mice collaboration meeting 16 ral, oct 2006 absorber focus coil module – progress & status by

14
MICE Collaboration Meeting 16 RAL, Oct 2006 Absorber Focus Coil Module – progress & status By Oxford University & all the collaborators on this module

Upload: oriel

Post on 07-Jan-2016

36 views

Category:

Documents


2 download

DESCRIPTION

MICE Collaboration Meeting 16 RAL, Oct 2006 Absorber Focus Coil Module – progress & status By Oxford University & all the collaborators on this module. Status on the AFC module Engineering design Absorber; Windows & window connections; Coil design; Cold mass support system; - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

MICE Collaboration Meeting 16

RAL, Oct 2006

Absorber Focus Coil Module – progress & status

By

Oxford University & all the collaborators on this module

Page 2: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Status on the AFC module

Engineering design

Absorber;

Windows & window connections;

Coil design;

Cold mass support system;

Hydrogen delivery system;

Hydrogen cooling loop;

Helium delivery and cooling system;

Power supply;

H T S leads;

Cold intercepts;

Magnet Vacuum cryostat;

AFC main vessel;

Thermal shields;

Vacuum system;

Control & instrumentation

Engineering design

Testing Design Calc.

Design review

Eng. Drawing /

spec.

Yes (KEK) Yes (KEK) N/A No Yes

Yes Not yet Yes Yes Yes

Yes N/A N/A No Spec done

Yes N/A On coil former only

No Yes

Yes Not yet Yes Yes No

Yes N/A Yes No Proprietary drawing + spec

Yes N/A No No Proprietary drawing + spec

No No Thro’ Mike Green

No No

Not yet No No No No

Yes N/A No No No

Yes N/A Yes No Yes

Yes N/A Yes No Yes

Yes N/A Req’d ? N/A Yes

Not yet No No No No

Not yet Only on KEK’s scope

N/A No No

Page 3: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

AFC module Engineering

Responsibility

Absorber;

Windows & window connections;

Coil design;

Cold mass support system;

Hydrogen delivery system;

Hydrogen cooling loop;

Helium delivery and cooling system;

Power supply;

H T S leads;

Cold intercepts;

Magnet Vacuum cryostat;

AFC main vessel;

Thermal shields;

Vacuum system;

Control & instrumentation

Engineering design

Testing Design Calc.

Design review

Eng. Drawing /

spec.

KEK KEK KEK Oxf/KEK KEK

Oxf ?? Oxf Oxf ??

RAL/Oxf N/A Green Oxf RAL/Oxf

Oxf N/A Oxf Oxf Oxf

RAL RAL RAL Done RAL

RAL/Oxf N/A Green Oxf Oxf

RAL/Oxf N/A Green Oxf Oxf

MICE RAL Green MICE MICE

MICE RAL MICE MICE MICE

RAL N/A RAL Oxf RAL/Oxf

Oxf N/A Oxf Oxf Oxf

Oxf N/A Oxf Oxf Oxf

Oxf N/A Oxf N/A Oxf

MICE MICE MICE MICE Oxf coord.

KEK/RAL KEK/RAL KEK/RAL RAL KEK/RAL

Page 4: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

AFC module Engineering

Responsibility (outstanding)

Absorber;

Windows & window connections;

Coil design;

Cold mass support system;

Hydrogen delivery system;

Hydrogen cooling loop;

Helium delivery and cooling system;

Power supply;

H T S leads;

Cold intercepts;

Magnet Vacuum cryostat;

AFC main vessel;

Thermal shields;

Vacuum system;

Control & instrumentation

Engineering design

Testing Design Calc.

Design review

Eng. Drawing /

spec.

KEK KEK KEK Oxf/KEK KEK

Oxf ?? Oxf Oxf ??

RAL/Oxf N/A Green Oxf RAL/Oxf

Oxf N/A Oxf Oxf Oxf

RAL RAL RAL Done RAL

RAL/Oxf N/A Green Oxf Oxf

RAL/Oxf N/A Green Oxf Oxf

MICE RAL Green MICE MICE

MICE RAL MICE MICE MICE

RAL N/A RAL Oxf RAL/Oxf

Oxf N/A Oxf Oxf Oxf

Oxf N/A Oxf Oxf Oxf

Oxf N/A Oxf N/A Oxf

MICE MICE MICE MICE Oxf coord.

