metric - wx.toronto.cawx.toronto.ca/inter/pmmd/callawards.nsf/209f892b11eda8b985257a0f00683f1d...a...
TRANSCRIPT
AS38
AS38
SHAFT CL
UP
DN
14T @ 255 TYP UNO
3570
TYP
1000
900 2
00
900
720
790
2430
FRP SUPPORT BRACE,TYP
FRP SUPPORT BRACE,TYP
TYP
1000
BASE PLATECONNECTED TOWALL WITH MIN 4 SSADHESIVE ANCHORSW / MIN 150 EMBEDMENT
NOTE:ALL STAIRS & LANDINGSTO BE SUPPORTED OFFCONCRETE WALL
FRP SU
PPORT BR
ACE
TYP255
TYP
1000
57.477
60.324
63.170
66.016
T/LANDING
T/LANDING
43.247
T/LANDING
T/LANDING
T/LANDING
T/LANDING
1S38
GRADE
BAFFLE WALL
INVERTED FRPBRACING
15R
@ 1
90 ±
85.938
80.246
74.554
68.862
63.170
57.477
51.785
46.093
T/LANDING
T/LANDING
T/LANDING
T/LANDING
T/LANDING
T/LANDING
92.200
1500
500
88.784
15R
@ 1
90 ±
17R
@ 1
90 ±
48.939
54.631
60.324
66.016
71.708
77.400
83.092
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
15R
@ 1
90 ±
AS38
AS38
FRP PLATFORM
FRP LADDER
FRP PLATFORM
SHAFT CL
BAFFLE WALL
UP
50mm SS (316) WATER SERVICECONNECTION ANCHORED TO SHAFTWALL WITH FIRE HOSE BIB AT EVERYPLATFORM AND SHAFT BASE
R 1
1000
80
FRP STAIRS
2700
9002
00
900
14T @ 255 TYP UNO
3570
3160270
1960
2000
1860
TYP
1000
FRP SUPPORT BRACE,TYP
INVERTED FRP BRACING
AS38
AS38
SHAFT CL
DN
UP
900
200
900
2000
17T @ 255
4340
14T @ 255 TYP UNO
3570
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
DIRECTOR,
GRAHAM HARDING ENG.
WATER INFRASTRUCTURE MANAGEMENT
DIRECTOR,
BILL DE ANGELIS, P. ENG.
DESIGN & CONSTRUCTION
DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNEL
ENGINEERING AND CONSTRUCTION SERVICES
MAJOR INFRASTRUCTURE
MEASUREMENTS SHOWN ON THESE PLANS
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
METRIC
11/2
8/2
017 1
:46:4
4 P
M CX-1(A) - STAIRS AND DETAILS
STAIRS AND DETAILS
GDN VPG DGC
AS SHOWN
SEPTEMBER 20171078-2014-02-158 S38
1 NOV 2017 ISSUED FOR ADDENDUM 3 DGC
STAIR PLAN TYP @ 46.093 TO 88.784
00.5 1 2 m#M50
00.5 1 2 m#M50
01 2 4 m#M100
00.5 1 2 m#M50
S38
DETAIL100.5 1 2 m
#M50
S38
SECTION - STAIRA
STAIR - PLAN @ EL 43.247
STAIR - PLAN @ EL 92.200
N
17ECS-MI-04DC
01
ffig D. THANGAT/EL' $
ffid
West
Limit of
Do
n
Channel
Co
n. S
ea
wall E
/S. o
f
Channel
124
180
LS
T
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
199
200
201
202
204
205
206
207
208210
211
212
213
214
215
216217
218
219220
221
222
223
1401
1403
1446
1448
0+998
0+998
1+000
1+025
1+050
1+075
1+100
1+125
1+130
LD-BD-06
LD-BSR-08
DON & WATERFRONT WET WEATHER FLOW SYSTEM
COXWELL BYPASS TUNNEL
PLAN & PROFILE
JK
N
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
TORONTO CITY
TORONTO CITY
DO
N RIV
ER
SIGNEDINITIALREVISIONSDATENo.
DESIGN:
DATE:
SCALE: HORIZONTAL 1:500 VERTICAL 1:200
DRAFTING: CHECK:
DRAWING
NUMBER:
CONTRACT No.
