mgm jcm projects gec finalgec.jp/jcm/seminar/2019chile/3-1_mgm_jcm_projects.pdf · 2.4mw power...
TRANSCRIPT
![Page 1: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/1.jpg)
SeminarontheJointCreditingMechanism(JCM)ImplementationinChileAcceleratingPromotionofEnvironmentalInfrastructurethroughJCM
MGMInnovaGruop– JCMProjectsinLatinAmerica
IntercontinentalHotel,SantiagoChile,August29th,2019
![Page 2: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/2.jpg)
MGMInnovaEnergyServicesLLCisaprojectdevelopmentfirmfocusingontheidentification,design,technicalandfinancialstructuring,implementation,operationandmonitoringofenergyefficiencyandrenewableenergyprojects,aswellasthroughtheprovisionofenergyservices.
ThefirmservesastheenergyservicesarmoftheMGMInnovaGroup.
MGMInnovaConsultingspecializesinthedesign,development,promotionandimplementationofinnovativesolutionsthatenabletheirclientstoincorporatesustainableandclimatechangepracticesintheirproducts,projects,services,operationsandcorporatestrategies.
ThefirmservesastheclimatechangeconsultancyarmoftheMGMInnovaGroup.
MGMInnovaCapitalLLCisaprivateequityandgreeninfrastructureinvestmentfirmfocusingonsociallyresponsible,triplebottomline(financial,socialandenvironmental)investmentsinenergyefficiencyandrenewableenergyinLatinAmericaandtheCaribbean.
ThefirmservesasthefinancialarmofMGMInnovaGroup
![Page 3: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/3.jpg)
ENERGY EFFICIENCY
Municipal Efficiency
Commercial Efficiency
Industrial Efficiency
Distributed Generation/Hybrid
Hotels,hospitals,shoppingmalls,fastfoodchains,universities,yachtclubs.
*Targetlargebuildingsandapplymultiplemeasures
Airconditioning,highefficiencylighting,highefficiencysteamboilersandwaterheaters,solarwaterheating,controlandautomation.
Streetlighting.
*Streetlightingisoneofthelargestexpensesofmunicipalities.
*50%+savingswithLEDlights.
HighefficiencyLEDstreetlighting.
Foodandbeverage(biogastoenergy),agro-industry(biomasstoenergy),cement,glass,steel(wasteheattoenergy).
*Largersizeandgreatestsavingspotential,bothinelectricandthermalenergy.
Energycogenerationsystems,wasteheatrecoverytogenerateelectricity(OrganicRankineCycle),steamandhotair,biogasfromwastewatertreatmenttogenerateelectricity(biogas-poweredinternalcombustionengines),steamandhotwater(efficientboilers),highefficiencymotors.
Hotels,hospitals,supermarkets,shoppingcenters,TVstations.
*Seekopportunitiesincountrieswithaclearlydefinedregulatoryframeworkandattractiveretail/commercialelectricityprices.*Establishportfoliosofprojects.
Solarphotovoltaic(PV)generationforself-consumption.
Energy Efficiency: Investment Types, Strategy and Technologies
![Page 4: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/4.jpg)
RENEWABLE ENERGY
Utility Scale Solar
Biogas to Energy
Small Hydro Power
Landfillgasusedasfuelforsteamboilerstogenerateelectricitywithturbinesorthroughgasifierscombinedwithinternalcombustionengines.
Selectinnovativeopportunitieswithinterestingexitstrategies.
Generationofsolarphotovoltaic(PV)energyforsaletothegrid.
Enterprojectswithhighpotentialatearlystagestoaddvaluetolocaldevelopersandachievehigherreturns
Earlystageinvestmentsinhydrogeneration(smallscale)andrehabilitationofhydroelectricplants.
Selectopportunitiesinsituationswithnocompromisingsocialand/orenvironmentalconcerns.
Renewable Energy: Investment Types, Strategy and Technologies
![Page 5: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/5.jpg)
MGM Innova Group – JCM Experience
1
Pionner in JCM in Latin America
Implemented the first projects in Costa Rica, Mexico and Chile
5 JCM projects approved to date
3 projects fully implemented, 1 partially implemented and 1 to start implementation
List of projects:
5MWSolarPowerProjectinBelen,CostaRicaCoopeguanacaste (100%implemented)- 2016
HighEfficiencyChillerandtheExhaustHeatRecoverySysteminSanJose,CostaRicaWyndhamHotel(100%Implemented)- 2016
2.4MWPowerGenerationwithMethaneGasRecoverySysteminMexico,Energreen(partiallyimplemented)- 2016
1MWRooftopSolarPowerSysteminChile– UniversityFedericoSantaMaria(100%implemented)- 2016
2MWSolarPowerand4MWhStorageBatteryProjectinSanPedrodeAtacama,Chile(tobeimplemented)- 2018
![Page 6: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/6.jpg)
Costa Rica Projects
![Page 7: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/7.jpg)
SMAInverters - 2.2MW
Juanilama 5MW SPV in Belen
1
Installed PV capacity (kWp) 5,000
Inverter power (kW AC) 4,400(2x2.200)
HIT 325 Wp Modules 15,456
Annual Electricity (MWh) 9,680
Expected GHG Emission Reductions (tCO2e/yr) 2,504
JCM Subsidy 40%
Japanese Representative Partner NTTData
PanasonicHITPanels
![Page 8: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/8.jpg)
Plant Layout: Subsidized Items
1 3 2
8
10
4 5
Panel detail(1 array consists of 42 panels)
1
3
2
4
5
8
10
PV Module with structures
Inverter (incl. sub-station)
