I n t e rn a ti o na l J o urn al o f App l icati o no r Inn o va ti on i nEng i ne e ri n g& Man a g e m e nt (IJ AI EM) We b Si te : ww w.ij aie m .org Em ail: e ditor@ij aie m .org, e ditori j aie m @g m ail.co m Volume 2, I s sue1, J anuary 20 13 ISSN 23 19 - 48 47  Volume 2, I s sue1, J anuary 2013 Pag e 29 ABSTRACT During the voltage unbalance, the resulting adverse effects on equipments such as induction motors and power electronic conve rters and d rive s on ASDs hav e be en d es cribe d. I t has b ee n obse rve d that d uring unsym me trical faul t, the input rectifier slips into the single phase operation and draw heavy currents which may actuate the overload protection and trip the ASDs. The app lication of sup e rcapacitors ba nk with boo st conv e rter to i nje ct ene rgy at DC-L ink unde r voltage unbalance c ondition has been incorporated. The supercapacitor provides ride-through and reduces the current overshooting by injecting energy at DC- Link. Base d on the de signed top ology, simulation mode l in MATLAB 7.5 (Sim Powe r Bl ock se t) has be e n de ve lope d for voltage unbalance cond itions with supercapacitor as an e nergy s torage de vice. The de signe d control technique is modeled , simulate d and succe ssful ly implem ente d in the laboratory. The exte nsive simulati on results s upported by exp eri mental results w e re provide d to v alidate the proposed s yste m .  K e ywo r ds : Adjusta ble Spe e d Dri ve s, Ele ctric Powe r Qua lity, Ride -throug h Capa bil itie s, Ene rgy Sto rage Dev ice s, Supercapacitors  1.  I NTRODUCTION  Th e g rea t est e ff ect of volta g e unbalance is on t hree -p hase induction motors. Three -p hase induc t ion m o tors are one o f the m ost com mon load s on the ne twork and a re f ound i n large num be rs esp e cially in indus trial e nvironments. When a three - phas e induction m otor is suppli e d by a n unba lance d sys tem the re sulting line c urre nts show a d e gree of unba lance that is se ve ral tim e s the vo ltage unb al ance . An excessi ve leve l of voltage unb alancecan have serious im pac ts on m ai ns conne cte d i nducti on motors. Although induction m otors a re d e signe d to tole rate a sm al l leve l of unba lance they have to be de rated if the unbalance is excessi ve. Voltage unbal ance also has an imp act on a c variable spe ed drive syste ms where the front e nd consists o f three - phas e rectifi e r syste m s. The tri ple n harm onic line currents tha t are uncha racte ri stic to these rectif ie r syste m s can e xist in thes e s ituati ons le ading to unexpe cte d harmo nic proble ms. Althou gh it i s prac tically im po ssible to e lim ina te v oltag eunbalance it can b e ke pt und er control at bo th utility a nd plant le ve l by s e ve ral practical app roache s. Voltage unb al ance is re ga rded as a power qua lity p roblem of signif icant conce rn at the e le ctri city distri bution le ve l. Although the voltage s a re qu ite we ll ba lance d a t the ge ne rator and transm issi on le ve ls the voltage s at the utilization leve l can b eco meunbal ance d due to the une qual system imp ed ances and the uneq ual distr ibution of si ngle-phase loads.  Th e le v el of cu rr ent unbalance that is present is s e v e ral times the le v el of vo lt age unbalance. Such an unbalance in the line currents can lead to excessi ve l osse s in the s tator and r otor that m ay cause prot ec ti on syste ms to ope rate cau sing loss of production. [1-5]  Th ree-phase diode re ctifier sys t ems are an es s ential part o f c onventional Ad ju s t able Speed Dr iv es as shown in . 1 and uninterruptibl e powe r supp lie s. The se rectifi e r sys te m s draw non-si nusoidal curre nt w ave forms f rom the ac m ai ns. I f  the ac s upply syste m is balance d the l ine cu rre nt waveform ma y take the “double pulse pe r half cycl e” shape that contains characteristic harmonic orders given by: 1 h k q (1) where h = harmo nic o rder ,k = 1, 2,….and q= num be r of pulse s o f the re ctif ie r system giving o nly 5th ,7th , 11th, 13th… order harmonics. Me thodo lo g y to A c hieve Ride - T hr o ug h o f a n A dj us tab le Spe e d Dr ives (A SD’ s ) Us ing Supe r c a pa ci tors during V o ltage Sa g S.S.Deswal 1 , Ra j ve er Mittal 2 , Ratna Dahiya 3 an d D.K .J a in 4  1 Asso c. Prof., Depa rtm e nt of El ec trical Engg ., M ah ara ja Agra se n Institute of Tec hno log y, Sec -22, Rohini, Delhi 2 Asso c. Prof., Depa rtm e nt of El ec trica l Engg ., M ah ara ja Agra se n Institute of Tec hno log y, Sec -22, Rohini, Delhi 3 Profes sor, Depa rtm en t of El ec tri ca l Engg., NIT, K urukshetra, Ha rya na 4 Professor, Department of Electrical Engg., DCRUST, Murthal, Haryana

