MicroBooNE Report Sophie Berkman & Zarko Pavlovic Proton Management Group Meeting August 1, 2019 August 1, 2019 1 S. Berkman

Upload: others

Post on 25-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MicroBooNEReport - Fermilab...•First fill after dewarpurge last week, no drop in cryostat purity •Stopped analyzing argon in cryostat •Analyzers not sensitive enough to detect

MicroBooNE Report

Sophie Berkman amp Zarko PavlovicProton Management Group Meeting

August 1 2019August 1 2019 1S Berkman

BNB Data

August 1 2019 2S Berkman

POT Delivered 186 x 1019

POT on Tape 179 x 1019

Fraction Recorded 96

Since June PMG Meeting

Run 4

POT Delivered 376 x 1020

POT on Tape 359 x 1020

Fraction Recorded 96

Computing Summary

August 1 2019 3S Berkman

CPU Efficiency

Job Success RateData Collected

Summer Shutdown

August 1 2019 4S Berkman

bull Collecting 16 Hz cosmic databull Staffing 24 hour shifts

bull MiniBooNE turned off July 17bull Laser calibration data collected July

22-24 bull Possibility for more later in the

summer

bull Power outagesbull Off July 31-August 2 and August 27-28

to accommodate outages at LArTF

bull New BES and RWM beam signals from ADbull Remove old hardwarebull Working to implement delay to match

previous BES signal used to trigger

New BES Current BES New RWM

plane_2_Pulse_height

170419 010519 150519 290519 120619 260619 100719 240719 Date

65

70

75

80

85

90

95

Puls

e he

ight

(AD

C)

plane_2_Pulse_height

Pulse height for plane 2Summer Shutdown Cryo Work

August 1 2019 5S Berkman

bull Argon purity related workbull Purged and refilled external dewar

bull Small drop in TPC pulse heights andPMT rates around cryostat fills

bull First fill after dewar purge last week no drop in cryostat purity

bull Stopped analyzing argon in cryostatbull Analyzers not sensitive enough to

detect impurities observed in TPCbull Top off detector every ~15 months

instead of every 2 weeksbull Fewer opportunities to introduce

contaminantsbull Regenerate filters

bull Recover more quickly in the future if there are contaminants in the argon

bull Pump replacementbull Pump tripped June 7 Restarted

manually and workingbull Needs to be replaced annually

bull Update controls computers to be compatible with Windows 10

May Fill

June Fill

TPC Pulse Heights Plane 2

July Fill

Physics News

August 1 2019 6S Berkman

bull Collaboration meeting July 24-26bull 88 participants

bull Papersbull ldquoRejecting cosmic background for

exclusive charged current quasi elastic neutrino interaction studies with Liquid Argon TPCs a case study with the MicroBooNE detectorrdquobull arXiv181205679bull Accepted by EPJC

bull ldquoFirst Measurement of Inclusive Muon Neutrino Charged Current Differential Cross Sections on Argon at Eνsim08 GeV with the MicroBooNE Detectorrdquobull arXiv190509694bull Submitted to PRL

bull Calibration of the charge and energy response of the MicroBooNE liquid argon time projection chamber using muons and protonsbull arXiv190711736bull Submitted to JINST

Page 2: MicroBooNEReport - Fermilab...•First fill after dewarpurge last week, no drop in cryostat purity •Stopped analyzing argon in cryostat •Analyzers not sensitive enough to detect

BNB Data

August 1 2019 2S Berkman

POT Delivered 186 x 1019

POT on Tape 179 x 1019

Fraction Recorded 96

Since June PMG Meeting

Run 4

POT Delivered 376 x 1020

POT on Tape 359 x 1020

Fraction Recorded 96

Computing Summary

August 1 2019 3S Berkman

CPU Efficiency

Job Success RateData Collected

Summer Shutdown

August 1 2019 4S Berkman

bull Collecting 16 Hz cosmic databull Staffing 24 hour shifts

bull MiniBooNE turned off July 17bull Laser calibration data collected July

22-24 bull Possibility for more later in the

summer

bull Power outagesbull Off July 31-August 2 and August 27-28

to accommodate outages at LArTF

bull New BES and RWM beam signals from ADbull Remove old hardwarebull Working to implement delay to match

previous BES signal used to trigger

New BES Current BES New RWM

plane_2_Pulse_height

170419 010519 150519 290519 120619 260619 100719 240719 Date

65

70

75

80

85

90

95

Puls

e he

ight

(AD

C)