Water
MANAGEMENT MAJOR INFRASTRUCTURE
DIRECTOR, DESIGN & CONSTRUCTION
BILL DE ANGELIS, P. ENG., MBAGRAHAM HARDING, P. ENG.
DIRECTOR, WATER INFRASTRUCTURE
ENGINEERING & CONSTRUCTION SERVICES
ADIT TUNNEL
6.3m I.D. COXWELL BYPASS TUNNEL
AND ADIT TUNNELALONG CENTRELINE OF DEAERATION TUNNELEXISTING GROUND PROFILE
1078-2014-02-213 C101
AR DGC
DON RIVER
CORRIDORMETROLINX
engineering environment infrastructure
R.V.Anderson Associates Limited
in association with
91°
ACCORDANCE TO THE CONTRACT DOCUMENTS.PIPELINE CORRIDOR SHALL BE CARRIED OUT IN ALL CONSTRUCTION ACTIVITIES WITHIN THE OIL
4SUN/4QUE
TUNNELDEAERATION
1+
100.0
0
1+
075.0
0
1+
050.0
0
1+
025.0
0
1+
000.0
0
90.00 m
80.00 m
40.00 / 70.00
30.00 m
CENTRE LINE
20.00m
DATUM ELEV.
EXISTING
GROUND
ELEVATION
ELEVATION
INVERT
CHAINAGE
1+
125.0
0
BY OTHERS BE COMPLETED STRUCTURE TOFUTURE VORTEX
BY OTHERS BE COMPLETED STRUCTURES TO DIVERSION FUTURE
BY OTHERS BE COMPLETED STRUCTURES TO DIVERSION FUTURE
17ECS-MI-04DC
(SEE C172 FOR DETAIL)1800 mm DIA STEEL CASING
BYPASS TUNNEL6.3m I.D. COXWELL
E. [email protected]: 416.392.4061TORONTO, ONTARIO, M5V 3C655 JOHN STREET, 7th FLOORCITY OF TORONTO DESIGN & CONSTRUCTION SERVICESWATERFRONT PROJECTSENIOR PROJECT MANAGER, DON & CENTRAL ROBERT H. MAYBERRY, M.A.Sc., P.ENGUTILITY OWNER INFORAMTION:
METROLINX CORRIDOR
(BALA AND BELLEVILLE SUBDIVISION)USRC SUBDIVISION MILEAGE 1.88E
0 OCT 2017 ISSUED FOR TENDER DGC
1+
007.0
0
WORKING POINTS COORDINATES
NORTHING EASTING DESCRIPTIONPOINT
316758.4684834964.169 CENTRE OF DROP SHAFT
4834959.805 316752.994 CENTRE OF AIR SHAFT
WP-1
WP-2
WP-1
WP-2
47.8
m
AND BELOW PIPELINESPRESENT DURING CONSTRUCTION WHEN ADJACENT PIPELINES INC.) PIPELINE INSPECTOR MUST BE SUN - CANADIAN PIPELINE AND TRANS NORTHERN HIGH PRESSURE OIL/GAS PIPELINES (IMPERIAL OIL, WARNING
FOR GO TRANSIT/METROLINX RECORDSINCLUDING PRE-CONSTRUCTION AND POST-CONSTRUCTION PHOTOS THE CONTRACTOR SHALL PROVIDE STATUS/PROGRESS PHOTOS, 4.
WITHIN THE RAILWAY RIGHT-OF-WAYAFTER THE COMPLETION OF THE UTILITY CROSSING INSTALLATION AS-BUILT DRAWINGS SHALL BE SUBMITTED NO LATER THAN 90 DAYS 3.
TRANSIT/METROLINX RIGHT-OF-WAY, IF REQUIREDC) ANY DEWATERING SCHEMES ON OR ADJACENT TO GO GO TRANSIT / METROLINX RIGHT-OF-WAY, IF REQUIREDB) METHODOLOGY FOR ANY TEMPORARY EXCAVATION WITHIN THE TUNNEL EXCAVATION AND PIPE INSTALLATION A) DETAILED WORK PLAN METHODOLOGY FOR THE PROPOSED CONSTRUCTION:AECOM ON BEHALF OF GO TRANSIT METROLINX PRIOR TO CONTRACT ADMINISTRATOR FOR REVIEW AND ACCEPTANCE BY THE CONTRACTOR SHALL SUBMIT THE FOLLOWING TO THE 2.