Upload: anonymous-vqrjlen

Post on 04-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 1/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 29

ABSTRACT During the voltage unbalance, the resulting adverse effects on equipments such as induction motors and power electronicconverters and drives on ASDs have been described. It has been observed that during unsymmetrical fault, the input rectifier

slips into the single phase operation and draw heavy currents which may actuate the overload protection and trip the ASDs. The

application of supercapacitors bank with boost converter to inject energy at DC-L ink under voltage unbalance condition hasbeen incorporated. The supercapacitor provides ride-through and reduces the current overshooting by injecting energy at DC-

Link. Based on the designed topology, simulation model in MATLAB 7.5 (Sim Power Block set) has been developed for voltage

unbalance conditions with supercapacitor as an energy storage device. The designed control technique is modeled, simulatedand successfully implemented in the laboratory. The extensive simulation results supported by experimental results were

provided to validate the proposed system. Keywords: Adjustable Speed Drives, Electric Power Quality, Ride-through Capabilities, Energy Storage Devices,Supercapacitors 

1. INTRODUCTION 

 The greatest effect of voltage unbalance is on three-phase induction motors. Three-phase induction motors are one of the most common loads on the network and are found in large numbers especially in industrial environments. When athree-phase induction motor is supplied by an unbalanced system the resulting line currents show a degree of unbalancethat is several times the voltage unbalance. An excessive level of voltage unbalance can have serious impacts on mainsconnected induction motors. Although induction motors are designed to tolerate a small level of unbalance they haveto be derated if the unbalance is excessive. Voltage unbalance also has an impact on ac variable speed drive systemswhere the front end consists of three-phase rectifier systems. The triplen harmonic line currents that areuncharacteristic to these rectifier systems can exist in these situations leading to unexpected harmonic problems.Although it is practically impossible to eliminate voltage unbalance it can be kept under control at both utility and plantlevel by several practical approaches.

Voltage unbalance is regarded as a power quality problem of significant concern at the electricity distribution level.Although the voltages are quite well balanced at the generator and transmission levels the voltages at the utilizationlevel can become unbalanced due to the unequal system impedances and the unequal distribution of single-phase loads.

 The level of current unbalance that is present is several times the level of voltage unbalance. Such an unbalance in theline currents can lead to excessive losses in the stator and rotor that may cause protection systems to operate causingloss of production. [1-5]

 Three-phase diode rectifier systems are an essential part of conventional Adjustable Speed Drives as shown in . 1 anduninterruptible power supplies. These rectifier systems draw non-sinusoidal current waveforms from the ac mains. If the ac supply system is balanced the line current waveform may take the “double pulse per half cycle” shape thatcontains characteristic harmonic orders given by:

1h kq (1)

where h =harmonic order ,k =1, 2,….and q=number of pulses of the rectifier system giving only 5th ,7th , 11th,13th… order harmonics.

Methodology to Achieve Ride-Through of anAdjustable Speed Drives (ASD’s) Using

Supercapacitors during Voltage SagS.S.Deswal1, Rajveer Mittal2, Ratna Dahiya3 and D.K.J ain4 

1Assoc. Prof., Department of Electrical Engg., Maharaja Agrasen Institute of Technology, Sec-22, Rohini, Delhi

2Assoc. Prof., Department of Electrical Engg., Maharaja Agrasen Institute of Technology, Sec-22, Rohini, Delhi

3Professor, Department of Electrical Engg., NIT, Kurukshetra, Haryana

4Professor, Department of Electrical Engg., DCRUST, Murthal, Haryana

Page 2: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 2/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 30

Figure 1 Typical adjustable speed drives (ASDs) system 

As the supply system becomes unbalanced the line current waveform deviates away from the double pulse formation tosingle pulse formation leading to uncharacteristic triplen harmonics. Supply voltage unbalance can lead to tripping of drive systems that is caused by excessive ac line currents on some phases and under voltage on the DC-Link. This can

also lead to excessive thermal stress on diodes and dc link capacitor. Increase in the unwanted triplen harmoniccurrents can also lead to undesirable harmonic problems in the supply system.

