method study
DESCRIPTION
industrialTRANSCRIPT
Method StudyMethod Study
Man, Machines, Materials, Money, Technology and Man, Machines, Materials, Money, Technology and Time are the main resources required to produce goods Time are the main resources required to produce goods and are to be deployed in the most effective mannerand are to be deployed in the most effective manner
We have to select the best available combination of We have to select the best available combination of these resources at any point of time.these resources at any point of time.
Method Study helps in analysing the existing Method Study helps in analysing the existing methods and develop a more efficient method for methods and develop a more efficient method for
future.future.
3.ii Method Study
Method Study is the systematic recording and Method Study is the systematic recording and critical examination of existing and proposed critical examination of existing and proposed ways of doing work, as a means of developing ways of doing work, as a means of developing
and applying easier and more effective and applying easier and more effective methods and reducing costs.methods and reducing costs.
The objectives of Method Study are :The objectives of Method Study are :– Improvement of processes and proceduresImprovement of processes and procedures– Improvement in the design of plant and Improvement in the design of plant and
equipmentequipment– Improvement of plant layout.Improvement of plant layout.– Improvement in the use of men, materials and Improvement in the use of men, materials and
machines.machines.– Efficient materials handlingEfficient materials handling
3.2.A Definition And Objective of Method Study
– Improvement in the flow of production and Improvement in the flow of production and process.process.
– Economy in human effort and the reduction Economy in human effort and the reduction of unnecessary fatigue.of unnecessary fatigue.
– Method StandardizationMethod Standardization– Improvement in safety standards.Improvement in safety standards.– Development of a better physical working Development of a better physical working
environmentenvironment
Definition And Objective of Method Study
The solution of any problem follows the The solution of any problem follows the following sequence of phases in that orderfollowing sequence of phases in that order : :
1)1) Define: Define: The problem.The problem.2)2) Record: Record: All the facts relevant to the problem.All the facts relevant to the problem.3)3) Examine: Examine: The facts critically but impartially.The facts critically but impartially.4)4) Consider: Consider: The courses of actions (possible The courses of actions (possible
solutions) and decide which to follow.solutions) and decide which to follow.5)5) Implement:Implement: The solution.The solution.6)6) Follow Up:Follow Up: The development.The development.
The basic procedure for the whole of work The basic procedure for the whole of work study, which embraces the procedures of both study, which embraces the procedures of both method study and work measurement.method study and work measurement. Contd… Contd…
Procedure
Steps and Procedure to conduct Method Steps and Procedure to conduct Method Study :Study :
a)a) Select: Select: the work to be studied.the work to be studied.b)b) RecordRecord: : all the relevant facts about the all the relevant facts about the
present method by direct observation.present method by direct observation.c)c) ExamineExamine: : those facts critically and in an those facts critically and in an
orderly sequence, using the techniques orderly sequence, using the techniques best suited to the purpose.best suited to the purpose.
d)d) DevelopDevelop: : the most practical, economic and the most practical, economic and effective method, having due regard to all effective method, having due regard to all contingent circumstances.contingent circumstances.
Procedure…
a)a) Define: Define: the new method so that it can the new method so that it can always be identified.always be identified.
a)a) Install: Install: that methods as standard practice.that methods as standard practice.
a)a) Maintain: Maintain: that standard practice by regular that standard practice by regular routine checks.routine checks.
These are the seven essential stages in the These are the seven essential stages in the application of method study ; none can be application of method study ; none can be
excluded. Strict adherence to the sequence, as excluded. Strict adherence to the sequence, as well as to their content, is essential for the well as to their content, is essential for the
success of an investigation. They are shown success of an investigation. They are shown diagrammatically on the chart.diagrammatically on the chart.
