MICE VIDEO Conference17th December 2003

Report on AFCSWG Safety Review --

Future Plan

By

Wing Lau -- Oxford

Page 2: MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford

What next?

.....the successful conclusion of the Safety Review allows us to enter into the second phase of the Conceptual Design and the initial phase for Detail Engineering & Design.......

What remains in the second phase of the Conceptual Design?

It consists of:-

1. Revising the existing design to take into account the comments and recommendations from the Safety Review

2. Defining the scope of supply and interface arrangements between the Absorber, Windows, Focus Coil, Coupling Coil and the Detector modules;

3. Continuation with the R&D programme and the HAZOP assessment;

4. Specification and arrangement of the control and monitoring instruments;

The immediate future

Page 3: MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford

Saf

ety

R

evie

w

En

gin

ee

rin

g &

F

ina

l S

afe

ty

Re

vie

w

The Plan

Note 1: Review of Safety issues, interface details etc

System design & integration

Integration review

Instrumentation & control design / specification

Set up Drawing system & change control

QA procedures & manufacturing plans

R & D

Dimension & tolerance details

Release for tender

Release for manufacture

Conceptual Design phase

Detail design / engineering

Manufacturing, inspection & expediting

Acceptance & testing

Yr 2004Note 2

Fin

al

Op

era

tin

g

Re

vie

w

See Note 1

Tender preparation

Approval of Man. dwg

Note 2: the above time scale is not linear

Page 4: MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford

The next phase will emphasize on:-

• Agreement and clarity on interface details;

• The need to be more specific on design details, dimensions and manufacturing / installation tolerances

• The need to optimise design with cost effectiveness

• Setting out a QA procedure that is practical and meaningful;

• Setting up a drawing system that can “de-couple” local and interface details so as to avoid / minimise any “domino” effect when changes are made by the different package suppliers;

Assuming that.....

The existing design can be modified without any major change to accommodate the recommendation and remarks made by the Safety Review committee

The R&D on window attachment will come to a satisfactory conclusion

We should aim to have an Engineering Review, which is also our Final Safety Review, before manufacturing commences

Our Focus

Page 5: MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford

Future Absorber Focus Coil Module work group will include representative from each of these areas:

Absorber;Windows;Coupling Coil module;Detector module;Instrumentation & Control;Hydrogen system and safety;Focus Coil module

This work group will place strong focus on engineering details and therefore it is important that it receives advices from physicist members (Zisman & Cumming) to make sure that no physics requirements are being compromised. Where necessary, additional physicists will be co-opted into this work group.

We shall also ask members from System Integration (Yuri and Ed) be co-opted into this work group.

The group format

Page 6: MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford

.....................This group will report to the MICE Technical Board through Mike Zisman