 The different ride-through require energy storage devices injecting power at the DC-link during voltage sags asdescribed in the literature[7-15]. They are based around software control (such as kinetic and magnetizing energyrecovery), hardware (such as increasing the DC-Link capacitor size), or a combination (such as a boost converter) [6,19]. Most of the mitigation techniques are based on the injection of active power, thus compensating the loss of activepower supplied by the system [10-13]. An important distinction between each of the possible ride-through approaches istheir ability to provide full-power ride-through, which is required by many applications.

 The conventional topology of a boost converter can be used to maintain the DC-Link voltage during voltage sag, andcan either be integrated into new drives between the rectifier and the DC-Link capacitors or retrofitted as an add-onmodule. The add-on module is used to retrofit existing drives with ride-through capabilities. Besides energy storagesystems, some other devices Constant voltage transformers (CVT), DVR may be used to solve Electric Power Quality

problems [9-12]. The sensitivity of AC ASD’s to voltage sags is presented in a voltage tolerance curve is defined by IEEE Std. 1346[5]as shown in Figure 2. It may be seen that the ASD’s can withstand a reduction in the line voltage upto 85% of nominalvalue for an extended duration of time. For all points falling below the voltage tolerance curve, the drive will trip.SEMI F47-0200, Specification for Semiconductor Processing Equipment Voltage Sag Immunity [6], specifies therequired voltage sag tolerance for semiconductor fabrication equipment. SEMI F47 requires that semiconductorprocessing equipment tolerate voltage sags connected onto their AC power line. They must tolerate sags to 50% of equipment nominal voltage for duration of up to 200 ms, sags to 70% for up to 0.5 seconds, and sags to 80% for up to1.0 second.

Figure 2 Voltage tolerance curve of an ASD’s as per IEEE Std.1346 

Page 3: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 3/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 31

It is observed from the literature survey that only theoretical analysis have been done by the different researchers inregards of providing ride-through to an Adjustable Speed Drives during voltage unbalance due to unsymmetrical faultconditions. Experimental work for improving upon the adverse effects of voltage unbalancing on Adjustable SpeedDrives has not yet been proposed and implemented. Therefore in the present work, it is aimed to study the effectivenessof the supercapacitor as an energy storage device for providing ride-through to ASD’s during symmetrical and

unsymmetrical fault conditions [16-22].

2. ANALY SIS OF S YMMETRICAL AND UNSYMMETRICAL FAULTS 

2.1  Symmetrical

 The classification of different types of voltage sags such as type A,B,C,D,E are described in [2]. Voltage sag of Type Aoccurs because of balanced three-phase faults or power failure. This type of voltage sag is the most severe. Voltage sagsof type A are symmetrical, all phases experience the same retained voltage and phase-angle jump. It results in thereduction of the voltage on the DC-Link which is proportional to the AC source voltage. The under-voltage or overcurrent protection on the DC-Link may trip the ASD’s. The basic model for a distribution system [7] is shown in Figure3.

Figure 3 Basic model for fault analysis

For a symmetric three-phase fault the voltage at the Point-of-Common-Coupling (PCC) can be estimated using a simplevoltage-divider model represented by the equation (2). In this case the fault impedance is not considered.

1

ZFeederV E

Z ZSFeeder

  (2)

Here V is the retained voltage at PCC, E1 is the pre-fault voltage in phase A, ZFeeder is the feeder impedance and ZSis the source impedance.

2.2  Unsymmetrical Faults

A phase to ground fault will result in a type B. A phase to phase fault results in a type C. If the voltage sag is of Type Bor Type C, the circuit will behave as a single-phase rectifier. Even 10% voltage sag will result in a single-phaseoperation of the three-phase diode rectifier. The voltage between the two non faulted phases is unaffected and the DC-Link voltage will not be reduced, however the current amplitude will increase. The same amount of energy must betransferred, but now in two pulses instead of six pulses. The peak value of the current will be 200% larger, and maycause an over-current or a current unbalance. The over-current or unbalance protection may trip the ASD’s. A phaseangle jump will affect the phase voltages and the DC-Link voltage. For sag magnitude of 50%, the DC-Link voltagedoes not drop below 70%, even for a small capacitance. This is because there is at least one phase that is still at 100%

magnitude, and this phase stablizes the DC-Link voltage.If there is a transformer that removes the zero-sequence between the fault location and the load for phase to groundfault, the voltage sag will be of type D. The voltage sags of type E, F and G are due to a two phase to ground fault [1-5].For sag magnitude 50% in Type D, there is no phase which has 100% magnitude and, therefore, the effect is moreharmful on the DC-Link. In case of type B, C, D or E voltage sag, input rectifier passes into single-phase operationswith the consequences such as input current distortion and DC voltage ripple increase with dominant component atdouble frequency and with average voltage reduction in C type voltage sag case. Consequently torque contains thesecond and fourth harmonic components along with the fundamental. The motor torque oscillatory component presencecan leads to mechanical resonance exciting in coupled multi-motor drives besides noise increase, for e.g. in paperproduction machines.

