Metropolitan Transit Authority of Harris County Fiscal Years 2012-2015 Performance Audit Task 3: Transit Operations January 2017

Upload: others

Post on 30-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Metropolitan Transit Authority of Harris County

    Fiscal Years 2012-2015 Performance Audit

    Task 3: Transit Operations

    January 2017

  • Contents SECTION 1. INTRODUCTION ................................................................................................................................. 1 

    1.1  TRANSIT PERFORMANCE AUDIT BACKGROUND .................................................................................................................... 1 1.2  TRANSIT PERFORMANCE AUDIT OVERVIEW ........................................................................................................................ 2 1.2.1  METRO’S AUDIT PERIOD ACCOMPLISHMENTS WILL ENHANCE SERVICE ................................................................................... 2 1.2.2  CHALLENGES WERE EVIDENT IN PERFORMANCE TRENDS........................................................................................................ 3 1.2.3  METRO’S MANAGEMENT RECOGNIZES THE NEED TO INCREASE RIDERSHIP ............................................................................. 3 1.2.4  METRO’S MANAGEMENT IS TAKING STEPS TO INCREASE SERVICE AND CONTROL COSTS ............................................................ 4 1.3  METRO’S TRANSPORTATION FUNCTIONS .......................................................................................................................... 4 1.4  ORGANIZATION OF THE REPORT ....................................................................................................................................... 7 

    SECTION 2. TRANSIT PERFORMANCE OVERVIEW .......................................................................................... 8 

    2.1  BACKGROUND .............................................................................................................................................................. 8 2.2  SYSTEM‐WIDE AND MODAL PERFORMANCE TRENDS ............................................................................................................ 8 2.2.1  TOTAL OPERATING COSTS AND COST EFFICIENCY INDICATORS .............................................................................................. 10 2.2.2  REVENUE‐BASED PERFORMANCE INDICATORS DEMONSTRATED MIXED TRENDS ...................................................................... 10 2.2.3  SERVICE QUALITY ........................................................................................................................................................ 10 

    SECTION 3. BUS OPERATIONS ............................................................................................................................. 12 

    3.1  BUS SERVICE .............................................................................................................................................................. 12 3.2  CONSULTANT ASSESSMENT ........................................................................................................................................... 12 

    SECTION 4. RAIL OPERATIONS ........................................................................................................................... 14 

    4.1  RAIL SERVICE .............................................................................................................................................................. 14 4.2  CONSULTANT ASSESSMENT ........................................................................................................................................... 14 

    SECTION 5. PARATRANSIT OPERATIONS ......................................................................................................... 16 

    5.1  PARATRANSIT SERVICE ................................................................................................................................................. 16 5.2  CONSULTANT ASSESSMENT ........................................................................................................................................... 16 

    SECTION 6. RECOMMENDATIONS ...................................................................................................................... 17 

    6.1  RECOMMENDATION 1: AUGMENT THE RESULTS OF THE REVIEW OF METRO’S TRANSPORTATION OPERATIONS WITH AN EVALUATION OF METRO’S GOALS AND OBJECTIVES ............................................................................................................................ 18 

    6.2  RECOMMENDATION 2: IMPROVE FARE RECOVERY RATIO .................................................................................................... 18 6.3  RECOMMENDATION 3: IMPROVE RAIL ON‐TIME PERFORMANCE .......................................................................................... 18 6.4  RECOMMENDATION 4: INCREASE THE NUMBER OF HOV LANES ........................................................................................... 19 6.5  RECOMMENDATION 5: EVALUATE RIDERSHIP TRENDS AND IDENTIFY OPPORTUNITIES TO TARGET NEW TRANSIT MARKETS ............. 19 6.6  RECOMMENDATION 6: ENHANCE RIDERSHIP WITH AN UPDATED MARKETING CAMPAIGN, ALIGNING TO POPULATION TARGETS ....... 20 6.7  RECOMMENDATION 7: TAKE ADVANTAGE OF THE OPPORTUNITIES PRESENTED BY THE UPCOMING SUPER BOWL .......................... 20 6.8  RECOMMENDATION 8: FORMALIZE A PLAN TO SHOW THE BENEFITS OF PUBLIC TRANSIT ........................................................... 20 6.9  RECOMMENDATION 9: WORK WITH THE CITY AND SOCIAL SERVICE ORGANIZATIONS TO REDUCE THE IMPACT OF VAGRANCY, 

    LOITERING, AND PANHANDLING ON AND AROUND METRO TRANSIT FACILITIES ...................................................................... 21 6.10  RECOMMENDATION 10: MAKE THE AREA AROUND THE DOWNTOWN RAIL LINE A TRANSIT‐ONLY CORRIDOR ............................... 21 

    SECTION 7. SUMMARY .......................................................................................................................................... 22 

    APPENDIX A: OPERATING DATA BY PERFORMANCE INDICATOR ............................................................. 23 

    APPENDIX B: PERFORMANCE DATA BY MODE ............................................................................................... 24 

  • SSECTION

    FY 2012Task 3: T

    Section 1

    1.1

    Section 4Texas traof the pofficials for impro

    The Metthereforein associconduct data, whiof the per

    The perfo

    This repoSeptemboperationservice d

    The detaperformabe reviewof two of

    While threcognizereviewinfunction METRO

    The resuhave bee

    1. INTRO

    – FY 2015 Transit Oper

    1. Introduct

    Transit P

    451.454 of tansit agencieerformance to perform

    oving efficie

    tropolitan Te retained Miation with Cthe Fiscal Yich was prevrformance st

    ormance aud

    ComplianceCode (Task

    Collection mandated p

    Performancoperations, three audit coperations.

    ort presents er 30, 2015 ns, focusing delivery.

    ailed reviewance auditingwed once in f METRO’s

    he scope of es that an ag transportamust be con’s transit ser

    ults of the ren provided i

    ODUCTION

    Performancerations 

    tion

    Performance

    the Texas Tres for munici

    audit is to oversight fu

    ency and effe

    ransit AuthoMilligan & Co

    Contract SerYears (FY) 2viously revietatistics repo

    dit assessed M

    e with applik 1).

    and compilperformance

    ce in one oor system mcycles (Task

    the results for FY 2012on METRO

    w of METROg requiremenevery three administrati

    f the audit iccurate unde

    ation functionsidered alonrvices.

    quired perfoin separate re

    N

    e Audit

    e Audit Bac

    ransportationipalities withprovide ev

    unctions andectiveness of

    ority of Harompany, LLrvice Innova2012 to 201ewed as partorted in FY 2

    METRO's:

    icable state

    lation of baindicators (T

    of three armaintenance)k 3). The foc

    of the trans2, FY 2013,

    O’s transporta

    O’s bus andnts, which saudit cycles

    ive functions

    is consistenerstanding oons in isolatng with trans

    ormance indeports:

    1

    ckground

    n Code manh a populatio

    valuative infd to provide f its operatio

    rris County LC to performations, LLC, 15 performant of the FY 22012 have b

    law from C

    ase statisticsTask 2).

    reas (i.e. ad). Each functcus of the fun

    sit operationFY 2014, anation functio

    d rail transpstipulate thats. The previos: finance an

    nt with stateof transit pertion, and thsportation to

    icator assess

    ndates quadreon of more tformation neuseful infor

    ons.

    (METRO) m the audit. worked clo

    nce audit. T2009 – FY 2een adjusted

    Chapter 451

    s and meas

    dministrationtional area mnctional revi

    ns review bend FY 2015.ons and activ

    portation fut each of theous performand human res

    e requiremenrformance tr

    hat the perfoo obtain a co

    sment and le

    ennial perfothan 1.9 millecessary forrmation to th

    meets this Milligan &

    osely with MThis audit in2012 quadrend for this rep

    of the Texa

    surement of

    n and manmust be addriew for this a

    etween Octo It is an assevities that ar

    unctions come three functance audit psources.

    nts, METROrends cannoormance of omplete and

    egislative co

    ormance audlion. The purr state and he transit ag

    requirement Company, L

    METRO’s stancluded FY nnial audit. Sport.

    as Transport

    f specified s

    nagement, trressed once eaudit is on tr

    ober 1, 2011essment of trre responsibl

    mplies with tional areas

    provided a re

    O’s manageot be obtaine

    the maintenbalanced vie

    ompliance re

    dits of rpose local

    gency

    t and LLC, aff to 2012

    Some

    tation

    state-

    ransit every ransit

    1 and ransit le for

    state must

    eview

    ement ed by nance ew of

    eview

  • SSECTION

    FY 2012Task 3: T

    To providof the tre

    1.2

    The perfoperformaaccompliactivitiesMETRO

    To provaccompliimprovemSeptembmoves fothat are c

    1.2.1

    • •

    • • • • •

    1. INTRO

    – FY 2015 Transit Oper

    Legislative

    Performanc

    de context fend analysis

    Transit P

    formance audance. This ishments ans that are ke

    to improve

    vide a baishments anment. The aer 2015. Sinorward, an ecurrently und

    METRO’s

    Bus and rai

    Texas Medconnectivity

    Major bus r

    Houston Liv

    Mobile tick

    Rail Purple

    Red Line sCollege

    Free transfe

    ODUCTION

    Performancerations 

    Compliance

    ce Indicators

    for the transiof system-w

    Performance

    dit is intendefunctional

    nd challengeey to the dits operating

    alanced pernd positive paudit is a lonce current teffort has alderway at M

    s Audit Peri

    l announcem

    dical Center y from bus to

    realignment

    vestock and

    keting

    and Green L

    successful e

    ers in any dir

    N

    e Audit

    e review (fin

    results (fina

    it operationswide perform

    e Audit Ove

    ed to providreview p

    es over the delivery of Mg efficiency,

    rspective operformanceok back ovtrends, objeso been mad

    METRO and t

    iod Accompl

    ments in Eng

    Transit Ceno rail

    to improve s

    Rodeo succ

    Lines succes

    xtension to

    rection allow

    2

    nal report dat

    al report date

    s review, a smance indicat

    erview

    de a balancedprovides a audit periodMETRO’s s effectivenes

    on METROe trends are er the past ctives, and pde to recognto articulate

    lishments w

    glish and Spa

    nter is well

    service

    cessfully carr

    ssfully opene

    the Northli

    wed within a

    ted January 2

    ed January 2

    ection of thitors.

