From: Bailey, JohnSent: Wednesday, November 13, 2013 8:24 AMTo: Wilson, TabathaCc: Fuller, Kim; Reiber, Loretta; Shafii, MoSubject: FW: pipeline failure - REPORT ADDENDUMAttachments: Engineers Report ADDENDUM.pdf
From: Chuck Campbell [mailto:[email protected]] Sent: Tuesday, November 12, 2013 5:28 PM To: Chuck Campbell; Benefield, Ryan; 'Mark Smith'; Shafii, Mo; Uyeda, Craig; Bailey, John; Bolenbaugh, Jason; Shafii, Mo; Reiber, Loretta; Fuller, Kim Cc: Vince Blubaugh; Marks, Teresa; Greg Withrow; Pete Howard ([email protected]); [email protected]; Tom Hammons; Johnson Koch, LeAnn M. (Perkins Coie); Mike Norman (Delek); Chuck Nestrud; Brian Ratcliff ([email protected]); [email protected] Subject: RE: pipeline failure - REPORT ADDENDUM Ryan, In response to questions from the Water Division, please accept the attached Addendum to the Engineer’s Report. If there are any further questions, please contact me. Thanks, Chuck Campbell, PE, REM Principal/Senior Engineer
From: Chuck Campbell Sent: Tuesday, November 12, 2013 10:13 AM To: 'Benefield, Ryan'; 'Mark Smith'; Shafii, Mo; Uyeda, Craig; Bailey, John; Bolenbaugh, Jason; Shafii, Mo; Reiber, Loretta; Fuller, Kim Cc: Vince Blubaugh; Marks, Teresa; Greg Withrow; Pete Howard ([email protected]); [email protected]; Tom Hammons; 'Johnson Koch, LeAnn M. (Perkins Coie)'; Mike Norman (Delek); 'Chuck Nestrud'; Brian Ratcliff ([email protected]); [email protected] Subject: RE: pipeline failure Ryan,
2
In accordance with Part III.D.6 of Permit AR0050296 and your 11/8/13 email, on behalf of El Dorado Water Utilities please find attached the Engineer’s Report regarding the 11/7/13 release from the Ouachita Joint Pipeline. The report contains information on the steps taken to verify the integrity of the repair, plus the Engineer’s certification the line is ready to resume operations. We appreciate your assistance in this matter, and request your prompt review of the document and the Department’s determination on resumption of operations for the pipeline. If you or any your staff have any questions, please contact me or Mark Smith, General Manager- EWU. Thanks, Chuck Campbell, PE, REM Principal/Senior Engineer
From: Benefield, Ryan [mailto:[email protected]] Sent: Friday, November 08, 2013 2:29 PM To: 'Mark Smith'; Shafii, Mo; Uyeda, Craig; Bailey, John; Bolenbaugh, Jason Cc: Vince Blubaugh; Chuck Campbell; Marks, Teresa Subject: RE: pipeline failure Mark Thank you for notifying the Department of the line failure. ADEQ has sent an inspector to the site to document the situation. At this time, ADEQ is requesting the following of El Dorado Water Utilities:
1. Comply with Standard Condition 6 of your permit 2. Fully remediate the site including the removal and disposal of all wastewater. 3. Fully assess and determine the cause of the line failure including a review of the entire pipeline to determine
if additional portions of the line are susceptible to the same failure. 4. Fully repair and recertify the damaged section. 5. Provide a report to the Director detailing the work completed in items 1‐4 above. 6. Continue to cease operation of the pipeline until such time as the work above has been completed and
approval to restart operation of the pipeline has been received from the Director.
Please confirm receipt of this email and call me at 501‐837‐2083 with any questions. Thanks Ryan Benefield, P.E. Deputy Director, ADEQ
3
From: Mark Smith [mailto:[email protected]] Sent: Friday, November 08, 2013 10:06 AM To: Shafii, Mo; Uyeda, Craig; Benefield, Ryan Cc: 'Vince Blubaugh'; 'Chuck Campbell' Subject: pipeline failure Dear Mr. Shaffi: The purpose of this email is to inform ADEQ of a line failure in the Joint Pipeline near Crain City Road. The failure was discovered around 8:00 pm last night and all pumping to the Joint Pipeline ceased as soon as all the parties could be notified. It is not known whether the failure of the line resulted in the release of treated effluent to waters of the State due to the depth of the line in that particular location. Nor has the cause of the failure been determined at this time. Repair actions are underway and we anticipate completion within 48 hours. We will be sending a full report to you at such time as we have more information. If you have any questions do not hesitate to contact me at (870) 862‐6451.
Mark A. Smith General Manager El Dorado Water Utilities 500 North Washington El Dorado, Arkansas 71730 870-862-6451 ext. 111
1
Wilson, Tabatha
From: Bailey, JohnSent: Wednesday, November 13, 2013 8:24 AMTo: Wilson, TabathaCc: Fuller, Kim; Reiber, Loretta; Shafii, MoSubject: FW: please see attached letterAttachments: Scan0032.pdf
Tabatha, Will you please make sure that all of the documents that I forward to you make it onto the web? Thanks, John
From: Mark Smith [mailto:[email protected]] Sent: Tuesday, November 12, 2013 4:43 PM To: Shafii, Mo; Uyeda, Craig; Bailey, John; Bolenbaugh, Jason; Reiber, Loretta; Fuller, Kim Cc: 'Chuck Campbell'; Brian Ratcliff Subject: please see attached letter Please see attached letter
Mark A. Smith General Manager El Dorado Water Utilities 500 North Washington El Dorado, Arkansas 71730 870-862-6451 ext. 111