Page 1: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

1

March 2012

Metro Green Line to LAXAlternatives Analysis

Page 2: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

2

March 2012The Crenshaw/LAX Project…

• 8.5 mile extension

• Metro Exposition Line (Crenshaw Exposition) to Metro Green Line (Aviation/LAX Station)

• 6 new stations (+2 stations as construction bid options)

• New maintenance facility

• Builds first mile of Metro Green Line Extension to Aviation/Century Station

• Forecasted opening: 2018

B

A

A

B

Foundation for Metro Green Line to LAX

Page 3: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

3

March 2012Metro Green Line to LAXProject Overview

• Goal: Connect the regional transit network to LAX

• Connection can take many forms• Long Range Transportation Plan

• Metro funding: $200 M (Measure R)• Opening year 2028 (could be as soon

as 2018-2020 with funding from America Fast Forward, the airport and/or other sources)

• Additional non-Metro funding will need to be secured

Airport

FutureMetro Rail

Page 4: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

4

March 2012Additional funding is required

• Measure R funded project: $200M ($2008) All rail alternatives (including light rail and automated people mover) require much more than this

• Project is contingent upon additional contributions from Los Angeles World Airports (LAWA) and/or other sources

• This planning process identifies feasible alternatives and develops preliminary cost estimates to determine funding needs

• Until funding is secured, no project can be adopted for construction

• Less expensive projects may have a higher likelihood of implementation

$200M

Total Cost of Alternative

Measure R Additional Funding Required

Page 5: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

5

March 2012

Minneapolis (MSP)32.0 million*

Metro Transit

Miami (MIA)35.7 million*

Metro Rail MIA Mover (APM)

New York (JFK)46.5 million*

AirTrain (APM)

Funding U.S. Airport Transit Systems

59.1 million annual passengers passed through LAX in 2010

*Annual Airport Passengers (2010)

San Francisco (SFO)39.3 million*

BART AirTrain(APM)

AirportSystem Funding Contributions ($M)

(indexed to 2010$)

Total Capital Cost ($M)

(indexed to 2010$)

$2,347

$2,338

$1,014

$724

$509 Airport$770 Local $180State $888 State

$2,338 Airport

$262Airport$557 Local $195

State

$88 Airport

$85 Local

$122State $429 Federal

Page 6: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

6

March 2012Types of Connections

Direct Light Rail Transit (LRT) Branch• Metro goes to the airport• Metro Green Line direct connection

Circulator• Airport (Circulator) goes to Metro• New transit system tailored to address the airport’s

unique travel demands/operating environment

Intermediate LRT and Circulator• Metro (LRT) and Airport (Circulator) meet in the middle

Modified LRT Trunk• Metro goes through the airport• Direct connection for Metro Green & Crenshaw/LAX lines• Parallels an alignment to be constructed as part of the

Crenshaw/LAX line

Page 7: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

7

March 2012Modes

Light Rail Transit(LRT)

Automated People Mover (APM)

Bus Rapid Transit (BRT)(Elevated Busway)

Page 8: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

8

March 2012Alignments

On-Airport (in Terminal area)

Off-Airport

Page 9: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

9

March 2012Two-Stage Screening Process

Direct LRT Branch

Circulator

Intermediate LRT & Circulator

Modified LRT Trunk

Initial Connection Concepts

(27)

Screened Alternatives

Alternative

Alternative

Alternative

Alternative

Alternative

Alternative

Stage II Screening

Alternatives Carried into EIS/EIR

Additional Funding needs to be Identified

Build Alternative

Build Alternative

Mode + Alignments

Mode + Alignments

Mode + Alignments

Mode + Alignments

Stage I Screening

Page 10: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

10

March 2012

We Screen Alternatives Using Common Evaluation Criteria

Stage I –Emphasizes Feasibility

Stage II –Emphasizes Performance and Cost> Travel Time > Reliability> Convenience> Construction Cost

• (Metro only has $200M available, all rail alternatives cost much more than this)

> Potential Environmental Impacts (e.g., visual, traffic)

> Operating Characteristics> Constructability> Compatibility with airport and

transportation system plans

> Mode• Appropriate for Connection

Type> Off-Airport

• Physical fit and constructability• Avoid encroachment into

Runway Protection Zone (RPZ) > On-Airport

• Walking distance from station to terminal

• Average total travel time (transit ride + walk)