    d and objectdiscussion

    d, reviews aservices, andss and/or pro

    O’s overalldiscussed

    four years, programs arnize and inctheir implic

    ill Enhance

    anish

    designed an

    ried over 26

    ed

    ine Transit

    a three-hour w

    2017)

    2017)

    is report disc

    tive assessmn of perfoand evaluated suggests oductivity.

    l performaas well as from Octob

    re more releclude the plaations for M

    e Service

    nd functiona

    ,000 people

    Center/Hou

    window

    cusses the re

    ment of METormance tres aspects oopportunitie

    ance, signifopportunitie

    ber 2011 threvant as MEans and activ

    METRO’s fut

    al with exce

    daily

    ston Comm

    esults

    RO’s rends, of the es for

    ficant es for rough

    ETRO vities ture.

    ellent

    munity

  • SSECTION

    FY 2012Task 3: T

    1.2.2

    Using sdemonstr

    As discuto the inThere is importan

    1.2.3

    Over theincludingThese enservice ahas shifte

    1. INTRO

    – FY 2015 Transit Oper

    Challenge

    state-mandatrates declinin

    Sales and u

    The four co

    Operatin

    Operatin

    Operatin

    Fare rec

    Service quashowed dec

    Average

    On-time

    Acciden

    Miles bpercent,

    ussed in the Pnformation pno requirem

    nt for METR

    METRO’s

    e audit perig expanded nhancementsarea and to med to the sou

    ODUCTION

    Performancerations 

    es were Evid

    ted key png performa

    se tax receip

    ost effectiven

    ng cost per p

    ng cost per r

    ng cost per r

    covery ratio

    ality is goodcline.

    e vehicle occ

    e performanc

    nts per 100,0

    between mec, Rail: -32.4

    Performanceprovided in

    ment for METRO to provide

    s Managem

    iod, METRrail service

    s were implemeet the neeuthwest.

    N

    e Audit

    dent in Perfo

    performanceance trends o

    pts which me

    ness/efficien

    passenger in

    revenue hour

    revenue mile

    fell 14.4 per

    , however, t

    cupancy incr

    ce decreased

    000 total mil

    chanical roadpercent)

    e Indicatorsmonthly re

    TRO to use te informatio

    ent Recogni

    RO implemee, extended emented to aeds of MET

    3

    formance Tre

    e indicatorsover the FY 2

    easure reven

    ncy measures

    ncreased 10.7

    r increased 1

    e increased 1

    rcent

    two of the fo

    reased 1.4 p

    d an average

    les decreased

    d calls decre

    report, the ports to MEthe state defn that is mea

    izes the Nee

    ented severabus service

    address the rRO’s patron

    ends

    s, METRO2012 – FY 2

    nues received

    s reflect incr

    7 percent

    11.7 percent

    11.4 percent

    our service p

    ercent

    e 7.8 percent

    d an average

    eased an ave

    results reporETRO’s Bofinitions for aningful to i

    d to Increas

    al enhancem, and an exrelocation ofns as the pop

    O’s perform2015 audit pe

    d increased b

    reased costs.

    productivity/

    e 5.1 percent

    erage 23.0 pe

    rted here areard during tits internal rits stakehold

    se Ridership

    ments to itsxtensive marf major trip pulation cen

    mance geneeriod.

    by 22.1 perc

    /quality mea

    t

    ercent (Bus:

    e not compathe audit pereports; it is ders.

    p

    s transit syrketing proggenerators i

    nter of the re

    erally

    ent

    asures

    +9.4

    arable eriod. more

    stem, gram. in the egion

  • SSECTION

    FY 2012Task 3: T

    METRO rail mileunnecessweekendefforts, sridershipchallengedowntowMETRO inspire tMETRO enhance

    METRO service m

    1.2.4

    Over the increase increase expansio

    Bus opergleaned f

    METROLresult, opMETRO the increa

    In additiofare struccomparatauthorizedeclined under Tecommon

    1.3

    METRO services municipacounties.buses. M

    1. INTRO

    – FY 2015 Transit Oper

    expanded ites to approsary bus routd. With thessuch as spec projectionse is amplifie

    wn in 2017, ashould cre

    heir fellow with one-o

    the public tr

    should contmeets the nee

    METRO’s

    audit periodwas for MEin rail open of the Red

    rating costs from the red

    Lift operatinperating cosincreased M

    ase in operat

    on to the inccture to incrtively low foed under Texto 13.7 at th

    exas Transpamong simi

    METRO’

    operates fover a 1,30

    alities, porti METRO’s

    METRO bus s

    ODUCTION

    Performancerations 

    ts Red Line oximately 2tes in favor se changes, ial school p. However, ted by businalthough it wate new maresidents t

    on-one interransit experie

    tinue to evaeds of the pu

    s Managem

    d METRO’s ETRORail serating cost,

    d Line and th

    grew relativesigned syst

    ng costs grest per passe

    METROLift ting costs.

    crease in the rease fare reor a transit axas Transpohe end of thortation Codilarly situate

    ’s Transpor

    fixed-route 03-square mons of uninbus routes

    services curr

    N

    e Audit

    and opened22. METRO

    of extendedMETRO p

    rograms andthere is a ch

    nesses, such will still be arketing inco ride MET

    raction with ence.

    aluate serviceublic.

    ent is Takin

    system-widervice at ap

    can be dirhe addition o

    vely more slotem.

    ew 43.9 perenger increafares in FY

    METROLifecovery rati

    agency of MEortation Codhe audit peride 451, in o

    ed transit sys

    rtation Func

    bus, light rmile service ncorporated are operatedrently provid

    4

    d the new GrO also realid service to arojected incd special far

    hallenge of loas Shell Oiwithin the Mentives and TRO. Benef

    commuters

    e changes un

    ng Steps to In

    de operating pproximatelyrectly attribuof the Purple

    owly at 10.6

    rcent due toased by a m

    Y 2016 from

    ft fare, METos and averETRO’s cali

    de 451. Consod. While inother parts ostems.

    ctions

    rail (METRarea that inHarris Coun

    d using a 10de about 84 m

    reen and Purigned its bareas with pcreased ridere free days,ow ridershipil Company

    METRO servuse employ

    fits of this s, in additio

    ntil ridership

    Increase Ser

    costs increay 192.6 percuted to incr

    e and Green L

    6 percent as

    o the servicmargin of 2a base fare

    TRO would brage fares. Miber, althougsequently, Mn line with oof the count

    RORail), anncludes the nty, and sm

    00-percent amillion boar

    rple Lines inus network

    population grership. Throu, METRO stp in downtow, moving itsvice area. Toyees that liinitiative in

    on to unfette

    p goals are

    vice and Co

    ased 17.8 percent. The larreased rail Lines.

    an indicatio

    e population26.5 percenof $1.15 to

    be served weMETRO’s $gh in line wi

    METRO’s faother transit try, rates of

    nd paratransCity of Ho

    mall portionsccessible fle

    rdings per ye

    ncreasing itsk by eliminrowth and ough its outrtrived to mewn Houston.s offices weo offset thisve downtownclude provered feedbac

    achieved an

    ontrol Costs

    rcent. The large, but expservice with

    on of the su

    n increase. nt. Conseque

    $1.25 to ad

    ell to redesig1.25 base faith other ageare recovery

    agencies crf 25 or mor

    sit (METROouston, 14 s of surrouneet of over 1ear.

    total nating on the reach

    eet its This

    est of loss,

    wn to viding ck to

    nd the

    argest ected h the

    ccess

    As a ently,

    ddress

    gn its are is encies

    ratio reated re are

    OLift) other nding 1,427

  • SSECTION

    FY 2012Task 3: T

    METRO operates approxim

    METROLnavigate qualified(ADA) oservices uthe thirdoperates most signtransport

    For this rfixed-rou

    Chief Ex

    Deputy C

    Superinte

    ExecutivSafety, anDirector EvaluatioChief Fin

    General M

    Chief Op

    Vice Pre

    Director

    Senior DVanpool Director

    Director

    Superinte

    1. INTRO

    – FY 2015 Transit Oper

    inauguratedprimarily a

    mately 22 mi

    Lift provideMETRO’s a

    d for serviceof 1990. Servuse 156 ME

    d-party cont272 dedicatnificant addtation.

    review, interute bus, rail,

    xecutive Offi

    Chief Execut

    endent of Ra

    ve Vice Presind Customeof Service P

    on nancial Offic

    Manager of

    perating Offi

    sident of Hu

    of Grant Pro

    Director of Co

    of Drug and

    of Paratrans

    endent of Tr

    ODUCTION

    Performancerations 

    d its light raat street grailes.

