Master Plan Master Plan March March 2009 2009 Fast Track Fast Track Projects Projects ( Next ( Next 6 6 months) months) Gas Power plants Gas Power plants 2009 2009-2012 2012 Thermal Power Thermal Power Plant Plant 2012 2012-2015 2015 medium term long term Short term Investment Projects Investment Projects To bridge the gap between demand and Production . A master plan was issued in 2006 and updated in march 2009 .

Upload: trinhkiet

Post on 23-Dec-2016

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Master PlanMaster PlanMarch March 20092009

Fast Track Fast Track Projects Projects

( Next ( Next 6 6 months)months)

Gas Power plantsGas Power plants20092009--20122012

Thermal Power Thermal Power Plant Plant 20122012--20152015

medium term long termShort term

Investment ProjectsInvestment Projects

To bridge the gap between demand and Production .

A master plan was issued in 2006 and updated in march 2009 .

Page 2: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335
Page 3: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Energy Production Plants in IraqEnergy Production Plants in Iraq

►►Thermal .Thermal .

►►Gas.Gas.

►►Hydro.Hydro.

►►Diesel.Diesel.

Page 4: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Percentage Participation of power plant for Percentage Participation of power plant for the years the years 19901990-- 20002000--20082008

200820001990

%Installed

capacity

%Installed

capacity

%Installed

capacity

Plant type

41.55015625015735415Thermal

49549620180081760Gas

9.52513182430192347Hydro

13024

MW

9245

MW

9522

MW

Total

Page 5: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Actual Energy production for the years Actual Energy production for the years 19901990--20082008

Page 6: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Power Plant Participation in Energy Power Plant Participation in Energy Production For Production For 2008 2008

41.50%

9.50%

49%

hydro

gas

Termal

Page 7: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Status of load consumptionStatus of load consumption

33%

12%10%

45% BAGHDAD

BASRAH

MOUSEL

OTHER GOV

Page 8: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Industrial14%

Governmental16%

Commercial 8%

Agricultural4%

Households58%

Summary of load DistributionSummary of load Distribution by by SectorsSectors

Page 9: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

On Going Power Projects

North Baghdad:45 MW (Diesel)

Samawa: 40 MW (Diesel)

Musaiyeb :100 MW (Gas)

Erbil :200 MW (Gas)

Chamchamal :100 MW (Gas)

Hilla :20 MW (Gas)

Najaf :2x125 MW (Gas)

Samarra :125 MW (Diesel)

Baghdad :300 MW (Diesel)

Baghdad south :100 MW (Gas)

Chamchamal :200 MW (Gas)

Nasriya :40 MW

2009

Yusfiya :600 MW (Thermal)

Dibis :300 MW (Gas)

,2010

Samarra :180 MW (Diesel)

Hadiytha:230 MW (Diesel)

Haidariya:150 MW (Gas)

Bazurgan:80MW (Gas)

,2011

Haidariya:150 MW (Gas)

2008,

Page 10: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Expected Power Addition from the Ongoing Expected Power Addition from the Ongoing ProjectsProjects

16501550

1500

3350

0

500

1000

1500

2000

2500

3000

3500

MW

2009 2010 2011 2012 Total

Page 11: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

New Gas Projects

Bazurgan:2x40 MW:

Nasiriya:1x40 MW

Taji:4x40 MWا

Shat Al-Basrah:6x125MW:

Rumaila:5x265MW

Dora(2):4x125 MW

Kirkuk:1x260 MW

Dewaniya:4x125 MW

Kerbala2x125 MW

Hilla:2x125 MW

Mansuriya:2x125 MWا

Naynawa:6x125 MW

Baiji:6x160 MW

Al-Khairat:6x125 MW

Akkas:2x160 MW Al-Sadr:2x160 MW

Najaf:4x125 MW

Dora(3):6x125 MWا

Dibis:2x160 MW

Samawa:4x125 MW

Nasiriya:4x125 MW

Quds:2x125 MWا

Omara2x125 MW:

Wasit:2x125 MW

Al-Anbar:4x125 MW

Chamchamal3x125 MW:

Page 12: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

0

2000

4000

6000

8000

10000

12000

14000

2009 2010 2011 2012 Total

1257012570

10701070

5335533561656165

Expected Capacity Additions from the New Gas Power

Projects by MoE

MW

Page 13: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Total Expected Capacity Additions

(Ongoing + Planned by MoE) 2009- 2012

1810

7555

5485

1070

15920

0

2000

4000

6000

8000

10000

12000

14000

16000

MW

2009 2010 2011 2012 Total

Page 14: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000MW

18 B. US$

( 4.5 B. US$ / Year )

2008 2009 2010 2011 2012

Page 15: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Al-shemal : 1400 MW

Wasit : 1320 MW

Salah Al-Deen : 1200 MWAnbar: 1200 MW

Khairat : 1200 MW

Shat Albasrah : 1200 MW

Nasriya Expansion : 400 MW

Hartha Expansion : 600 MW

Planned Thermal Projects

2012-2015

Page 16: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

موازنة القدرة بين الطلب واBنتاجموازنة القدرة بين الطلب واBنتاج

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

2009 2010 2011 2012

MW

الطلب اBنتاج

Page 17: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

MoE and MoO are

continuously

coordinating short

and medium term

plans

Types of fuel used for generation in Iraq:

Fuel OilFuel Oil

Natural GasNatural Gas

Gas OilGas Oil

Crude OilCrude Oil

Page 18: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Technical ChallengesTechnical Challenges

SPARE PARTS AVAILABILITY

AGING OF ELECTRICAL SYSTEM

FUEL SUPPLY (Mismatch of Demand & Supply)

CAPACITY BUILDING

Page 19: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

NonNon--Technical Technical ChallengesChallenges

SECURITY

MILITARY OPERATIONS AND SABOTAGE

FINANCIAL RESOURCES

TARIFF AND BILL COLLECTION

Page 20: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Investment in Electrical Investment in Electrical Sector in IraqSector in Iraq

Page 21: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

►►Expected Huge amount of Investment Expected Huge amount of Investment in all sectors in Iraq in the near future.in all sectors in Iraq in the near future.

►►MoE invites and encourages MoE invites and encourages companies to come and invest in Iraq.companies to come and invest in Iraq.

►►MoE has put an ambitious investment MoE has put an ambitious investment plan .plan .

Page 22: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

Ministry of ElectricityMinistry of Electricity

Investment plan

Estimated

Cost

M/USD

Fuel Total

MWMW

No

.unit

TypeStationGovernor

ate

250

250

400

Fuel oil /

natural gas

Crud oil / fuel

oil

250

250

600

125

125

300

2

2

2

Gas

Steam

Al-Garraf

Nasiria

(Extension)

Thi-Qar

400Fuel oil 6003002steamAl-khyratKarbela

400Fuel oil 6003002steamAl-ShemalNenavia

400Crud oil / fuel

oil

6003002steamAl-AnbarAl- Anbar

400Fuel oil 6003002steamShat al-

Basra

Al-Basra

Page 23: (Microsoft PowerPoint - \223d\227\315\217\310summary [\214\335

AL-Gharaf:4x125

MW

Al-Anbar: 2x300

MW

Shat al-

Basrah:2x300MW

Salah Al-Dean : 2x300

MW

Nasriya : 2x300 MW

Khairat : 2x300

MW

Al-shemal : 2x350

MW

IPP ProjectsIPP Projects