• Construction cost

Page 11: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

11

March 2012

Stage I Screening

Stage I Stage II

Page 12: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

12

March 2012

Off-Airport Options –Direct LRT Branch

Stage I Stage II

Station and Route Options*

* Exact route and station location dependent on future LAX plans in area

98th North

Century Blvd

Pedestrian Bridge

Page 13: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

13

March 2012

Stage I Stage II

Century Blvd

98th St

Off-Airport Options –Circulator

Page 14: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

14

March 2012

Off-Airport Options –Intermediate LRT & Circulator

Stage I Stage II

* Exact route and station location dependent on future LAX plans in area

98th North

1994 SEIR

Station and Route Options*

Pedestrian Bridge

Page 15: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

15

March 2012

Off-Airport OptionsModified LRT Trunk

Stage I Stage II

Through LAX

Airport Blvd

Airport Blvd with CirculatorThrough LAX

Connection to Existing Metro Green Line Aerial

Structure near Douglas St

Page 16: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

16

March 2012

On-Airport Options*Rail & BRT Alignments and Station Options

AerialOr

Tunnel

Stage I Stage II

Aerial

At-grade

Rail AlignmentBus AlignmentPotential Station

* Apply to Direct LRT Branch, Circulator and Intermediate Connection Types

Tom Bradley International TerminalTBIT

Page 17: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

17

March 2012

On-Airport Options –Balancing Cost and Travel Time

Capital Cost

2 3 4 5 8

2.5x

2x

1.5x

1x

0x

Number of Stations

Cos

t

Average Travel Time (Min)

1

0.5x

3x

2 3 4 5

10

8

6

4

0

Number of Stations

Trav

el T

ime

1

2

12

Aerial Alignment (Rail)

Stage I Stage II

8

With More Stations…• Capital Costs increase • Walk distance and walk time

decrease• Total travel times (transit ride +

walk) • decrease from 1 to 3

stations• but then increase with 4 or

more stations

Page 18: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

18

March 2012

Tunnel (Rail)

Aerial (Rail)

On-Airport Options –4 Alignments Carried ForwardAll rail options require additional funding

Stage I Stage II

Aerial (Rail)Lowest Rail Cost Best Average Travel Time

Balances Cost and Travel TimeAt-Grade (BRT)

Lowest Cost and Walk Time

Page 19: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

19

March 2012

Stage I Screening Results

Direct LRT Branch6 Alternatives

Circulator8 Alternatives

Intermediate LRT & Circulator8 Alternatives

Modified LRT Trunk5 Alternatives

27 Alternatives Carried into Stage II Screening

Stage IIStage I

Page 20: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

20

March 2012Intentionally Left Blank

Page 21: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

21

March 2012

Stage II Screening

Page 22: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

22

March 2012

Trade-offsPassenger Convenience

Stage IIStage I

1-2

1

5,300-5,400

4,700-4,900

4,700-6,10016

2-4

4-6

11

9

7

4,900-5,400

4,600-5,100

3,600-4,300

Intermediate LRT & Circulator

Modified LRT Trunk

0-1

Average Travel Time Saved (min)

Number of Transfers

Capital Cost ($M)($200M is available)

Direct LRT Branch

Circulator(APM/BRT)

Airport Transit Riders per Day**

1-4

$540 - $1,160

$624-$1,250(APM)

0-1 2-4

$680-$1,370(APM)

$940-$1,460

$120-140 (BRT)

Average travel time saved/added dependent on station location

AlternativeConnection

TypesVertical Level

Changes

**Depending on future airport plans, alternatives have 5,000-10,000 additional riders who drive to the LAX area and ride to terminals.

Page 23: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

23

March 2012

Stage IIStage I

Trade-offsPassenger Convenience (Cont.) > Ridership and travel time savings go up as the number of transfers for

airport transit riders goes down

> Direct LRT Branch and Modified LRT Trunk have fewest transfers, most travel time savings and highest ridership for airport passengers

> Circulator (APM/BRT) ridership is slightly lower, since all Metro Rail passengers transfer

> Intermediate LRT and Circulator Alternative has the most transfers and level changes, and the lowest ridership

> All Alternatives, except the BRT Circulator, require funding in excess of the $200M available from Metro

Note: In addition to “pure” airport transit riders shown, there will likely be 5,000-10,000 additional riders who drive to the LAX area and then use the project alternatives to access the airport terminals.