    es service taccessible fi

    e based on pvices are sc

    ETRO-ownedtractor Greated wheelchaition to this

    rviews wereand paratran

    icer

    tive Officer

    ail Transport

    ident, Operar Service

    Planning, Sch

    cer

    First Transit

    icer

    uman Resour

    ograms

    ontracted Pa

    d Alcohol Pr

    sit (METROL

    ransportation

    N

    e Audit

    ail service iade in a sem

    to persons ixed-route bparameters eheduled in rd vans operaater Houstoair accessiblservice is th

    e conducted nsit transpor

    tation

    ations, Public

    heduling, an

    t - Northwes

    rces

    aratransit, an

    ograms

    Lift) Service

    n - Kashmere

    5

    in January 2mi-exclusive

    with disabilus and rail sestablished bresponse to ated by Firstn Transportle minivans he Taxicab b

    with the startation functi

    Direc

    Direc

    Direc

    c ExecEngi

    nd LeadPolicDirec

    st Direc

    MET

    Chie

    Exec

    nd Senio

    Senio

    es Chie

    e Supe

    2004. It is ae right of w

    lities who aservices. MEby the Amespecific cust Transit. Mitation Compleased by drbackup serv

    aff who are kions. Key sta

    ctor of Healt

    ctor of Safet

    ctor of Right

    cutive Vice Pneering, and

    d Managemecy ctor of Labo

    ctor of Staffi

    TROLift Serv

    f of Signals

    cutive Vice P

    or Director o

    or Director o

    f Safety Off

    erintendent B

    a double tracway serving

    are unable ETROLift cuericans withstomer requeinivan servicpany (Yellorivers from Y

    vice that allo

    knowledgeabaff include:

    th, Pension,

    ty

    t of Way

    President, Pld Constructiont Analyst o

    or Relations

    fing and Dive

    vices Operat

    and Commu

    President of

    of Bus Main

    of Transport

    ficer

    Bus Mainten

    cked systemg 24 station

    to board austomers are

    h Disabilitiesests. METROce is provideow Cab), wYellow Cab

    ows for same

    ble of MET

    and Wellnes

    lanning, on of Revenue/F

    ersity

    tions Superv

    unication

    Administrat

    ntenance

    ation

    nance - Kashm

    m that ns for

    and/or e pre-s Act OLift ed by which . The e day

    RO’s

    ss

    Fare

    visor

    tion

    mere

  • SSECTION

    FY 2012Task 3: T

    The perftransit op

    Addition

    1. INTRO

    – FY 2015 Transit Oper

    formance auperations, su

    Safety Prog

    Capital and

    Monthly Bo

    Operations

    METROLif

    METROLif

    Operator Ti2015

    Monthly Su

    Databases rgrievances,

    METRO’s l

    Performanc System

    nal key docum

    METRORa

    Rail Operat

    FY 2012 – F

    FY 2012 – F

    Rail Operat

    Accident Re

    Constructio

    METRORa

    ODUCTION

    Performancerations 

    udit also incch as:

    gram Plan fo

    d Operating B

    oard Busines

    and Transpo

    ft Goals and

    ft Service Co

    ime Keeping

    ummary of C

    related to accmanpower,

    labor agreem

    ce Managem

    ments review

    ail Performan

    tions Organi

    FY 2015 Ra

    FY 2015 Ra

    tions Compla

    eporting For

    on Safety Pro

    ail Standard O

    N

    e Audit

    cluded exten

    r Metropolit

    Budgets, FY

    ss Reports, F

    ortation Goa

    Objectives,

    ontracts

    g System, H

    Complaints/C

    cidents, discand incentiv

    ment with the

    ment, Appra

    wed included

    nce Statistics

    zation Chart

    ail Objective

    ail On-Time

    aint Statistic

    rms

    ogram Guide

    Operating Pr

    6

    nsive review

    tan Transit A

    Y 2012 – FY

    FY 2012 – F

    als and Objec

    FY 2012 – F

    History Oper

    Commendati

    ciplinary active payments

    e Transport W

    isal and Co

    d:

    s

    ts

    s and Accom

    Performance

    cs

    e

    rocedures

    ws of docum

    Authority of

    2015

    Y 2015

    ctives, FY 20

    FY 2015

    rator Utilizat

    ions/Comme

    ions, schedus for the revi

    Workers Un

    ompensation

    mplishments

    e

    ments and d

    Harris Coun

    012 – FY 20

    tion Reports

    ents, FY 201

    ling informaew period

    nion

    n Policies an

    ata pertainin

    nty (Bus & R

    015

    s, FY 2012 –

    2 – FY 2015

    ation, compl

    nd Procedur

    ng to

    Rail)

    – FY

    5

    aints,

    res –

  • SSECTION

    FY 2012Task 3: T

    The consRail OpEmergenFacility.

    1.4

    The rema

    1. INTRO

    – FY 2015 Transit Oper

    sultant visiteerations Ce

    ncy ManageThe consulta

    Organiza

    aining sectio

    Section 2:operations ris a discusindicators d

    Section 3:delivering boperations pperformanc

    Section 4: Rof rail opera

    Section 5: METROLifof ADA. Mpeople with

    Section 6:improving tfunctions.

    Section 7: METRO’s s

    Appendix Aas well as th

    Appendix Bservice efferevenue miltransit indu

    ODUCTION

    Performancerations 

    ed two of Menter, Transment Centeant also rode

    ation of the R

    ons of this re

    Transit Preview. Thisssion of MEduring the au

    Bus Operbus services,planning suce, as well as

    Rail Operaations planni

    Paratransift is a compl

    METROLift ph disabilities

    : Recommthe efficienc

    Summarysystem and t

    A – providehe annual pe

    B – providefectiveness ile) that are fstry.

    N

    e Audit

    METRO’s bussit Police Oer, and METe the bus and

    Report

    eport provide

    Performancs section proETRO’s perudit period.

    rations – d, including tch as schedus customer fe

    tions – descing, includin

    it Operationlementary pprovides curwho cannot

    endations cy, effective

    y – providethe recomme

    es the annualerformance m

    s the performindicators (pfrequently re

    7

    s operating fOperations, TROLift opd light rail sy

    e the results

    ce Overviewvides a backrformance r

    discusses Mthe organizauling, manpoeedback on s

    cribes METRng performan

    ns – discusaratransit serb-to-curb, ot use the fixe

    – discussesness and pro

    s a synopsendations.

    l data used imeasures.

    mance indicpassengers eported as a

    facilities (KHouston T

    perations at ystems.

    of the transi

    w – providkground for tesults and t

    METRO’s sational structower planninservice deliv

    RO’s organiznce.

    ses METROervice designor door-to-ded-route syst

    s and recooductivity o

    is of the c

    in calculatin

    cators by moper revenu

    a basis for ev

    ashmere andTranStar Tra

    the Frist T

    it operations

    des contexttransit in thetrends for k

    ystems andture and resung, dispatchivery and serv

    zational stru

    O’s service ned to meet

    door service tem.

    ommends of METRO’s

    consultant’s

    ng the perfor

    ode, includine hour andvaluating pe

    d Northwestansportation

    Transit Oper

    review:

    t for the tre service arekey perform

    d proceduresults of METing, and opevice quality.

    ucture and as

    for the disathe requiremupon reques

    opportunitiess service del

    observation

    rmance indic

    ng two additd passengerserformance i

    t), the n and rating

    ransit a and

    mance

    s for RO’s erator

    spects

    abled. ments st for

    s for livery

    ns of

    cators

    tional s per in the

  • S

    SECTION

    FY 2012Task 3: T

    Section 2

    2.1

    AccordinCity is tgrowing the perionation in

    2.2

    System-wefficiencythat has efficiencyactivitiesoperation

    System-wperformagenerallyperiod.

    The meatax receip

    2. TRAN

    – FY 2015 Transit Oper

    2. Transit P

    Backgrou

    ng to a studythe fastest gmetropolita

    od. From 20 population

    As of 2011Hunters CrVillage.

    Among the and third in

    The Univeeconomy eqjobs.

    Greater HouIt is on the diversity an

    Multiple unthe Universnearly 40,0area include

    System-w

    wide and my of METRObeen used ay, effectiven

    s behind thens sections o

    wide and moance trends. y demonstrat

    sure of regiopts per passe

    SIT PERF

    Performancerations 

    Performance

    und

    y conducted growing metn area nume00 to 2030, growth as ev

    , Greater Hoeek Village,

    ten most pon the United

    rsity of Hoquates to $1

    uston is knolist of 65 m

    nd business.

    niversities arsity of Houst00 students es the histori

    wide and Mo

    modal perforO's transit opas a starting ness, and p

    em, are discuof this report

    odal performUsing state

    tes some dec

    onal subsidizenger increas

    FORMANC

    e Audit

    e Overview

    by Woods atropolitan arerically durithe Housto

    videnced by

    ouston includ, Bunker Hi

    opulous areaStates in the

    ouston scho1.1 billion in

    own for its emost importa

    re located wton is a natioon a 667-ac

    ically black

    odal Perform

    rmance trenperations. Thpoint for th

    productivity ussed at a m.

    mance indica-mandated kclining perfo

    zation of MEsed by 14.7 p

    CE OVERV

    8

    and Poole Ecrea in the Uing 2013 – 2n metropolithe followin

    des four of till Village, W

    as in the Unite “Best Place

    ool system’sn new funds

    ethnic diversant world cit

    within the Honally recogncre campus icollege, Tex

    mance Tren

    ds were revhe discussio

    he functionaltrends, alon

    more detaile

    ators have bkey performormance tren

    ETRO transpercent.

    VIEW

    conomics IncUnited State2014, with 1tan area is png statistics.

    the ten wealWest Unive

    ted States, Hes for Busine

    s annual ims each year,

    sity and stroties – it is n

    ouston metrnized Tier Oin southeast xas Southern

    nds

    viewed to aon provided hl review of ng with theed level in t

    een validatemance indicat

    nds during th

    it service wh

    c. of the Cityes. The area156,371 peopprojected to

    thiest commersity Place,

    Houston rankess Careers.”

    mpact on th, and genera

    ong internatinumber 35. I

    ropolitan areOne research

    Houston. Mn University.

    assess the ehere is a higtransit opera

    e practices, the bus, rail

    ed as a basistors, METRhe FY 2012

    hich equates

    y of Houstona was the faple added drank fifth i

    munities in Tand Piney

    ked first in T”

    he Houston ates 24,000

    onal commuIt is a magne

    ea. Among tuniversity;

    METRO’s se.

    effectivenessgh-level overations. Operprocedures,

    l, and paratr

    s for determRO’s perform

    – FY 2015

    s to sales an

    n, the astest

    during in the

    Texas: Point

    Texas

    area local

    unity. et for

    them, it has

    ervice

    s and rview rating , and ransit

    mining mance

    audit

    d use

  • S

    SECTION

    FY 2012Task 3: T

    The four 2015 aud

    Trends inservice im

    Each of calculatedservices.

    Performadefinitionperformaappendic

    2. TRAN

    – FY 2015 Transit Oper

    cost effectivdit period.