Procedure…
Method StudyRecord
At Work Place By means of
At Work Place
By means of
Examine the facts critically
Two handed ; Simo ; Multiple Activity
Charts
Other MeansCycle Graphs ; Chronocycle Graphs ;Film Analysis ; Memotion Photography
Select
Define Scope of Study
Work which can be studiedWith economic advantage
Charts
Other Means
Outline Process ;Flow Process – Man type , Material type ;Multiple Activity ; TravelFlow Diagrams ; String Diagrams ; Models
Challenge
PURPOSE – PLACE – SEQUENCE – PERSON - MEANS
Seek Alternatives
Find PointersCombine or
ChangeSimplifyEliminat
eDevelopA record of an improved
methodRe - Examinethat record to
establish
Method Study to improve
methods of production
The Best Method under Prevailing Circumstances
Planning and ControlMaterials HandlingGeneral Environment and Working ConditionsPlant Layout
Mechanical Aids ; Manual Controls and Visual instrumentsEquipment design ; Jigs and fixturesLocal Working Conditions
Define
InstallThe Improved method
Plan - Arrange - Implement
MaintainVerify at regular intervals that
The important method as defined is in fact in use
To achieve improved factory and work space
layoutImproved design of equipment
Better working conditionsReduction of fatigue
Resulting in improved use of materialPlant and equipment
manpower
HigherProductivity
The Field Of Choice
Types of Jobs Examples Recording Technique
Complete Sequence of manufacture
Manufacture of an electric motor from raw material to dispatchTransformation of thread into cloth from preparation to inspectionReceipt, packing and dispatch of fruit
Outline process chartFlow process chartFlow diagram
Factory layout : movement of materials
Movements of a diesel engine cylinder head through all machining operations. Movements of grain between milling operations
Outline process chartFlow process chart–material typeFlow diagramTravel chartModels
The Field Of Choice…
Types of Jobs Examples Recording Technique
Factory layout : movement of workers
Labourers servicing spinning machine with bobbinsCooks preparing meals in a restaurant kitchen
Flow process chart-man type string diagramString diagram
Handling of materials
Putting materials into and taking them out of storesLoading lorries with finished products.
Flow process chart – material typeFlow diagramString diagram
Workplace layout
Light assembly work on a benchTypesetting by hand
Flow process chart-man type. Two-handed process chart. Multiple activity chart. Simo chart. Cyclegraph.Chronocyclegraph.
Types of Jobs Examples Recording Technique
Gang work or automatic machine operation
Assembly line Operator looking after semi-automatic lathe
Multiple activity chartFlow process chart-equipment type
Movements of operatives at work
Female operatives on short – cycle repetition workOperations demanding great manual dexterity
Multiple activity chartFlow process chart – equipment typeFilmsFilm analysisSimo chartMemotion photographyMicromotion analysis
The Field Of Choice…
When selecting a job for method study it will be found helpful to have a standerdised list of points to be covered as shown below :-
1.1. Product and operationProduct and operation2.2. Person who proposes investigationPerson who proposes investigation3.3. Reason for proposalReason for proposal4.4. Suggested limits of investigationSuggested limits of investigation5.5. Particulars of the jobParticulars of the job
a)a) How much is produced or handled How much is produced or handled per week?per week?
The Field Of Choice…
The most commonly used method study charts The most commonly used method study charts and diagrams and diagrams
A. Charts
Indicating process SEQUENCEOutline Process ChartFlow Process Chart – Man TypeFlow Process Chart – Material TypeFlow Process Chart – Equipment TypeTwo – Handed Process Chart
B. ChartsUsing a TIME SCALEMultiple Activity ChartSimo Chart
C. Diagrams
Indicating movementFlow DiagramString DiagramCyclegraphChromocyclegraphTravel Chart
Record, Examine, Develop…
Process Chart Symbols…
Indicates the main steps in a process, method or procedure.Indicates the main steps in a process, method or procedure.Usually the part, material or product concerned is modified or Usually the part, material or product concerned is modified or
changed during the operation. changed during the operation.
Inspection
Indicates an inspection for quality and / or check for quantityIndicates an inspection for quality and / or check for quantity
Operation
Transport
Indicates the movement of workers, materials or equipment from place Indicates the movement of workers, materials or equipment from place to placeto place
Temporary Storage or Delay
Indicates a delay in the sequence of events : for example, Indicates a delay in the sequence of events : for example, work waiting work waiting between consecutive operations, or any object laid between consecutive operations, or any object laid aside temporarily without aside temporarily without record until required. record until required.