 Thus, the unsymmetrical faults lead to three major negative effects that unbalanced input voltages can have on ASD’sperformance. [9-12] :

a)  Significant input current unbalances which stresses the diode bridge rectifiers and input protective devicessuch as fuses, contactors and circuit breakers.

b)  Injects a second harmonic voltage component on the DC-Link voltage which increases the electricalstresses on the DC-Link choke inductor (if used) and the DC-Link electrolytic capacitors. It potentiallyshortens the capacitor lifetime.

Page 4: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 4/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 32

c)  May give rise to ripple torque of magnitude double the fundamental frequency of induction machinewhich increases the mechanical and thermal stresses.

3. PROPOSED RIDE- THROUGH TOPOLOGIES 

 The objective of this section is to investigate the performance of an ASD’s under three-phase symmetrical and

unsymmetrical fault leading to balanced and unbalanced voltage sag at PCC. The proposed topology is designed byusing supercapacitor as energy storage device along with boost converter across DC-Link as a ride-through alternativefor ASD’s.

 The performance of ASD’s under various fault conditions has been simulated using MATLAB Simulink Power SystemBlock set tool box. The functional block diagram is shown in Figure 4. A three-phase programmable voltage sourcefeeds the power bus to PCC through series impedance (taken as resistance of 0.1 ohm assuming the length of line to bevery small). Two independent feeders are connected at this PCC bus; one feeds the ASD’s and the other is connected tothe load. The faults are created at the load feeder to study the impact of voltage sags on the ASD’s connected at thesame PCC. The shunt impedance method has been used to generate voltage sags [22]. At the time of faults the faultcurrent flows through the impedance leading to a voltage drop across it, thereby causing voltage sags at PCC.

Figure 4 Block Diagram of Proposed Technique 

 The ASD’s used is a scalar controlled induction motor of specifications 5 H.P, 415 volts (L-L), 3- Phase, 4 Poles, 50Hz, 1444 rpm and is having a supercapacitors as an energy storage device at DC-Link. A buck-boost DC-DC converterconverts the output of the connected energy storage device to the desired DC-Link voltage. The hardware set up isshown in Figure 5. It consists of:

a)  AC/DC converter section: This unit consists of uncontrolled three- phase diode bride rectifier.b)  DC/AC inverter unit: This unit consists of MOSFET based inverter.c)  Energy Storage Devices: The device is a supercapacitor bank of 12V modules. This 12V DC is converted

to 220 V DC (for experimental purpose) with the help of buck-boost converter

Voltage Sag Generator Unit: The various types of faults were created in the lab using shunt impedance method byactually grounding/shorting the line terminals in order to represent the true voltage sag conditions as shown in Figure4.

Page 5: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 5/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 33

Figure 5 View of Designed Hardware 

1. Waveform in LabVIEW 9. AC/DC converter section2. DAQ board 10.Capacitor bank(DC- link)3. DC isolation circuit 11. Adjustable speed drives4. Isolation transformer 12. Boost convereter5. Supercapacitor 13. DC- link6. 3-phase induction motor 14. Function generator7. Sag generator 15.3-phase Auto transformer

8. 3-phase supply 16. Battery

4. MODELING OF THE S YSTEM 

4.1  Diode Rectifier Equations The basic equations of a three-phase uncontrolled rectifier with input impedance in derivative form are given as:

( ) 2maxpi V V Ldc sd (3)

( )pV i i Cd o odc (4)

where, id is supply current and io is the current drawn by the inverter section. The input AC currents of the rectifier are computed as follows. When VRY is maximum (Vmax) the current (id) flowsfrom terminal ‘R’ to ‘Y ’ through the concerned rectifier diode pair and the load. Where as for minimum value of VYRis maximum, the current flows from terminal ‘Y’ to ‘R’. The current in line ‘B’ is zero when these conditions exist.

Likewise the currents flowing through the lines are computed when V YB andVBR satisfy these upper and lower voltageconditions.

4.2  Scalar Control of Induction Motor DriveAn AC induction machine is scalar controlled, wherein, the ratio of stator voltage to frequency (V/F) is kept constant.