plane_2_Pulse_height

Pulse height for plane 2Summer Shutdown Cryo Work

August 1 2019 5S Berkman

bull Argon purity related workbull Purged and refilled external dewar

bull Small drop in TPC pulse heights andPMT rates around cryostat fills

bull First fill after dewar purge last week no drop in cryostat purity

bull Stopped analyzing argon in cryostatbull Analyzers not sensitive enough to

detect impurities observed in TPCbull Top off detector every ~15 months

instead of every 2 weeksbull Fewer opportunities to introduce

contaminantsbull Regenerate filters

bull Recover more quickly in the future if there are contaminants in the argon

bull Pump replacementbull Pump tripped June 7 Restarted

manually and workingbull Needs to be replaced annually

bull Update controls computers to be compatible with Windows 10

May Fill

June Fill

TPC Pulse Heights Plane 2

July Fill

Physics News

August 1 2019 6S Berkman

bull Collaboration meeting July 24-26bull 88 participants

bull Papersbull ldquoRejecting cosmic background for

exclusive charged current quasi elastic neutrino interaction studies with Liquid Argon TPCs a case study with the MicroBooNE detectorrdquobull arXiv181205679bull Accepted by EPJC

bull ldquoFirst Measurement of Inclusive Muon Neutrino Charged Current Differential Cross Sections on Argon at Eνsim08 GeV with the MicroBooNE Detectorrdquobull arXiv190509694bull Submitted to PRL

bull Calibration of the charge and energy response of the MicroBooNE liquid argon time projection chamber using muons and protonsbull arXiv190711736bull Submitted to JINST

Page 3: MicroBooNEReport - Fermilab...•First fill after dewarpurge last week, no drop in cryostat purity •Stopped analyzing argon in cryostat •Analyzers not sensitive enough to detect

Computing Summary

August 1 2019 3S Berkman

CPU Efficiency

Job Success RateData Collected

Summer Shutdown

August 1 2019 4S Berkman

bull Collecting 16 Hz cosmic databull Staffing 24 hour shifts

bull MiniBooNE turned off July 17bull Laser calibration data collected July

22-24 bull Possibility for more later in the

summer

bull Power outagesbull Off July 31-August 2 and August 27-28

to accommodate outages at LArTF

bull New BES and RWM beam signals from ADbull Remove old hardwarebull Working to implement delay to match

previous BES signal used to trigger

New BES Current BES New RWM

plane_2_Pulse_height

170419 010519 150519 290519 120619 260619 100719 240719 Date

65

70

75

80

85

90

95

Puls

e he

ight

(AD

C)

plane_2_Pulse_height

Pulse height for plane 2Summer Shutdown Cryo Work

August 1 2019 5S Berkman

bull Argon purity related workbull Purged and refilled external dewar

bull Small drop in TPC pulse heights andPMT rates around cryostat fills

bull First fill after dewar purge last week no drop in cryostat purity

bull Stopped analyzing argon in cryostatbull Analyzers not sensitive enough to

detect impurities observed in TPCbull Top off detector every ~15 months

instead of every 2 weeksbull Fewer opportunities to introduce

contaminantsbull Regenerate filters

bull Recover more quickly in the future if there are contaminants in the argon

bull Pump replacementbull Pump tripped June 7 Restarted

manually and workingbull Needs to be replaced annually

bull Update controls computers to be compatible with Windows 10

May Fill

June Fill

TPC Pulse Heights Plane 2

July Fill

Physics News

August 1 2019 6S Berkman

bull Collaboration meeting July 24-26bull 88 participants

bull Papersbull ldquoRejecting cosmic background for

exclusive charged current quasi elastic neutrino interaction studies with Liquid Argon TPCs a case study with the MicroBooNE detectorrdquobull arXiv181205679bull Accepted by EPJC

bull ldquoFirst Measurement of Inclusive Muon Neutrino Charged Current Differential Cross Sections on Argon at Eνsim08 GeV with the MicroBooNE Detectorrdquobull arXiv190509694bull Submitted to PRL

bull Calibration of the charge and energy response of the MicroBooNE liquid argon time projection chamber using muons and protonsbull arXiv190711736bull Submitted to JINST

Page 4: MicroBooNEReport - Fermilab...•First fill after dewarpurge last week, no drop in cryostat purity •Stopped analyzing argon in cryostat •Analyzers not sensitive enough to detect