Permanent Storage
Indicates a controlled storage in which material is received Indicates a controlled storage in which material is received into or issued into or issued from a store under some form of authorization; or from a store under some form of authorization; or an item is retained for an item is retained for reference purposes.reference purposes.
Combined Activities
Indicates a controlled storage in which material is received Indicates a controlled storage in which material is received into or issued into or issued from a store under some form of authorization; or from a store under some form of authorization; or an item is retained for an item is retained for reference purposes.reference purposes.
Process Chart Symbols…
The Outline Process ChartThe Outline Process Chart
ExampleExample
Assembling a switch rotorAssembling a switch rotor
Switch Rotor AssemblySwitch Rotor Assembly
The operations and inspections carried out on the The operations and inspections carried out on the spindle made from 10mm spindle made from 10mm ØØ steel rod are as follows steel rod are as follows
O 1O 1 Face, turn, undercut and part off on capstan latheFace, turn, undercut and part off on capstan lathe(0.025 (0.025 hrs)hrs)
O 2O 2 Face opposite end on the same machine(0.010 hrs). Face opposite end on the same machine(0.010 hrs). Transport to inspn deptTransport to inspn dept
I 1I 1 Inspect for dimensions and finish (no time fixed). Inspect for dimensions and finish (no time fixed). Transport to milling sectionTransport to milling section
O 3 O 3 mill four flats on end on a horizontal miller mill four flats on end on a horizontal miller (0.020 (0.020 hrs). Transport to work hrs). Transport to work benchbench
O 4 O 4 Remove burrs at the burring bench(0.020 hrs). Remove burrs at the burring bench(0.020 hrs). Transport to inspn deptTransport to inspn dept
I 2 I 2 Final inspn of machine (no time)Final inspn of machine (no time)
O5 O5 Degreasing(0.0015 hrs)Degreasing(0.0015 hrs)O6 O6 Cadmium plating(.008 hrs)Cadmium plating(.008 hrs)I3 I3 Final check (no time)Final check (no time)O7 O7 Face on both sides, bore the cored hole and ream Face on both sides, bore the cored hole and ream to to
size on a capstan lathe(0.080 hrs)size on a capstan lathe(0.080 hrs)O8 O8 Drill cross-hole and burr on two-spindle drill Drill cross-hole and burr on two-spindle drill
press(0.022 hrs)press(0.022 hrs)I4 I4 Final check dimensions and finish (no time)Final check dimensions and finish (no time)
Transport to finished parts stores and await with-Transport to finished parts stores and await with-drawl drawl for assembly.for assembly.
Note the numbering of operations and inspectionsNote the numbering of operations and inspections
Outline process chartOutline process chart
3.ii.D3.ii.D FLOW PROCESS CHARTFLOW PROCESS CHART
Process activity symbolsProcess activity symbols
– OperationOperation
– InspectionInspection
– TransportTransport
– Temporary storage or DelayTemporary storage or Delay
– Permanent storagePermanent storage
3.ii.D Flow process chart3.ii.D Flow process chart 2/62/6
A FLOW PROCESS CHART records what the A FLOW PROCESS CHART records what the worker does.worker does.
It is a chart setting out the frequency of flow of It is a chart setting out the frequency of flow of a product or procedure by recording all events a product or procedure by recording all events under review using process chart symbols.under review using process chart symbols.
there are different types of flow process charts.there are different types of flow process charts.
PurposePurpose::
To set out the sequence of the flow of a product To set out the sequence of the flow of a product or a procedure by recording all the events under or a procedure by recording all the events under review review
( Inspection ) using the appropriate process chart ( Inspection ) using the appropriate process chart symbols.symbols.
Activities recorded in the flow chartActivities recorded in the flow chart
Those where some thing is happening to Those where some thing is happening to the work piece.the work piece.
