Michigan Bridge Conference2015
Michigan Bridge ConferenceMarch 2015 - FHWA
UpdateMetrics:
• Results – 15/23 in compliance• Inventory – new, closed, and missing bridges • UW Inspections – review for correct coding• FHWA OIG audit 2/15/2015
LAP Bridges:• FHWA “Strategic Goal – Program Delivery” for PY
2016 includes LPA Administration of projects• 2012 Program review for Bridge Design QC/QA
to current LAP QA review
2015 Likely Focus Areas Critical Path Management ◦ (CIR finding)
Maintaining pedestrian traffic◦ (CIR and CAP finding)
Utility delays ◦ (CIR finding)
Job site posters ◦ (CIR and CAP finding)
2 CFR 200 (OMB)streamlines guidance on administrative and audit
requirements and cost principles for Federal awards
• New: Went into effect 12/26/2014• Cancels 49 CFR Parts 18 & 19• Requires a period of performance in the
agreement defining project start and end dates
• Establishes greater responsibilities for sub-recipient (LPA) monitoring
Inactive Projects
•Currently required as part of 23 CFR 630.106
•FHWA Policy to enforce
SHRP2 Education ConnectionRound 5 Implementation
Save lives.
Save money.
Save time.
• Nondestructive Testing for Concrete Bridge Decks (R06A)
• Innovative Bridge Designs for Rapid Renewal (R04) – Prefab Elements
• Service Life Design for Bridges (R19A)• - select durable bridge systems• Performance Specifications for Rapid
Renewal (R07)
State-based model to identify and rapidly deploy, proven but underutilized innovations to shorten the project delivery process, enhance roadway safety, reduce congestion and improve environmental sustainability.
What is EDC?
Focused, State-based approach for rapid deployment of proven
innovations
Every Day Counts (EDC)
10
Other Proven
InnovationsAASHTO
TIG
Accelerated Innovation Deployment (AID) Program
AID Demonstration Grant
• MDOT received $1,000,000 award for the US 131 @ 3 Mile Bridge Slide
Accelerated Innovation Deployment (AID) Program
AID Demonstration Grant
• MDOT/Dickinson Co. Road Commission received $600,000 award for hot in-place recycling to rehabilitate 4.5 miles of road in Kingsford.
https://www.youtube.com/watch?v=UKNVKa6WoTI&feature=youtu.be
The 3rd Round of Every Day Counts: features ELEVEN technologies and practices that can shorten the project delivery process, enhance safety and improve environmental sustainability.
• Ultra-High Performance Concrete connections
• GRS-IBS• e-Construction• e-NEPA and IQED• Road Diets• Smarter Work Zones• Data-Driven Safety Analysis
EDC-3 Innovations (2015-2016)
Michigan Bridge Conference 2015Research Implementation Update