KEK/RAL KEK/RAL KEK/RAL RAL KEK/RAL

Page 5: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Status on the AFC module

Engineering interface

Absorber;

Windows & window connections;

Hydrogen internal pipework;

Crycoolers

Hydrogen delivery pipework;

Vacuum system;

Docking & Ground fixing;

Helium delivery pipework;

Power supply;

Module connections (Bellows);

Venting system;

Control & Instrumentation Cabling;

Liquid Nitrogen delivery system;

Interface between Interface parameters

defined?

Interface Drawing No.

KEK / Oxf / USA KEK/Oxf -- yes

KEK / US -- ??

MC-AFC-H2-PT04/IF-01

KEK / Oxf / USA Not yet MICE to advise

KEK / Oxf Yes MC-AFC-H2-PT03/IF-01

Supplier / Oxf / RAL Available To be assigned

Oxf / RAL Not yet MC-AFC-H2-PT07/IF-01

Oxf / MICE / LBL Not yet To be assigned

Oxf / RAL Not yet MC-AFC-CS-PT15/IF-01

RAL / MICE Not yet MC-AFC-CS-PT14/IF-01

Oxf / MICE Not yet MICE to advise

Oxf / LBL Yes MC-AFC-CS-PT16/IF-01

Oxf / RAL / MICE Not yet To be assigned

Oxf / KEK / MICE Not yet To be assigned

Oxf / MICE Not yet MICE to advise

Page 6: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Towards a tender specification

Where are we?

The following is a check list of what we have accomplished to date:-

Safety review of the Hydrogen safety; ✔

R & D work on the Window fixing – welded or bolted✔

Safety review of the hydrogen delivery system ✔

Selection of Cryocoolers;✔

Cryogen condense pot, cold intercept connections etc✔

Design & validation of the Coil Former & Cold Mass support✔

Internal pipework connection design & arrangement✔

Page 7: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By
Page 8: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By
Page 9: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By
Page 10: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Mini-Flange Test

Mini Rotation Flange Mini-Flange

S-S

Aluminum

KF16

1mm dia. Indium

Page 11: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Towards a tender specification

Where are we?

The following is a check list of what we have accomplished to date:-

Safety review of the Hydrogen safety; ✔

R & D work on the Window fixing – welded or bolted✔

Safety review of the hydrogen delivery system ✔

Selection of Cryocoolers;✔

Cryogen condense pot, cold intercept connections etc✔

Design & validation of the Coil Former & Cold Mass support✔

Internal pipework connection design & arrangement✔

Cryostat sizing and module connections✔

Creating a tree structure, defining supply & drawingresponsibility, drawing directory etc✔

C & I and thermal performance test of the Absorber ✔

Page 12: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Drawing & design information on the AFC

The repository for all the AFC drawings is at RAL;

Chris Nelson is the keeper of this information;

Oxford (Stephanie Yang) will ensure that Chris gets the latest version of all the cooling AFC drawings;

However, for read only information on the AFC 3-D model, this could be downloaded from our web page and Stephanie will demonstrate how easy this could be done.

Page 13: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Towards a tender specification

The following is a check list of actions that have not been accomplished:-

Formal response to the H2 R&D review;

Final design details and specifications on:-HTS Leads; Power supply; vacuum pumping; rail & docking system; N2 & helium supply; quench protection etc;

QA procedure for window measurement;

Burst pressure test (3 to 4 sets) for the current window geometry;

Finalising a bidders list, vendor qualification inspection and a set of well defined Tender specification;

Page 14: MICE Collaboration Meeting 16 RAL,  Oct 2006 Absorber Focus Coil Module – progress & status By

Summary

A fair amount of work still to be done before we are ready for tender;

Our priority is on making sure that the interface parameters are well defined and that the tolerances are achievable;

We are still getting feed back from the Spectrometer solenoid manufacture on how we should improve our tender specifications to avoid expensive changes after contract signing;