mice collaboration meeting 16 ral, oct 2006 absorber focus coil module – progress & status by
DESCRIPTION
MICE Collaboration Meeting 16 RAL, Oct 2006 Absorber Focus Coil Module – progress & status By Oxford University & all the collaborators on this module. Status on the AFC module Engineering design Absorber; Windows & window connections; Coil design; Cold mass support system; - PowerPoint PPT PresentationTRANSCRIPT
MICE Collaboration Meeting 16
RAL, Oct 2006
Absorber Focus Coil Module – progress & status
By
Oxford University & all the collaborators on this module
Status on the AFC module
Engineering design
Absorber;
Windows & window connections;
Coil design;
Cold mass support system;
Hydrogen delivery system;
Hydrogen cooling loop;
Helium delivery and cooling system;
Power supply;
H T S leads;
Cold intercepts;
Magnet Vacuum cryostat;
AFC main vessel;
Thermal shields;
Vacuum system;
Control & instrumentation
Engineering design
Testing Design Calc.
Design review
Eng. Drawing /
spec.
Yes (KEK) Yes (KEK) N/A No Yes
Yes Not yet Yes Yes Yes
Yes N/A N/A No Spec done
Yes N/A On coil former only
No Yes
Yes Not yet Yes Yes No
Yes N/A Yes No Proprietary drawing + spec
Yes N/A No No Proprietary drawing + spec
No No Thro’ Mike Green
No No
Not yet No No No No
Yes N/A No No No
Yes N/A Yes No Yes
Yes N/A Yes No Yes
Yes N/A Req’d ? N/A Yes
Not yet No No No No
Not yet Only on KEK’s scope
N/A No No
AFC module Engineering
Responsibility
Absorber;
Windows & window connections;
Coil design;
Cold mass support system;
Hydrogen delivery system;
Hydrogen cooling loop;
Helium delivery and cooling system;
Power supply;
H T S leads;
Cold intercepts;
Magnet Vacuum cryostat;
AFC main vessel;
Thermal shields;
Vacuum system;
Control & instrumentation
Engineering design
Testing Design Calc.
Design review
Eng. Drawing /
spec.
KEK KEK KEK Oxf/KEK KEK
Oxf ?? Oxf Oxf ??
RAL/Oxf N/A Green Oxf RAL/Oxf
Oxf N/A Oxf Oxf Oxf
RAL RAL RAL Done RAL
RAL/Oxf N/A Green Oxf Oxf
RAL/Oxf N/A Green Oxf Oxf
MICE RAL Green MICE MICE
MICE RAL MICE MICE MICE
RAL N/A RAL Oxf RAL/Oxf
Oxf N/A Oxf Oxf Oxf
Oxf N/A Oxf Oxf Oxf
Oxf N/A Oxf N/A Oxf
MICE MICE MICE MICE Oxf coord.
KEK/RAL KEK/RAL KEK/RAL RAL KEK/RAL
AFC module Engineering
Responsibility (outstanding)
Absorber;
Windows & window connections;
Coil design;
Cold mass support system;
Hydrogen delivery system;
Hydrogen cooling loop;
Helium delivery and cooling system;
Power supply;
H T S leads;
Cold intercepts;
Magnet Vacuum cryostat;
AFC main vessel;
Thermal shields;
Vacuum system;
Control & instrumentation
Engineering design
Testing Design Calc.
Design review
Eng. Drawing /
spec.
KEK KEK KEK Oxf/KEK KEK
Oxf ?? Oxf Oxf ??
RAL/Oxf N/A Green Oxf RAL/Oxf
Oxf N/A Oxf Oxf Oxf
RAL RAL RAL Done RAL
RAL/Oxf N/A Green Oxf Oxf
RAL/Oxf N/A Green Oxf Oxf
MICE RAL Green MICE MICE
MICE RAL MICE MICE MICE
RAL N/A RAL Oxf RAL/Oxf
Oxf N/A Oxf Oxf Oxf
Oxf N/A Oxf Oxf Oxf
Oxf N/A Oxf N/A Oxf
MICE MICE MICE MICE Oxf coord.