4.3  Modeling of SupercapacitorA supercapacitor can be modeled using some standard circuit components as shown in Figure6. The two variablecapacitances are nonlinearly varying with the voltage that is applied across the circuit. The capacitanceC is responsiblefor the most important phenomenon in the model. The amount of energy stored and the rate of energy level variationsare both determined mainly by the capacitance value. The resistance R2 connected in parallel with the capacitor ismeant to represent the self discharge effect. The series resistance R1 represents the losses during charge and discharge.

 The over voltage protection provided by R3 and the switch controlling its connection to the circuit is necessary toprevent damage to the capacitor elements by balancing the voltage level. The resistance Rp and the capacitance Cp areincluded in the circuit to model some of the fast dynamics in the behavior of the supercapacitor [11].

Page 6: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 6/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 34

Figure 6 Basic circuit model of the supercapacitor 

Energy stored in the supercapacitor is given by the following equation:21

2E CV (5)

Where, C is the capacitance in farads, V is the voltage acrossC in volts; E is the energy stored inC in joules.

Usable Energy = 2 21 212E C V V (6)

Where, V1 is the rated charging voltageV2 is the rated minimum operating voltage of supercapacitors.

5. CONTROL OF BUCK -BOOST DC-DC CONVERTER 

 The output voltage of the switch-mode DC-DC buck-boost converter is regulated to be within a specified range. Thereare two control methods for DC-DC converters: voltage mode control and current mode control respectively. Thecurrent mode control for a DC-DC buck boost converter has been employed in the proposed technique. It contains two-loop system as shown in Figure 4. An additional inner current loop is added to the voltage loop. The current loopmonitors the inductor current and compares it with its reference value. The reference value for the inductor current isgenerated by the voltage loop.

 The key principle that drives the buck-boost converter is the tendency of an inductor to resist changes in current. Whenbeing charged it acts as a load and absorbs energy, when being discharged, it acts as an energy source. The voltage itproduces during the discharge phase is related to the rate of change of current, and not to the original charging voltage,thus allowing different input and output voltages.

6. RESULTS ANDDISCUSSION 

 The objective of this section is to investigate the performance of an ASD’s under various power system faults. Figures.7-10 show the performance of ASD’s with the proposed scheme during balanced voltage sag and Figures. 11-14 duringDouble Line to Ground Faults (Type-E) with supercapacitor as ride-through.

 The simulations have been carried out to get the traces of three-phase source voltages (Vsry, Vsyb, Vsbr), three-phasesource currents (Isr, Isy, Isb), Electromagnetic Torque( Te) , rotor speed (ωr) and DC-Link voltage (Vdc) respectively.

Performance of ASD’s during balanced voltage sag with supercapacitor as ride-through The simulation and hardware results during voltage sag due to symmetrical three-phase line to ground fault are shownin Figure 7 and Figure 8. The main characteristics of the voltage sag are magnitude and duration. The amplitude of linevoltages drops to a value of about 60% of the pre-event voltage during 1.025 to 1.6 sec (about 28 cycles). During thesymmetrical three phase fault the DC-Link voltage drops from 210V to 100 V. It can also observed from the same s thatthe Electromagnetic torque ( Te) the speed (wr) decrease during fault period.

 The simulation and experimental results have been taken using supercapacitor as an energy storage device to provideride-through to the ASD’s as shown in Figure 9 and Figure 10. In this case the three-phase source voltage amplitudedrops to a value of about 60% of the normal voltage during fault period i.e from 0.85 to 1.68 sec about 42 cycles. Thetransient response of the supercapacitor is fast enough to supply the current required by the ASD’s during the sag. Ithas also been observed from the Figure 9 and Figure 10 that there is a marginal change in the DC-Link voltage during

fault condition which fluctuates normally above the preset value of the DC-Link.

Page 7: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 7/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 35

-250

-150

-50

50

150

250

  V  s  r  y

  (  V  )

-250-150

-50

50

150

250

  V  s  y  b

  (  V  )

-250

-150

-50

50

150

250

  V  s  b  r

  (  V  )

 

-25

-15

-5

5

15

25

  i  s  r  (  A

  )

-25

-15

-5

5

15

25

  i  s  y  (  A

  )

-25-15

-5

5

15

25

  i  s  b

  (  A  )

0.9 0.95 1 1. 05 1 .1 1.15 1.2 1 .2 5 1.3 1.3 5 1 .4 1 .45 1.5 1 .5 5 1 .6 1.65 1.7 1.75 1.8 1. 85 1.90

100

200

300

400

  v  d  c

  (  V  )

 

-1

-0.5

0

0.5

1

  T  e  (  N -  m  )