Summer Shutdown

August 1 2019 4S Berkman

bull Collecting 16 Hz cosmic databull Staffing 24 hour shifts

bull MiniBooNE turned off July 17bull Laser calibration data collected July

22-24 bull Possibility for more later in the

summer

bull Power outagesbull Off July 31-August 2 and August 27-28

to accommodate outages at LArTF

bull New BES and RWM beam signals from ADbull Remove old hardwarebull Working to implement delay to match

previous BES signal used to trigger

New BES Current BES New RWM

plane_2_Pulse_height

170419 010519 150519 290519 120619 260619 100719 240719 Date

65

70

75

80

85

90

95

Puls

e he

ight

(AD

C)

plane_2_Pulse_height

Pulse height for plane 2Summer Shutdown Cryo Work

August 1 2019 5S Berkman

bull Argon purity related workbull Purged and refilled external dewar

bull Small drop in TPC pulse heights andPMT rates around cryostat fills

bull First fill after dewar purge last week no drop in cryostat purity

bull Stopped analyzing argon in cryostatbull Analyzers not sensitive enough to

detect impurities observed in TPCbull Top off detector every ~15 months

instead of every 2 weeksbull Fewer opportunities to introduce

contaminantsbull Regenerate filters

bull Recover more quickly in the future if there are contaminants in the argon

bull Pump replacementbull Pump tripped June 7 Restarted

manually and workingbull Needs to be replaced annually

bull Update controls computers to be compatible with Windows 10

May Fill

June Fill

TPC Pulse Heights Plane 2

July Fill

Physics News

August 1 2019 6S Berkman

bull Collaboration meeting July 24-26bull 88 participants

bull Papersbull ldquoRejecting cosmic background for

exclusive charged current quasi elastic neutrino interaction studies with Liquid Argon TPCs a case study with the MicroBooNE detectorrdquobull arXiv181205679bull Accepted by EPJC

bull ldquoFirst Measurement of Inclusive Muon Neutrino Charged Current Differential Cross Sections on Argon at Eνsim08 GeV with the MicroBooNE Detectorrdquobull arXiv190509694bull Submitted to PRL

bull Calibration of the charge and energy response of the MicroBooNE liquid argon time projection chamber using muons and protonsbull arXiv190711736bull Submitted to JINST

Page 5: MicroBooNEReport - Fermilab...•First fill after dewarpurge last week, no drop in cryostat purity •Stopped analyzing argon in cryostat •Analyzers not sensitive enough to detect

plane_2_Pulse_height

170419 010519 150519 290519 120619 260619 100719 240719 Date

65

70

75

80

85

90

95

Puls

e he

ight

(AD

C)

plane_2_Pulse_height

Pulse height for plane 2Summer Shutdown Cryo Work

August 1 2019 5S Berkman

bull Argon purity related workbull Purged and refilled external dewar

bull Small drop in TPC pulse heights andPMT rates around cryostat fills

bull First fill after dewar purge last week no drop in cryostat purity

bull Stopped analyzing argon in cryostatbull Analyzers not sensitive enough to

detect impurities observed in TPCbull Top off detector every ~15 months

instead of every 2 weeksbull Fewer opportunities to introduce

contaminantsbull Regenerate filters

bull Recover more quickly in the future if there are contaminants in the argon

bull Pump replacementbull Pump tripped June 7 Restarted

manually and workingbull Needs to be replaced annually

bull Update controls computers to be compatible with Windows 10

May Fill

June Fill

TPC Pulse Heights Plane 2

July Fill

Physics News

August 1 2019 6S Berkman

bull Collaboration meeting July 24-26bull 88 participants

bull Papersbull ldquoRejecting cosmic background for

exclusive charged current quasi elastic neutrino interaction studies with Liquid Argon TPCs a case study with the MicroBooNE detectorrdquobull arXiv181205679bull Accepted by EPJC

bull ldquoFirst Measurement of Inclusive Muon Neutrino Charged Current Differential Cross Sections on Argon at Eνsim08 GeV with the MicroBooNE Detectorrdquobull arXiv190509694bull Submitted to PRL

bull Calibration of the charge and energy response of the MicroBooNE liquid argon time projection chamber using muons and protonsbull arXiv190711736bull Submitted to JINST

Page 6: MicroBooNEReport - Fermilab...•First fill after dewarpurge last week, no drop in cryostat purity •Stopped analyzing argon in cryostat •Analyzers not sensitive enough to detect

Physics News

August 1 2019 6S Berkman

bull Collaboration meeting July 24-26bull 88 participants

bull Papersbull ldquoRejecting cosmic background for

exclusive charged current quasi elastic neutrino interaction studies with Liquid Argon TPCs a case study with the MicroBooNE detectorrdquobull arXiv181205679bull Accepted by EPJC

bull ldquoFirst Measurement of Inclusive Muon Neutrino Charged Current Differential Cross Sections on Argon at Eνsim08 GeV with the MicroBooNE Detectorrdquobull arXiv190509694bull Submitted to PRL

bull Calibration of the charge and energy response of the MicroBooNE liquid argon time projection chamber using muons and protonsbull arXiv190711736bull Submitted to JINST