ORDER E-10 AND THE TERMS OF THE EASEMENT AGREEMENTBE IN ACCORDANCE WITH THE LATEST TRANSPORT CANADA GENERAL CONSTRUCTION MAINTENANCE AND OPERATION OF THE LINE SHALL 1.
METROLINX STANDARD NOTES AND DETAILS
TRCA REGULATION LIMIT
TR
CA R
EG
ULATIO
N LIMIT
EASTERN AVENUE
0 205 30 METERSMETER 2 10
SCALE 1:500 - HORIZONTAL
0 2 51 10
SCALE 1:200 - VERTICAL
METER METERS
"RUNNING RIGHTS"
39.9m
(CLASS 'B' BEDDING AND BACKFILL AS PER OPSD 802.030, 802.031)5.75m - 525 mm DIA (R.C.P. CLASS 65-D) AIR CONNECTOR PIPE (REFER TO C171)
REFER SHEET C172 FOR PROFILE SECTIONS AND TUNNEL DETAILS1.
GENERAL NOTE:
2100 mm DIA DROP SHAFT (REFER TO C171)
525 mm DIA AIR SHAFT (REFER TO C171)
(SEE C172)ECCENTRIC REDUCER
109.9m - 1200mm DIA CPP ADIT TUNNEL @ 0.2%
@0.2%18.0m - 2550mm DIA CPP DEAERATION TUNNEL
ACCORDANCE WITH METROLINX REQUIREMENTS.METROLINX CORRIDOR TO BE CARRIED OUT IN ALL CONSTRUCTION ACTIVITIES WITHIN THE
OCTOBER 2017
1
1
1 NOV 2017 DGCISSUED FOR ADDENDUM 1
2 NOV 2017 DGCISSUED FOR ADDENDUM 3
2
250 mm Pipeline (Trans. Northern)
250 mm Pipeline (Imperial Oil)
200 mm Pipeline (Sun Oil)
250 mm Pipeline (Trans. Northern)
250 mm Pipeline (Imperial Oil)
200 mm Pipeline (Sun Oil)
Pipeline (Trans. Canada)
Pipeline (Trans. Canada)
450 mm Conc. Stm.Sewer
375 mm Conc. Stm.Sewer
300 mm PVC Water Main
300 mm PVC Water Main
300 mm PVC Water Main
Unknown
79.4
2
77.4
6
76.2
5
74.6
8
77.13
77.2
1
79.4
2
CHAMBER, SEE DWG PROFILEFOR CONTINUATION TO DEAERATION
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DON & WATERFRONT WET WEATHER FLOW SYSTEM
JKAR
COXWELL BYPASS TUNNEL
SIGNEDINITIALREVISIONSDATENo.
DESIGN:
DATE:
SCALE: AS NOTED
DRAFTING: CHECK:
DRAWING
NUMBER:
DGC CONTRACT No.
WaterENGINEERING & CONSTRUCTION SERVICES
GRAHAM HARDING, P. ENG.