Combiner Boxes/Electric Materials (DC)
Electric Materials (MV)
Recloser
Pyranometer (Weather Station)
UPS
Equipment Q’ty
15,456
2
32
1 set
1
1
1
New transmission line to connect with existing point of Coope Guanacaste
Grid Connecting Point
8km
187,
600
mm(2
3 ro
ws)
269,272 mm(16 arrays per row)
1array=42panels42panelsX16X23rows=15,456panels
CB#1
CB#4CB#5
CB#6CB#7
CB#8
CB#9
CB#3CB#2
CB#10
CB#17
CB#20
CB#18
CB#14
CB#21
CB#22CB#23
CB#24
CB#25
CB#26CB#27
CB#28
CB#11
CB#12CB#13
CB#19
CB#29
CB#31CB#30
CB#16CB#15
CB#32
INV#1 INV#2
![Page 9: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/9.jpg)
Costa Rica 5MW SPV Belen – Aerial View
2
![Page 10: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/10.jpg)
Wyndham High Efficiency Chiller and the Exhaust Heat Recovery
1
Chiller EfficiencyOldCentrifugal
Efficient Magnectic
Hot Water System EfficiencyBunker OilBoiler
TemplifierHeatRecovery
Annual Electricity (MWh/yr) 1,116
Annual Bunker Oil savings (liters/yr) 185,682
Financial Savings Upto40%
Expected GHG Emission Reductions (tCO2e/yr) 402
JCM Subsidy 40%
Japanese Representative Partner NTTData
![Page 11: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/11.jpg)
High Efficiency Chiller and Heat Recovery
HighEfficiencyChiller
• Capacity– 400TR• ElectricitySavings– 769,184kWh/year• Financialsavings– 95,665US$/year• ExpectedEmissionReductions– 71.45tCO2/year
• Technology– DaikinMagneticChiller• Model–WMC400DC
BEFORE AFTER
![Page 12: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/12.jpg)
Exhaust Heat Recovery
BEFORE AFTER
ExhaustHeatRecovery
• Capacity– 1,088MBH• BunkerOilSavings– 185,682liters/year• Financialsavings– 55,286US$/year• ExpectedEmissionReductions– 330.67tCO2/year
• Technology– DaikinTemplifier• Model– TGZ060B
![Page 13: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/13.jpg)
Mexico Project
![Page 14: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/14.jpg)
Energreen LFG to Energy Mexico
1
Landfill gas recovery and power generation systems in 2 landfills in Mexico:
2 Landfills in Mexico StateAtizapan(operational)Mextepec(in progress)
Installed capacity (MW) 2,4
Nominal capacity (MW) 2,0
Fuji Eletric / 2G Gensets - 1,2 MW (units) 2
Annual Electricity (MWh/year) 28,400
Expected GHG Emission Reductions (tCO2e/yr) 185,000 estim.
JCM Subsidy 40%
Japanese Representative Partner NTTData
![Page 15: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/15.jpg)
Atizapan Landfill – 1,2 MW Installed Capacity
AtizapanLandfill
• Beginingofcommercialoperations– August2019• Regimen– SaleofElectricitytoCFEgrid
• Installedcapacity– 1,2MW• Nominalcapacity– 1,0MW• Annualgeneration– 12,000MWh/year• ExpectedEmissionReductions– 80,000tCO2/year(est.)
• Technology– 2GGensets (Germany)byFujiElectric• Model– AVUS1200
![Page 16: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/16.jpg)
Mextepec Landfill – 1,2 MW in progress
2
MextepecLandfill
• Beginingofcommercialoperations– January2020(planned)• Regimen– SaleofElectricitytoCFEgrid
• Installedcapacity– 1,2MW(Potentialexpansionto2,4MW)• Nominalcapacity– 1,0MW• Annualgeneration– 16,400MWh/year• ExpectedEmissionReductions– 105,000tCO2/year(est.)
• Technology– 2GGensets (Germany)byFujiElectric• Model– AVUS1200
![Page 17: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/17.jpg)
Chile Projects
![Page 18: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/18.jpg)
1MW Rooftop Solar Power system to University
1
PV power (kWp) 992
Inverter power (kW AC) 974
HIT 325 Modules 3.054
Annual Electricity (MWh) 1.628
Emission Factor (tCO2/MWh) 0,314
Expected GHG Emission Reductions (tCO2/yr) 511
Japanese Representative Partner Waseda
![Page 19: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/19.jpg)
2MW Solar Power and 4MWh Storage Battery Project
1
SPV and Storage Battery Project in Chile (Mining, Hotel and Utility)
Project under design and contract negotaiations phase
Project Location1SiteinTarapacáRegion2
SitesinAntofagasta
PV Power (kWp) 2,000
Battery capacity (kWh) 3,300
Sharp 370 Wp Modules (Japan) and Qinous Batteries (Germany)
Annual Electricity (MWh/year) 4,491
Expected GHG Emission Reductions (tCO2e/yr) 185,000 estim.
Japanese Representative Partner LiberalSolutions
![Page 20: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/20.jpg)
Marco G. Monroy María Pía IannarielloFounderandCEO|MGMInnova [email protected]
FounderandCOO|MGMInnova [email protected]
Gonzalo DiazCountryRepresentativeMGMInnovaCapitalChilegdiaz@sherpasgroup.cl
VPGlobalOperationsMGMInnova [email protected]
Alfredo Nicastro
www.mgminnovagroup.com
![Page 21: MGM JCM Projects GEC Finalgec.jp/jcm/seminar/2019chile/3-1_MGM_JCM_Projects.pdf · 2.4MW Power Generation with Methane Gas Recovery System in Mexico, Energreen (partially implemented)](https://reader033.vdocument.in/reader033/viewer/2022060213/5f0563d57e708231d412b8f4/html5/thumbnails/21.jpg)
Thank you