Michael B. Johnson State Asset Management Engineer January 2017
![Page 2: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/2.jpg)
Integrates 10 Year SHOPP and 5 Year Maintenance Plans.
Aligns objectives with CT Strategic Plan
Implements Performance Management
Unprecedented Transparency
![Page 3: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/3.jpg)
Safety Goal Bridge safety rail upgrades Collision severity reduction Roadside safety improvements Triggered safety improvements
Sustainability Goal ADA Mitigation Advanced environmental mitigation Bridge resiliency Hazardous waste mitigation Roadside rehabilitation Storm water mitigation Zero emission vehicle infrastructure
Stewardship Goal Pavement & Bridge Condition Culverts / Pump facilities Major damage / Perm restoration Facilities (all types) Signs and Lighting rehabilitation Roadside rest rehabilitation ……
System Performance Goal Commercial vehicle enforcement facilities Operational improvements Sign panel replacements Transportation management systems Bridge goods movement upgrades Weigh scales
![Page 4: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/4.jpg)
Establish Performance Measures
Strategic Direction Where Do We Want to Go?
Establish Goals and Objectives
Establish Investment Priorities
Develop Strategies and Analyze Alternatives
Establish Performance Targets
Analysis How Do We Get There?
Resource Allocation What Is It Going To Take?
Programming Resource Allocation
Project Delivery
Monitor Performance
Reporting Trend Analysis
Performance Evaluation How Are We Doing?
![Page 5: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/5.jpg)
Current Condition Distribution (Bridges)
Good 75% Fair
22% Poor 3%
![Page 6: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/6.jpg)
Include Deterioration Rates Use individual management systems Use service life estimates / published research Expert judgement
Good 75%
Good to Fair
Fair 22%
Fair to Poor
Poor 3%
![Page 7: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/7.jpg)
Establish Condition Targets
![Page 8: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/8.jpg)
Determine Performance Gaps
Current Condition Target Condition
Good 75% Increase by 8.5% Good
83.5%
Fair 22%
Decrease by 7.0% Fair 15%
Poor 3%
Decrease by 1.5% Poor 1.5%
![Page 9: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/9.jpg)
Deduct Pipelined Work Existing project commitments need to be deducted from the measured gaps The remaining gaps are the unmet need
![Page 10: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/10.jpg)
Estimate costs
The unconstrained costs to close the performance gaps were estimated Unconstrained needs exceed available funding by about 4 times A constrained investment plan was required
![Page 11: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/11.jpg)
![Page 12: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/12.jpg)
Pavement $2.4 B
Bridges $1.3 B
Culverts $2.6 B
Traffic Management Sys.
$0.2 B
![Page 13: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/13.jpg)
Safety $13.3
Stewardship $35.5Sustainability
$13.3
System Performance
$9.8
Escalation / Other $25.1
![Page 14: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/14.jpg)
Pavement $18.6
Bridge Health $5.5
Facilities $2.9
Culverts $2.6
Emergency $2.8
All Others $3.2
10 Year Needs (Billions)
![Page 15: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/15.jpg)
Minor/Other
System
Safety 19%
Stewardship 64%
Sustainability 6%
Performance 6%
5%
![Page 16: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/16.jpg)
: • Planned commitments for each
objectives over the first 5 years of the plan period
• Investment level for each objective for the last five years of the plan period
• Combined ten year totals
![Page 17: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/17.jpg)
• District level performance targets are defined for each objective
• Preservation work is isolated from rehabilitation and replacement
• Proposed lump sum project portfolio targets for each district
![Page 18: Michael B. Johnson State Asset Management Engineer January … · 2020. 8. 17. · Integrates 10 Year SHOPP and 5 Year Maintenance Plans. Aligns objectives with CT Strategic Plan](https://reader034.vdocument.in/reader034/viewer/2022051906/5ff97eb3c7fc7b562d1e57b3/html5/thumbnails/18.jpg)
Draft plan due to Legislature/CTC Jan 31st
Make plan available for public comment Finalize the plan by May 1 , 2017