0.9 0.95 1 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5 1.55 1.6 1.65 1.7 1.75 1.8 1.85 1.9399

399.5

400

400.5

401

401.5

402

  w  r

  r  a  s

time(s)  Figure 7 Simulation Results showing three-phase source voltages, three-phase source currents, DC-Link voltage,

Electromagnetic Torque and Rotor speed during symmetrical fault condition without providing any ride-through

Figure 8Experimental Results showing three-phase source voltages, three-phase source currents, DC-Link voltage,Electromagnetic Torque and Rotor speed during symmetrical fault condition without providing any ride-through.Voltage scale: 100 V per division. Current scale: 2.25 A per division. DC-Link Voltage scale: 100 V per division

Page 8: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 8/13

Page 9: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 9/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 37

Performance of ASD’s during Double Line to Ground Faults (Type-E) with supercapacitor as ride-through

 The simulation and hardware results during double line to ground fault are shown in Figure 11 to Figure 14. Simulatedresults shows that the amplitude of line voltage ‘ry’ drops to a value of about 40% of the pre-event voltage and that of ‘yb’ and ‘br’ drops to 80% of the pre-event voltage during 1.32 to 1.48 sec about 8 cycles. During the fault period thethree-phase uncontrolled rectifier operates in unbalanced mode and draws unbalanced peaky currents The DC-Link

voltage drops from 195V to 155 V which is below the threshold setting at the DC-Link which may actuate the undervoltage protection and trips the ASD’s. The electromagnetic torque ( Te) and the speed (wr) drop slightly as shown inFigure 11 and Figure12. It can be observed that the effective motor current during the fault period increases so as tomaintain the desired torque.

 The simulation and hardware results under unsymmetrical fault condition are shown in Figure 13 and Figure 14 withsupercapacitor as a ride-through capability connected across DC-Link using a buck-boost Converter. It is clearly seenfrom Figure 13 and Figure 14, the supercapacitor bank provides ride-through during the fault as well as post fault;since there is no inrush current after fault recovery.

-250

-150

-50

50

150

250

  v  s  r  y

  (  V  )

-250

-150

-50

50

150

250

  v  s  y  b

  (  V  )

-250

-150

-50

50

150

250

  v  s  b  r

  (  V  )

 

-7.5

-2.5

2.5

7.5

  i  s  r

   (  A   )

-7.5

-2.5

2.5

7.5

  i  s  r   (  A

   )

-7.5

-2.5

2.5

7.5

  i  s  r

   (  A   )

100

150

200

250

  v  d  c

   (  V   )

 

0

0.1

0.2

0.3

0.4

0.5

  T  e  (  N -  m

1 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5 1.55 1.6 1.65 1.7 1.75 1.8400

400.1

400.2

400.3

400.4

400.5

  w  r

  (  r  a  d  /  s

time(s)  Figure 11Simulation results showing three-phase source voltages, currents, DC- Link voltage, electro-magnetic torque

and rotor speed during DLG fault (Type-E) without providing any ride- through

Page 10: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 10/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 38

Figure 12. Experimental results showing three-phase source voltages, currents, DC- Link voltage, electro-magnetictorque and rotor speed during DLG fault (Type-E) without providing any ride- through. Voltage scale: 100 V per

division. Current scale: 2.25 A per division. DC-Link Voltage scale: 100 V per division

-250

-150

-50

50

150

250

  v  s  r  y

-250

-150

-50

50

150

250

  v  s  y  b

-250

-150

-50

50

150

250

  v  s  b  r

 

-5

-2.5

0

2.5

5

  i   s  r  (  A

  )

-5

-2.5

0

2.5

5

  i   s y  (  A  )

-5

-2.5

0

2.5

5

  i   s  b  (  A

  )

200

225

 v  d  c  (  V

  )

 

0

0.1

0.2

0.3

0.4

0.5

  T  e  (  N -  m  )

1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.20

200

400

600

800

  w  r  (  r  a  d  /  s  )

time(s)  Figure 13Simulation results showing three-phase source voltages, currents, DC-Link voltage, electro-magnetic torque

and rotor speed during DLG fault (Type-E) with supercapacitor as ride-through alternative

Page 11: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 11/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 39

Figure 14 Experimental results showing three-phase source voltages, currents, DC-Link voltage, electro-magnetictorque and rotor speed during DLG fault (Type-E) with supercapacitor as ride-through alternative. Voltage scale: 100

V per division. Current scale: 2.25 A per division. DC-Link Voltage scale: 100 V per division 