DIRECTOR, WATER INFRASTRUCTURE
MANAGEMENT
BILL DE ANGELIS, P. ENG., MBA
DIRECTOR, DESIGN & CONSTRUCTION
MAJOR INFRASTRUCTURE
1078-2014-02-283engineering environment infrastructure
R.V.Anderson Associates Limited
in association with
C171
VARIES
VARIESVARIES
SEE NOTESVARIES
AIR SHAFTC/L OF DROP OR
NTS
JOINT
JOINT
6096m
m M
AX
CIVIL
DETAILS
C/L VENT SHAFTC/L DROP SHAFT
OR CLASS A CONCRETEWITH CEMENT GROUTFILL ANNULAR SPACE
(SEE SCHEDULE)DROP SHAFT DIA
(SEE SCHEDULE)AIR SHAFT DIA
NTS
(SEE NOTE 4)STEEL CASING INITIAL SUPPORT
OR CLASS A CONCRETEWITH CEMENT GROUTFILL ANNULAR SPACE
STEEL CASINGBOTTOM OF
VARIES
NTS
A A
DROP SHAFT LINER PIPE
17ECS-MI-04DC
EXCAVATION LINEEXCAVATION LINE
MAINTENANCE HOLE1200mm DIA PRECAST
0 OCT 2017 ISSUED FOR TENDER DGC
(DESIGNED BY CONTRACTOR)STEEL CASING INITIAL SUPPORT
VENT SHAFT LINER PIPE, SEE NOTE 2
3.0
m MIN
*SEE DRAWINGS S50-S55 FOR 4CAR/4LES, 7ROS AND 7RES
(DESIGNED BY CONTRACTOR)SHAFT INITIAL SUPPORT SYSTEM
150mm MINCONCRETE GROUTWITH HIGH PERFORMANCEANNULAR SPACE TO BE FILLED
(DESIGNED BY CONTRACTOR)SHAFT INITIAL SUPPORT SYSTEM
150mm MINCONCRETE GROUTWITH HIGH PERFORMANCE ANNULAR SPACE TO BE FILLED
VARIES (SEE SCHEDULE)
REFER TO C173TOP OF BEDROCK,
REFER TO C173INITIAL SUPPORT,DROP SHAFT
FOR ROOF DETAILSREFER TO DETAIL 4 AND 6 ON SHEET S56
AS PER OPSD 401.030WATER TIGHT COVER
OCTOBER 2017
2400mm DIA PRECAST CHAMBER
DROP SHAFT TOP SLAB
AS PER OPSD 701.061MAINTENANCE HOLE RISER2400mm DIA PRECAST
SEE SCHEDULEBOTTOM OF SLAB ELEVATION
TO MATCH EXISTINGFINISH GRADE
TO MATCH EXISTINGFINISH GRADE
1 NOV 2017 DGCISSUED FOR ADDENDUM 3
300mm BELOW GRADETOP OF SLAB
300mm BELOW GRADETOP OF SLAB
MIN 1.2m BELOW GRADEPIPE TO BE INSTALLED AT AIR VENT CONNECTOR
150m
m
SEE NOTE 5CAST IN PLACE BASE SLAB
SEE NOTE 5CAST IN PLACE BASE SLAB
SPECIFICATION SECTION 03300.MEET THE REQUIREMENTS IN DESIGNED BY THE CONTRACTOR, TO CAST-IN-PLACE BASE SLABS TO BE 5.
INITIAL SUPPORT.CONTRACTOR IS RESPONSIBLE FOR BY THE CONTRACTOR. SHALL BE SELECTED AND DESIGNED THE STEEL CASING TYPE AND SIZE 4.
IN SPECIFICATION SECTION 03300.PIPES TO MEET THE REQUIREMENTS ALL CAST-IN-PLACE CONCRETE 3.
CONTRACTOR'S OPTION.PRESSURE PIPE AT THE CONCRETE PIPE OR CONCRETE EITHER PRECAST REINFORCED ALL AIR SHAFT PIPES MAY BE 2.
CONCRETE.ARE TO BE CAST-IN-PLACE PIPES LARGER THAN 2100mm DIA PRESSURE PIPE. ALL DROP SHAFT AND LESS ARE TO BE CONRETE ALL DROP SHAFT PIPES 2100 mm DIA 1.
NOTES:
701.031AS PER OPSD 701.030 AND MAINTENANCE HOLE RISER 1200mm DIA PRECAST
PLAN
SECTION
DROP AND AIR SHAFTTYPICAL VERTICAL SECTION
TYPICAL PLAN
SECTION A - A
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
1404
1401
1402
1403
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1435
1436
1437
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
1404
1401
1402
1403
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1435
1436
1437
LIMIT OF DISTURBANCE
MASS TREE PLANTING AREA
TREES TO BE INSTALLED ON 3.0m
SPACINGS IN A RANDOM
DISTRIBUTION OF NOTED SPECIES
6000
12000
E
A
S
T
E
R
N
A
V
E
N
U
E
D
IV
E
R
S
IO
N
NEW DECIDUOUS TREES
0 SEPT 2017 ISSUED FOR TENDER JSM
D
O
N
V
A
L
L
E
Y
P
A
R
K
W
A
Y
LEGEND
EXISTING TREES TO REMAIN
UNDISTURBED OR TO BE
REMOVED
(SEE ARBORIST REPORT)
As
3
Ta
3
Qr
3
Pt
4
Ar
2
Pt
6
Ar1
6
Pt
4
Ar1
8
Qr1
4
Ar1
4
Pt
4
Pog
6
As1
3
Ass1
3
Ta1
3
Qr1
9
To
15
Qr1
4
As1
4
4QUE-4SUN - LANDSCAPE PLAN
CONTRACT No.DRAFTING:
SCALE:
DATE:
DESIGN: CHECK:
NUMBER:DRAWING
SIGNEDINITIALREVISIONSDATENo.
DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT
GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.
DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE
ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
engineering environment infrastructure
R.V.Anderson Associates Limited
in association with
17ECS-MI-04DC
SEPTEMBER 2017
1:200
LANDSCAPE PLAN
1078-2014-02-291 L4
JSM TFG DGC
J
A
M
E
S
S
.
Mc
I
I
A
M
L
W
L
FO
N
O
I
T
A
I
C
OS
S
A
A
A
A
A
S
R
I
O
T
N
O
S
N
L
D
C
P
ER
C
H
I
T
E
C
T
NEW CONIFEROUS TREES
09/15/17
1 NOV 2017 ISSUED FOR ADDENDUM 2 JSM
1
3
T
O
R
O
N
T
O
C
IT
Y
250
251
256
257
258
248
252
255
259
260
247
249
1455
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1476
250
251
256
257
258
245
248
252
253
254
255
259
260
246
247
249
1455
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1476
CONTRACT No.DRAFTING:
SCALE:
DATE:
DESIGN: CHECK:
NUMBER:DRAWING
SIGNEDINITIALREVISIONSDATENo.
DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT
GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.
DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE
ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
engineering environment infrastructure
R.V.Anderson Associates Limited
in association with
17ECS-MI-04DC
SEPTEMBER 2017
1:200
LANDSCAPE PLAN
1078-2014-02-295
JSM TFG DGC
J
A
M
E
S
S
.
Mc
I
I
A
M
L
W
L
FO
N
O
I
T
A
I
C
OS
S
A
A
A
A
A
S
R
I
O
T
N
O
S
N
L
D
C
P
ER
C
H
I
T
E
C
T
Ass1
3
TREE PLANTING AREA
TREES TO BE INSTALLED ON 3.0m
SPACINGS IN A RANDOM DISTRIBUTION OF
NOTED SPECIES
5000
10000
Qr1
3
Ar1
2
Pt
2
Ass1
2
As1
2
Qr1
2
Ta1
2
LIMIT OF DISTURBANCE
D
O
N
V
A
L
L
E
Y
P
A
R
K
W
A
Y
0 SEPT 2017 ISSUED FOR TENDER JSM
LEGEND
EXISTING TREES TO REMAIN
UNDISTURBED OR TO BE
REMOVED
(SEE ARBORIST REPORT)
Ass1
3
Ar1
3
As
2
As
1
4MTS - LANDSCAPE PLAN
L809/15/17
1
1 NOV 2017 ISSUED FOR ADDENDUM 2 JSM
1
1
1
1
3
60
61
62
67
68
69
70
6
9
7
0
7
1
7
2
7
3
7
4
7
5
7
6
7
7
7
8
8
0
8
1
8
2
8
3
8
4
8
6
8
7
8
8
8
9
9
0
9
1
9
2
9
3
9
4
9
5
9
6
9
7
CONTRACT No.DRAFTING:
SCALE:
DATE:
DESIGN: CHECK:
NUMBER:DRAWING
SIGNEDINITIALREVISIONSDATENo.
DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT
GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.
DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE
ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
engineering environment infrastructure
R.V.Anderson Associates Limited
in association with
17ECS-MI-04DC
SEPTEMBER 2017
1:400
LANDSCAPE PLAN
1078-2014-02-297
JSM TFG DGC
J
A
M
E
S
S
.