Page 24: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

24

March 2012

TTTT

T T T

T

5,300-5,400

6,10025

29-30 5,300-5,400 $540-$1,160

$940-$1,130

Trade-offsDirect LRT Branch vs. Through LAX

Stage IIStage I

Average Travel Time* (minutes)

Ridership (Transit Riders per Day) Constructability IssuesCapital Cost ($M)

($200M is available)

Direct LRT Branch

Through LAX

Alternative

TTTT

T T T

T

*Average from Norwalk, Expo, and South Bay

*Average from Norwalk, Expo, and South Bay

**Add 5,000 to 10,000 for airport area park and ride passengers

**Add 5,000 to 10,000 for airport area park and ride passengers

Page 25: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

25

March 2012

Stage IIStage I

> Because Modified LRT Trunk Alternative (Through LAX) has shorter travel time, ridership is higher than Direct LRT Branch for airport passengers

> The Through LAX Alternative requires some additional travel time for non-airport bound passengers traveling between Expo (Crenshaw Corridor) and South Bay (Redondo Beach)

> For the Through LAX Alternative, the single station in the terminal area requires a long walk (0.3 to 0.4 miles) to reach western terminals (T3, T4, TBIT), or potential transfer to a circulator (e.g., bus, moving walkway, shuttle) to shorten walk

> Constructability issues for Through LAX Alternative:• Parallels portion of Crenshaw/LAX Line that is scheduled to begin

construction in 2013• Requires a complex connection to existing Metro Green Line in

El Segundo that would have operational impacts during construction

Trade-offs related to the Type of LRT Connection (Branch v. Trunk)

Page 26: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

26

March 2012

$110-$130

820

820

600

200

32.2

31.5

31.2

34.3

Aerial (Rail)

Trade-offsAlignments in the Airport Terminal Area

Stage IIStage I

On-Airport Options

Average Total Travel Time to Terminal (min)

Capital Cost ($M)($200M is available)

Average Walk Dist. to Terminal (feet)

Potential Visual Impacts to Theme Building

Tunnel (Rail)

Aerial (Rail)

At-Grade (BRT)

$1,060-$1,270

$1,040-$1,250

$620-$740

Add 5-10 minutes under severe traffic congestion

Page 27: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

27

March 2012

Stage IIStage I

> For LRT and APM, the 2 station aerial option • Costs approximately $450 million less than the 2 station subway and 3 station aerial

options • Runs adjacent to the Theme Building, leading to potential visual impacts

> The 3 station aerial loop option provides the shortest walk distances to terminals among the rail alignments, but extra travel time around the loop leads to comparable total travel times (ride + walk) to terminals

> BRT is the least costly and has shorter walking distances than the rail (LRT and APM) alignments, but…

• Involves the longest total travel times (ride + walk) to airport terminals• Is subject to airport roadway congestion

Trade-offs Among Alignments within the Airport Terminal Area

Page 28: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

28

March 2012

TTTT

T T TT

TTTT

T T TT

TTTT

T T TT

2 29-30

3.3

4

4

31-32

31-32

29-30

540-1,160

470-1,080

620-1,270

600-1,240

Trade-offsCentury Boulevard vs. 98th Street

Stage IIStage I

Alternative

Average Travel Time (minutes)

Potential Impacts Visual, Traffic/Access

98th StCentury Blvd Average Number of

Vertical Level ChangesCapital Cost (millions)

PRELIMINARY

TTTT

T T TT

Direct LRT Branch

Circulator

Average from Norwalk, Expo, and South Bay

Page 29: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

29

March 2012

Stage IIStage I

Trade-Offs Related to Century Blvd & 98 Street Alignments

> Century Blvd LRT

• Requires a second station at Aviation/Century

• Results in transfers, additional level changes, longer walks and longer travel times

> For both Direct LRT Branch and Circulator ,

the aerial structure along Century Blvd may result in:

• Visual impacts

• Impacts to traffic circulation and access to businesses

Page 30: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

30

March 2012Breakout Sessions

Stage IIStage I

#1Passenger

Convenience

#2Direct LRT Branch vs.

Through LAX

#3On-Airport Alignments

#4Century Blvd.

vs. 98th Street

•Ten minutes per station

•Bell will ring when it is time to move to the next station

•Rotate clockwise through the tables

•Return to seats for a recap

Page 31: Metro Green Line to LAX - Alternative Analysismedia.metro.net/.../images/mgllax_presentation_2012_0301.pdf · 2013-04-17 · 2 March 2012 The Crenshaw/LAX Project… • 8.5 mile

31

March 2012Upcoming Activities

Community Workshops

(February-March)

Metro Board Meeting

(April)

Environmental Scoping Meetings

(Late Spring)

Environmental Document

Preparation(2012-2013)

Stakeholder Outreach and Coordination with LAWA