7. CONCLUSIONS 

In this paper the supercapacitors as an energy storage device for providing ride- through to ASD’s during symmetricaland unsymmetrical fault conditions have been presented. The proposed topology is capable of providing ride- throughduring both symmetrical and unsymmetrical voltage sags. The effectiveness of the proposed topology has been verifiedby means of simulations based on MATLAB and experimental results obtained on a laboratory prototype. From theseresults it is clear that the supercapacitor’s dynamic response is fast enough to respond to the load transientrequirements and avoid the affects of the various power quality disturbances on the adjustable speed drives. Thesupercapacitor maintains the DC-Link voltage thereby reduces the input inrush current. The main emphasis of thispaper is that, the supercapacitor as an energy storage device may be employed during unsymmetrical fault condition soas to avoid the nuisance tripping of the ASD’s.

REFERENCES 

[1] G.T. Heydt, Electric Power Quality, 2nd ed. WestLafayette, Stars in a Circle, 1994.[2] M. H. J. Bollen, “Understanding Power Quality Problems: Voltage Sags and Interruptions”, Series on Power

Engineering. New York: IEEE Press, 2000.[3] Hingorani N, Gyugyi L, Understanding FACTS, Wiley IEEE Press, 1999.[4]  IEEE Recommended Practices on Monitoring Electric Power Quality, IEEE Std.1159, 1995.[5]  IEEE Recommended Practices for Evaluating Electric Power System Compatibility With Electronic Process

Equipment, IEEE Std.1346, 1998.[6] SEMI F47-0200, Specification for Semiconductor Processing Equipment Voltage Sag Immunity.[7] A. Z. Van. R. Spee, A. Faveluke and S. Bhowmik, “Voltage Sag Ride-Through for Adjustable-Speed Drives With

Active Rectifiers”, IEEE Trans. on Industry Applications, vol. 34, issue 6, pp. 1270 – 1277, Nov.-Dec. 1998.[8] A. Von, P.N. Enjeti, B. Banerjee, “Assessment of Ride-Through Alternatives for Adjustable-Speed Drives”, IEEE Trans. on Industry Applications, vol. 35, issue 4, pp. 908 - 916, July-Aug. 1999.

Page 12: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 12/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 40

[9]  J. L. D. Gomez, P.N. Enjeti, A. J. Von,”An Approach to Achieve Ride-Through of an Adjustable-Speed Drivewith Fly back Converter Modules Powered by Super Capacitors”, IEEE Trans. on Industry Applications, vol. 38,issue 2, pp. 514-522, March-April 2002.

[10]  K. Lee, T.M. Jahns, D.W. Novotony, T.A. Lipo, W.E. Berkopec, and V. Blasko, “Impact of Inductor Placementon the Performance of Adjustable-Speed Drives Under Input Voltage Unbalance and Sag Conditions”, IEEE

 Trans. on Industry Applications, vol. 42, no. 5, pp. 1230-1240, Sept./Oct. 2006.[11]  A. Sannino, M. G. Miller, M. H. J . Bollen, " Overview of Voltage Sag Mitigation”, IEEE Power EngineeringSociety Winter Meeting, vol. 4, pp. 2872 – 2878, 2000.

[12]  M.H.J. Bollen, “Characterization of Voltage Dips Experienced by Three-Phase Adjustable-Speed Drives”, IEEE Trans. on Power Delivery, vol. 12, No. 4, pp. 1666-1671, October 1997

[13]  K. Lee, T. M. Jahns, G. Venkataramanan,, “Modeling Effects of Voltage Unbalances in Industrial DistributionSystems With Adjustable-Speed Drives”, IEEE Trans. on Industry Appl., vol. 44 , Issue. 5 , pp. 1322 – 1332,2008.

[14]  S. Z. Djokic, K. Stockman, J . V. Milanovic, J . J . M. Desmet and R. Belmans, “Sensitivity of AC AdjustableSpeed Drives to Voltage Sags and Short Interruptions”, IEEE Trans. on Power Del, vol. 20, Issue. 1, pp. 494–505,2005.

[15]  M. H. J . Bollen, L. D. Zhang,“Analysis of VoltageTolerance of AC Adjustable-Speed Drives for Three-PhaseBalanced And Unbalanced Sags”, IEEE Transactions on Industry Applications, vol. 36 , Issue. 3, pp. 904- 910,2000.

[16]   J. Pedra, F. Corcoles, F. J. Suelves, “Effects of Balanced and Unbalanced Voltage Sags on VSI-Fed Adjustable-Speed Drives”, IEEE Transactions on Power Delivery, vol. 20, Issue. 1, pp. 224-233, 2005.

