.8 150%15:50 5 18.8 99.2 125%15:55 5 15.0 85.6 100%16:00 5 11.3 71.9 75%16:05 5 7.5 58.3 50%16:10 5 3.8 44.7 25%16:15 120 0.0 0.0 0%

P i l e N o . 368

Table 2 Schedule of Loading

K a e n g K h o i 2 P o w e r P l a n t (L a t e r a l T e s t i n g )

Design Load = 7 Tons FS = 2 Test Load = 14 TonsHydraulic Jack No./s 8

CYCLE 1: Maximum to 100% of the design load.

Date Start Interval Load Pressure RemarksTime min (Tons) (Bars) (%)

10-Jul 09:00 10 1.8 36.2 25%09:10 10 3.5 51.9 50%09:20 15 5.3 67.6 75%09:35 20 7.0 83.2 100%09:55 20 8.8 98.9 125%10:15 20 10.5 114.5 150%10:35 20 11.9 127.1 170%10:55 20 12.6 133.3 180%11:15 20 13.3 139.6 190%11:35 60 14.0 145.8 200%12:35 10 10.5 118.0 150%12:45 10 7.0 86.0 100%12:55 10 3.5 54.1 50%13:05 0.0 0.0 0%

P i l e N o . 416

Table 3 Schedule of Loading

AS

TM

Testi

ng

Co

., L

td.

1032/2

17 P

haholy

oth

in 1

8/1

Road,

Bangkok 1

0900

�: (6

62)+

272-2

474!5

: (6

62)+

272-2

475

CA

LIB

RA

TIO

N O

F O

NE

HY

DR

AU

LIC

JA

CK

FO

R S

TA

TIC

PIL

E L

OA

D T

ES

TIN

G

Kaeng K

hoi 2

Pow

er

Pla

nt

(Com

pre

ssio

n T

est

ing)

LO

AD

ING

UN

LO

AD

ING

Ga

ge

Rd

g.

LO

AD

ING

(T

on

s)G

ag

e R

dg

. U

NL

OA

DIN

G (

Ton

s)

in b

ars

(Y

)90

5T

OT

AL

(X

)in

ba

rs (

Y)

90

5T

OT

AL

(X

)

00

0.0

00

0.0

50

49.5

49.5

50

43.5

43.5

100

10

0.5

10

0.5

100

93.5

93

.5

150

15

0.5

15

0.5

150

14

3.5

14

3.5

200

19

9.5

19

9.5

200

19

3.5

19

3.5

250

25

0.0

25

0.0

250

24

4.0

24

4.0

300

30

2.0

30

2.0

300

29

5.0

29

5.0

350

35

2.0

35

2.0

350

34

5.5

34

5.5

400

40

3.5

40

3.5

400

39

5.5

39

5.5

450

45

6.5

45

6.5

450

44

8.0

44

8.0

480

48

5.0

48

5.0

Ca

lib

rate

d

Reg

ress

ion

Ou

tpu

t :

Reg

ress

ion

Ou

tpu

t :

C

onst

ant

2.0

0762866

C

onst

ant

7.7

2212362

S

td E

rr o

f Y

Est

1.1

8920934

S

td E

rr o

f Y

Est

0.7

4816827

R

Squar

ed0.9

9994275

R

Squar

ed0.9

9997388

N

o. of

Obse

rvat

ion

s10

N

o. of

Obse

rvat

ion

s9

D

egre

es o

f F

reed

om

8

Deg

rees

of

Fre

edom

7

X C

oef

fici

ent(

s)0.9

8578527

X

Co

effi

cien

t(s)

0.9

9023655

LO

AD

ING

(Y

) =

0.9

85

8 *

X +

2.0

07

6U

NL

OA

DIN

G (

Y)

= 0

.99

02

* X

+ 7

.72

21

AS

TM

AS

TM

Testi

ng

Co

., L

td.

437-4

41 K

am

pangpeth

III R

oad, behin

d J

atu

jak P

ark

, B

angkok 1

0900 T

HA

ILA

ND

�:

(66

2)+

27

2-5

96

6~

7,

272

-45

65,

27

2-5

973

, 2

72-4

58

2

: (6

62

)+ 2

72

-45

83

CA

LIB

RA

TIO

N O

F O

NE

HY

DR

AU

LIC

JA

CK

FO

R S

TA

TIC

PIL

E L

OA

D T

ES

TIN

G

Kaeng K

hoi 2

Pow

er

Pla

nt(Tensi

on T

est

ing)

LO

AD

ING

UN

LO

AD

ING

Ga

ge

Rd

g.