KEK/RAL KEK/RAL KEK/RAL RAL KEK/RAL
Status on the AFC module
Engineering interface
Absorber;
Windows & window connections;
Hydrogen internal pipework;
Crycoolers
Hydrogen delivery pipework;
Vacuum system;
Docking & Ground fixing;
Helium delivery pipework;
Power supply;
Module connections (Bellows);
Venting system;
Control & Instrumentation Cabling;
Liquid Nitrogen delivery system;
Interface between Interface parameters
defined?
Interface Drawing No.
KEK / Oxf / USA KEK/Oxf -- yes
KEK / US -- ??
MC-AFC-H2-PT04/IF-01
KEK / Oxf / USA Not yet MICE to advise
KEK / Oxf Yes MC-AFC-H2-PT03/IF-01
Supplier / Oxf / RAL Available To be assigned
Oxf / RAL Not yet MC-AFC-H2-PT07/IF-01
Oxf / MICE / LBL Not yet To be assigned
Oxf / RAL Not yet MC-AFC-CS-PT15/IF-01
RAL / MICE Not yet MC-AFC-CS-PT14/IF-01
Oxf / MICE Not yet MICE to advise
Oxf / LBL Yes MC-AFC-CS-PT16/IF-01
Oxf / RAL / MICE Not yet To be assigned
Oxf / KEK / MICE Not yet To be assigned
Oxf / MICE Not yet MICE to advise
Towards a tender specification
Where are we?
The following is a check list of what we have accomplished to date:-
Safety review of the Hydrogen safety; ✔
R & D work on the Window fixing – welded or bolted✔
Safety review of the hydrogen delivery system ✔
Selection of Cryocoolers;✔
Cryogen condense pot, cold intercept connections etc✔
Design & validation of the Coil Former & Cold Mass support✔
Internal pipework connection design & arrangement✔
Mini-Flange Test
Mini Rotation Flange Mini-Flange
S-S
Aluminum
KF16
1mm dia. Indium
Towards a tender specification
Where are we?
The following is a check list of what we have accomplished to date:-
Safety review of the Hydrogen safety; ✔
R & D work on the Window fixing – welded or bolted✔
Safety review of the hydrogen delivery system ✔
Selection of Cryocoolers;✔
Cryogen condense pot, cold intercept connections etc✔
Design & validation of the Coil Former & Cold Mass support✔
Internal pipework connection design & arrangement✔
Cryostat sizing and module connections✔
Creating a tree structure, defining supply & drawingresponsibility, drawing directory etc✔
C & I and thermal performance test of the Absorber ✔
Drawing & design information on the AFC
The repository for all the AFC drawings is at RAL;
Chris Nelson is the keeper of this information;
Oxford (Stephanie Yang) will ensure that Chris gets the latest version of all the cooling AFC drawings;
However, for read only information on the AFC 3-D model, this could be downloaded from our web page and Stephanie will demonstrate how easy this could be done.
Towards a tender specification
The following is a check list of actions that have not been accomplished:-
Formal response to the H2 R&D review;
Final design details and specifications on:-HTS Leads; Power supply; vacuum pumping; rail & docking system; N2 & helium supply; quench protection etc;
QA procedure for window measurement;
Burst pressure test (3 to 4 sets) for the current window geometry;
Finalising a bidders list, vendor qualification inspection and a set of well defined Tender specification;
Summary
A fair amount of work still to be done before we are ready for tender;
Our priority is on making sure that the interface parameters are well defined and that the tolerances are achievable;
We are still getting feed back from the Spectrometer solenoid manufacture on how we should improve our tender specifications to avoid expensive changes after contract signing;
The AFC Work Group will be re-activated so that we can received more feed back and suggestions from parties outside RAL and Oxford before we conclude the tender specification;