Mc
I
I
A
M
L
W
L
FO
N
O
I
T
A
I
C
OS
S
A
A
A
A
A
S
R
I
O
T
N
O
S
N
L
D
C
P
ER
C
H
I
T
E
C
T
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE
Ass
2
Ta
3
Qr
3
Gb
2
As
2
Qr
3
Ta
3
Ar
1
Ar
2
Ar
2
Qr
4
Gd
1
As
1
11000TYPICAL
12000TYPICAL
12000TYPICAL
SPORTS TRACK
SPORTS TRACK
B
R
O
A
D
V
IE
W
A
V
E
N
U
E
0 SEPT 2017 ISSUED FOR TENDER JSM
NEW DECIDUOUS TREES
LEGEND
EXISTING TREES TO REMAIN
UNDISTURBED OR TO BE
REMOVED
(SEE ARBORIST REPORT)
4SPK-4W08 - LANDSCAPE PLAN
L1009/15/17
1
1
1 NOV 2017 ISSUED FOR ADDENDUM 2 JSM
1
1
3
12
13
15
16
17
18
21
2
2
2
3
2
4
1
6
0
2
1
6
0
6
1
6
0
7
1
6
0
8
1
6
0
9
1
6
1
0
1
4
8
4
1
4
8
5
1
4
8
6
1
4
8
7
1
4
8
8
1
4
8
9
1
4
9
0
1
4
9
1
1
4
9
2
1
4
9
3
1
4
9
4
1
4
9
5
1
4
9
6
1
4
9
7
1
4
9
8
1
4
9
9
1
5
0
0
1
6
0
1
1
2
3
4
5
6
7
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Ta1
5
Qr1
9
Ar1
5
Pog
9
Qr1
9
Ar1
9
Ta1
3
Pog
6
Pt
9
Ta1
9
As1
9
As1
3
Qr1
9
Ar1
10
Pt
6
Pt
3
Ta1
3
Pog
3
Ta1
3
Ass1
3
Pt
3
Ar1
3
As1
3
Pt
3
Pog
3
Ar1
3
Ass1
3
Ta1
3
Ar1
3
Pt
3
Pog
3
Ass
2
As
2
Qr
3
Ar
2
Ta
5
Qr
3
Ar
5
Qr
3
12000TYPICAL
10000TYPICAL
10000TYPICAL
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCEPROPOSED ACCESS ROAD
PROPOSED ACCESS ROAD LOWER DON TRAIL
1500
OFF
SET
FROM
TRA
IL (T
YPIC
AL)
LOWER DON TRAIL
12000
TYPICAL
MASS TREE PLANTING AREA
TREES TO BE INSTALLED ON 3.0m
SPACINGS IN A RANDOM DISTRIBUTION OF
NOTED SPECIES
6000
20000
Ar
3
Qr
1
Ta
1
24000 TYPICAL
To
15
24000 TYPICAL
HYDR
OCO
RRID
OR
NEW DECIDUOUS TREES
LEGEND
EXISTING TREES TO REMAIN
UNDISTURBED OR TO BE
REMOVED
(SEE ARBORIST REPORT)
0 SEPT 2017 ISSUED FOR TENDER JSM
DCAD - LANDSCAPE PLAN
CONTRACT No.DRAFTING:
SCALE:
DATE:
DESIGN: CHECK:
NUMBER:DRAWING
SIGNEDINITIALREVISIONSDATENo.
DIRECTOR, WATER INFRASTRUCTUREMANAGEMENT
GRAHAM HARDING, P. ENG.DIRECTOR,BILL DE ANGELIS, P. ENG.
DESIGN & CONSTRUCTIONMAJOR INFRASTRUCTURE
ENGINEERING AND CONSTRUCTION SERVICES DON & WATERFRONT WET WEATHER FLOW SYSTEMCOXWELL BYPASS TUNNELWater
engineering environment infrastructure
R.V.Anderson Associates Limited
in association with
17ECS-MI-04DC
SEPTEMBER 2017
1:200
LANDSCAPE PLAN
1078-2014-02-300 L13
JSM TFG DGC
J
A
M
E
S
S
.
Mc
I
I
A
M
L
W
L
FO
N
O
I
T
A
I
C
OS
S
A
A
A
A
A
S
R
I
O
T
N
O
S
N
L
D
C
P
ER
C
H
I
T
E
C
T
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
09/15/17
1
1
1 NOV 2017 ISSUED FOR ADDENDUM 2 JSM
1
1
1