    Cost effecti

    Operatin

    Operatin

    Operatin

    Fare rec

    n service qumprovement

    Service qua

    Average

    On-time

    o Bus

    o Rail

    Acciden

    o Bus

    o Rail

    Miles b

    o Bus

    o Rail

    these indicad for METR

    ance indicatns, and genance statistices to this rep

    SIT PERF

    Performancerations 

    veness/effici

    iveness/effic

    ng cost per p

    ng cost per r

    ng cost per r

    covery ratio:

    uality showet.

    ality, measur

    e vehicle occ

    e performanc

    : -2.7 percen

    l: -12.8 perce

    nts per 100,0

    : -2.7 percen

    l: -7.4 percen

    etween mech

    : +9.4 perce

    l: -32.4 perce

    ators is discRO services s

    tors were cnerally demoics used toport.

    FORMANC

    e Audit

    iency measu

    ciency, meas

    passenger: +

    revenue hour

    revenue mile

    -14.4 perce

    ed small im

    red as:

    cupancy: +1

    ce

    nt

    ent

    000 miles

    nt

    nt

    hanical road

    nt

    ent

    cussed furthystem-wide

    calculated bonstrated de

    o calculate

    CE OVERV

    9

    ures reflected

    ured as:

    +10.7 percen

    r: +11.7 perc

    e: +11.4 perc

    ent

    mprovements

    .4 percent

    d calls

    er in this sas well as se

    based on veeclining perthe perform

    VIEW d increased c

    t

    cent

    cent

    in custome

    section. Costeparately for

    erified dataformance dumance indic

    costs over th

    er satisfactio

    t-based indicbus, light ra

    , in compliuring the aucators are p

    he FY 2012

    on, and room

    cators have ail, and paratr

    iance with udit period.provided in

    – FY

    m for

    been transit

    state The

    n the

  • S

    SECTION

    FY 2012Task 3: T

    2.2.1

    Both totaconsume

    2.2.2

    Among Mand use t

    2.2.3

    There are

    2. TRAN

    – FY 2015 Transit Oper

    Total Ope

    al operating d increased

    Total operaMETRO’s c

    Operating crevenue millargest increthe growth audit period

    Bus revrevenue

    METRO

    METRO

    Revenue-

    METRO’s ktax receipts p

    Sales and subsidizatiogrowth in th

    METRO’s fcompared tooperating cofrom 16.0 icreated undaround the higher fare that requirecurrent rate

    Service Q

    e four state-m

    Average ve

    On-time per

    SIT PERF

    Performancerations 

    erating Cost

    costs and oover the aud

    ating costs control is lim

    costs adjustele. Both of thease betweein operating

    d:

    venue hourse miles incre

    ORail servic

    OLift service

    -Based Perfo

    key performaper passenge

    use tax recon, increasedhis indicator

    fare structuro peer transiost that is rein FY 2012 der Texas T

    country averecovery ra

    e higher reco is low.

    Quality

    mandated pe

    hicle occupa

    rformance

    FORMANC

    e Audit

    ts and Cost E

    operating codit period, fr

    include thomited (e.g. fu

    ed for servichese costs inn FY 2014 t

    g costs, whic

    s grew 184,ased 1,081,0

    e added 67,1

    e has grown

    formance Ind

    ance indicater trip and th

    ceipts per pd 14.7 percer is attributab

    re is complexit systems. Tecovered fro

    to 13.7 in Transportatioerage fare r

    atios are subovery rates.

    erformance i

    ancy

    CE OVERV

    10

    Efficiency In

    osts adjustedom FY 2012

    ose costs ofuel, insuranc

    ce include oncreased 11.7to FY 2015.ch exceeded

    249 hours f075.

    118 hours an

    by 190,552

    dicators Dem

    ors are two he fare recov

    passenger trent over the ble to a signi

    x and deeplyThe fare recoom passengeFY 2015. W

    on Code 451recovery ratebject to state

    Nevertheles

    ndicators tha

    VIEW Indicators

    d for the lev2 to FY 2015

    f delivering ce, mandated

    operating co7 and 11.4 p The increasthe growth

    from FY 20

    nd 727,747 r

    hours and 1

    monstrated M

    that measurvery ratio.

    rip, a measaudit perio

    ificant increa

    y discountedovery ratio, r fare paym

    While in line1, similar syes of 25 or

    e or local mass, compared

    at pertain to

    vels of servi5.

    transit servd benefits an

    ost per revenpercent, respeses in these in service le

    012 to FY

    revenue mile

    ,920,316 rev

    Mixed Tren

    re revenue tr

    sure of MEd, from $7.2ase in tax rec

    d. The $1.25which measents, decreae with otherystems of M

    more. Ofteandates or ind to the ind

    service qua

    ice delivered

    vice over wnd programs)

    nue hour andectively, witindicators reevels. Durin

    2015, while

    es.

    venue miles.

    ds

    rends: sales

    ETRO’s reg27 to $8.34ceipts.

    5 base fare issures the shased 14.4 perr transit age

    METRO’s caen, agencies nternal stand

    dustry, MET

    lity:

    d and

    which ).

    d per th the eflect

    ng the

    e bus

    .

    gional . The

    s low are of rcent, encies aliber with

    dards RO’s

  • S

    SECTION

    FY 2012Task 3: T

    Two of toccupanc

    The rema

    2. TRAN

    – FY 2015 Transit Oper

    Accidents p

    Miles betwe

    the four mecy and accid

    Average veincreased slmiles, whicpassenger briders.

    Accidents pan average focus on implementemaintenanc

    aining two m

    On-time peon-time perperformanc12.8 percenmechanical replace the

    Mileage int2012 to 9,8reaching a h9,855. Resupractices, fbetween mein FY 2015system men

    SIT PERF

    Performancerations 

    per 100,000 v

    een mechani

    easures of sedents per 100

    ehicle occuplightly by 1ch measure boardings. T

    per 100,000 tof 5.1 perceimproving

    ed since Fce.

    measures of s

    rformance imrformance dee decreased nt decline failure of th

    signal interf

    tervals betwe55 miles in Fhigh of 10,2ults like thefleet compoechanical ro. This decre

    ntioned abov

    FORMANC

    e Audit

    vehicle mile

    ical road cal

    ervice qualit0,000 vehicle

    ancy, an ind.4 percent a

    the length These result

    total miles int between Fsafety, the

    FY 2012,

    service quali

    mpacts the recreased sligfrom 97.3 p

    in rail on-the axle coun

    face system w

    een bus mecFY 2015. Th

    261 miles. Sise reiterate

    osition, sparad calls has

    ease is due inve.

    CE OVERV

    11

    es (directly o

    ls (directly o

    ty improvede mile.

    dicator of cus passenger

    of passengs show the

    s an indicatoFY 2012 and

    effectivenealong with

    ity declined

    riders’ willinghtly, from 7percent in FYtime performnter signal iwhich will im

    chanical roadhis indicatorince that timthe importa

    re ratios, andecreased f

    n part to a fa

    VIEW operated serv

    operated serv

    d over the a

    ustomer satismiles increa

    ger trips, alwork MET

    or of system d FY 2015. Tess of the h METRO’

    over the aud

    ngness to re73.3 percent Y 2012 to 8mance can interface sysmprove serv

    d calls increr showed gre

    me, performaance METROnd reportingfrom 24,744ailure of the

    vices only)

    vices only)

    audit period,

    sfaction withased significlso correlate

    TRO is doin

    safety. The This trend re

    programs ’s commitm

    dit period.

    ely on METRto 71.3 perc

    84.8 percent be directly

    stem. METRvice quality f

    ased from 9eat improvemance has fallO places ong consistenc in FY 2012axle counte

    , average ve

    h service qucantly. Passee with trendng to attract

    accident rateflects METthat have

    ment to sy

    RO servicescent. Rail onin FY 2015

    y attributed RO is workinfor this mode

    ,006 miles iment in FY 2len 4.0 percen its maintency. Rail mi2 to 16,724 mer signal inte

    ehicle

    uality, enger ds in t new

    te fell RO’s been

    ystem

    . Bus n-time . The to a

    ng to e.

    in FY 2014, ent to nance leage miles

    erface

  • SSECTION

    FY 2012Task 3: T

    Section 3

    3.1

    METRO carries ov(BOFs) Fallbrooktransit ceand the d

    The mostNew BusAfter thrMETRO route in i

    In its selwas that with a dresidencedesignedeverywhemonth coto determwere a nreliably.

    The netwevery 15 of the citfrequent are moniservice ipatrons, the New

    3.2 C

    The consand trainincluded comfortaansweredaround Hpercentag

    3. BUS O

    – FY 2015 Transit Oper

    3. Bus Oper

    Bus Servi

    operates buver 86 millithat are owk) and 29 Paenters. METdisabled.

    t significant s Network. Tree years of launched it

    its system ov

    lf-assessmenpeople wer

    downtown emes and jobs w

    d to take pere. To begionversation wmine what senew system

    work is headminutes or

    ty so that monetwork is s

    itored for fus operated hso there areBus Networ

    Consultant A

    sultants spenns in downtow

    eight routeable, timely d questions Houston. Buge was not c

    OPERATIO

    Performancerations 

    rations

    ice

    us service wion passengewned and oark and RideRO offers a

    change in bThe New Buf planning, cs New Bus Nvernight as d

    nt, METRO re moving awmployment were movin

    people downin assessing with the leadervice was ndesigned to

    dlined by 22better, seven

    ost common supported byuture upgradhourly to lowe more optiork, METRO

    Assessment

    nt five weekswn areas, to

    es taken at vand effici

    from patronus stops had clean.