Those where the work piece is not Those where the work piece is not touched – (stored or standstill)touched – (stored or standstill)
Three types of flow process chartsThree types of flow process charts
Man typeMan type– Flow chart which records what the worker doesFlow chart which records what the worker does
Material typeMaterial type– Flow chart which records how material is handled or Flow chart which records how material is handled or
treatedtreated
Equipment typeEquipment type– Flow chart which records how the equipment is Flow chart which records how the equipment is
usedused
FLOW PROCESS CHART FOR FLOW PROCESS CHART FOR ENGINE ENGINE
Stripping – Cleaning - GreasingStripping – Cleaning - Greasing
Critical ExaminationCritical Examination
The questioning technique is the The questioning technique is the critical means by which the critical means by which the critical examination is conducted critical examination is conducted – each activity being subjected in – each activity being subjected in turn to a systematic and turn to a systematic and progressive series of questionsprogressive series of questions
OPERATIONSOPERATIONS
Make ReadyMake Ready
DoDo
Put AwayPut Away
Make ready and put away operations can Make ready and put away operations can be represented by transport and be represented by transport and inspection symbols inspection symbols
DO operations can be shown by “O”DO operations can be shown by “O”
CRITICAL EXAMINATIONCRITICAL EXAMINATION- - Primary questionsPrimary questions
The Purpose The Purpose for which…for which…
The Place The Place at which…at which…
The sequence The sequence in which…in which…
The person The person by which…by which…
The means The means by which…by which…
……the activities are undertakenthe activities are undertaken
CRITICAL EXAMINATIONCRITICAL EXAMINATION- - Primary questionsPrimary questions
With a view toWith a view to
EliminatingEliminatingCombiningCombiningRearrangingRearrangingSimplifyingSimplifying
……those Activitiesthose Activities
PRIMARY QUESTIONSPRIMARY QUESTIONS
PURPOSEPURPOSE ELIMINATEELIMINATE
PLACEPLACE COMBINECOMBINE
SEQUENCESEQUENCE REARRANGEREARRANGE
PERSON PERSON REARRANGEREARRANGE
MEANSMEANS SIMPLIFYSIMPLIFY
EXAMPLE: ENGINE EXAMPLE: ENGINE Stripping – Cleaning - DegreasingStripping – Cleaning - Degreasing
1.1. String diagramString diagram
2.2. Flow Process chartFlow Process chart
3.3. Travel ChartTravel Chart
4.4. Flow diagramFlow diagram
5.5. Multiple activity chartMultiple activity chart
6.6. Template ModelsTemplate Models
TOOLS USED FOR PREPARING TOOLS USED FOR PREPARING PLANT LAYOUTSPLANT LAYOUTS
3.ii.D.1 String diagram3.ii.D.1 String diagram 1/61/6
String diagram is a useful tool to record the String diagram is a useful tool to record the distance traveled by a worker in the working area. distance traveled by a worker in the working area. The string diagram is a scale plan or model on The string diagram is a scale plan or model on which a thread is used to trace and measure the which a thread is used to trace and measure the distance traversed which has to be distance traversed which has to be minimumminimum by by
•WorkersWorkers•Material orMaterial or•Equipment Equipment
during a specified sequence of eventsduring a specified sequence of events
Observe the clusters of points, pins, turning Observe the clusters of points, pins, turning points. points.
Also observe the grid lines which represent a Also observe the grid lines which represent a measure of the distance between the points.measure of the distance between the points.
Example of a String diagramExample of a String diagramMovement, Transport of tiles from Inspection to Movement, Transport of tiles from Inspection to
StorageStorage
IMPROVED METHODIMPROVED METHOD
Serving dinners in a hospital wardServing dinners in a hospital ward
FPC - FPC - Dinners in a hospital Dinners in a hospital wardward
Original Flow Diagram Inspn and MarkingOriginal Flow Diagram Inspn and Marking
Improved FD of Inspection and Improved FD of Inspection and MarkingMarking
Travel chartTravel chart
Original Flow Diagram Inspection and MarkingOriginal Flow Diagram Inspection and Marking
Improved FD of Inspection and Improved FD of Inspection and MarkingMarking
MAC-Inspn of catalyst in a converter-MAC-Inspn of catalyst in a converter-original methodoriginal method
MAC-Inspn of catalyst in a converter-MAC-Inspn of catalyst in a converter-Improved methodImproved method