OSP Project Scope of Work
Primary objectives
– Perform 960 facility surveys and provide necessary instruction
to modify sources for testing (test ports, platforms, ladders)
– Perform minimum of 6,048 individual test runs (the equivalent
of 960 sources) for PM, SO2, NOx, CO and metals
– Generate representative emission test data in comparison with
the Philippine Clean Air Act standards
– Produce EPA-quality test reports suitable for EMB regulatory
follow-up actions (NONC, Technical Conference, CAP)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Project Status (through Aug 31)
Status
Through August 31, 2006
Current Percent
Goals Accomplishment of Target
Specific Outputs
Number of Stack Surveys 960 1,592 166%
Number of Test Runs 6,048 7,489 124%
Number of Equiv. Sources Tested 960 1,189 124%
Number of Analyses 12,500 15,790 126%
Number of Test Reports --- 424 ---
Stacks Failing the Standard --- 388 ---
18
Project Status (through Aug 31)
Status
Regional Accomplishments
NCR Reg 3 Reg 4a Total
Number of Stack Surveys 636 484 472 1,592
Percent of Total 40% 30% 30%
Number of Test Runs 2,691 2,206 2,592 7,489
Percent of Total 36% 29% 35%
Number of Stacks Tested 308 247 255 810
38% 30% 31%
Number of Stacks Failing 161 142 85 388
19
Stack Test Results
Of the 795 stacks reported, 388 are above the CAA standard for at least one parameter:
– 289 stacks are failing for SO2
– 161 stacks are failing for PM
– 83 stacks are failing for CO
– 26 stacks are failing for NOx
– 1 stack is failing for lead
20
General Observations
The following are some of the typical
– Sources firing bunker C fuel oil are exceeding the SO2 and PM standards (boilers, gensets, heaters)
– Gensets are exceeding the NOx standard
– Solid fuel-fired units are exceeding the CO standard
– Only 1 source was exceeding the lead standards
– No sources have exceeded the mercury (or other metal) standards
21
Equipment Returned to DENR
At the conclusion of the project OSP provides over $230,000 equipment:
– 7 vehicles (3 Revos and 4 Kia Vans)
– Stack testing equipment (meter boxes, sample probes, impingers, etc)
– Laboratory equipment (analytical balance, spectrophotometer, support equipment)
22
OSP Supplemental ItemsAlthough not required by our contract, the OSP has provided the following support (at the request of EMB):
• Extensive regulatory and policy guidance and support (CEMS, accreditation, methodology questions, emission averaging, mass emission rates, correction factors, etc)
• Established test port and platform standards with industry
• Created culture of safety in stack testing
• Training (test procedures, laboratory procedures, test report review, regulatory follow-up, PCO workshops)
• Survey and testing of large sources outside the Airshed
Supplemental Items
23
Primary Goal
“Improve air quality over the medium term”
– Of the 795 stacks that have been reported, 388 (49%) are
failing (without DENR applying the appropriate dilution
correction factors). This leads to a NONC and compliance
plan.
– For sources that pass, the report generally provides the
necessary data to make that compliance sustainable
– The vast source data should now be used to re-evaluate,
and where necessary, tighten the emission standards