    ONS

    e Audit

    within the Citers a year. Soperated bye facilities. T

    50 percent

    bus service dus Network wcountless meNetwork in Adiscussed bel

    determined way from thcenter surro

    ng away fromntown, but the direction

    ders of all afneeded. The o take peopl

    2 routes (up n days a weetrips can be

    y a few dozedes to frequew-ridership

    ons for gettinincreased se

    s riding the s park and ridvarious timeent. Announs and were

    signage (so

    12

    ty of HoustoService is opy METRO There are 75

    discount on

    during the auwas a signifieetings, pubAugust 2015low.

    that a majohe city. In thounded by dm the centra

    today peopn of change ffected comm

    results of the from their

    from 11 on ek. This servmade witho

    en routes thaent service wareas. The s

    ng to work, ervice in FY

    system in mode lots, and es (see Cha

    uncements we knowledgeome were no

    on and fourtperated from(Polk, Westlocal and 32bus and rail

    udit period wcant realignm

    blic hearings5. The New

    or reason forhe 1970s, thdense resideal business dple are travfor the bus

    munities, elehese conversr origin to t

    weekdays avice forms aout connectioat operate evwhen ridershservice nowschool, and2016.

    ost areas of outside of th

    art below). Bwere in Eneable about ot updated w

    teen other mm five bus op

    t, Kashmere2 commuter rl service to

    was the implement of the s and help fBus Networ

    r a decline ihe city was ential neighbdistrict. The veling fromservice, ME

    ected officialsations and their destina

    and one on a grid acrossons and shorvery 30 minuhip increases

    w matches thd recreationa

    service. Thehe city. The Buses appeaglish and Sroutes and

    with new sig

    municipalitieperating facie, Hiram Croutes servinseniors, stud

    ementation olocal bus syfrom consultrk changed e

    n bus boardmore centra

    borhoods. Toold network

    m everywherETRO held als, and businultimate cha

    ation quickly

    Sunday) thas the busiest rt wait timesutes or bettes. The rema

    he destinatioal activities.

    e team rode bsampling of

    ared to be cSpanish. Drlocations ingns) and a s

    s and ilities

    Clark, ng 20 dents,

    of the stem. tants, every

    ding’s alized oday, k was re to a six-

    nesses anges y and

    at run parts

    s. The er and aining ns of With

    buses f trips clean, rivers n and small

  • S

    SECTION

    FY 2012Task 3: T

    Bus servthe wait disembarpassengemorning particularminutes, traffic co10) was 1

    During tstakeholdnew systservice oRoute 14Route 98every 60 three blolow, but

    Bus operper revenOn-time The Newnot reflec

    3. BUS O

    – FY 2015 Transit Oper

    ice connectetime for a

    rking one roers at the tra

    routes travr afternoon approximat

    ongestion du10 minutes l

    the five-weeders. Many tem was conon weekends4 bus, where8, which ranminutes. As

    ocks. When athat the new

    rating cost penue hour greperformance

    w Bus Netwocted in the cu

    OPERATIO

    Performancerations 

    ed well withpassenger

    oute to boardansfer centeveling on s

    trip to the tely 30 minue to highwalate due to do

    ek period, mwere delighnvenient ands. Though the a patron con every 15 ms a result, theasked if the

    w service mee

    er passengerew 3.4 perce decreased ork was launurrent perfor

    R

    ONS

    e Audit

    h other routesbetween trading the other. Bus servchedule. Onairport from

    nutes more tay constructowntown tra

    Chart 1 –

    members ofhted with thd comfortab

    he overall feeomplained aminutes, proe patron nowridership onets their nee

    r increased bcent and ope

    2.7 percent.nched near thrmance mea

    Route No.

    10 Wil14 Hira49 Chi50 Bro

    10 Wil14 Hira30 Clin49 Chi102 Bus

    14 Hira32 Ren96 Vet

    Afte

    Mo

    N

    13

    s at transit cansfers was her; many ofvice in total n two occam downtownthan the expion. The oth

    affic congest

    Sample Bus

    f the consuhe New Bus ble. They exedback was

    about missingovided transpw takes the Rn the bus wads.

    by 9.3 percenerating cost . These meahe end of thsures.

    Destinati

    lowbendam Clarkemney Rock/Soadway

    lowbend ‐ LAam Clarkenton/Ellamney Rock/Ssh IAH Express

    am Clarkenwick/San Felterans Memor

    ernoon Trips

    orning Trips

    Night Trips

    centers and aminimal, a

    f the connecwas genera

    asions afternn Houston pected one her afternoontion during r

    s Trips

    ultant team Network. T

    xpressed satipositive, theg the old Roportation to Route 14 to was satisfactor

    nt during theper revenuesures reflect

    he audit perio

    on

    . Post Oak

    ATE

    . Post Oaks ‐ LATE

    iperial

    at train statioaveraging fivcting buses ally on-timenoon buses (Route 102)hour. Theren trip to Wirush hour.

    met with aThey commuisfaction wiere was one oute 98. The

    work, but nwork, but mry, the patro

    e audit perioe mile increat that serviceod; therefore

    ons, meaningve minutes were waitin

    e, with all owere late.

    ) spanned ne was signifillowbend (R

    approximatelunicated thaith the additencounter o

    e reason wasnow it only

    must walk an on stated tha

    d. Operatingased 7.7 pere is less effice, its benefit

    g that from

    ng for of the

    One ninety ficant Route

    ly 50 at the tional on the s that runs extra

    at it is

    g cost rcent. cient. ts are

  • S

    SECTION 4

    FY 2012Task 3: T

    Section 4

    4.1

    METROThe Red the Nortinclude dLine proheadwayWeekendheadway

    METRO Line has through tThe portUniversitMagnolia

    METRO has 10 struns throSouthernwith the Red Line

    4.2

    The consfrom endcrowded capacity into and car delay

    The statAnnounchaving dinclude fwhen theplatform

    4. RAIL O

    – FY 2015 Transit Oper

    4. Rail Oper

    Rail Serv

    ’s 13-mile RLine was e

    thline Transdowntown, thvides six-m

    ys between 7d service is pys from 8:42

    opened the nine station

    the historic Etion of trackty of Houstoa Park Trans

    also openedtations and tough one ofn University Green Line,

    e at Central S

    Consultan

    sultants roded to end. Se

    conditions approximatout of the ho

    yed the train

    tions were cements on difficulty buyfeatures for tey are apprdesign enha

    OPERATIO

    Performancerations 

    rations

    vice

    Red Line opxpanded in it Center/Hohe Museum inute headw

    7:47 pm and provided witpm to 12:00

    3.3-mile Grns and traveEast End to k closest to on’s central sit Center wh

    d the 6.6-miltravels downf Houston’s

    and the Un, which enabStation Main

    nt Assessme

    e the rail syervice is freon the trainely 200 patrospital parkifor approxim

    clean, welthe train w

    ying a metrothe visually oaching the

    ances METR

    ONS

    e Audit

    pened in 200December 2ouston ComDistrict, the

    ways between9:00 pm, an

    th 12-minute0 am.

    reen Line exels along Haa variety of downtown campus and

    hen the Harr

    le Purple Linntown southoldest Africiversity of Hbles riders ton.

    ent

    ystem almostquent; there

    n itself at throns. In adding garages. mately three

    ll-lit, and ere clear an

    o card; but wimpaired. S

    e exit and toRO’s accessib

    14

    04 and now 2013, offerinmmunity Coe Texas Medn 3:35 am tnd 18-minute headways f

    xtension duriarrisburg Strdowntown eis shared wd the Palm risburg Bridg

    ne during thheast along Ccan AmericaHouston. Tho transfer do

    t every day efore, there e Medical C

    dition, there One car stal minutes.

    contained snd in Engliswere aided bSuch patronso identify thbility and cu

    carries overng fast and cllege to Fan

    dical Center ato 7:47 pm de headways from 4:29 am

    ing the auditreet from Maentertainmen

    with the PurpCenter. The

    ge is comple

    he audit perioCapitol and an communi

    he last sectioowntown. Ri

    for five weis no need

    Center area; were many

    lled on the tr

    signs in bosh and Spanby METRO s can use theheir destinaustomer serv

    r 45,000 paconvenient rnnin South. and NRG Stduring the wfrom 9:00 p

    m to 8:42 pm

    t period in 2agnolia Parknt and businple Line an

    e Green Lineted.

    od in 2015. TRusk to the ities and con

    on of the traciders can als

    eks. Each lifor a scheduone car wacars crossin

    racks in fron

    oth Englishnish. There employees. em on the ra

    ation. Both tvice.

    ssengers a yrail service f

    Featured stadium. The week, 12-mipm to 11:24 m and 18-mi

    2015. The Gk Transit Ceess destinati

    nd travels toe will go to

    The Purple LPalm Cente

    nnects to Teckway is sh

    so transfer to

    ine was travule. There w

    as almost fung the rail lnt of a train.

    h and Spanwere customOther amenail cars to kthe rail car

    year. from stops Red nute pm. nute

    Green enter ions. o the o the

    Line er. It exas

    hared o the

    veled were

    ull to lines The

    nish. mers nities know

    and

  • S

    SECTION 4

    FY 2012Task 3: T

    The consthat theyand on-tiand arouin downtto stationpayment Wheeler METRO situation.they use

    During timplemenAs operameasurinif the degrew at measuremresult, mto FY 20increasedrecovery service qindicatorpercent a

    The asseimprovemsystems sthe servictime perfthese effo

    4. RAIL O

    – FY 2015 Transit Oper

    sultant teamy were generime. The onlnd the syste

    town Houstons and often

    from sociaStreet Stathas deploy

    . Neverthelethe system.

    the audit pentation and/

    ating cost is ung the effectinominator d192.6 percements such

    many of the p015. The cod by 44.2 p

    ratio decreaquality also rs saw the band rail mile

    essment of ment. Overastrive to attace area, throformance. Sorts.