LO

AD

ING

(T

on

s)G

ag

e R

dg

. U

NL

OA

DIN

G (

Ton

s)

in b

ars

(Y

)9

12

TO

TA

L (

X)

in b

ars

(Y

)9

12

TO

TA

L (

X)

00

0.0

00

0.0

100

27.0

27.0

100

20.0

20.0

200

53.5

53.5

200

46.0

46.0

300

82.0

82.0

300

73.0

73.0

40

01

09.0

10

9.0

40

01

01

.01

01

.0

50

01

38.0

13

8.0

50

01

30

.01

30

.0

60

01

65.0

16

5.0

Ca

lib

rate

d

Reg

ress

ion

Ou

tpu

t :

Reg

ress

ion

Ou

tpu

t :

C

onst

ant

4.7

2899540

C

onst

ant

31.0

3357124

S

td E

rr o

f Y

Est

2.2

7054121

S

td E

rr o

f Y

Est

3.9

2681306

R

Squar

ed0.9

9988216

R

Squar

ed0.9

9953740

N

o. of

Obse

rvat

ions

6 N

o. of

Obse

rvat

ions

5 D

egre

es o

f F

reed

om

4 D

egre

es o

f F

reed

om

3 X

Coef

fici

ent(

s)3.6

0596349

X

Coef

fici

ent(

s)3.6

3468147

LO

AD

ING

(Y

) =

3.6

06

0 *

X +

4.7

29

0U

NL

OA

DIN

G (

Y)

= 3

.63

47

* X

+ 3

1.0

33

6

AS

TM

AS

TM

Testi

ng

Co

., L

td.

437-4

41 K

am

pangpeth

III R

oad,

behin

d J

atu

jak P

ark

, B

angkok 1

0900 T

HA

ILA

ND

�: (6

62

)+ 2

72-5

96

6~

7, 2

72-4

56

5,

27

2-5

973

, 2

72

-45

82

: (6

62

)+ 2

72-4

58

3

CA

LIB

RA

TIO

N O

F O

NE

HY

DR

AU

LIC

JA

CK

FO

R S

TA

TIC

PIL

E L

OA

D T

ES

TIN

G

Kaeng K

hoi 2

Pow

er

Pla

nt(Late

ral Test

ing)

LO

AD

ING

UN

LO

AD

ING

Ga

ge

Rd

g.

LO

AD

ING

(T

ons)

Ga

ge R

dg.

U

NL

OA

DIN

G (

Ton

s)

in b

ars

(Y

)8

TO

TA

L (

X)

in b

ars

(Y

)8

TO

TA

L (

X)

00

0.0

00

0.0

50

3.0

3.0

50

3.0

3.0

100

9.0

9.0

100

9.0

9.0

150

15.

015

.01

501

4.5

14.5

200

20.

020

.02

001

9.0

19.0

250

25.

525

.52

502

5.0

25.0

300

31.

031

.03

003

0.0

30.0

350

37.

037

.03

503

5.5

35.5

400

42.

042

.04

004

1.0

41.0

450

48.

048

.04

504

7.0

47.0

500

54.

054

.05

005

3.0

53.0

550

59.

059

.0

Ca

lib

rate

d

Reg

ress

ion

Ou

tpu

t :

Reg

ress

ion

Ou

tpu

t :

C

onst

ant

20.5

7458

863

C

on

stan

t22

.0971

851

5

Std

Err

of

Y E

st2.7

6858

80

1

Std

Err

of

Y E

st4.1

64

896

90

R

Squar

ed0.9

9974

91

4

R S

quar

ed0.9

99

327

17

N

o. of

Obse

rvat

ions

11

N

o. of

Obse

rvat

ions

10

D

egre

es o

f F

reed

om

9

Deg

rees

of

Fre

edom

8

X C

oeff

icie

nt(

s)8.9

4812

08

9

X C

oeff

icie

nt(

s)9.1

30

065

52

LO

AD

ING

(Y

) =

8.9

481

* X

+ 2

0.57

46U

NL

OA

DIN

G (

Y)

= 9

.130

1 *

X +

22.

0972

AS

TM

KHAENG KHOI 2 Power Plant Project ASTM TESTING CO., LTD.

416

367 368

417

385

Main Beam

Main Beam

Hydraulic Jack

Figure 1 Compression Test

KHAENG KHOI 2 Power Plant Project ASTM TESTING CO., LTD.

369368367

Hydraulic Jack

Figure 2 Tension Test

367 369368

Reaction Beam

Hydraulic Jack

KHAENG KHOI 2 Power Plant Project ASTM TESTING CO., LTD.

417

385

432

416

Hydraulic Jack

Figure 3 Lateral Test

416 4171.0 m.

APPENDIX B SAMPLE PRESENTATION OF RESULTS

Infratech ASTM CO., LTD.

1

APPENDIX C EQUIPMENT DETAILS

Infratech ASTM CO., LTD.

2

APPENDIX D COMPANY REFERENCE PROJECTS