metro.net/i-605-CIP Next stop: a better drive on the 605. For general project information, to ask questions, to provide a comment, or to join the mailing list, please contact us at: Isidro Panuco, Project Manager Metro One Gateway Plaza, 99-22-9 Los Angeles, CA 90012 213.922.4091 [email protected] metro.net/i-605-CIP Stay Connected metro.net/605hotspots I-605 Corridor Improvement Project Overview The San Gabriel River Freeway, Interstate 605 (I-605), between Interstate 105 (I-105) and Interstate 10 (I-10), is one of the busiest and most congested highways in the greater Los Angeles area. Projected growth in the region’s population and goods movement are expected to further deteriorate the traffic capacity and operations of I-605. To ease congestion and plan for future growth, operational and safety improvements are needed. The Los Angeles County Metropolitan Transportation Authority (Metro), in collaboration with the California Department of Transportation (Caltrans), District 7, the Gateway Cities Council of Governments (GCCOG) and the San Gabriel Valley Council of Governments (SGVCOG), is proposing improvements to approximately 16 miles of highway located along I-605, from approximately I-105 to I-10. The I-605 Corridor Improvement Project (project) also includes improvements along Interstate 105 (I-105), Interstate 5 (I-5), State Route 60 (SR-60), and Interstate 10 (I-10). The proposed project considers and studies multiple alternatives, which are outlined below. I-605 Alternatives Improvements will revitalize the heart of Southern California’s freeway network, allowing people and goods to move freely, which will stimulate and support a robust economy, capable of growing with the region and demands of the future. Existing Freeway Corridor No Build (Existing Condition) 1 converted ExpressLane (HOT) 1 new ExpressLane (HOT) *Auxiliary lanes added where needed 1 new HOV lane *Auxiliary lanes added where needed *Auxiliary lanes added between interchanges. new auxiliary lane (aux) existing general purpose lane new general purpose (gp) high occupany vehicle (hov) lane new expresslane (hot) 1 converted ExpressLane (HOT) 1 new General Purpose lane *Auxiliary lanes added where needed AUX AUX AUX HOV HOV HOV HOT HOT HOT GP *ExpressLanes also referred to as High-Occupancy Travel (HOT) lanes. 20-3031AA ©LACMTA2020

Upload: others

Post on 20-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: metro.net/i-605-CIP I-605 Corridor Improvement Project ...media.metro.net/2020/605CIP-Alt-Fact-Sheet-FINAL.pdf˜-605/-10 ˜˘ ˇ˝ ˘ ˇ ˜˚˛˝˙ˆˇ˚ˇ˘ > Add a direct connector

metro.net/i-605-CIP

Next stop: a better drive on the 605.

For general project information, to ask questions, to provide a comment, or to join the mailing list, please contact us at:

Isidro Panuco, Project ManagerMetroOne Gateway Plaza, 99-22-9Los Angeles, CA 90012

213.922.4091

[email protected]

metro.net/i-605-CIP

Stay Connected

metro.net/605hotspots

I-605 Corridor Improvement Project Overview

The San Gabriel River Freeway, Interstate 605 (I-605), between Interstate 105 (I-105) and Interstate 10 (I-10), is one of the busiest and most congested highways in the greater Los Angeles area. Projected growth in the region’s population and goods movement are expected to further deteriorate the tra�c capacity and operations of I-605. To ease congestion and plan for future growth, operational and safety improvements are needed.

The Los Angeles County Metropolitan Transportation Authority (Metro), in collaboration with the California Department of Transportation (Caltrans), District 7, the Gateway Cities Council of Governments (GCCOG) and the San Gabriel Valley Council of Governments (SGVCOG), is proposing improvements to approximately 16 miles of highway located along I-605, from approximately I-105 to I-10. The I-605 Corridor Improvement Project (project) also includes improvements along Interstate 105 (I-105), Interstate 5 (I-5), State Route 60 (SR-60), and Interstate 10 (I-10).

The proposed project considers and studies multiple alternatives, which are outlined below.

I-605 Alternatives

Improvements will revitalize the heart of Southern California’s freeway network, allowing people and goods to move freely, which will stimulate and support a robust economy, capable of growing with the region and demands of the future.

Existing Freeway Corridor

No Build(Existing Condition)

1 converted ExpressLane (HOT)1 new ExpressLane (HOT)*Auxiliary lanes added where needed

1 new HOV lane*Auxiliary lanes added where needed

*Auxiliary lanes added between interchanges.

new auxiliarylane (aux)

existinggeneral purpose lane

new generalpurpose (gp)

high occupanyvehicle (hov) lane

newexpresslane(hot)

1 converted ExpressLane (HOT)1 new General Purpose lane*Auxiliary lanes added where needed

AUX

AUX

AUX

HOV

HOV HOV

HOT HOT

HOTGP

*ExpressLanes also referred to as High-Occupancy Travel (HOT) lanes.