    OPERATIO

    Performancerations 

    m spoke withrally satisfiely negative f

    em. METROon presents an on trains al service ation is inunyed its poliess, patrons s

    eriod, METR/or expansionused as the biveness in sedoes not keent. This levas: passenge

    performance ost per passpercent, the ased by 58.5declined, b

    barometer ms between m

    METRO’sall, METROain. METROough initiativSection 6 of

    ONS

    e Audit

    h many rail ped with the rfeedback rec

    O is aware tha challenge. T

    as they areagencies. Thndated with ce departmestill express

    RO continun of any tranbasis (numerervice, thereep pace. In tvel of growther trips, reveindicators s

    senger increacost per re

    5 percent. Fbut not at th

    moving downmechanical ro

    service efO’s rail serviO is workingves to increathis report

    15

    patrons. Therail system aceived was ihat the homeThe homelese generally the consultan

    the homeleent and othconcern abo

    ued its expansit service, rator) for cale will be a dithe case oveh does not enue hours, howed decliased by 116evenue mile

    Following thhe same ratnward: rail oad calls dec

    fficiency anice meets th

    g to implemease visibilitypresents rec

    e consensus and it is comn regards to

    eless populatss can be foutransit depent team obsess populatiher METROout being ap

    ansion plansthere will b

    lculating perirect correlaer the audit correlate wirevenue mi

    ines in servi6.6 percent, e increased

    he trend of dte. Only twon-time per

    clined by 32.

    nd quality he needs of ent strategiesy, address sacommendati

    received frmfortable, cl the numbertion on trainund on the stndent and c

    served that ion. To add

    O personnel pproached by

    for rail sebe increased rformance in

    ation with serperiod, rail

    ith the growiles, and farice efficiency

    the cost peby 50.4 pe

    declining serwo of the forformance d.4 percent.

    presents opf its patrons s that can ta

    afety issues aons to MET

    rom patrons lean, convenr of homeles

    ns and at stattreets leadincan receive the Red Li

    dress this isto manage

    y panhandler

    ervice. Withoperating co

    ndicators uservice efficie operating c

    wth in efficiee revenue. Ay from FY 2er revenue hercent, and rvice efficieour performadeclined by

    pportunities – a goal m

    ake advantagand increaseTRO to assis

    was nient ss on tions g up fare

    ine’s ssue,

    the rs as

    h the osts. ed in ency, costs ency As a 2012 hour fare

    ency, ance 12.8

    for many ge of e on-st in

  • S

    SECTION

    FY 2012Task 3: T

    Section 5

    5.1

    METROLdoor to dvan, mini

    5.2

    Due to ththereforethe METday servi

    Though indicatorMETRO operatingover the and operthese mehas alreaThe expeoperationdemand t

    5. PARAT

    – FY 2015 Transit Oper

    5. Paratrans

    Paratran

    Lift is the cdoor service ivan, taxi ca

    Van service156 vans wmaintenanc

    Minivan serCab), whicprovided bytraining, ma

    Taxicab bacare wheelchpassenger tcannot acco

    METROLifsame-day seby METROYellow CabCab $8.00 fare.

    Consultan

    he uniquenese make no asTROLift service. Most oth

    the assessmrs and interv

    projectionsg costs increaudit period

    rating cost pasures indic

    ady begun adected effect nal cost indito ensure tha

    TRANSIT

    Performancerations 

    sit Operatio

    sit Service

    complementafor people w

    ab backup an

    e is providedwhich are proce for the pro

    rvice is provch operates y Yellow Caintenance, r

    ckup servicehair accessitraining. Taommodate.

    ft Taxi serviervice, same

    OLift van, mb for servicefor a total tr

    nt Assessme

    ss of this serssessment onvice, it is coher transit sy

    ment of paraviews of ME. Service is g

    eased 43.9 ped of 26.5 peper revenue ate that the eddressing the

    on this paricators. MEat costs keep

    OPERATI

    e Audit

    ons

    ary paratranwith disabili

    nd taxi cab se

    d by a third-ovided by Mogram.

    vided by the272 dedicat

    Cab. In addiradios and T

    e is also provible. The Yaxicab backu

    ice is taxi ce-day trip chminivan, or te. The patronrip cost of $

    ent

    rvice, the con a firsthandonsidered verystems do no

    transit serviETROLift stgrowing fastercent contrercent. Opermile increa

    efficiency anese trends byrticular initia

    ETRO is expp pace with b

    IONS

    16

    nsit service. ities. There ervice.

    -party contraMETRO. Fir

    e Greater Hoted wheelchtion to the

    Trapeze (disp

    vided by YelYellow Cab

    up service

    ab service fhanges, and/otaxicab backn pays Yello$9.00. The p

    nsultant teamd basis. Howry capable bot offer same

    ice is limitetaff, the trenter than expeibuting to thating cost psed by 28.4nd effectiveny increasingative is to inpected to cobudget goals

    METROLiftare four mo

    actor, First Trst Transit p

    ouston Transhair accessibvehicles, Y

    patching soft

    llow Cab. Aldrivers in tis provided

    for METROor last minutkup service. ow Cab $1.0patron then p

    m was unablwever, when because of the day.

    ed to interprnds observeected as demhe operating er revenue h percent. As

    ness of the seg fares in FYncrease para

    ontinue to ms.

    ft provides codes of MET

    Transit. Firstprovides driv

    sportation Cble minivan

    Yellow Cab ptware) mobil

    ll the cabs uthe program

    d for trips t

    Lift patronste changes thTo book a

    00 and METpays any co

    le to use thecompared whe convenie

    retation of td appear to

    mand increascost per pas

    hour increass with bus aervice is dec

    Y 2016 fromatransit reve

    monitor para

    curb-to-curb TROLift serv

    t Transit opevers, training

    Company (Yens. The vanprovides drile data termi

    sed in the sem all have Athat METRO

    s who wouldhat cannot betrip, patrons

    TRO pays Yest over the $

    service andwith systems

    nce of the s

    the performabe in line w

    ses. METROssenger incrsed 19.1 perand rail servclining. MET

    m $1.15 to $1enue and redatransit cost

    and vice:

    erates g and

    ellow s are ivers, inals.

    ervice ADA OLift

    d like e met s call ellow $9.00

    d can like

    same

    ance with

    OLift rease rcent vice, TRO 1.25. duce and

  • S

    SECTION

    FY 2012Task 3: T

    Section 6

    Findings performaThis secopportunagainst Mthrougho

    Recommperformarequiremassessmeperforma

    Audit reamong thanother a

    6. RECO

    – FY 2015 Transit Oper

    6. Recomme

    documenteance as wellction inclu

    nities. RatherMETRO’s p

    out this repor

    mendations oance trends

    ments are prent. Additioance indicato

    commendatihe recommearea, they are

    Performanc

    Recommoperatio

    Recomm

    Recomm

    Recomm

    Ridership

    Recommnew tran

    Recommaligning

    Recommupcomin

    Transit Ima

    Recomm

    Recommthe impfacilitie

    OMMENDA

    Performancerations

    endations

    d in previoul as opportu

    udes detailer than viewipositive perrt.

    offered for s. Recommrovided in aonal recommor trends.

    ions are theendations sue broadly cat

    ce measures

    mendation 1ons with an e

    mendation 2

    mendation 3

    mendation 4

    mendation 5nsit markets

    mendation 6g to populati

    mendation ng Super Bo

    age

    mendation 8

    mendation 9pact of vagras

    ATIONS

    e Audit

    us sections unities for imed recomming the recorformance r

    METRO’s mendations a separate rmendations

    e results of uch that a retegorized as

    : Augment tevaluation o

    : Improve fa

    : Improve ra

    : Increase th

    5: Evaluate r

    6: Enhance on targets

    7: Take adowl

    : Formalize

    9: Work withancy, loiterin

    17

    of the opermproved eff

    mendations tommendationresults durin

    consideratconcerning

    report summare also i

    findings in ecommendati follows:

    the results of METRO’s

    are recovery

    ail on-time p

    he number of

    ridership tre

    ridership w

    dvantage of

    a plan to sho

    h the city anng, and panh

    ations reviefectiveness, to capitalizns as negating the aud

    ion addressg complianmarizing theincluded in

    four key arion in one a

    of the review goals and o

    rate

    performance

    f High Occu

    ends and ide

    with an up

    f the oppo

    ow the benef

    nd social serhandling on

    ew indicate efficiency a

    ze on thesive, they shodit review p

    s opportunince with se results of the report

    reas. While area may als

    w of METROobjectives

    upancy Vehic

    entify oppor

    pdated mark

    ortunities pr

    fits of public

    rvice organizn and around

    areas of posand productse improveould be balaperiod, as n

    ties to impstate legisl

    f the complt on MET

    there is ovso be releva

    O’s transport

    cle (HOV) la

    rtunities to t

    keting camp

    resented by

    c transit

    zations to red METRO tr

    sitive tivity. ement anced noted

    prove lative iance RO’s

    verlap ant to

    tation

    anes

    target

    paign,

    y the

    educe ransit

  • SSECTION

    FY 2012Task 3: T

    For eachexpected

    6.1

    Issue antransportefficiencymade in o

    To fully agency wevaluatioevaluatiocontrol su

    Recommgoals andproductiv

    Expectedimproved

    6.2

    Issue anaudit pertrip cost p

    Recommridership

    Expected

    6.3

    Issue an97.3 perc

    6. RECO

    – FY 2015 Transit Oper

    Safety-relat

    Recommcorridor

    h of the abod results are p

    RecommeTransporObjective

    nd Opportutation functioy, effectivenother operati

    analyze perwould augmeon of a servon of pull ouuch as road

    mended Actid objectives vity and serv

    d Result. Ad performanc

    Recomme

    nd Opporturiod from FYpaid by the p

    mended Acti to fill empty

    d Results. M

    Recomme

    nd Opportucent in FY 20

    OMMENDA

    Performancerations 

    ted

    mendation 1r.

    ve recommeprovided in t

    endation 1rtation Opes

    unity. METons can onlyness, productional areas,

    rformance reent a performvice availabuts, vehicle conditions, e

    ion. METROto determin

    vice quality.

    A comprehence measures

    endation 2:

    nity. METRY 2012 to FYpassenger.

    ion. Reviewy seats on bu

    METRO’s far

    endation 3:

    nity. METR012 to 84.8 p

    ATIONS

    e Audit

    10: Make the

    endations, ththe remainde

    1: Augmenerations w

    TRO’s many partially extivity and seas well as in

    esults and tomance audit bility measu

    and operatoetc.

    O should unne if there ar

    nsive evaluas.

