Unit Specifications (ISO Conditions)

Full-load power 28kW* net (+/- 1)

N0x emissions: 9ppm @ 15% O2

Natural gas input: 420,000 Btu/hr

Dimensions: 74.8”H, 28.1” W, 52.9” D

Sound level: 65 dBA @ 33ft*Low pressure natural gas model

Advertised efficiency levels were verified within the manufacturer’s tolerances.

Emission performance at steady state loads appears to be a strong advantage with NOx and CO readings below 20 ppm at full load.

Various design deficiencies were brought to the manufacturer’s attention.

Microturbine tested at Gas Technology Institute’s Distributed Energy Test Center

Lab tested prior to installation

Located along the Peconic River in downtown Riverhead3.2 acre facility contains over 80 exhibits including the

largest live coral reef display in the U.S.

Field test site

Atlantis Marine World Aquarium

Not this Atlantis!

Units installed in July, 2000

But...

Long Island Power Authority (LIPA) is not under jurisdiction of Public Service Commission.

New York State’s standard interconnection requirements (SIR) much less stringent than LIPA’s parallel generation agreement.

Interconnection issue

LIPA Parallel Generation Agreement

NYS Standard Interconnection Requirements

LIPA agrees to honor SIR

After over six months of negotiations!!!

In January 2001

System startup Jan. 2001

Capstone 30kW microturbine

Natural gas compressor

Unifin heat exchanger System baseloaded Operates grid-parallel Heat recovery

supplements existing water heaters

Ironing out the bugs

First Capstone installation the NYC Metropolitan area!

Early compressor selection by Capstone proved to be unreliable replaced twice.

Digital control board was also replaced.

Field monitoring

Power Measurement ION 7500

Yokogawa DX-210

Data acquisition system

Data acquisition system

System performance

Month Availability AveragekW Rate

ElectricalEfficiency*

CombinedEfficiency*

Sep.2003 99.9 23.1 21.0 38.2Oct.2003 100.0 25.2 22.0 37.0Nov.2003 99.9 25.9 22.4 34.5Dec.2003 98.4 27.0 23.2 36.7Jan. 2004 99.9 27.1 23.8 37.1Feb.2004 100.0 27.1 23.5 36.7Mar.2004 100.0 26.9 22.9 36.0Apr. 2004 99.9 26.0 22.3 35.5May.2004 100.0 24.4 21.7 35.3Jun. 2004 100.0 23.2 21.0 33.2Jul. 2004 100.0 22.2 20.6 32.8Aug.2004 100.0 22.2 20.6 30.0

*Based on LHV

Daily summer-time performance

Day AveragekW Rate

ElectricalEfficiency*

CombinedEfficiency*

Aug. 2,2004 21.6 20.6 32.0Aug. 3,2004 21.7 20.4 31.2Aug. 4,2004 21.4 20.3 31.1Aug. 5,2004 22.6 20.8 33.1Aug. 6,2004 22.7 20.9 34.4Aug. 7,2004 23.2 21.0 34.8Aug. 8,2004 23.1 20.9 34.0

*Based on LHV

Daily winter-time performance

Day AveragekW Rate

ElectricalEfficiency*

CombinedEfficiency*

Jan. 5,2004 27.2 24.0 36.4Jan. 6,2004 27.2 22.9 34.6Jan. 7,2004 27.3 23.8 36.8Jan. 8,2004 27.2 23.6 36.8Jan. 9,2004 27.3 23.8 36.8Jan.10,2004 27.2 24.8 39.0Jan.11,2004 27.3 24.3 39.4

*Based on LHV

Capstone has switched to a more reliable compressor.

United Technologies (UTC) has purchased 4.9% of Capstone.

60 kW unit has been introduced. 60 kW unit with packaged heat recovery

has been commercialized. UTC Power has introduced hybrid

microturbine/chiller packages. 200 kW unit undergoing field testing in

New York, California and Connecticut.

What has changed since 2001

Lab testing uncovered design flaws. Initial compressor selection proven

unreliable. Heat recovery potential sometimes

overestimated. After design and equipment modifications

microturbines can run very reliably. Atlantis unit running very well after 27,000

hours of baseload operation 99.8% availability during last 12 months.

Lessons learned