20-3

031A

A ©

LAC

MTA

2020

Page 2: metro.net/i-605-CIP I-605 Corridor Improvement Project ...media.metro.net/2020/605CIP-Alt-Fact-Sheet-FINAL.pdf˜-605/-10 ˜˘ ˇ˝ ˘ ˇ ˜˚˛˝˙ˆˇ˚ˇ˘ > Add a direct connector

SAN GABRIEL RIVER

RIO H

ONDO CHANNEL

Peck

Rd

Peck Rd

Garvey Av

Ramona Bl

Durfe

e Av

Valley Bl

S 7t

h Av

Turn

bull

Cany

on R

d

Beverly Bl

Mines BlWashington Bl

Slauson Av

Telegraph Rd

Florence Av

Lake

wood

Bl

Firestone Bl

Bellfl

ower

Bl

Rosecrans Av

Imperial Hwy

Whittier Bl

Rose Hills Rd

Stewart St

Crossroads Pkwy

Param

ount

Bl

Foster Rd

E Gale Av

Temple

y Av

Obregon St

Saragosa St

605

5

1010

605

605

60

105

5

ROSEMEAD

MONTEREYPARK

EL MONTE

BALDWIN PARK

SOUTHEL MONTE

CITY OF INDUSTRY

WHITTIERHACIENDAHEIGHTS

SANTA FESPRINGS

NORWALK

DOWNEY

MONTEBELLO

COMMERCE

PICORIVERA

LOS NIETOS

BELLFLOWER

LA PUENTE

AVOCADOHEIGHTS

ROSE HILLS

WEST WHITTIER/

ROSECRANS

Metro C Line (Green) & Station

Metro J Line (Silver) & Station

Amtrak/Metrolink/Union Pacific

Improvement Study Area

Subject to Change

Major On-/Off-Ramp ImprovementMinor On-/Off-Ramp Improvement

Ramp Access ModificationOvercrossing ImprovementUndercrossing ImprovementPedestrian Bridge ReplacementBike Lane Improvement

Local Improvements

Metro Service

Direct ConnectorInterchange Improvement

Non-freeway Roadway Improvement

N18-1269AA ©LACMTA2019

Study Area Map with Local Improvements

i-605 improvements (approx. 16 miles)> Add one lane on northbound and southbound I-605, either as a general purpose (GP), high-occupancy vehicle (HOV) or ExpressLane

> Convert existing HOV to ExpressLane (Alt. 2 & 3)

> Add auxiliary lanes as needed between on- and o�-ramps

> Improvements to interchanges

> Safety improvement: increase inside shoulder and lane widths to full standard

i-605/i-10 interchange improvements> Add a direct connector HOV lane or ExpressLane from northbound I-605 to westbound I-10 with reverse movement

sr-60 improvements (approx. 5.5 miles)> Add one GP lane on westbound SR-60 from Hacienda Bl to I-605/SR-60 interchange

> Add one GP lane on eastbound SR-60 from I-605/SR-60 > Interchange to 7th Av

> Add auxiliary lanes in the westbound direction leading > up to the I-605/SR-60 system interchange

> Safety improvement: increase lane widths to > full-standard

i-5 improvements (approx. 3 miles)> Add new HOV lane to northbound and southbound > direction from Florence Av through the I-605 interchange

> Add auxiliary lanes as needed between on- and o�-ramps

> Increase lane and shoulder and widths to full standard > to align with new I-5 construction south of Florence Av > and for improved safety

i-605/i-105 interchange improvements> Add a direct connector HOV lane or ExpressLane from> northbound I-605 to westbound I-105 with reverse movement

> Add a direct connector HOV lane or ExpressLane from > southbound I-605 to westbound I-105 with reverse movement

Major On-/Off-Ramp Improvement

Minor On-/Off-Ramp Improvement

Ramp Access Modification

Overcrossing Improvement

Undercrossing Improvement

Pedestrian Bridge Replacement

Bike Lane Improvement

Direct Connector

System Interchange Improvement

Non-freeway Roadway Improvement

Nor

wal

k

Dow

ney

Sant

a Fe

Spr

ings

Whi

ttie

r

Pico

Riv

era

Sout

h El

Mon

te

Indu

stry

El M

onte

Bal

dwin

Par

k

Uni

ncor

pora

ted

LA C

ount

y

1 1* 1

1 1 1 1 1

4

1 4

1 1 1 4 7

2

1

2

2

2

2

3

*Shared improvement

1

2

3

4

3

1

1*

4

2

5

3

2

4

1*

1

1

1

2

Local Improvements by Jurisdiction

Major Corridor Improvements

Proposed improvements to on- and o�-ramps, bridges, underpasses, and local connecting roadways will greatly increase circulation on local streets and streamline access to businesses and connections to nearby residential neighborhoods.

Corridor and Local Bene�ts

There are a number of corridor and local jurisdiction improvements that will result from the proposed project. These include:

improved average daily travel times

safer travel conditions

improved traffic flow

> Improvements to > local interchanges

> Redesign and/or > relocate existing > ramps and merge > locations

> Local intersection upgrades

> Enhanced tra�c signal syncronization

new and improved bicylce/ pedestrian features

> Better connectivity to the> San Gabriel River trail

> Improve pedestrian crossing > and bicycle lane connections

upgraded and additional storm water treatment facilities

enhanced freeway amenities

> Consistent structural and landscape > beauti�cation treatments

> Construction of soundwalls to reduce the > impacts of tra�c noise on local communities

> Improved water quality

> Reduction of trash entering local rivers and streams

> Enhanced pedestrian connections > with additional and upgraded > sidewalks and pedestrian > overcrossings and undercrossings > in compliance with Americans with > Disability Act standards

> Improvements to equestrian crossings > and trails