    Improve Fa

    RO’s fare reY 2015. Fare

    w the cost struses and trai

    re recovery

    Improve R

    RO’s rail onpercent in FY

    18

    e area aroun

    he context, er of this sec

    nt the Reswith an Ev

    nagement rexplain the auervice qualityn transportati

    o provide ansuch as this,

    urement likeor availabili

    ndertake a rere opportunit

    ation of goa

    are Recover

    ecovery ratioe recovery is

    ructure and ins on existin

    ratio will mo

    Rail On-time

    n-time perforY 2015.

    nd the down

    specific impction.

    sults of thvaluation o

    ecognizes thudit period pey indicators ion.

    n accurate pi, with practice on-time peity, and othe

    eview of the ties to impro

    als and objec

    ry Ratio

    o is 13.7; it s a standard m

    discounts fong service.

    ore closely a

    e Performan

    rmance decr

    ntown rail li

    plementation

    he Review of METRO

    hat an auderformance treflect the re

    icture of opecal evaluatioerformance er factors be

    rail and buove efficienc

    ctives could

    fell 14.4 pemeasure of t

    or METRO

    align with in

    nce

    reased by 12

    ine a transit

    n steps, and

    of METRO’s Goals

    it of METtrends. Operesult of deci

    erations, a trons. For exam

    may includeyond MET

    s service intcy, effective

    d lead to bro

    ercent durinthe portion o

    service. Inc

    ndustry stand

    2.8 percent

    t-only

    RO’s and

    RO’s rating isions

    ransit mple, de an RO’s

    ternal eness,

    oader

    ng the of the

    crease

    dards.

    from

  • S

    SECTION

    FY 2012Task 3: T

    Recomminterface

    Expected

    6.4

    Issue anHOV lanencourag

    RecommHouston.

    Expectedincreasedcongestio

    6.5

    Issue andrelocationthe city rthe fastedowntowCompanyservice adowntowcapacity. to have potential

    Recommbasis. ThMETROcongestioshould aimplemen

    Expecteddowntow

    6. RECO

    – FY 2015 Transit Oper

    mended Actsystem.

    d Result. Im

    Recomme

    nd Opportunes provide ge ridesharin

    mended Act.

    d Result. Ind ridership fon.

    RecommeTarget Ne

    d Opportunn of work ceremains onest growing

    wn and the y will be marea. To add

    wn with its NAttracting n

    a clear undtransit users

    mended Actihis includes ’s control ason, conveniealso evaluatnt transit ext

    d Result. Mwn.

    OMMENDA

    Performancerations 

    ion. Improv

    mproved serv

    endation 4:

    unity. METRefficiency

    ng and transit

    tion. METR

    ncreased on-from stakeho

    endation 5:ew Transit

    nity. METROenters and ride of the natio

    regions in tpopulation

    moving its ofdress this s

    New Bus Nenew ridershiperstanding o

    s.

    ion. METROconsidering

    s well as thoence, land ute opportunitensions and

    METRO will

    ATIONS

    e Audit

    ve the reliab

    vice reliabilit

    Increase th

    RO has chalby moving

    t use.

    RO should in

    time performolders who

    Evaluate RMarkets

    O’s ridershipdership popuon's fastest gthe country.center of th

    ffices west ohift, METR

    etwork. Consp is one of Mof the cause

    O staff shoula full range

    se that METuse patternsities to targd service imp

    increase the

    19

    bility of trai

    ty and increa

    he Number o

    llenges with more peop

    ncrease the

    mance for busee buses m

    Ridership T

    p downtown ulation withingrowing citi. Work centhe region hof downtow

    RO has beensequently, raMETRO’s pres of ridersh

    ld analyze ane of possible

    TRO can con, etc., and t

    get new traprovements.

    e potential ri

    in service b

    ased on-time

    of HOV lan

    h traffic conple in fewer

    number of

    us service, gmoving whil

    Trends and

    fell during thn the METRies, and the ters are nowhas shifted

    wn, but still n improvingail cars and brimary goals

    hip loss and

    nd explain rie factors (inntrol), such athe insights

    ansit market

    idership pop

    y fixing the

    e performanc

    nes

    ngestion on r vehicles.

    f HOV lane

    greater servie they are d

    d Identify O

    he audit periRO service ar

    Harris Counw located noto the southremains wit

    g service webuses downtos. It is impor

    d amenities n

    idership pattncluding thosas the weathe

    they can pts, especiall

    pulation and

    e rail axle s

    ce.

    major highwHOV lanes

    es in and ar

    ice reliabilitydelayed in tr

    Opportuniti

    iod because orea. Neverthnty region oorth and wehwest. Shelthin the MEest and souown operatertant for MEneeded to a

    terns on a rese that are oer, service le

    provide. MEy with plan

    overall ride

    signal

    ways. also

    round

    y and raffic

    ies to

    of the eless, ne of

    est of ll Oil

    ETRO uth of e with ETRO attract

    egular out of evels,

    ETRO ns to

    ership

  • S

    SECTION

    FY 2012Task 3: T

    6.6

    Issue anuniversitygraduatio

    Recomm75 millionew gradmost trad

    METRO recent doby ridersMETRO

    Expecteddowntowto increas

    6.7

    Issues anBowl wila festivalSuper Bothe entirethe event

    Recommtransit syopportun

    Expectedexperiencand reput

    6.8

    Issue anMETRO living, an

    Recommuse. Ther

    6. RECO

    – FY 2015 Transit Oper

    RecommeAligning

    nd Opportuy students, aon.

    mended Action people wduates from ditional mark

    should anaownward trehip, such as in designing

    d Result. Mwn. Downtowsed ridership

    RecommeUpcomin

    nd Opportull be hosted l associated owl LIVE ise city to expet.

    mended Actiystem. With nity to reach

    d Result. Ince riding MEtation will b

    Recomme

    nd Opportuis one of th

    nd helps save

    mended Actire is unique

    OMMENDA

    Performancerations 

    endation 6: to Populatio

    unity. The at well over

    ion. METROworldwide, is

    the universketing effort

    alyze ridershends in bus r

    service cong programs t

    METRO wiwn Houston p.

    endation 7:g Super Bow

    unity. On Fein Houston. with the Su

    s a free evenerience the S

    ion. METRover one mpotential rid

    ncreased rideETRO firsthe shared all

    endation 8:

    unity. In 20he best transie the environ

    ion. METROopportunity

    ATIONS

    e Audit

    Enhance Ron Targets

    Greater Ho70,000 peo

    O should targs the largest ities. They

    ts.

    hip trends toridership andsumption anto attract rid

    ill experiencwill become

    : Take Advwl

    ebruary 5, 2The game w

    uper Bowl thnt with food,Super Bowl.

    O should usmillion peoplders from all

    ership on MEhand, while eover the wo

    Formalize a

    015 and perit systems innment as we

    O should creto inspire th

    20

    Ridership w

    ouston area ple, are prim

    get marketingeneration

    are sophistic

    o provide dad the other p

    nd fare recovdership and m

    ce increasese the desirab

    vantage of

    017, the 51swill be playehat will run f music, ente More than o

    se the platfole attending over the wo

    ETRO. Potenenjoying therld.

    a Plan to Sh

    r the Amerin the United ell as money

    eate a campahe next gener

    with an Upda

    is home tome candidate

    ng to Millennsince the Bcated, techn

    ata and insigperformance

    very ratios. Tmeet targets r

    s in the nuble place to

    the Oppor

    st National Fed at NRG Sfrom Januaryertainment, aone million p

    orm of the the Super B

    orld.

    ntial riders ie Super Bow

    how the Ben

    ican Public States. Publ.

    aign that focuration of tran

    ated Marke

    o multiple ues for downt

    nials, which Baby Boomernology savvy

    ghts into thee measures tTrend data anrelated to rid

    umber of Mlive, work a

    rtunities Pr

    Football LeagStadium. Supy 28, until Fattractions anpeople are e

    Super BowlBowl, METR

    in and arounwl activities.

    nefits of Pub

    Transportatlic transit en

    uses on the bnsit users.

    eting Camp

    universities.town living

    at approximrs. These ary and immu

    e reasons fothat are impnalysis will adership.

    Millennials land play equ

    resented by

    gue (NFL) Sper Bowl LIVFebruary 5, 2nd more to a

    expected to a

    l to showcasRO has a un

    nd Houston gMETRO’s n

    blic Transit

    tion Associancourages he

    benefits of tr

    aign,

    The post-

    mately re the une to

    or the acted assist

    living uating

    y the

    Super VE is 2017. allow attend

    se its nique

    get to name

    ation, ealthy

    ransit

  • S

    SECTION

    FY 2012Task 3: T

    Expectedopportunefficient transit.

    6.9

    Issue anrail is likMETRO more holaddress t

    Recommimpact th

    Expected

    6.10

    Issue anservice. IMaking access to

    Recommeliminate

    Expectedthere are

    6. RECO

    – FY 2015 Transit Oper

    d Result. Unity to promo

    and investe

    RecommeReduce tMETRO

    nd Opportunkely impacte

    has launchlistic and cothe underlyin

    mended Actihis issue has

    d Result. M

    Recommeonly Corr

    d OpportunIt is an efficithe rail line

    o the rail line

    mended Acte access by o

    d Results. Iobstructions

    OMMENDA

    Performancerations 

    Using publiote longevit

    ed in the env

    endation 9:the Impact Transit Fac

    nity. In obseed by vagranhed initiativeost effectiveng issues.

    ion. Work won rail rider

    ETRO’s ride

    endation 10ridor

    nity. The doient and relie downtowne.

    tion. Make other motoriz

    Improve rails on or close

    ATIONS

    e Audit

    ic transit iny. People wvironment. M

    : Work witof Vagran

    cilities

    ervations anncy, loiteringes to addrese approach c

    with the cityrship.

    ership impro

    0: Make the

    owntown raiable service

    n a transit o

    the Red Lized vehicles

    l safety by ee to the rail r

    21

    n Houston who use publMETRO wil

    th the City ncy, Loiterin

    nd interviewsg, and panhas this issue could be to

    y and social

    oves and the

    Area aroun

    l line (Red Loperating w

    only corridor

    ne downtows.

    eliminating right of way.

    will be prolic transit will change th

    and Sociang, and Pa

    s with ridersandling on an

    with its poengage soc

    service agen

    cost of poli

    nd the Dow

    Line) is the with six-minur will increa

    wn corridor

    potential ac.