[17]  V. B. Bhavaraju and P. N. Enjeti, “An Active Line Conditioner to Balance Voltages in a Three-Phase System,”IEEE Trans. Industry Applications, vol. 32, no. 2, pp. 287-292, Mar./Apr. 1996.

[18]  P. N. Enjeti and S. A. Choudhury, “A New Control Strategy to Improve the Performance of a PWM AC To DCConverter Under Unbalanced Operating Conditions,” IEEE Trans. Power Electron., vol. 8, pp. 493-500, Oct.1993.

[19]  L. Morán, P. D. Ziogas, and G. Joos, “Design Aspects of Synchronous PWM Rectifier-Inverter Systems underUnbalanced Input Voltage Conditions,” IEEE Trans. Industry Applications, vol. 28, no. 6, pp. 1286-1293,Nov./Dec. 1986.

[20]  W. E. Brumsickle, R. S. Schneider, G. A. Luckjiff, D. M. Divan, and M. F. McGranaghan, “Dynamic Sag

Correctors: Cost Effective Industrial Power Line Conditioning,” IEEE Trans. Ind. Application, vol. 37, pp. 212–217, J an./Feb. 2001.

[21]   Y. Jang, M. M Jovanovic, “New Two- ductor Boost Converter with Auxiliary Transformer”, IEEE Transactionson Power Electronics, vol. 19, Issue. 1, pp. 169-175, 2004.

[22]   Y. H. Chung, G. H. Kwon, T. B. Park, K. Y . Lim,“Voltage Sag and Swell Generator for the Evaluation of Custom Power Devices”,IEEE General Meeting of Power Engineering Society, vol. 4, 2003.

AUTHOR

S. S. Deswal received his B.Tech degree in Electrical Engineering from R.E.C, Kurukshetra ,Kurukshetra University ,Haryana, India in 1998, the M.E degree in Electrical Engineering(PowerApparatus and Systems) from Delhi College of Engineering, Delhi University, Delhi, India in 2005, andPh.D. degree from N.I.T, Kurukshetra a Deemed University, Haryana in Feb 2012. Currently, he is

working as a Associate Professor in EEE Department with the Maharaja Agrasen Institute of Technology,Rohini, Delhi under GGSIP University, Delhi, India. His research interests include electric power quality, ASD’s,electric motor drives, renewable energy sources.

Rajveer Mittal received his B.E degree in Electrical Engineering from R.E.C, Kurukshetra ,Kurukshetra University ,Haryana, India in 1987, the M.E degree in ElectricalEngineering(Instrumentation & Control) from Delhi College of Engineering, Delhi University, Delhi,India in 2003, and is currently pursuing the Ph.D. degree in the research area of “Power Quality Studiesof Wind Energy Systems” of Electrical Engineering from N.I.T, Kurukshetra a Deemed University,

Haryana, India. Currently, he is working as Head of the EEE Department with the Maharaja Agrasen Institute of  Technology, Rohini, Delhi under GGSIP University , Delhi, India.His research interests include power quality, motordrives, and Renewable energy.

Ratna Dahiya received her B.Tech from GBU, Pant Nagar and M.Tech and Ph.D. degree degree in

Electrical Engineering from R.E.C, Kurukshetra, Kurukshetra University, Haryana, India. Currently, sheis working as Professor in Electrical Engineering Department with the NIT, Kurukshetra (DeemedUniversity), Haryana, India. Her research interests include SMES, electric power system and electricpower quality.

Page 13: Methodology to Achieve Ride-Through of an  Adjustable Speed Drives (ASD’s) Using  Supercapacitors during Voltage Sag

7/29/2019 Methodology to Achieve Ride-Through of an Adjustable Speed Drives (ASD’s) Using Supercapacitors during Voltage…

http://slidepdf.com/reader/full/methodology-to-achieve-ride-through-of-an-adjustable-speed-drives-asds 13/13

International Journal of Application or Innovation in Engineering& Management (IJAIEM)Web Site: www.ijaiem.org Email: [email protected], [email protected]

Volume 2, Issue 1, J anuary 2013 ISSN 2319 - 4847 

Volume 2, Issue 1, J anuary 2013 Page 41

D. K . J ain received his B.Sc. (Engg), M.E (Electrical Engg.) and Ph.D. degree in Electrical Engineeringfrom R.E.C, Kurukshetra, Kurukshetra University, Haryana, India. Currently, he is working as Professorin Electrical Engineering Department with the Deen Bandhu Chhotu Ram University of Science and

 Technology(DCRUST), Murthal, Haryana, India. His research interests include electric power quality,ASD’s, electric motor drives, renewable energy sources.