    omoted as ill be seen a

    he perception

    l Service Oanhandling

    s, METRO’snd around th

    olice departmcial service

    ncies to add

    cing the syst

    wntown Rail

    focal point oute headwayase safety a

    a transit on

    ccidents that

    the only vas smart, hean of using p

    Organizationon and aro

    s ridership ohe transit syment; howevagencies to

    dress the neg

    tem reduces

    l Line a Tra

    of METRO’ys during theand aid cust

    nly corridor

    can occur w

    viable althy,

    public

    ns to ound

    on the stem.

    ver, a help

    gative

    .

    ansit-

    ’s rail e day. tomer

    r and

    when

  • SSECTION

    FY 2012Task 3: T

    Section 7

    METRO to stakehservice tenhance opportundirectly outreach of studenMETRO and panhagencies,to addres

    7. SUMM

    – FY 2015 Transit Oper

    7. Summary

    has an exceholders in ano meet the the system

    nity in Houscorrelate to and build re

    nts attendingneeds to be

    handling on , churches anss this challe

    MARY

    Performancerations 

    y

    ellent transit nd around Hneeds of the

    m. As one oton’s downtincreased r

    elationships g become tra

    a part of theand around

    nd the city tenge could st

    e Audit

    system. It prHouston and

    e communitof the fastetown area foridership. Twith Housto

    ansit patronse discussion d the transit to address thtem the loss

    22

    rovides safethe 14 mun

    ty. The recoest growing or METRO o do so, M

    on’s many un. In 2017, Hand ultimatesystem. ME

    his issue. Theof ridership

    , efficient, renicipalities inommendation

    cities in tto capitalize

    METRO needniversities to

    Houston will e solution reETRO shoule ultimate ou.

    eliable cost en the servicens provided the United e on that grods to expano ensure thatbe hosting t

    egarding vagld work witutcome of an

    effective sere area. It adj

    are intendeStates, therowth which

    nd its market the generatthe Super B

    grancy, loiterth social serny collabora

    rvice justs

    ed to re is

    can eting tions owl. ring, rvice ation

  • A

    APPENDIX

    FY 2012Task 3: T

    PerformanKPIOperating Operating Operating Sales and upassengerFare recoveAverage veOn‐time peOn‐time peNumber ofmiles Number of100,000 miNumber ofmechanica

    Additional Operating Passenger Unlinked PRevenue VRevenue VTotal VehicPassenger Accidents*Mechanica

    For CalculaSales Tax R

    NTD PassenRail ‐ DONonRail‐CBNonRail ‐ CNonRail‐DRNonRail‐DTNonRail‐MNonRail‐MNonRail‐VP

    * N/A ‐ Notwas at the ** NTD rep

    Appendi

    Informatito calculbeen calclight rail,

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

      The  opertransportaHOV/HOT

    X A. OPE

    – FY 2015 Transit Oper

    nce Indicators pe

    cost per passencost per revenucost per revenuuse tax receipts

    ery rateehicle occupancerformance Buserformance Raif Bus accidents 

    f Rail accidents les f miles betweenl road calls 

    DataCostFare RevenuePassenger TripsVehicle HoursVehicle Milescle MilesMiles**l Roadcalls

    ations OnlyReceipts

    nger Miles

    B‐DOCB ‐ PTR‐PTT‐PT

    MB‐DOMB‐PTP‐PT

    t Available; in Ftime responsibportable acciden

    ix A: Opera

    ion in the talate the nineculated at th, paratransit)

    rating  expenation  includeT  Lane  and 

    RATING D

    Performancerations 

    er TransportatioCod

    nger 451ue mile 451ue hour  451s per  451

    451cy 451s  451l  451per 100,000 451

    per  451

    n  451

    LRCBCBDRDTMMVP

    FY2014 there is oble for collectingnts including rai

    ating Data b

    able below ine state-mand

    he mode leve), as well as

    nses/revenueses  rail,  bus, vanpool  rev

    DATA BY

    e Audit

    on Code Sec 451de Sec1.454 (c) (3) (A)1.454 (c) (3) (A)1.454 (c) (3) (A)1.454 (c) (3) (B)

    1.454 (c) (3) (C )1.454 (c) (3) (D)1.454 (c) (3) (E) 1.454 (c) (3) (E) 1.454 (c) (3) (F) 

    1.454 (c) (3) (F)

    1.454 (c) (3) (G)

    RDOBDOBPTRPTTPTBDOBPTPPT

    only OTP data ag this data.  Thisil and bus opera

    by Performa

    ncludes bothdated perforel for each oat the system

    s  used  to and  paratra

    venue  and  e

    PERFORM

    23

    1.454 (c ) (3) (A‐FY2012

    5.11                    7.30                    

    108.34               

    7.27                    16.0%9.43                    73.3%97.3%

    0.73                    

    3.65                    

    9,664                  

    FY2012414,014,072     66,371,822       80,941,271       3,821,567         56,684,878       64,319,413       534,369,113     

    175                     4,323                  

    588,278,273     

    534,369,113     24,960,750       98,265,706       33,177,914       17,543,948       1,305,541         

    235,148,457     54,461,474       69,505,323       

    available for twos function was sated by METRO

    ance Indicat

    h operating srmance indiof the three sm-wide level

    calculate  thansit  as  repexpenses  hav

    MANCE IN

    ‐G)FY2013

    1 5.0                    0 7.2                    4 109.8               

    7 7.5                    % 16.43 9.8                    % 73.0% 97.7

    3 0.6                    

    5 3.5                    

    4 9,93                  

    FY20132 423,778,25     2 69,308,17       1 84,461,05       7 3,858,49         8 58,608,51       3 66,929,70       3 574,228,41     5 18                     3 4,19                  

    3 635,541,98     

    3 574,228,41     0 26,539,38       6 111,621,45     4 36,610,45       8 17,653,45       1 1,589,42         7 254,630,33     4 56,169,99       3 69,413,91       

    o months due tosubsequently b

    tor statistics andicators. Eachservices thatl.

    he  performanorted  in  theve  not  been 

    NDICATOR

    FY201402 5.                    23 7.                    83 110.               

    52 7.                    4% 15.80 10.                  0% 71.7% N/A*

    69 0.7                  

    53 3.2                  

    32 10,4               

    FY201459 443,667,7     72 69,664,9       53 85,396,2       91 4,006,9         15 60,357,3       07 68,595,3       12 606,140,2     80 1                     98 3,8                  

    81 677,912,3     

    12 606,140,2     82 33,086,5       54 113,922,4     57 36,879,5       56 18,415,3       20 2,385,1         31 277,366,2     97 54,511,6       15 69,573,4       

    o problems witbrought in‐hous

    d performanch performant METRO op

    nce  indicatoe  National  Tincluded  in

    R

    FY201520 5                    35 8                    72 121               

    94 8                    .7% 1304 9                    .6% 71

    84

    750 0                    

    220 3                    

    493 9,                  

    FY2015743 487,907,     941 66,959,       225 86,142,       936 4,030,         393 59,983,       384 71,938,       282 573,489,     155                      890 4,                  

    303 718,386,     

    282 573,489,     541 40,873,       475 104,341,     518 37,675,       314 18,303,       192 2,779,         204 249,047,     638 48,976,       400 71,491,       

    h a contractor we.

    ce measures nce indicatoperates (i.e.,

    ors  by  modeTransit  Datab  this  worksh

    55.668.131.06

    8.343.7%9.561.3%4.8%

    0.75

    3.38

    568

    5171131484235144298760163116

    911

    760954266477305128779992859

    who 

    used r has , bus,

    e  of base. heet.

  • A

    APPENDIX

    FY 2012Task 3: T

    AppendiThe perfomodes th

    In additiindicatorper reven

    The operatrail, bus, aexpenses h

    Fare RecoMETRORa

    Fare ReOperat

    Recovery 

    BusFare ReOperat

    Recovery 

    METROLifFare ReOperat

    Recovery 

    NTD RepoCBDO ‐ CoCBPT ‐ CoDRPT ‐ DeDTPT ‐ DeLRDO ‐ LigMBDO ‐ MMBPT ‐ Mo

    NTD RepoCBDO ‐ CoCBPT ‐ CoDRPT ‐ DeDTPT ‐ DeLRDO ‐ LigMBDO ‐ MMBPT ‐ Mo

    X B. PER

    – FY 2015 Transit Oper

    ix B: Perforformance indhat METRO

    ion to the nrs are includnue hour and

    ting expenses/and paratransit have not been

    very Ratiosilevenueting CostRatio

    evenueting CostRatio

    tevenueting CostRatio

    orted Op Exp (Fommuter Bus Dmmuter Bus Pumand Responsemand Taxi Purcght Rail DirectlyMotor Bus Direcotor Bus Purcha

    orted Rev (F‐10)ommuter Bus Dmmuter Bus Pumand Responsemand Taxi Purcght Rail DirectlyMotor Bus Direcotor Bus Purcha

    FORMANC

    Performancerations 

    rmance Datdicators incluoperates (i.e

    nine state-med that are o

    d passengers

    /revenues usedt as reported inincluded in this

    ‐30)irectly Operateurchased Transpe Purchased Trachased Transpo Operatedtly Operatedased Transport

    )irectly Operateurchased Transpe Purchased Trachased Transpo Operatedtly Operatedased Transport

    CE DATA

    e Audit

    a by Mode uded in this e., bus, light

    mandated peoften reporteper revenue

    Fare R

    d to calculate tn the National s worksheet.

    dportationansportationrtation

    ation

    dportationansportationrtation

    ation

    BY MOD

    24

    appendix arrail, paratran

    erformance ed as a basise mile.

    Recovery Rat

    the performancTransit Databa

    FY2012

    3,978,767       17,365,999     

    0.2291            

    60,302,288     334,021,714  

    0.1805            

    1,524,759       40,594,214     

    0.0376            

    FY201236,913,400     7,209,288       37,663,281     2,930,933       17,365,999     245,851,608  44,047,418     

    FY201222,207,584     5,492,565       1,265,876       258,883          

    3,978,767       26,243,497     6,358,642       

    E

    re reported bnsit).

    indicators, s for evaluat

    tios

    ce indicators base. HOV/HOT

    FY2013

    7 4,483,44